This is a set of construction plans for the repair and upgrade of Quarters 1 driveways and sidewalks at U.S. Army Garrison Rock Island Arsenal in Rock Island, Illinois (Project Number 2026-0215). The project encompasses removal and replacement of existing Portland Cement Concrete (PCC) and Hot Mix Asphalt (HMA) pavements, construction of a new PCC parking lot, installation of new storm sewer infrastructure, electrical upgrades including new and refurbished lighting, landscape improvements, and water service installation. The design is based on the 2026 Statewide Urban Design and Specifications (SUDAS) standards.
Key project components include: removal of approximately 233.8 square yards of existing PCC pavement on Durnin Avenue and associated sidewalks and driveways; construction of 6-inch and 7-inch thick PCC pavements with 6-inch modified subbase on various drives and parking areas; installation of 331.9 linear feet of 6-inch drain tile and new storm sewer systems including 10-inch and 12-inch PVC pipes; electrical demolition and new work involving removal and refurbishment of existing light poles with installation of new LED fixtures across three zones; installation of 1-inch PEX water service line (118 linear feet); placement of landscape plantings including trees and shrubs with cedar chip mulch and landscape fabric; and construction of custom 6-inch landscape curbing (80-160 linear feet). The project also includes flag post installation, electrical cabinet and pad construction, and hydro-seeding of disturbed areas. All work must comply with SUDAS specifications, utilize C-4 concrete mix design with 3,500 PSI at 14 days and 4,000 PSI at 28-day strength, and include proper jointing, subdrain installation, and compaction testing.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
PLANS OF PROPOSED IMPROVEMENT ON THE
ROCK ISLAND ARSENAL
ROCK ISLAND, ILLINOIS
REPAIR QUARTERS 1 DRIVEWAYS AND SIDEWALKS
PROJECT NUMBER: 2026-0215
NORTH
NO SCALE
UTILITY NOTE
The location of the existing utilities are shown on the plans for information only and represents the best knowledge of the engineer. It shall be the contractor's responsibility to verify all utility locations during construction.
R O
C K
IS
LA
N D
A R
SE
N
AL
R
EP
AI
R Q
U
AR
TE
R
S
D R
IV
EW
AY
S
AN
D
S
ID
EW
AL
KS
PR
O
JE
C T
N U
M
BE
R : 2
6-
TOTAL SHEETS: 38
Note:
The 2026 Statewide Urban Design and Specifications (SUDAS) shall apply to construction on this project The SUDAS design specfications may be download at https://iowasudas.org/manuals/specifications-manual/
C O
VE
R
S H
EE
T
-0
O F
/1
0/
D
ES
IG
N
ED
B Y:
M . S
U
LL
IV
AN
D R
AW
N
B Y:
M . S
U
LL
IV
AN
C H
EC
KE
D B
Y:
S.
B
AC
H
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
IN
G
R
EP
AI
R
Q U
AR
TE
R S
D
R
IV
EW
AY
S
AN
D
SI
D
EW
AL
KS
A.01
BLDG 301 "QTRS 1"
PROJECT SITE
GILLESPIE STREET
DURNIN AVE
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
EXISTING P.C.C. SIDE:AL.
TYPICAL (QUARTERS 1)
EXISTING P.C.C. SIDEWALK,
6", WITH 6" X 6" WELDED
WIRE FABRIC
EXISTING HMA SIDE:AL.
TYPICAL (QUARTERS 1)
EXISTING HMA DRIVE:AY PAVEMENT
TYPICAL (QUARTERS 1)
EXISTING P.C.C. DRIVE:AY PAVEMENT
TYPICAL (QUARTERS 1)
EXISTING HMA SIDEWALK, 3"
EXISTING HMA DRIVEWAY, 4"
EXISTING DRIVEWAY PAVEMENT, 6",
WITH 6" X 6" WELDED WIRE FABRIC
NOTE: REMOVE THE EXISTING P.C.C. SIDEWALK, THE
TYPICAL WIDTH OF THE SIDEWALK IS 4', BUT MAY
VARY, SEE THE "ER" SHEETS FOR MORE SPECIFICS.
NOTE: REMOVE THE EXISTING HMA SIDEWALK, THE
TYPICAL WIDTH VARIES FROM 2' TO 4' SEE THE "ER"
SHEETS FOR MORE SPECIFICS.
NOTE: REMOVE THE EXISTING HMA DRIVEWAY
PAVEMENT, THE TYPICAL WIDTH VARIES, SEE THE "ER"
SHEETS FOR MORE SPECIFICS.
NOTE: REMOVE THE EXISTING P.C.C. DRIVEWAY
PAVEMENT TYPICAL WIDTH VARIES SEE THE "ER" SHEETS
FOR MORE SPECIFICS.
NO SCALE
NO SCALE
NO SCALE
NO SCALE
EXISTING P.C.C. PAVEMENT DURNIN AVENUE
STA 90+41.83 TO STA 91+35.07
EXISTING 7" P.C.C. PAVEMENT
15.00'
WEST BOUND LANE2.00'
STANDARD 6" P.C.C. CURB AND GUTTER
(7" THICKNESS)
NO SCALE
NOTE: REMOVE THE NOTED EXISTING P.C.C. PAVEMENT.
SEE SHEET ER.03 FOR MORE INFORMATION.
EXISTING CENTERLINE OF DURNIN AVENUE
EX
SI
TI
N
G C
R O
SS
S
EC
TI
O N
TY
PI
C
AL
-0
O F
D
ES
IG
N
ED
B
Y:
M
. S U
LL
IV
AN
D
R
AW
N B
Y:
M
. S U
LL
IV
AN
C
H
EC
KE
D
B Y:
S.
B
AC
H
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
AI
R
Q U
AR
TE
R S
D
R
IV
EW
AY
S
AN
D
SI
D
EW
AL
KS
B.01
/1
0/
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
PROPOSED P.C.C. PAVEMENT DURNIN AVENUE
STA 90+41.83 TO STA 91+35.07
6" STAND. CURB & GUTT (TYP.)
7" DEPTH
P.C.C. PAVEMENT, 7"
MODIFIED SUBBASE, 6"
15.00' WB TRAVEL LANE2.00'
THIS JOINT ON DURNIN AVENUE IS 15' FROM THE EXISTING CENTERLINE.
THIS DISTANCE SHALL VARY AS THE PAVEMENT TRANSITIONS INTO
QUATERS 1'S SOUTH ENTRANCE. THE CURB AND GUTTER TRANSITION
WIDTH TRANSITIONS FROM 2' TO 1.5'. SEE THE PROPOSED TYPICAL
BELOW FOR DETAILS AND SPECIFICS FOR THAT ENTRANCE.
-2.00% TARGET
GRADE AND PLACE TOPSOIL, 6"
HYDRO SEED, FERT. & MULCH,
TYPE 1 PERMANENT SEED
4:1 SLOPE
NO SCALE
EXISTING CENTERLINE
DURNIN AVENUE
PROPOSED P.C.C. PAVEMENT DURNIN AVENUE
TYPICAL CROSS SECTION NOTES :
1.) MAINLINE JOINTING:
TRANSVERSE JOINTS: "RD" JOINT SHALL BE USED TO TIE INTO THE EXISTING PAVEMENT ON
DURNIN AVENUE. "C" JOINT AT 15' MAX SPACING.
LONGITUDINAL JOINTS: "B" JOINT WITH A BOND BREAKER SHALL BE USED ADJACENT TO ALONG
THE CENTERLINE OF DURNIN AVENUE.
CURB JOINTING:
LONGITUDINAL JOINT NOT REQUIRED WHEN DISTANCE FROM BACK OF CURB TO NEAREST JOINT
IS EQUAL TO OR LESS THAN 15'. "BT-5" JOINT SHALL BE USED WHEN THE DISTANCE IS GREATER
THAN 15'.
2.) SINGLE POUR: L-2
STAGED: "L-1" OR "BT-5" DEPENDING ON THE SITUATION
TRANSVERSE: "C" AT 15' SPACING
SEE SUDAS FIGURE 7010.101 (JOINTS) FOR DETAILED INFORMATION.
3.) ALL GREEN SPACE AREAS TO RECEIVE 6" OF TOPSOIL AND TYPE 1 PERMANENT HYDRAULIC SEED
MULCH AND FERTILIZER.
4.) THE GRANULAR MODIFIED SUBBASE SHALL MEET THE IOWA DOT GRADATION NO. 12b.
5.) THE CONTRACTOR SHALL SUBMIT A JOINTING PLAN TO THE ENGINEER FOR APPROVAL PRIOR TO
POURING.
PROPOSED P.C.C. PAVEMENT QUARTERS 1 SOUTH ENTRANCE
STA 20+42.28 TO STA 22+56.89
℄ ROAD
6" STAND. CURB & GUTT (TYP.)
1.50' 12.00'
SB TRAVEL LANE
12.00'
NB TRAVEL LANE 1.50'
P.C.C. PAVEMENT, 6"
MODIFIED SUBBASE, 6"
27.00'
℄ ROAD
GRADE AND PLACE TOPSOIL, 6"
PERMANENT TYPE 1 SEED MIX
HYDRO SEED, FERT. & MUCH
GRADE AND PLACE TOPSOIL, 6"
PERMANENT TYPE 1 SEED MIX
HYDRO SEED, FERT. & MUCH
-2.00% TARGET -2.00% TARGET
PROPOSED P.C.C. PAVEMENT QUARTERS 1 SOUTH ENTRANCE TYPICAL
CROSS SECTION NOTES:
1.) MAINLINE JOINTING:
TRANSVERSE JOINTS: "C" JOINT SHALL BE USED WHEN THE DISTANCE FROM BACK OF CURB TO
THE NEAREST JOINT IS EQUAL TO OR LESS THAN 13.5 FEET.
LONGITUDINAL JOINTS: "BT-1" REQUIRED AT CENTERLINE.
CURB JOINTING:
IF THE CURB IS POURED SEPARATELY :
LONGITUDINAL JOINT IS REQUIRED, "BT-5" JOINT.
IF THE CURB IS POURED INTEGRAL:
LONGITUDINAL JOINT NOT REQUIRED WHEN DISTANCE FROM BACK OF CURB TO NEAREST JOINT
IS LESS THAN 15'. "BT-5" JOINT SHALL BE USED WHEN THE DISTANCE IS GREATER THAN 15'.
2.) SINGLE POUR: L-2
STAGED: "L-1" OR "BT-1" DEPENDING ON THE SITUATION
TRANSVERSE: "C" AT 13.5' SPACING
SEE SUDAS FIGURE 7010.101 (JOINTS) FOR DETAILED INFORMATION.
3.) ALL GREEN SPACE AREAS TO RECEIVE 6" OF TOPSOIL AND TYPE 1 PERMANENT HYDRAULIC SEED
MULCH AND FERTILIZER.
4.) THE GRANULAR MODIFIED SUBBASE SHALL MEET THE IOWA DOT GRADATION NO. 12b.
5.) THE CONTRACTOR SHALL SUBMIT A JOINTING PLAN TO THE ENGINEER FOR APPROVAL PRIOR TO
POURING.
