Attachment 0001 - Specifications.docx

DOCX document 30 KB Posted

Attached to
Fabricate & Deliver - Trunnion Blocks, Arm Bushings, Strut Pins, and Miscellaneous Parts for Nickajack Lock
Solicitation number
W912P526QA049
Issued by

About this file

This is a Specifications document for the fabrication and delivery of miter gate strut components for Nickajack Lock located in Jasper, Tennessee. The contractor must provide all materials, labor, supervision, and quality control necessary to fabricate, assemble, and deliver the following components within 180 calendar days of contract award: four trunnion blocks (MK 9), eight arm bushings (MK 15), four strut pins (MK 4), four strut pins (MK 5), and miscellaneous parts per drawings 64N552r0 and 64N554r0. Material specifications have been updated to modern standards, with superseded specifications replaced by ASTM A668 Class F, ASTM A668 Class J, ASTM A572 Grade 65, AISI 4140/4340, or ASTM B584 UNS C93700 as appropriate substitutions.

Fabrication requirements include strict material handling protocols, dimensional tolerances measured by calibrated instruments with a maximum deviation of 1/32-inch where not otherwise specified, and specialized machining for bronze bushings with rough-machined outer diameters at +0.100" tolerance to allow for finish machining during installation. All steel surfaces except bearing or contact surfaces must be painted with Amerlock 400 or approved equal in an aluminum finish color, applied per manufacturer specifications with comprehensive surface preparation and protection protocols. The Government shall have two scheduled hold points for inspection, with shipments prohibited prior to Government approval. Delivery must occur Monday through Thursday between 0700 and 1600 hours, excluding federally observed holidays, to Nickajack Lock, directed to Cory Richardson, Lockmaster, at 3490 TVA Road, Jasper, Tennessee 38347.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY OF WORK

FOR

Nickajack Lock Gate Strut – Trunnion Blocks, Bushings, and Pins

Contractor shall provide all materials, labor, supervision, and quality control necessary to fabricate, assemble, and deliver components in accordance with the contract drawing and specifications. These specifications seek to fabricate:

CLINQuantityDescriptionMark#Reference Drawing
00014Trunnion BlockMK 964N552r0
00028Arm BushingMK 1564n552r0
00034Strut PinMK 464N554r0
00044Strut PinMK 564N554r0
0005LotMisc Partsvaries64N552r0 & 64N554r0

Material specifications shown of the contract drawing that have been superseded. The contractor shall use the following materials as substitutions for those materials that have been superseded.

Old Specification
Modern Specification
ASTM A235 Class F
ASTM A668 Cl F
ASTM A237 Class D
ASTM A668 Cl J, ASTM A572 Gr 65, or AISI 4140/4340
ASTM B144 Alloy 3A
ASTM B584 UNS C93700

All requirements herein shall be completed within 180 calendar days of contract award.

SPECIFICATIONS

FOR

Miter Gate Strut – Trunnion Blocks, Bushings, and Pins for Nickajack Lock

1. SCOPE. Contractor shall provide all materials, labor, supervision, and quality control necessary to fabricate, assemble, and deliver components in accordance with the contract drawing and specifications. These specifications seek to fabricate:

CLINQty. DescriptionMark#Ref. Drawing
00014 Trunnion Block MK 964N552r0
00028 Arm Bushing MK 1564N552r0
00034 Strut Pin MK 464N554r0
00044 Strut Pin MK 564N554r0
0005Lot Misc Parts MK 21, MK 24, &64N552r0
MK 3, MK 664N554r0

2. MATERIALS. Material specifications shown of the contract drawing have been superseded. The contractor shall use the following materials in place of those shown.

Old Specification
Modern Specification
ASTM A235 Class F
ASTM A668 Cl F
ASTM A237 Class D
ASTM A668 Cl J, ASTM A572 Gr 65, or AISI 4140/4340
ASTM B144 Alloy 3A
ASTM B584 UNS C93700

3. GOVERNMENT INSPECTION. The Government shall be provided with the opportunity to inspect the work. The contractor’s schedule shall include two hold points for inspection. The Contractor will notify the Government when the items are ready for inspection and shall make available any facilities needed for such inspection. Shipments may not be made prior to approval by the Government.