'BT-1' JOINT
SEE JOINTING NOTES ABOVE
PR
O
PO
SE
D T
YP
IC
AL
C
R O
SS
S
EC
TI
O N
IN
FO
R M
AT
IO
N
-0
O
F
D
ES
IG
N
ED
B
Y:
M
. S U
LL
IV
AN
D
R
AW
N B
Y:
M
. S U
LL
IV
AN
C
H
EC
KE
D
B Y:
S.
B
AC
H
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
AI
R
Q U
AR
TE
R S
D
R
IV
EW
AY
S
AN
D
SI
D
EW
AL
KS
B.02
PLACE BOND BREAKER BETWEEN
THE EXISTING AND NEW PAVEMENT
PLACE GEOGRID, TYPE 4, MULTIAXIAL
PLACE GEOGRID, TYPE 4, MULTIAXIAL
NO SCALE
/1
0/
2.41'
1.00'
0.59'
D
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
PROPOSED P.C.C. PAVEMENT DRIVE:AY CIRCLE
STA 140+00.00 TO STA 143+81.77
6" STAND. CURB & GUTT (TYP.)
6" DEPTH
P.C.C. PAVEMENT, 6"
MODIFIED SUBBASE, 6"
NO SCALE
PROPOSED P.C.C. PAVEMENT DRIVE:AY CIRCLE
TYPICAL CROSS SECTION NOTES:
1.) MAINLINE JOINTING:
TRANSVERSE JOINTS: "C" JOINT
LONGITUDINAL JOINTS: "BT-1" JOINT OR "L-1" JOINT
CURB JOINTING:
LONGITUDINAL JOINT: "BT-5" JOINT
2.) SINGLE POUR: "L-1" JOINT
STAGED: "L-1" OR "BT-5" JOINT DEPENDING ON THE SITUATION
TRANSVERSE: "C" JOINT AT 15' MAX SPACING AT THE OUTSIDE EDGE OF PAVEMENT IN THE
CIRCLE
SEE SUDAS FIGURE 7010.101 (JOINTS) FOR DETAILED INFORMATION.
3.) ALL GREEN SPACE AREAS TO RECEIVE 6" OF TOPSOIL AND TYPE 1 PERMANENT HYDRAULIC SEED
MULCH AND FERTILIZER.
4.) THE GRANULAR MODIFIED SUBBASE SHALL MEET THE IOWA DOT GRADATION NO. 12b.
5.) THE CONTRACTOR SHALL SUBMIT A JOINTING PLAN TO THE ENGINEER FOR APPROVAL PRIOR TO
POURING.
PROPOSED P.C.C. PAVEMENT QUARTERS 1 EAST ENTRANCE
STA 130+00.00 TO STA 132+39.32
℄ TRAVEL LANE
P.C.C. PAVEMENT, 6"
MODIFIED SUBBASE, 6"
℄ TRAVEL LANE
GRADE AND PLACE TOPSOIL, 6"
PERMANENT TYPE 1 SEED MIX
HYDRO SEED, FERT. & MUCH
-2.00% TARGET -2.00% TARGET
PROPOSED P.C.C. PAVEMENT QUARTERS 1 EAST ENTRANCE TYPICAL
CROSS SECTION NOTES:
1.) MAINLINE JOINTING:
TRANSVERSE JOINTS: "C" JOINT AT 13' MAX SPACING.
LONGITUDINAL JOINTS: "BT-1" JOINT AT CENTERLINE.
2.) SINGLE POUR: "L-1" JOINT
STAGED: "L-1" OR "BT-5" JOINT DEPENDING ON THE SITUATION
TRANSVERSE: "C" JOINT AT 13' SPACING
SEE SUDAS FIGURE 7010.101 (JOINTS) FOR DETAILED INFORMATION.
3.) ALL GREEN SPACE AREAS TO RECEIVE 6" OF TOPSOIL AND TYPE 1 PERMANENT HYDRAULIC SEED
MULCH AND FERTILIZER.
4.) THE GRANULAR MODIFIED SUBBASE SHALL MEET THE IOWA DOT GRADATION NO. 12b.
5.) THE CONTRACTOR SHALL SUBMIT A JOINTING PLAN TO THE ENGINEER FOR APPROVAL PRIOR TO
POURING.
-1.50% TARGET -1.50% TARGET
9.00' 7.50' 1.50'
16.50' LANE
GRADE AND PLACE TOPSOIL, 6"
PERMANENT TYPE 1 SEED MIX
HYDRO SEED, FERT. & MUCH
GRADE AND PLACE TOPSOIL, 6"
PERMANENT TYPE 1 SEED MIX
HYDRO SEED, FERT. & MUCH
GRADE AND PLACE TOPSOIL, 6"
PERMANENT TYPE 1 SEED MIX
HYDRO SEED, FERT. & MUCH
6.50' 6.50'
NO SCALE
13.00' LANE
NOTE:
1.) THE PAVEMENT WIDTH VARIES FROM
STATION 130+00.00 TO 130+88.21 AS IT
TRANSITIONS FROM THE CIRCLE TO THE
DRIVEWAY. THE PAVEMENT WIDTH FROM
130+88.21 TO 132+39.32 IS 13' TYPICAL.
"BT-1" JOINT
"BT-5" JOINT"BT-1" JOINT
SEE JOINTING NOTES BELOW -
"EDGE OF PAVEMENT IN THE CIRCLE"
PR
O
PO
SE
D T
YP
IC
AL
C
R O
SS
S
EC
TI
O N
IN
FO
R M
AT
IO
N
-0
O
F
D
ES
IG
N
ED
B
Y:
M
. S U
LL
IV
AN
D
R
AW
N B
Y:
M
. S U
LL
IV
AN
C
H
EC
KE
D
B Y:
S.
B
AC
H
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
AI
R
Q U
AR
TE
R S
D
R
IV
EW
AY
S
AN
D
SI
D
EW
AL
KS
B.03
6" CORRUGATED PVC SUBDRAIN (TYP.)
CRUSHED STONE OR PEA GRAVEL (TYP.)
WRAPPED IN ENGINEERING FABRIC
1.00'
PLACE GEOGRID, TYPE 4, MULTIAXIAL
PLACE GEOGRID, TYPE 4, MULTIAXIAL
/1
0/
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
PROPOSED P.C.C. PAVEMENT QUARTERS 1 DRIVE:AY
P.C.C. PAVEMENT, 6"
MODIFIED SUBBASE, 6"
NO SCALE
PROPOSED P.C.C. PAVEMENT QUARTERS PAR.ING LOT
℄ DRIVEWAY
PROPOSED TYPICAL CROSS SECTION NOTES FOR THE QUARTERS 1
PAR.ING LOT :
1.) CURB JOINTING:
LONGITUDINAL: "BT-5" JOINT
2.) SINGLE POUR: "C" JOINT
STAGED: "C" JOINT
TRANSVERSE: "C" JOINT AT 14' SPACING
SEE SUDAS FIGURE 7010.101 (JOINTS) FOR DETAILED INFORMATION.
3.) ALL GREEN SPACE AREAS TO RECEIVE 6" OF TOPSOIL AND TYPE 1 PERMANENT HYDRAULIC SEED
MULCH AND FERTILIZER.
4.) THE GRANULAR MODIFIED SUBBASE SHALL MEET THE IOWA DOT GRADATION NO. 12b.
5.) THE CONTRACTOR SHALL SUBMIT A JOINTING PLAN TO THE ENGINEER FOR APPROVAL PRIOR TO
POURING. SOME REINFORCING MAY BE REQUIRED AT THE ENTRANCE OF THE PARKING LOT.
GRADE AND PLACE TOPSOIL, 6"
PERMANENT TYPE 1 SEED MIX
HYDRO SEED, FERT. & MUCH
NO SCALE
P.C.C. PAVEMENT, 6"
MODIFIED SUBBASE, 6"
STANDARD 6" P.C.C. CURB AND GUTTER
(6" THICKNESS)
1.50' 14.00' (TYPICAL JOINT SPACING)
GRADE AND PLACE TOPSOIL, 6"
PERMANENT TYPE 1 SEED MIX
HYDRO SEED, FERT. & MUCH
"BT-5" JOINT
QUARTERS 1
(BLDG 301)
DISTANCE VARIES
SLOPE VARIES: 1.5% - 2.5%
DISTANCE VARIES
SLOPE VARIES: 1.5% - 2.5%
1.50'
STANDARD 6" P.C.C. CURB AND GUTTER
(6" THICKNESS)
"BT-5" JOINT
PROPOSED P.C.C. PAVEMENT QUARTERS 1 DRIVE:AY
TYPICAL CROSS SECTION NOTES :
1.) MAINLINE JOINTING:
TRANSVERSE JOINTS: "C" JOINT
LONGITUDINAL JOINTS: "BT-1" JOINT OR "L-1" JOINT
CURB JOINTING:
LONGITUDINAL JOINT: "BT-5" JOINT
2.) SINGLE POUR: "L-1" JOINT
STAGED: "L-1" OR "BT-5" JOINT DEPENDING ON THE SITUATION
TRANSVERSE: "C" JOINT AT 15' MAX SPACING
SEE SUDAS FIGURE 7010.101 (JOINTS) FOR DETAILED INFORMATION.
3.) ALL GREEN SPACE AREAS TO RECEIVE 6" OF TOPSOIL AND TYPE 1 PERMANENT HYDRAULIC SEED
MULCH AND FERTILIZER.
4.) THE GRANULAR MODIFIED SUBBASE SHALL MEET THE IOWA DOT GRADATION NO. 12b.
5.) THE CONTRACTOR SHALL SUBMIT A JOINTING PLAN TO THE ENGINEER FOR APPROVAL PRIOR TO
POURING.3
6.) THIS TYPICAL CROSS SECTION APPLIES TO THE AREA ADJACENT TO THE EXISTING GARAGE AND
SIDEWALK RAMP.
"BT-1" JOINT
PR
O
PO
SE
D T
YP
IC
AL
C
R O
SS
S
EC
TI
O N
IN
FO
R M
AT
IO
N
-0
O
F
D
ES
IG
N
ED
B
Y:
M
. S U
LL
IV
AN
D
R
AW
N B
Y:
M
. S U
LL
IV
AN
C
H
EC
KE
D
B Y:
S.
B
AC
H
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
AI
R
Q U
AR
TE
R S
D
R
IV
EW
AY
S
AN
D
SI
D
EW
AL
KS
B.04
PLACE GEOGRID, TYPE 4, MULTIAXIAL
PLACE GEOGRID, TYPE 4, MULTIAXIAL
/1
0/
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
ALL PROPOSED P.C.C. SIDE:AL.
P.C.C. PAVEMENT, 6"
MODIFIED SUBBASE, 6"
NO SCALE
℄ SIDEWALK
GRADE AND PLACE TOPSOIL, 6"
PERMANENT TYPE 1 SEED MIX
HYDRO SEED, FERT. & MUCH
GRADE AND PLACE TOPSOIL, 6"
PERMANENT TYPE 1 SEED MIX
HYDRO SEED, FERT. & MUCH
1.50% TARGET
6.00'
NOTES:
1.) THE SIDEWALK SLOPE TARGET IS 1.50% AND 6 FEET
IN WIDTH UNLESS OTHERWISE NOTED. THE SLOPE
DIRECTION VARIES ON LOCATION AND SITUATION,
PLEASE SEE THE "D SHEETS" FOR MORE
INFORMATION, STAKE ACCORDING TO THE
MODEL/DRAWING FILE.
2.) EXISTING GROUND TIE IN LOCATIONS CAN BE
FOUND IN THE "D SHEETS".
3.) MAX SAW CUT SPACING IS 6 FEET.
4.) ALL SIDEWALKS SHALL BE A DARK GRAY COLOR
STAMPED WITH A LONDON COBBLE STONE
PATTERN. THE CONTRACTOR SHALL SUBMIT AN
EXAMPLE OF THE PATTERN AND COLOR FOR
APPROVAL BY THE PROJECT C.O.R. OR ENGINEER
PRIOR TO PLACING THE MATERIAL.
1.00' 2.00' 2.00' 1.00'
PLACE STEEL CHAIRS TO ELEVATE THE
WELDED WIRE MESH OFF OF THE
GROUND. THE CHAIRS SHALL BE PLACED
IN A 2' X 2' GRID.
PLACE 6" X 6" WELDED WIRE FABRIC,
10 GAUGE STEEL
0.25' 0.25'
PR
O
PO
SE
D T
YP
IC
AL
C
R O
SS
S
EC
TI
O N
IN
FO
R M
AT
IO
N
-0
O
F
D
ES
IG
N
ED
B
Y:
M
. S U
LL
IV
AN
D
R
AW
N B
Y:
M
. S U
LL
IV
AN
C
H
EC
KE
D
B Y:
S.
B
AC
H
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
AI
R
Q U
AR
TE
R S
D
R
IV
EW
AY
S
AN
D
SI
D
EW
AL
KS
B.05
3'
3.5'
2.17'
0.83'
2'
CENTERLINE OF FLAG POLE (POST)
NO SCALE
1'
1.25" I.D. X 1.50" O.D. SCHEDULE 40 STEEL PIPE,
POWDER COATED ARSENAL BROWN
1.33'
4" DIAMETER P.C.C. ANCHOR/FOOTING
NOTE:
1.) THE CONCRETE USED FOR THE FOOTING SHALL BE A
3500 PSI 28-DAY STRENGTH.
2.) SEE SHEET "D.01" FOR SPECIFIC LOCATIONS.
PROPOSED FLAG POST TYPICAL
FINISHED GRADE
7.00'
/1
0/
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
NOTE:
1.) THIS SHEET SHOULD BE TREATED AS A REFERENCE ONLY. THE PROJECT IS BID AS A LUMP SUM
PROJECT AND THE CONTRACTOR'S BID SHOULD ACCOUNT FOR ALL WORK DETAILED IN THE
PLAN SHEETS. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING THEIR OWN QUANTITY TAKE
OFF FOR THE PROJECT AND MAKING A BID BASED ON THEIR TAKE OFF AND THE BID ITEM CODE
REFERENCES FOUND ON THIS SHEET.
PROJECT DESCRIPTION
THE PREMISE FOR THIS PROJECT IS TO REMOVE, RE-GRADE, RE-ALIGN AND REPLACE THE EXISTING P.C.C./HMA DRIVEWAY AND SIDEWALKS.
THE PROJECT ALSO INCLUDES BUILDING A NEW P.C.C. PARKING LOT IN THE EXISTING GRASS AREA SOUTH OF QUARTERS 1. NEW STORM SEWER SHALL BE INSTALLED IN THE PROPOSED PARKING LOT AND IN THE CIRCLE PORTION OF THE DRIVEWAY. THE EXISTING ROOF DRAINS ALONG THE NORTH SIDE OF QUARTERS 1 SHALL BE HOOKED TO THE NEW STORM SEWER SYSTEM. THE EXISTING FLAG POSTS ADJACENT TO THE DRIVEWAY SHALL BE REMOVED AND REPLACED. EXISTING LIGHT POLES ALONG THE DRIVEWAY SHALL BE REMOVED, REFURBISHED AND REINSTALLED WITH LIGHTING UPGRADES. ADDITIONAL NEW LIGHT POLES WILL BE INSTALLED AROUND THE PROPOSED PARKING LOT AND SIDEWALKS. NEW TREES SHALL BE PLANTED AROUND THE NEW PARKING LOT AND ALONG THE SOUTH ENTRANCE TO QUARTERS 1. THE EXISTING LANDSCAPE OF THE EAST SIDE OF QUARTERS 1 SHALL BE REMOVED AND REPLACED. A NEW 1 INCH WATER SERVICE LINE SHALL BE INSTALLED TO QUARTERS 1. THE EXISTING POWER FEED TO QUARTERS 1 SHALL BE RELOCATED AND NEW ELECTRICAL SHALL BE RAN TO THE NEW DRIVEWAY AND PARKING LOT LIGHTS. ALL DISTURBED GREEN SPACE AREAS SHALL BE HYDRO MULCH, SEEDED AND FERTILIZED.
Q U
AN
TI
TY
T
AK
E
O
FF
-0
O F
D
ES
IG
N
ED
B
Y:
M
. S U
LL
IV
AN
D
R
AW
N B
Y:
M
. S U
LL
IV
AN
C
H
EC
KE
D
B Y:
S.
B
AC
H
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
AI
R
Q U
AR
TE
R S
D
R
IV
EW
AY
S
AN
D
SI
D
EW
AL
KS
C.01
/1
0/
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
ES
TI
M
AT
E R
EF
ER
EN
C
E
IN
FO
-0
O F
D
ES
IG
N
ED
B
Y:
M
. S U
LL
IV
AN
D
R
AW
N B
Y:
M
. S U
LL
IV
AN
C
H
EC
KE
D
B Y:
S.
B
AC
H
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
AI
R
Q U
AR
TE
R S
D
R
IV
EW
AY
S
AN
D
SI
D
EW
AL
KS
C.02
/1
0/
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
ES
TI
M
AT
E R
EF
ER
EN
C
E
IN
FO
-0
O F
D
ES
IG
N
ED
B
Y:
M
. S U
LL
IV
AN
D
R
AW
N B
Y:
M
. S U
LL
IV
AN
C
H
EC
KE
D
B Y:
S.
B
AC
H
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
AI
R
Q U
AR
TE
R S
D
R
IV
EW
AY
S
AN
D
SI
D
EW
AL
KS
C.03
/1
0/
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
ES
TI
M
AT
E R
EF
ER
EN
C
E
IN
FO
-0
O F
XX
D
ES
IG
N
ED
B
Y:
M
. S U
LL
IV
AN
D
R
AW
N B
Y:
M
. S U
LL
IV
AN
C
H
EC
KE
D
B Y:
S.
B
AC
H
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
AI
R
Q U
AR
TE
R S
D
R
IV
EW
AY
S
AN
D
SI
D
EW
AL
KS
C.04
/1
0/
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
ES
TI
M
AT
E R
EF
ER
EN
C
E
IN
FO
-0
O F
XX
D
ES
IG
N
ED
B
Y:
M
. S U
LL
IV
AN
D
R
AW
N B
Y:
M
. S U
LL
IV
AN
C
H
EC
KE
D
B Y:
S.
B
AC
H
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
AI
R
Q U
AR
TE
R S
D
R
IV
EW
AY
S
AN
D
SI
D
EW
AL
KS
C.05
/1
0/
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
G
EN
ER
AL
N O
TE
S
-0
O F
D
ES
IG
N
ED
B
Y:
M
. S U
LL
IV
AN
D
R
AW
N B
Y:
M
. S U
LL
IV
AN
C
H
EC
KE
D
B Y:
S.
B
AC
H
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
AI
R
Q U
AR
TE
R S
D
R
IV
EW
AY
S
AN
D
SI
D
EW
AL
KS
C.06
1.) THIS PROJECT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE 2026 EDITION OF THE STATEWIDE URBAN DESIGN AND SPECIFICATIONS
PROGRAM (SUDAS) UNLESS OTHERWISE NOTED.
2.) IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROTECT ALL EXISTING UTILITIES AND PAVED STREETS, INCLUDING ANY NOT SHOWN ON THESE DRAWINGS. THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION AND NOTIFY THE ENGINEER AND DEPARTMENT OF PUBLIC WORKS IF ANY CONFLICTS WITH THE DRAWINGS OCCUR. ANY DAMAGE TO EXISTING UTILITIES CAUSED BY TRENCHING AND GRADING OPERATIONS SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE. EXISTING UTILITY LOCATIONS SHOWN ON THE DRAWINGS ARE APPROXIMATE. IT IS POSSIBLE THAT THERE ARE OTHER UTILITIES WHOSE EXISTENCE IS PRESENTLY NOT KNOWN OR SHOWN. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE TYPE AND LOCATION OF UNDERGROUND UTILITIES AND TO AVOID DAMAGE THERETO. MINOR CONFLICT WITH UNDERGROUND UTILITIES THAT ARE ABANDONED BUT NOT REMOVED BY THE OWNER OF THE UTILITY SHALL BE REMOVED AS NECESSARY FOR THE CONSTRUCTION OF THE PROJECT BY THE CONTRACTOR.
REMOVAL SHALL BE INCIDENTAL TO THE JOB AND SHALL NOT ENTITLE THE CONTRACTOR TO ANY EXTRA COMPENSATION.
3.) THE DEPARTMENT OF PUBLIC WORKS SHALL HAVE ACCESS TO THE PROJECT FOR CONSTRUCTION AND TO MAKE EXTENSIONS OR
ADJUSTMENTS OF SERVICES.
4.) ALL UNSUITABLE MATERIAL, CONSTRUCTION DEBRIS RESULTING FROM CONSTRUCTION OPERATIONS SHALL BE PROPERLY DISPOSED OF
OFF-SITE IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL GUIDELINES.
5.) IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE WASTE AREAS OR DISPOSAL SITES FOR EXCESS OR UNDESIRABLE MATERIAL.
WHICH IS NOT TO BE INCORPORATED IN THE WORK INVOLVED IN THIS PROJECT. NO PAYMENT FOR OVERHAUL WILL BE ALLOWED FOR
MATERIAL HAULED TO THESE SITES.
6.) THE CONTRACTOR SHALL PREVENT SILT AND DEBRIS FROM ENTERING STORM SEWERS AND CULVERTS AND SHALL REMOVED ANY SUCH
MATERIAL THAT ENTERS THEM.
7.) CARE SHALL BE TAKEN TO PREVENT STORM WATER FROM UNDERMINING THE PAVEMENT DURING CONSTRUCTION. IF AREAS BECOME UNDERMINED, THEY SHALL BE REPAIRED IN A MANNER ACCEPTABLE TO THE ENGINEER/C.O.R. REPRESENTATIVE. PRESSURE GROUTING MAY
BE REQUIRED.
8.) THE CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING ADJACENT STREETS FREE FROM EXCESSIVE BUILD-UP OF SOIL AND/OR GRANULAR MATERIAL FROM THE PROJECT. THE CONTRACTOR SHALL CLEAN EXCESS SOIL AND OTHER MATERIAL FROM THE ADJACENT STREETS AS REQUIRED BY THE ENGINEER/C.O.R. REPRESENTATIVE. ANY DAMAGE DONE TO EXISTING STREETS SHALL BE REPAIRED AT THE
CONTRACTOR'S EXPENSE.