4. FABRICATION.

4.1 General. Material must be straight before being laid off or worked. If straightening is necessary, it shall be done by methods that will not impair the metal. Sharp kinks or bends shall be cause for rejection of the material. Material with welds will not be accepted except where welding is definitely specified, indicated on the drawings, or otherwise approved. Bends, except where minor, shall be made by approved dies, press breaks or bending rolls. Where heating is required, precautions shall be taken to avoid overheating the metal and it shall be allowed to cool in a manner that will not destroy the original properties of the metal. Shearing shall be accurately done, and all portions of the work shall be neatly finished. Re-entrant cuts shall be filleted unless otherwise approved or indicated on the contract drawings. Finished members shall be free from twists, bends and open joints.

4.2 Dimensional Tolerances. Dimensions shall be measured by calibrated instruments. Dimensional tolerances shall be as indicated in the contract drawing. Dimensions without tolerances shall not deviate from those indicated on the contract drawings by more than 1/32-inch.

4.3 Steel Components. Steel may be cut by mechanically guided or hand guided tools, provided an accurate profile with a smooth surface which is free from cracks and notches is obtained. Hand guided cuts which are to be exposed or visible shall be chipped, ground, or machined to sound metal.

4.4 Bronze Components. Bushing ID shall be machined to the dimension, tolerance, and finish indicated on the contract drawings. The bushing is intended to be press fit and doweled into a bearing casting which cannot be provided. Therefore, the bushing OD shall be rough machined +0.100” to the dimension indicate on the contract drawing to allow for finish machining by others at the time of installation.

5. PAINTING. All steel surfaces that are not a bearing or contact surface shall be painted with Amerlock 400 or approved equal. The finish coat shall be aluminum in color. The primer and any intermediate coats shall be a different color. Red or orange may not be used. Ensure all coatings, thinners, and cleaners are compatible. Paint shall be applied in strict accordance with the paint manufacturer’s instructions, including surface preparation method, environmental considerations (humidity, air and surface temperatures, etc.), and minimum surface cleanliness. Surfaces not painted shall be appropriately protected from corrosion, damage, and overspray.

5.1 PAINT APPLICATION.

5.1.1 General. The finished coating shall be free from holidays, pinholes, bubbles, runs, drops, ridges, waves, laps, unnecessary brush marks, and variations in color, texture, and gloss. All paint coats shall be applied in such manner as to produce an even, continuous film of uniform thickness. Care shall be taken to ensure bearing and contact surfaces are not painted.

5.1.2 Mixing and Thinning. Paints shall be thoroughly mixed, strained where necessary, and kept at a uniform composition and consistency during application. Mixing and thinning shall be performed in strict accordance with the paint manufacture’s guidance. The mixing method will also ensure the exclusion of induced air.

5.1.3 Protection of Painted Surfaces. Items that have been painted shall not be handled, worked on, or otherwise disturbed until the paint coat is fully dry and hard. All metalwork coated in the shop or field prior to final delivery to the Government shall be stored out of contact with the ground in such manner and location as will minimize the formation of water-holding pockets, soiling, contamination, and deterioration of the paint film. Any damaged areas of paint on such metalwork shall be cleaned and touched up without delay.

6. QUALITY CONTROL. The Contractor shall establish and maintain quality control for operations under this section to assure compliance with contract requirements. Provide quality control plan and quality control documentation upon request.

7. PLACE OF DELIVERY. Upon completion, the Contractor shall contact the Facility Manager(s) one week prior to the delivery date. Delivery will be made Monday thru Thursday, between the hours of 0700 and 1600. No deliveries will be accepted on federally observed holidays.

Nickajack Lock Cory Richardson, Lockmaster 3490 TVA Road Jasper, TN 38347 Email: Cory.E.Richardson@usace.army.mil Phone: 423-942-3985

--END OF SECTION--