9.) THE CONTRACTOR SHALL TAKE MEASURES TO PREVENT THE SPREAD OF DUST FROM THE CONSTRUCTION AREAS AND HAUL ROUTES, WHICH INCLUDE THE APPLICATION OF WATER AS DIRECTED BY THE ENGINEER/C.O.R. REPRESENTATIVE. THIS WORK SHALL BE CONSIDERED
INCIDENTAL TO EARTH EXCAVATION.
10.) WHEN NOT INITIATED AT AN EXISTING JOINT, REMOVAL OF EXISTING CONCRETE PAVEMENT, ASPHALT OR CONCRETE DRIVES AND SIDEWALKS SHALL BE INITIATED WITH FULL DEPTH SAW CUTS, EXERCISING EXTREME CARE TO AVOID SURFACE BREAKS AND SPALLING. IF SURFACE BREAKS OR SPALLING OCCUR, ADDITIONAL REMOVAL AND REPLACEMENT SHALL BE MADE AT THE CONTRACTOR'S EXPENSE. THE
COST OF SAW CUTS SHALL BE CONSIDERED INCIDENTAL TO THE COST OF CONSTRUCTION.
11.) SPECIAL CARE SHALL BE TAKEN FORMING AT INTERSECTIONS SO THAT THE PROFILES AND GRADES OBTAINED ARE AS SHOWN ON THE PLANS AND GRADE SHEETS. SHORT LENGTHS OF FORMS OR FLEXIBLE FORMS MAY BE NECESSARY AT THESE
LOCATIONS.
12.) ALL CONCRETE SHALL UTILIZE A C-4 CONCRETE MIX DESIGN AND HAVE A COMPRESSIVE STRENGTH OF 3,500 PSI AT 14 DAYS
AND 4,000 PSI AT 28 DAYS.
13.) THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY IF ANY DISCREPANCIES ARE ENCOUNTERED BETWEEN THE PLANS AND SPECIFICATIONS AND THE EXISTING FIELD CONDITIONS. WORK WARRANTING A CHANGE IN SCOPE SHALL BE SUBMITTED TO THE C.O.R. WITHIN 30 DAYS OF NOTICE OR THE CONTRACTOR WILL FORFEIT RIGHTS TO COMPENSATION FOR
THE WORK.
14.) PUMPING GROUND WATER AND/OR STORM WATER FROM OPEN TRENCHES SHALL BE CONSIDERED INCIDENTAL TO THE
CONTRACT.
15.) CONSTRUCTION STAKING SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR AND SURVEY CREW AND COMPANY SHALL BE CONSIDERED COMPETENT AND RESPONSIBLE FOR REPORTING ANY DISCREPANCIES OR UNFORESEEN PROJECT ERRORS BEFORE AND DURING CONSTRUCTION STAKING TO ENSURE BLUNDERS AND MISINFORMATION IS NOT CONSTRUCTED IN THE FIELD. IF AN APPARENT ERROR IN THE DESIGN IS DISCOVERED DURING CONSTRUCTION STAKING OF THE PROJECT, THE CONTRACTOR AND OR SURVEY CREW AND COMPANY SHALL CEASE CONSTRUCTION AND REPORT IT TO DPW IMMEDIATELY SO THE ERROR MAY BE CORRECTED AS SOON AS POSSIBLE. ANY LOST WORK TIME, LABOR OR EQUIPMENT
FEE WILL NOT BE PAID DURING WORK STOPPAGE DUE TO UNFORESEEN ERROR.
16.) ALL EXISTING STORM INFORMATION SHALL BE CONSIDERED A REFERENCE AND IS THE RESPONSIBILITY OF THE CONTRACTOR
VERIFY IN THE FIELD PRIOR TO CONSTRUCTION.
17.) THE CONTRACTING AUTHORITY RESERVES THE RIGHT TO KEEP ANY/ALL REMOVED MATERIAL THAT INCLUDES BUT IS NOT LIMITED TO MANHOLES AND STORM SEWER PIPE. IF THE CONTRACTING AUTHORITY ELECTS NOT TO KEEP REMOVED MATERIAL, THE MATERIAL BECOMES THE PROPERTY OF THE CONTRACTOR AND IS RESPONSIBLE FOR THE DISPOSAL/REMOVAL
FROM THE PROJECT.
18.) NO OVERHAUL ON THIS PROJECT.
19.) STORM AND SANITARY TRENCH BACKFILL SHALL HAVE AGGREGATE BACKFILL FROM THE TOP OF BEDDING AROUND THE PIPE TO THE BOTTOM OF THE PAVEMENT SUBBASE FOR ALL LOCATIONS UNDER PAVED SURFACES. STORM AND SANITARY PIPES OUTSIDE OF PAVED SURFACES REQUIRE AGGREGATE BACKFILL FROM THE TOP OF BEDDING AROUND THE PIPE TO 12 INCHES ABOVE THE PIPE. AFTER MEETING THE 12 INCHES ABOVE THE PIPE THE EXISTING TRENCH BACKFILL MATERIAL MAY BE USED
TO BACKFILL TO THE SURFACE UNLESS OTHERWISE NOTED.
20.) ALL STORM SEWER PIPE SHALL BE INSTALLED WITH RUBBER O-RING OR PROFILE GASKET UNLESS OTHERWISE NOTED.
GENERAL NOTES
/1
0/
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
TA
BL
ES
A
N D
D
ES
C R
IP
TI
O N
S
-0
O
F
D
ES
IG
N
ED
B
Y:
M
. S U
LL
IV
AN
D
R
AW
N B
Y:
M
. S U
LL
IV
AN
C
H
EC
KE
D
B Y:
S.
B
AC
H
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
AI
R
Q U
AR
TE
R S
D
R
IV
EW
AY
S
AN
D
SI
D
EW
AL
KS
C.07
SEE SHEET L.01 FOR MORE DETAILS
SEE SHEET D.02 FOR MORE DETAILS
/1
0/
HORIZONTAL CONTROL
POINT #
ELEVATION
569.36
560.61
572.12
570.07
563.41
569.05
569.85
572.68
564.91
565.06
572.90
569.59
NORTHING
1768899.51
1769045.19
1768564.85
1768237.02
1768149.76
1768460.01
1768415.34
1768586.72
1768887.69
1768961.23
1768760.66
1768465.90
EASTING
2192247.54
2192478.54
2192350.14
2192291.70
2191844.02
2191740.12
2191331.63
2191225.08
2191586.07
2191973.87
2191991.36
2192070.82
DESCRIPTION
5/8" W/RED CONTROL CAP
5/8" W/RED CONTROL CAP
5/8" W/RED CONTROL CAP
5/8" W/RED CONTROL CAP
5/8" W/RED CONTROL CAP
5/8" W/RED CONTROL CAP
1/2" REBAR
1/2" REBAR
1/2" REBAR
1/2" REBAR
5/8" W/RED CONTROL CAP
1/2" REBAR
VERTICAL CONTROL
POINT #
ELEVATION
573.83
DESCRIPTION
CUT "X" ON STREET LIGHT BASE, W. SIDE GILESPIE STREET @ CUL-DE-SAC
401 562.95CUT "X" ON N.E. CORNER CONCRETE BARRIER WALL TO TRANSFORMER PAD, S.
CLUBHOUSE PARKING LOT
402 575.18BOLT BY "O" IN OPEN ON FIRE HYDRANT @ S.E. COR. OF HOUSE #2635 BAKER AVE.
403 570.45BOLT BY "O" IN OPEN ON FIRE HYDRANT, AT N.W. CORNER OF CLUBHOUSE
D
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
UTILITY NOTE
THE LOCATION OF THE EXISTING UTILITIES ARE SHOWN
ON THE PLANS FOR INFORMATION ONLY AND
REPRESENTS THE BEST KNOWLEDGE OF THE ENGINEER.
IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
VERIFY ALL UTILITY LOCATIONS DURING CONSTRUCTION.
NOTE:
THE 2026 STATEWIDE URBAN DESIGN AND SPECIFICATIONS
(SUDAS) SHALL APPLY TO CONSTRUCTION ON THIS PROJECT
THE SUDAS DESIGN SPECFICATIONS
MAY BE DOWNLOAD AT
https://iowasudas.org/manuals/specifications-manual/
PROJECT WAS SURVEYED USING ILLINOIS STATE:
NAD83 ILLINOIS STATE PLANES, WEST ZONE, US FOOT
DATUM: NAD83
G
8''W - CI
2'' W - GS
W
T
UE
4'' PVC <<
6'' PVC <<
12'' VC >>
4''W - CI
4'' CI <<
6'' CI <<
8'' PVC <<
10'' PVC <<
WSV
EXISTING SIGN
EXISTING FLAG POST
PROPOSED FLAG POST
EXISTING HANDHOLE
EXISTING GAS VALVE
EXISTING FIRE HYDRANT
PROPOSED WATER SERVICE VALVE
EXISTING WATER VALVE
EXISTING STORM MANHOLE
EXISTING SANITARY MANHOLE
EXISTING SPRINKLER SYSTEM CONTROLS
EXISTING LIGHT POLE W/ ARM
PROPOSED LIGHT POLE
EXISTING LIGHT POLE
EXISTING SHRUB/BUSH
EXISTING TREE STUMP
EXISTING CONIFEROUS TREE
EXISTING DECIDUOUS TREE
PROPOSED DECIDUOUS TREE
EXISTING UNDERGROUND ELECTRIC LINE
EXISTING COMMUNICATION LINE
EXISTING GAS LINE
EXISTING 4" WATER MAIN - CAST IRON
EXISTING 8" WATER MAIN - CAST IRON
EXISTING 2" WATER MAIN - GALVANIZED STEEL
EXISTING WATER MAIN
EXISTING SANITARY SEWER - 4 INCH PVC
EXISTING SANITARY SEWER - 6 INCH PVC
EXISTING SANITARY SEWER - 12 INCH VITRIFIED CLAY
EXISTING STORM SEWER - 4 INCH CAST IRON
EXISTING STORM SEWER - 6 INCH CAST IRON
EXISTING STORM SEWER - 8 INCH PVC
EXISTING STORM SEWER - 10 INCH PVC
EXISTING HOT MIX ASPHALT DRIVEWAY
EXISTING ROCK DRIVEWAY
EXISTING LANDSCAPE AREA
EXISTING LANDSCAPE ROCK
EXISTING PORTLAND CEMENT CONCRETE DRIVEWAY
EXISTING PORTLAND CEMENT CONCRETE SIDEWALK
EXISTING HOT MIX ASPHALT SIDEWALK
PROPOSED PORTLAND CEMENT CONCRETE SIDEWALK
PROPOSED PORTLAND CEMENT CONCRETE DRIVEWAY
PROPOSED LANDSCAPE AREA
PROPOSED TOPSOIL, HYDRO SEED, MULCH & FERTILIZER AREA
SYMBOLS
SU
R
VE
Y
C O
N
TR
O L
LE
G
EN
D
-0
O F
D
ES
IG
N
ED
B
Y:
M
. S U
LL
IV
AN
D
R
AW
N B
Y:
M
. S U
LL
IV
AN
C
H
EC
KE
D
B Y:
S.
B
AC
H
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
AI
R
Q U
AR
TE
R S
D
R
IV
EW
AY
S
AN
D
SI
D
EW
AL
KS
C.08
/1
0/
AutoCAD SHX Text S
AutoCAD SHX Text H
AutoCAD SHX Text P
AutoCAD SHX Text P
24"24"
24"
24"
12"
24"
24"24"
G G G G G G G G G G G G G G G
U E
U E
UE
UE
U E W
48"
3"
ROW"
ROW"
ROW"
30"
30"
40"
30"
48"
36"
36"15"
26"
4"
24" 24"
6"
36"
36"
12"
12"
36" 36"
24" 12"
12"
24"
24"
24"
12"
12"
12"12" 12"
24"
48"
24"
24"
48"
24"
15"
36"36" 36"
8''W - CI 8''W - CI 8''W - CI 8''W - CI
8''W - CI 8''W - CI 8''W - CI 8''W - CI
2'' W
- GS
UE UE
UE
UE
UE
UE
W
U E
UE
UE
UE
UE
UE UE UE UE
UE
UE UE
U E
UE
UE
U E
U E
10"
572 572
572 573
571573
D
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
M
AT
CH
L
IN
E
S
EE
S
H
EE
T
ER
.0
MATCH LINE - SEE SHEET ER.04
G
ILLES
S
PI S
TR
EET
P.C .C
. PA
V
EM
EN
T
QUARTERS 1 � EAST ENTRANCE
EX. HMA PAVEMENT
EX. P.C.C. SIDE:AL.
EX. P.C.C. SIDE:AL.
EX
. H
M A
SI
DE
AL
EX
P.
C .C
S
ID
E:
AL
BEGIN REMOVAL OF
EXISTING DRIVEWAY
13.55'
30.44'
16.81'17.67'
13.46'
17.31' 3.67' 4.06'
3.81'
3.79'
3.93'
4.06'
3.68' 3.94'
5.58'
5.13'
MATCH LINE - SEE SHEET ER.04
M
AT
CH
L
IN
E
S
EE
S
H
EE
T
ER
.0
12.80'14.31'
REMOVE EXISTING HMA
DRIVEWAY PAVEMENT
REMOVE EXISTING
P.C.C. SIDEWALK
BEGIN REMOVAL OF
EXISTING P.C.C. SIDEWALK
BEGIN REMOVAL OF
EXISTING P.C.C. SIDEWALK
EXISTING LANDSCAPE WALL,
TO REMAIN UNDISTURBED
REMOVE EXISTING
P.C.C. SIDEWALK
REMOVE EXISTING
HMA SIDEWALK
EXISTING STRUCTURE LANDSCAPE
BLOCKS/WALL AND TREE TO REMAIN
UNDISTURBED
REMOVE EXISTING LIGHT POLE,
1 EA
REMOVE EXISTING
FLAG POLES, 50 EA
REMOVE EXISTING
FLAG POLES, 6 EA
REMOVE EXISTING
STRUCTURE LANDSCAPE
BLOCKS/WALL, 1 EA
EXISTING RIVER ROCK LANDSCAPE
TO BE REMOVED AND REPLACED
WITH 6" OF TOPSOIL
EXISTING RIVER ROCK LANDSCAPE
TO BE REMOVED AND REPLACED
WITH 6" OF TOPSOIL
REMOVE EXISTING BRUSH
REMOVE EXISTING BRUSH
REMOVE EXISTING
P.C.C. SIDEWALK
MATCH LINE - SEE SHEET ER.03
REMOVE EXISTING HANDHOLE,
1 EA
REMOVE EXISTING HANDHOLE,
1 EA
REMOVE EXISTING HANDHOLE,
1 EA
EX
IS
TI
N
G P
R O
JE
C
T
FE
AT
U
R
ES
A N
D R
EM
O
VA
LS
-0
O F
D
ES
IG
N
ED
B
Y:
M
. S U
LL
IV
AN
D
R
AW
N B
Y:
M
. S U
LL
IV
AN
C
H
EC
KE
D
B Y:
S.
B
AC
H
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
AI
R
Q U
AR
TE
R S
D
R
IV
EW
AY
S
AN
D
SI
D
EW
AL
KS
ER.01
NOTES:
1.) ALL LIGHT POLES NOTED FOR REMOVAL ARE HISTORIC AND
SHALL NOT BE DAMAGED DURING CONSTRUCTION. THE
POLES ARE TO BE REUSED. IF THE A POLE IS DAMAGED IT
SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE.
2.) SEE SHEETS E.01 AND E.02 FOR DETAILS ON LIGHT REMOVAL
AND REPLACEMENT.
REMOVE EX. TREE
/1
0/
N
S
W E
Feet 0 30 60
G G G G G G G G
48"
3"
ROW"
ROW"
ROW"
30"
30"
40"
36"
24" 12"
12"
24"
24"
24" 24"24"
24"
24"
24"
24"
24"
12"
12"
12"12"
48"
24"
24"
6"6"
6"
12"
36"
36"
36"
24"
36"
36"36"
24"
24"
24"
48"
24"
15"
36"
36"
36"
48"
36"
36"36" 36"36" 36"
G G
G G
G 4'
'W
CI
8''W - CI 8''W - CI 8''W - CI 8''W - CI 8''W - CI
2'' W
- GS
2'' W
- GS
U E
U E
U E
U E
U E
T T
T T
T T
T T
UE
UE
UE UE
8'' VC >>
8'' VC >>
8'' VC >>
8'' VC >>
8'' VC >>
8'' VC >>
U E
U E
UE
UE
UE
VC
VC
12'' VC >>
12'' VC >>
12'' VC >>
12'' VC >>
U E
UE
UE
UE
UE
6' ' P
VC
10'' PVC <<
10'' PVC <<
10'' PVC <<
8'' PVC <<
4'' PVC << 4'' PVC <<
UE UE
UE UE
U E
UE
UE
U E
U E
6.00'
572 572
570 570
D
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
M
AT
CH
L
IN
E
SE
E
SH
EE
T
ER
.0
M
AT
CH
L
IN
E
- S
EE
S
H
EE
T
ER
.0
MATCH LINE - SEE SHEET ER.03MATCH LINE - SEE SHEET ER.03
Q U A R
TE
R S
S
O U
TH
E N
TR
A N C E
EX
H M
A P
A V
EM
EN
T
EX. P.C
.C
. S
ID
E:
AL.
QUARTERS 1
(BLDG 301)
GARAGE
(BLDG 301G)
EX. P.C.C. SIDE:AL.EX
P.
C .C
S
ID
E:
A L.
EX. HMA SIDE:AL.
EX. P.C.C. SIDE:AL.
EX
. H
M A
SI
DE
AL
EX. P.C.C. DRIVE:AY
EX. GRAVEL DRIVE:AY
Q U
AR
TE
RS
EX
H M
A
PA
V
EM
EN
T
QUARTERS 1
EX. HMA PAVEMENT
EX. P.C.C. SIDE:
AL.
REMOVE EXISTING LARGE BUSHES
REMOVE EXISTING LARGE BUSHES
REMOVE EXISTING
15" DIA. TREE
PREVIOUSLY ABANDONED 12"
VC STORM SEWER TO REMAIN
REMOVE EXISTING
P.C.C. SIDEWALK
REMOVE EXISTING
P.C.C. SIDEWALK
REMOVE EXISTING
P.C.C. SIDEWALK
REMOVE EXISTING
HMA SIDEWALK
REMOVE EXISTING
HMA SIDEWALK
REMOVE EXISTING
P.C.C. SIDEWALK
REMOVE EXISTING HMA
DRIVEWAY PAVEMENT
REMOVE EXISTING HMA
DRIVEWAY PAVEMENT
REMOVE EXISTING BRUSH AND TREES
REMOVE EXISTING P.C.C.
DRIVEWAY PAVEMENT
REMOVE EXISTING BRUSH AND TREES
REMOVE EXISTING
6" DIA. TREES
REMOVE EXISTING LARGE BUSHES
REMOVE EXISTING CHAINLINK
RAILING AND POSTS ON BOTH SIDES
OF THE SIDEWALK, 56 LF TOTAL
REMOVE EXISTING
BRUSH AND TREES
REMOVE EXISTING
WOOD FENCE, 12 LF
PREVIOUSLY ABANDONED 8" VC
SANITARY SEWER TO REMAIN
REMOVE EXISTING WATER
MAIN VALVE, 1 EA
WATER MAIN ABANDONMENT,
CAP, 2", 1 EA
WATER MAIN ABANDONMENT,
CAP, 2", 1 EA
ABANDON EXISTING 2"
WATER MAIN SERVICE IN
PLACEΎABBREVIATIONS
CI = CAST IRON
GS = GALVANIZED STEEL
VC = VITRIFIED CLAY
PVC = POLYVINYL CHLORIDE
CO = COPPER
PEX = CROSS-LINKED POLYETHYLENE
EXISTING POWER POLE TO BE REMOVED AND
EXISTING ELECTRIC FEED SHALL BE RELOCATED
REMOVE EXISTING
BRUSH/TREE LINE
EX. P.C.C. SIDE:AL.
REMOVE EXISTING HANDHOLE,
1 EA
EX
IS
TI
N
G P
R O
JE
C
T
FE
AT
U
R
ES
A N
D R
EM
O
VA
LS
-0
O F
D
ES
IG
N
ED
B
Y:
M
. S U
LL
IV
AN
D
R
AW
N B
Y:
M
. S U
LL
IV
AN
C
H
EC
KE
D
B Y:
S.
B
AC
H
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
AI
R
Q U
AR
TE
R S
D
R
IV
EW
AY
S
AN
D
SI
D
EW
AL
KS
ER.02
MATCH LINE - SEE SHEET ER.04
REMOVE EXISTING SPRINKLER CONTROL SYSTEM,
1 LS
NOTE:
1.) SEE SHEETS E.01 AND E.02 FOR DETAILS ON LIGHT REMOVAL AND REPLACEMENT.
/1
0/
Feet 0 30 60
N
S
W E
G G G G
24"
24"
12"
8"
12"
4"
10"10"10"10"10"10" 10"
24"
2" 2"
24" 24"24"
24"
24"
24"
12"
24"
48"
24"
24"
6"
36"
G G
G G
G G
G G
G G
G G
G G
G
4' 'W
CI
4' 'W
CI
4' 'W
CI
4' 'W
CI
4' 'W
CI
8''W - CI 8''W - CI
W W
W W
W W W
UE UE UE UE UE UE
UE UE UE UE
T T
T T
2'' W
- GS
2'' W
- GS
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
T T
T T
T
UE8'' VC >> 8'' VC >>
12'' VC >>
12'' VC >>
12'' VC >>
12'' VC >>
12'' VC >>
12'' VC >>
12'' VC >>
12'' VC >>
12'' VC >>
12'' VC >>
UE UE UE UE UE UE UE
U E
UE
570 570
569 569
D
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
M
AT
CH
L
IN
E
- S
EE
S H
EE
T
ER
.0
MATCH LINE - SEE SHEET ER.02 MATCH LINE - SEE SHEET ER.02
Q U A R
TE
R S
S
O U
TH
E N
TR
A N C E
EX
H M
A P
A V
EM
EN
T
DURNIN AVENUE
7" P.C.C. PAVEMENT
REMOVE EXISTING
BRUSH/TREE LINE
REMOVE EXISTING
BRUSH/TREE LINE
REMOVE EXISTING
BRUSH/TREE LINE
REMOVE EXISTING
24" DIA. TREE 3.16'
19.41'
REMOVE EXISTING
P.C.C. SIDEWALK
REMOVE EXISTING
BRUSH/TREE LINE
REMOVE EXISTING
BRUSH/TREE LINE
REMOVE AND RELOCATE THE
EXISTING STREET LIGHT POLE,
SEE SHEETS E.01 & E.02 FOR
MORE INFORMATION AND THE
PROPOSED LOCATION, 1 EA93.24'
17.07'
REMOVE EXISTING P.C.C. PAVEMENT,
233.8 SY
EX. 7" P.C.C. PAVEMENT
16.91'
13.35'
REMOVE EXISTING 15" RCP STORM SEWER CULVERT,
32 LF
REMOVE EXISTING HMA
DRIVEWAY PAVEMENT
M
AT
CH
L
IN
E
- S
EE
S H
EE
T
ER
.0
M
AT
CH
L
IN
E
- S
EE
S
H
EE
T
ER
.0
EX
IS
TI
N
G P
R O
JE
C
T
FE
AT
U
R
ES
A N
D R
EM
O
VA
LS
-0
O F
D
ES
IG
N
ED
B
Y:
M
. S U
LL
IV
AN
D
R
AW
N B
Y:
M
. S U
LL
IV
AN
C
H
EC
KE
D
B Y:
S.
B
AC
H
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
AI
R
Q U
AR
TE
R S
D
R
IV
EW
AY
S
AN
D
SI
D
EW
AL
KS
ER.03
NOTE:
1.) SEE SHEETS E.01 AND E.02 FOR DETAILS ON
LIGHT REMOVAL AND REPLACEMENT.
/1
0/
Feet 0 30 60
N
S
W E
E
36"
G G G G G G G G G G G G G G G G G
U E
U E
U E
W W
W W
W W
U E
24" 24" 24"
24"
24"
24"
12"
18"
48"
24"
24"
2"
W
3"
ROW"
ROW"
ROW"
24" 24"
6"
36"
36"
36"
24"4"2" 24"36"
12"
12"
36" 36"
24" 12"
12"
24"
24"
12"
12"
12"12" 12"
12" 24"
8''W - CI 8''W - CI 8''W - CI 8''W - CI
8''W - CI 8''W - CI 8''W - CI 8''W - CI
W W
W W W W W W W W W W
UE
UE
UE
W W
ST
HH
G
IL
LE
SP
IE
S
TR
EE
T
UE UE UE
UE
UE
UE UE UE UE UE UE UE UE UE UE
UE
U E
UE
UE
U E
U E
U E
UE
UE
UE
UE
UE
UE
UE
573 57
D
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
M
AT
CH
L
IN
E
- S
EE
S H
EE
T
ER
.0
MATCH LINE - SEE SHEET ER.01
EX. P.C
.C
. S
ID
E:
AL.
EX. P.C.C. SIDE:AL.
DURNIN AVENUE
7" P.C.C. PAVEMENT
G
ILLES
S
PI S
TR
EET
P.C .C
. PA
V
EM
EN
T
MATCH LINE - SEE SHEET ER.01
M
AT
CH
L
IN
E
- S
EE
S H
EE
T
ER
.0
M
AT
CH
L
IN
E
- S
EE
S
H
EE
T
ER
.0
5.38'
5.05'
5.12'
REMOVE EXISTING BRUSH
REMOVE EXISTING P.C.C. SIDEWALK
EX
IS
TI
N
G P
R O
JE
C
T
FE
AT
U
R
ES
A N
D R
EM
O
VA
LS
-0
O F
D
ES
IG
N
ED
B
Y:
M
. S U
LL
IV
AN
D
R
AW
N B
Y:
M
. S U
LL
IV
AN
C
H
EC
KE
D
B Y:
S.
B
AC
H
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
AI
R
Q U
AR
TE
R S
D
R
IV
EW
AY
S
AN
D
SI
D
EW
AL
KS
ER.04
NOTE:
1.) ALL LIGHT POLES NOTED FOR REMOVAL ARE HISTORIC
AND SHALL NOT BE DAMAGED DURING CONSTRUCTION.
THE POLES ARE TO BE REUSED. IF THE A POLE IS
DAMAGED IT SHALL BE REPAIRED AT THE CONTRACTOR'S
EXPENSE.
2.) SEE SHEETS E.01 AND E.02 FOR DETAILS ON LIGHT
REMOVAL AND REPLACEMENT.
/1
0/
N
S
W E
12"
UE
U E
U E
U E
U E
UE
UE
30"
40"
48"
36"
36"15"
26"
4"
24" 40"
12"
40"
48"
24"
15"
36"
36"
36" 36"36" 36"
FLAGPOLE
U E
UE
UE
UE
UE
UE UE UE UE
UE
572 572
572 573
571573
563 565
564563
567567
565 565
D
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
QUARTERS 1
(BLDG 301)
EX. P.C.C. SIDE:AL.
EX
. H
M A
SI
DE
AL
QUARTERS 1
EX. HMA PAVEMENT
EX
H M
A S
ID
E:
A L.
EX. P.C.C. SIDE:AL.
EXISTING BLOCK WALKWAY TO REMAIN UNDISTURBED
END OF HMA SIDEWALK REMOVAL
REMOVE EXISTING HMA SIDEWALK
REMOVE EXISTING HMA SIDEWALK
EXISTING LANDSCAPE FOUNTAIN AREA TO REMAIN UNDISTURBED
EXISTING LANDSCAPE WALL,
TO REMAIN UNDISTURBED
EXISTING LANDSCAPE WALL,
TO REMAIN UNDISTURBED
4.21'
3.57'
3.36'
2.00'
EX. P.C.C. SIDE:
AL.
27.11'
MISSISSIPPI RIVER
EX
IS
TI
N
G P
R O
JE
C
T
FE
AT
U
R
ES
A N
D R
EM
O
VA
LS
-0
O F
D
ES
IG
N
ED
B
Y:
M
. S U
LL
IV
AN
D
R
AW
N B
Y:
M
. S U
LL
IV
AN
C
H
EC
KE
D
B Y:
S.
B
AC
H
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
AI
R
Q U
AR
TE
R S
D
R
IV
EW
AY
S
AN
D
SI
D
EW
AL
KS
ER.05
NOTE:
1.) SEE SHEETS E.01 AND E.02 FOR DETAILS ON
LIGHT REMOVAL AND REPLACEMENT.
/1
0/
N
S
W E
24"
12"
24"
24"24"
G G G G G G G G G G G G G G G
U E
U E
UE
UE
U E W
48"
3"
30"
40"
30"
48"
36"
36"15"
26"
4"
24" 24"
6"
36"
36"
12"
12"
36" 36"
24"
24"
24"
48"
24"
24"
48"
24"
8''W - CI 8''W - CI 8''W - CI 8''W - CI
8''W - CI 8''W - CI 8''W - CI 8''W - CI
UE UE
UE
UE
UE
UE
W
102+00
BP: 120+00.00
EP: 120+82.09
573574
33+52
30+00
31+00
32+0033+00
U E
UE
UE
UE
UE
UE UE UE UE
UE
UE UE
U E
UE
UE
U E
U E
0+
141+00
141+25
142+00 143+00
130+00
131+00 132+0030
4+
0+
4+
EP: 304+90.94
PC: 304+36.95
PT: 304+86.45
Mid: 304+61.70
PC
: 1
+1 0.
PT: 131+58.61
PC
C:
+4 2.
M id : 1
+5
0.
M id
: 1
+7 6.
BP: 140+00.00
EP: 143+81.77
0+
EP: 211+00.26
192+00
193+00 194+00
195+00200+00
STA. 21+40.31 PROP - CL - QUARTERS 1 - SOUTH ENTRANCE
STA. 40+00.00 PROP - CL - PARKING LOT
PC: 101+36.02
PT: 101+98.72
M id: 101+67.37
BP: 30+00.00
EP: 33+52.41
PC: 30+13.71
PC
: 3
1+
.7
PC: 33+35.58
PT
: 3
0+
.1
PT
: 3
2+
.9
M id
: 3 0+
.9
M id
: 3 1+
.8
Mid: 33+44.00
10"
572 572
572 573
571573
BP: 230+00.00
EP: 230+16.97
D
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
M
AT
CH
L
IN
E
S
EE
S
H
EE
T D.
MATCH LINE - SEE SHEET D.04
G
ILLES
S
PI S
TR
EET
P.C .C
. PA
V
EM
EN
T
MATCH LINE - SEE SHEET D.04
M
AT
CH
L
IN
E
S
EE
S
H
EE
T D.
EXISTING LANDSCAPE WALL,
TO REMAIN UNDISTURBED
EXISTING STRUCTURE LANDSCAPE
BLOCKS/WALL AND TREE TO REMAIN
UNDISTURBED
MATCH LINE - SEE SHEET D.03
13.00'
END OF DRIVEWAY PAVING MATCH
INTO EXISTING STA 132+39.32
13.00'
16.50' 18.00'
16.50'
PLACE FLAG POST,
50 EA
3.00'
6.12'
PROPOSED 18" CURB & GUTTER
PROPOSED 6
P.C.C. SIDE:AL.
PR
O
PO
S
ED
P
.C .C
S
ID
E:
AL
PLACE LIGHT POLE, 1 EA
PLACE LIGHT POLE, 2 EA
PLACE LIGHT POLE, 1 EA
PLACE LIGHT POLE, 1 EA
PLACE LIGHT POLE, 1 EA PLACE LIGHT POLE, 1 EA
PLACE LIGHT POLE, 1 EA
PLACE LIGHT POLE, 1 EA
PLACE LIGHT POLE, 1 EA
PLACE LIGHT POLE, 1 EA
PLACE LIGHT POLE, 1 EA
PLACE LIGHT POLE, 1 EA
PLACE FLAG POST,
6 EA
PLACE LIGHT POLE, 1 EA
PR
O
PO
SE
.C
.C
SI
D E:
AL
6.00'
6.00'
R69.77' ETW
R60.76' R53.26'
R51.76' @ B.O.C.
R83.82'
R3
.0 6'
R99.99'
R5.00'
R2.50'
PROP CL LANE QUARTERS 1 � EAST ENTRANCE
6" P.C.C. PAVEMENT
6" MODIFIED SUBBASE
℄ LANE - DRIVEWAY CIRCLE
R5.00'
R5.00'
R2.00'
TIE INTO EX. GROUND
TIE INTO EX. GROUND
TIE INTO EX. GROUND TIE INTO EX. GROUND
TIE INTO EX. GROUND
TIE INTO EX. GROUND
TIE INTO EX. GROUND
TIE INTO EX. GROUND
BEGIN 6' P.C.C. SIDEWALK,
MATCH INTO EXISTING
TREE T-31
TIE INTO EX. GROUND
TIE INTO EX. GROUND
PRO
P CL DR IVE:AY C IRCLE
PR
O
PO
SE
D P
LA
N
S H
EE
T
-0
O F
/1
0/
D
ES
IG
N
ED
B Y:
M . S
U
LL
IV
AN
D R
AW
N
B Y:
M . S
U
LL
IV
AN
C H
EC
KE
D B
Y:
S.
B
AC
H
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
AI
R
Q U
AR
TE
R S
D
R
IV
EW
AY
S
AN
D
SI
D
EW
AL
KS
D.01
NOTE:
1.) SEE SHEETS E.01 AND E.02 FOR DETAILS ON
LIGHT REMOVAL AND REPLACEMENT.
N
S
W E
G G G G G G G
48"
3"
30"
40"
36"
24"
24"
24"
24"24"
24"
24"
24"
48"
24"
24"
36"
36"
36"
24"
36"
36"36"
24"
24"
24"
48"
24"36"
36"
36"
48"
36"
G G
G G
G 4'
'W
CI
8''W - CI 8''W - CI 8''W - CI 8''W - CI 8''W - CI
U E
U E
U E
U E
U E
T T
T T
T T
T T
UE
UE
UE UE
8'' VC >>
8'' VC >>
8'' VC >>
8'' VC >>
8'' VC >>
8'' VC >>
U E
U E
UE
UE
UE
VC
VC
12'' VC >>
12'' VC >>
12'' VC >>
12'' VC >>
100+00 101+00
102+00
U E
UE
UE
UE
UE
6' ' P
VC
10'' PVC <<
10'' PVC <<
10'' PVC <<
8'' PVC <<
4'' PVC << 4'' PVC <<
UE UE
UE UE
U E
UE
UE
U E
U E
141+00
W W
W W
WSV
0+
EP: 211+00.26
BP: 220+00.00
EP: 220+32.47
191+00 192+00
193+00
200+00
+0
CL-CL
STA. 21+40.31 PROP - CL - QUARTERS 1 - SOUTH ENTRANCE
STA. 40+00.00 PROP - CL - PARKING LOT
CL-CL
STA. 22+56.89 PROP - CL - QUARTERS 1 - SOUTH ENTRANCE
STA. 100+29.49 PROP - CL DRIVEWAY
6.00'
EP: 41+94.50
EP: 22+56.89
PI: 21+97.94
PC: 101+36.02
PT: 101+98.72
M id: 101+67.37
572 572
570 570
BP: 230+00.00
EP: 230+16.97
D
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
M
AT
CH
L
IN
E
SE
E
SH
EE
T
D.
M
AT
CH
L
IN
E
- S
EE
S H
EE
T
D.
MATCH LINE - SEE SHEET D.03MATCH LINE - SEE SHEET D.03
ΎABBREVIATIONS
CI = CAST IRON
GS = GALVANIZED STEEL
VC = VITRIFIED CLAY
PVC = POLYVINYL CHLORIDE
CO=COPPER
PEX=CROSS-LINKED POLYETHLENE
QUARTERS 1
(BLDG 301)
GARAGE
(BLDG 301G)
27.00'
18.00'
22 PARKING STALLS
10 PARKING STALLS
42.85'
10.00' R8.25'
6.00'
10.00' 5.00'
10.00' 5.00'
10.00'
8.00'
10.00'TREE T-18
TREE T-19
TREE T-20
TREE T-21
TREE T-22
TREE T-23 TREE T-24 TREE T-25
TREE T-26
TREE T-27
TREE T-28 TREE T-29
TREE T-30
Q U A R
TE
R S
S O
U
TH
E N
TR
A N C E
(6 " P
.C .C
PA
V
EM
EN
T)
(6 " M
O D
IF
IE
D S
U B B A S E)
PLACE LIGHT POLE, 2 EA
PLACE LIGHT POLE, 1 EA
PLACE LIGHT POLE, 1 EA
PLACE LIGHT POLE, 1 EA
PLACE LIGHT POLE, 1 EA
PROPOSED 6
P.C.C. SIDE:AL.
PR
O
PO
S
ED
P
.C .C
S
ID
E:
A L.
PROP. 6
P.C.C. SIDE:AL.
PR
O
P.
P
.C .C
S
ID
E:
A L.
PLACE LIGHT POLE, 1 EA
PLACE LIGHT POLE, 1 EA
61.51'
17.33'
50.88'
QUARTERS 1 PAR.ING LOT
(6" P.C.C. PAVEMENT)
(6" MODIFIED SUBBASE)
PROPOSED 18" CURB AND GUTTER (TYP.)
41.02'
PROPOSED 18" CURB
AND GUTTER (TYP.) QUARTERS 1 ℄ DRIVE:AY
(6" P.C.C. PAVEMENT)
(6" MODIFIED SUBBASE)
16.50'
20.00'
TYP.
15.00'
TYP.
R5.00' R5.00' R28.00'
R5.00'
50.65'
PROPOSED 18" CURB
AND GUTTER (TYP.)
R5.00'
R5.00'
INSTALL 1" PEX WATER SERVICE PIPE,
118 LF
INSTALL 1" WATER SERVICE CORPORATION,
1 EA
NOTES:
1.) INSTALL A 1 INCH CORPORATION VALVE TAPPED AT 45
DEGREES ABOVE HORIZONTAL AT A MINIMUM OF 18 INCHES
FROM THE PIPE BELL.
2.) THE BEDDING AND BACKFILL MATERIAL USED FOR THE
INSTALLATION OF THE 1" PEX WATER SERVICE LINE SHALL BE
CLEAN MAN SAND. USE P-1 PIPE EMBEDMENT FROM FIGURE
3010.104 (SW-104) FOR WATER MAIN PIPE INSTALLATIONS.
GRANULAR MATERIAL SHALL NOT BE USED FOR BEDDING OR
BACKFILL MATERIAL.
3.) THE EXISTING WATER SERVICE TO THE HOUSE IS A 2 INCH
LINE.
4.) THE PROPOSED LIGHT POLES ARE SET 2' FROM CENTER FROM
THE PROPOSED PAVEMENTS. THIS DISTANCE MAY BE
ADJUSTED TO ENSURE THE LIGHT POLES DON'T ENCROACH
INTO THE PROPOSED PAVEMENTS.
5.) PLACE A DROP CURB IN THE PARKING LOT AT THE 8' CROSS
HATCH AREA FOUND NEXT TO THE VAN ACCESSIBLE
HANDICAP STALL.
6.) THE MOST EAST HANDICAP STALL SHALL HAVE A VAN
ACCESSIBLE SIGN.
7.) THE NOTATION S-1, S-2, S-3 AND S-4&5 ARE IN REFERENCE
TO THE SIGN TABLE ON SHEET C.07.
8.) SEE SHEETS E.01 TO E.03 FOR DETAILS ON LIGHT REMOVAL
AND REPLACEMENT.
9.) THE UNDERGROUND ELECTRIC ON THIS SHEET REPRESENTS
THE EXISTING CONDITIONS.
INSTALL WATER SERVICE
CURB STOP BOX, BALL-TYPE,
1 EA
CONNECT NEW WATER SERVICE TO
EXISTING WATER CONNECTION
12.20' R2.50'
BEGIN 6' P.C.C. SIDEWALK
MATCH INTO EXISTING
P.C.C. PAVEMENT STA
190+00.00
MATCH LINE - SEE SHEET D.04
R5.00'
R2.50'
5' CURB DROP
5' CURB DROP
5' CURB DROP
PR
O
P.
P
.C .C
S
ID
E:
A L.
MATCH SIDEWALK TO
EXISTING STEP (WIDTH)
℄ PROP. 6' SIDEWALK
℄ PROP. 6' SIDEWALK
℄ PROP. 6' SIDEWALK
TIE INTO EX. GROUND
TIE INTO EX. GROUND
TIE INTO EX. GROUND
TIE INTO EX. GROUND
TIE INTO EX. GROUND
TIE INTO EX. GROUND
TIE INTO EX. GROUND
TIE INTO EX. GROUND
PROPOSED LANDSCAPE
PROPOSED LANDSCAPE
R30.00'
11.97'
PR
O
PO
SE
D P
LA
N
S H
EE
T
-0
O F
D
ES
IG
N
ED
B
Y:
M
. S U
LL
IV
AN
D
R
AW
N B
Y:
M
. S U
LL
IV
AN
C
H
EC
KE
D
B Y:
S.
B
AC
H
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
AI
R
Q U
AR
TE
R S
D
R
IV
EW
AY
S
AN
D
SI
D
EW
AL
KS
D.02
R30.00'
AT B.O.C.
R25.00'
AT B.O.C.
5.00'
PLACE HANDICAP
SIGNS & SYMBOLS,
4 EA
S-1 S-2 S-3&4 S-5&6
/1
0/
N
S
W E
G G G G
24"
24"
12"
8"
4"
10"10"10"10"10"10" 10"
24"
2" 2"
24"24"
24"
24"
48"
24"
24"
36"
G G
G G
G G
G G
G G
G G
G G
G
4' 'W
CI
4' 'W
CI
4' 'W
CI
4' 'W
CI
4' 'W
CI
8''W - CI 8''W - CI
W W
W W
W W W
UE UE UE UE UE UE
UE UE UE UE
T T
T T
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
T T
T T
T
UE8'' VC >> 8'' VC >>
40+00 41+00
41+95
12'' VC >>
12'' VC >>
12'' VC >>
12'' VC >>
12'' VC >>
12'' VC >>
12'' VC >>
12'' VC >>
12'' VC >>
12'' VC >>
90+00 91+00
91+80
UE UE UE UE UE UE UE
U E
UE
W W
W
4+
PT: 303+02.77
Mid: 304+61.70
Mid: 302+98.64
+0
+0
+0
CL-CL
STA. 90+86.24 PROP - CL - DURNIN AVENUE
STA. 20+00.00 PROP - CL - QUARTERS 1 - SOUTH ENTRANCE
CL-CL
STA. 21+40.31 PROP - CL - QUARTERS 1 - SOUTH ENTRANCE
STA. 40+00.00 PROP - CL - PARKING LOT
BP: 40+00.00
EP: 41+94.50
BP: 20+00.00
PI: 21+97.94
570 570
569 569
D
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
M
AT
CH
L
IN
E
- S
EE
S H
EE
T
D.
MATCH LINE - SEE SHEET D.02 MATCH LINE - SEE SHEET D.02
℄ DURNIN AVENUE
7" P.C.C. PAVEMENT
M
AT
CH
L
IN
E
- S
EE
S H
EE
T
D.
M
AT
CH
L
IN
E
- S
EE
S H
EE
T
D.
BEGIN 6" P.C.C. PAVING AND 6" (THICK) CURB AND
GUTTER ON 6" MODIFIED SUBBASE, STA 20+42.28
PLACE 7" P.C.C. PAVING AND 7"
(THICK) CURB AND GUTTER ON
6" MODIFIED SUBBASE
PROPOSED 18" CURB AND GUTTER (TYP.)
PROPOSED 18" CURB AND GUTTER (TYP.)
18.00'
27.00'
18.00'
18.00'
27.00'
18.00'
16 PARKING STALLS
22 PARKING STALLS
10 PARKING STALLS 4 HANDICAP PARKING STALLS
PROPOSED 18" CURB AND GUTTER (TYP.)
TREE T-1
TREE T-2
TREE T-3
TREE T-4
TREE T-5
TREE T-6
TREE T-7
TREE T-8
TREE T-9
TREE T-10
TREE T-11
TREE T-12
TREE T-13
TREE T-14
TREE T-15
TREE T-16
TREE T-17
166.00' E-E
42.74'
42.85'
10.00'
10.00'
10.00'
R8.25'
R8.25'
166.00' E-E
15.00'
15.00'
PLACE LIGHT POLE, 1 EA
PLACE LIGHT POLE, 1 EA
PLACE LIGHT POLE, 1 EA
PLACE LIGHT POLE, 1 EA
PLACE LIGHT POLE, 1 EA
RELOCATE EXISTING LIGHT POLE TO THIS
LOCATION, STA 91+38.98, 18.95' L (SEE
SHEET ER.03 FOR ORIGINAL LOCATION)
25.00'
26.50'
19.50'
10.00' 5.00'
10.00' 5.00'
10.00'
8.00'
10.00'
27.00'
BOC TO BOC
12.00'
LANE
12.00'
LANE
11.91'
12.01'
PROPOSED 18" CURB
AND GUTTER (TYP.)
Q U A R
TE
R S
S O
U
TH
E N
TR
A N C E
(6 " P
.C .C
PA
V
EM
EN
T)
(6 " M
O D
IF
IE
D S
U B B A S E)
QUARTERS 1 PAR.ING LOT
(6" P.C.C. PAVEMENT)
(6" MODIFIED SUBBASE)
20.00'
TYP.
129.00' E-E
R25.00' B.O.C.
R25.00'
TIE INTO EX. GROUND
TIE INTO EX. GROUND
4:1 4:1
PR
O
PO
SE
D P
LA
N
S H
EE
T
-0
O F
D
ES
IG
N
ED
B
Y:
M
. S U
LL
IV
AN
D
R
AW
N B
Y:
M
. S U
LL
IV
AN
C
H
EC
KE
D
B Y:
S.
B
AC
H
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
AI
R
Q U
AR
TE
R S
D
R
IV
EW
AY
S
AN
D
SI
D
EW
AL
KS
D.03
DRIVEWAY DROP CURB
5.00'
PLACE LIGHT POLE, 1 EA
PLACE LIGHT POLE, 1 EA
NOTE:
1.) SEE SHEETS E.01 AND E.02 FOR DETAILS ON
LIGHT REMOVAL AND REPLACEMENT.
/1
0/
N
S
W E
Feet 0 30 60
E
36"
G G G G G G G G G G G G G G G G G
U E
U E
U E
W W
W W
W W
U E
24" 24" 24"
24"
24"
24"
12"
18"
48"
24"
24"
2"
W
3"
24" 24"
6"
36"
36"
36"
24"4"2" 24"36"
12"
12"
36" 36"
24"
24"
8''W - CI 8''W - CI 8''W - CI 8''W - CI
8''W - CI 8''W - CI 8''W - CI 8''W - CI
W W
W W W W W W W W W W
UE
UE
UE
W W
ST
HH
0+
00BP: 120+00.00
UE UE UE
UE
UE
UE UE UE UE UE UE UE UE UE UE
UE
U E
UE
UE
U E
U E
U E
UE
UE
UE
UE
UE
UE
UE
4+
0+
1+
302+00
303+00
4+
PC: 304+36.95
PC: 302+94.51
PC: 300+93.11
PT: 303+02.77
PT: 301+48.51
Mid: 304+61.70
Mid: 302+98.64
M id: 301+20.81
R278.49'
573 57
D
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
M
AT
CH
L
IN
E
- S
EE
S H
EE
T
D.
MATCH LINE - SEE SHEET D.01
DURNIN AVENUE
7" P.C.C. PAVEMENT
G
ILLES
S
PI S
TR
EET
P.C .C
. PA
V
EM
EN
T
MATCH LINE - SEE SHEET D.01
M
AT
CH
L
IN
E
- S
EE
S H
EE
T
D.
M
AT
CH
L
IN
E
- S
EE
S H
EE
T
D.
PR
O
P.
.C S
ID
E:
AL
PROP. 6
P.C.C. SIDE:AL.
PR
O
.C
SI
D E:
AL
R50.00'
R6.00'
PLACE LIGHT POLE, 1 EA
PLACE LIGHT POLE, 1 EA
PLACE LIGHT POLE, 1 EA
PLACE LIGHT POLE, 1 EA
TIE INTO EX. GROUND
PLACE 6" OF TOPSOIL AND HYDRO
SEED AND MULCH WHERE EXISTING
P.C.C. SIDEWALK WAS REMOVED
MATCH EXISTING GRADE
TIE INTO EX. GROUND
TIE INTO EX. GROUND
TIE INTO EX. GROUND
TIE INTO EX. GROUND
℄ PROP. 6' SIDEWALK
PR
O
PO
SE
D P
LA
N
S H
EE
T
-0
O F
D
ES
IG
N
ED
B
Y:
M
. S U
LL
IV
AN
D
R
AW
N B
Y:
M
. S U
LL
IV
AN
C
H
EC
KE
D
B Y:
S.
B
AC
H
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
AI
R
Q U
AR
TE
R S
D
R
IV
EW
AY
S
AN
D
SI
D
EW
AL
KS
D.04
/1
0/
N
S
W E
Feet 0 30 60
NOTES:
1.) ALL DISTURBED GREEN SPACE AREAS SHALL RECEIVE HYDRO
SEED, FERTILIZING AND MULCH, TYPE 1 (PERMANENT LAWN
MIXTURE), SEE SUDAS SECTION 9010, SECTION 2.02, PART A,
FOR SEED MIXTURE SPECIFICS.
2.) SEE SHEETS E.01 TO E.03 FOR DETAILS ON LIGHT REMOVAL AND
REPLACEMENT.
3.) THE UNDERGROUND ELECTRIC ON THIS SHEET SHOWS EXISTING
CONDITIONS.
12"
UE
U E
U E
U E
U E
UE
UE
30"
40"
48"
36"
36"15"
26"
4"
24" 40"
12"
40"
48"
24"36"
36"
FLAGPOLE
573574
U E
UE
UE
UE
UE
UE UE UE UE
UE
141+25
142+00 143+00
EP: 143+81.77
EP: 201+37.27
EP: 211+00.26
BP: 220+00.00
EP: 220+32.47
EP: 195+58.73
PI: 191+98.01
PC: 192+29.28
PC: 194+27.88
PC
: 1
+0
0.
PT: 193+41.57 PT
: 1
+7
9.
PT: 195+45.42
PCC: 192+36.13
PC
C:
+3 9.
PRC: 192+62.11 PR
C:
+2 3.
M id: 192+32.70
M id: 192+49.12
M id: 192+92.58
M id
: 1
+3 2.
M id
: 1
+5 3.
M id
: 1
+2 0.
M id
: 1
+4 2.
65192+00
193+00 194+00
195+00200+00
1+
572 572
572 573
571573
563 565
564563
567567
565 565
BP: 230+00.00
EP: 230+16.97
D
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
QUARTERS 1
(BLDG 301)
EXISTING LANDSCAPE WALL,
TO REMAIN UNDISTURBED
EXISTING LANDSCAPE WALL,
TO REMAIN UNDISTURBED
EXISTING BLOCK WALKWAY TO REMAIN UNDISTURBED
MISSISSIPPI RIVER
6.00'
6.00'
6.00'
6.00'
6.00'
6.00'
6.00'
6.00'
12.20'
PROP. 6
P.C.C. SIDE:AL.
PR
O
.C S
ID
E:
A L.
END OF 6' P.C.C. SIDEWALK,
MATCH INTO EXISTING
END OF 6' P.C.C. SIDEWALK,
MATCH INTO EXISTING
PLACE 6" OF TOPSOIL AND HYDRO
SEED AND MULCH WHERE EXISTING
HMA SIDEWALK WAS REMOVED
MATCH EXISTING GRADE
R60.76'
R3 2.
R253.63'
R1
.0 8'
R45.11'
R76.21'
R73.24'
R85.51'
ALL SIDEWALK
RETURN RADIUS'
ARE 5' IN THIS
INTERSECTION
NOTES:
1.) ALL DISTURBED GREEN SPACE AREAS SHALL RECEIVE HYDRO
SEED, FERTILIZING AND MULCH, TYPE 1 (PERMANENT LAWN
MIXTURE), SEE SUDAS SECTION 9010, SECTION 2.02, PART A,
FOR SEED MIXTURE SPECIFICS.
2.) SEE SHEETS E.01 TO E.03 FOR DETAILS ON LIGHT REMOVAL AND
REPLACEMENT.
3.) THE UNDERGROUND ELECTRIC ON THIS SHEET SHOWS EXISTING
CONDITIONS.
EXISTING LIMESTONE
LANDSCAPE AREA TO
REMAIN UNDISTURBED
CL DR I VE:AY
℄ PROP. 6' SIDEWALK
℄ PROP. 6' SIDEWALK
℄ PROP. 6' SIDEWALK
℄ PROP. 6' SIDEWALK
PR
O
PO
SE
D P
LA
N
S H
EE
T
-0
O F
D
ES
IG
N
ED
B
Y:
M
. S U
LL
IV
AN
D
R
AW
N B
Y:
M
. S U
LL
IV
AN
C
H
EC
KE
D
B Y:
S.
B
AC
H
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
AI
R
Q U
AR
TE
R S
D
R
IV
EW
AY
S
AN
D
SI
D
EW
AL
KS
D.05
/1
0/
N
S
W E
G G G G G G
U E
U E
U E
W W
W
G G
G G
G G
G
4' 'W
CI
8''W - CI 8''W - CI 8''W - CI 8''W - CI
W W W W W
UE UE
UE U
E U
E U
E U
E U
E T
T T
ST
8'' VC >>
8'' VC >>
8'' VC >>
HH
U E
UE
VC
VC
VC
VC
12'' VC >>
12'' VC >>
12'' VC >>
12'' VC >>
12'' VC >>
12'' VC >>
U E
UE
UE
UE UE UE
6' ' P
VC
10'' PVC <<
10'' PVC <<
4'' PVC <<
UE UE UE UE
UE
UE UE UE UE UE UE
UE
UE
UE
U E
UE
UE
572 572
572 573
572 57
571573
572571
570569
570 570
572 57
566 566
569 569
565 565
D
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
QUARTERS 1
(BLDG 301)
GARAGE
(BLDG 301G)
-0
O F
D
ES
IG
N
ED
B
Y:
M
. S U
LL
IV
AN
D
R
AW
N B
Y:
M
. S U
LL
IV
AN
C
H
EC
KE
D
B Y:
S.
B
AC
H
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .