Attachment 0001_SOW APPENDIX 2.7.4 JBMHH Excavation Permit SOP June 2023.pdf
PDF 2 MB Posted
- Solicitation number
- W51EW7-26-R-A002
About this file
This document is the Excavation Permit Standard Operating Procedures (DPW-OMD-10-001 v3) for Joint Base Myer-Henderson Hall (JBMHH) Directorate of Public Works (DPW). The procedures establish the process for submitting, approving, and executing excavation permits on the installation. All excavation permit requests must be submitted through the DPW Operations & Maintenance Division located in Building 313 using form JBMHH-1254. Requestors must provide a two-week minimum notice for routine excavation work, though this timeframe may vary during peak periods or inclement weather. The Excavation Permit Coordinator receives and processes all requests, which may be submitted via email or in person and must include required coordination documentation prior to approval. Permits expire 30 days after issuance, and extension requests require approval from the JBMHH Branch Chief. Emergency or urgent excavation permit requests require immediate coordination with the O&M Chief or Director, and Miss Utilities must be contacted immediately.
Required documentation for permit acceptance includes the completed JBMHH-1254 form with Fields A-E containing requestor contact information, excavation location, work description, and date clearance required, along with a to-scale drawing marked with excavation route staked or flagged every 30 feet. Requestors must obtain a Miss Utility Reference Number by contacting Miss Utilities at 1-800-552-7001 a minimum of 48 hours prior to digging for natural gas, electric, telephone, and cable television markings. The Excavation Permit Coordinator creates an Army Maintenance Application (ArMA) case in GFEBS to generate a service request number for tracking and reference by the requestor, NEC representatives, and shop personnel. Field F of the permit requires sign-offs from applicable personnel including Environmental, Plumbing, Electric, HVAC, and NEC representatives confirming markings are complete. Once fully executed and approved, the permit is provided to the requestor via email or in-person pickup, with the requestor then responsible for maintenance of all utility markings. The document includes uniform color codes for temporary underground utility markings and provides examples of Miss Utility tickets, schematic outlines, color maps, and service request tickets as reference materials.
View the file
Other files
Show 40 more
Latest 50 of 127 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JBMHH Directorate of Public Works (DPW) Excavation Permit Standard Operating Procedures
DPW-OMD-10-001 v3
1. All proposed Excavation Permits by the requester must be approved through JBMHH DPW
Operations & Maintenance Division, located in Building 313.
2. JBMHH-1254 form can be received by the Excavation Permit Coordinator via email, or in person; to include any coordination that is required prior to approval.
3. For all routine excavation permit requests, a minimum time of two-weeks is required for scheduling and execution by JBMHH DPW personnel. This should be communicated to the requestor at the time of receipt by the Excavation Permit Coordinator. During peak periods, and inclement weather, this time frame may vary. Please ensure the customer has listed: Date Clearance Required on the DPW Excavation Permit, form JBMHH-1254.
4. All Excavation Permit extension requests must be approved by JBMHH Branch Chief. The
Excavation Permit Coordinator will submit the memorandum to the Branch Chief for review and approval. Upon approval, JBMHH Branch Chief will forward to the Excavation Permit Coordinator to email the requestor the approved extension.
5. For all Emergency/Hot Excavation Permit requests the Excavation Permit Coordinator is required to contact immediately the O&M Chief or Director for coordination *(Miss Utilities is required to be contacted immediately by O&M.)
6. The Excavation Permit Coordinator is required to create an Army Maintenance Application
(ArMA) case, to convert into a service request in GFEBS. The service request number should be documented in the Service Order/Work Order/Project # Field of the DPW Excavation Permit, form JBMHH-1254. The service request number is used for reference by the following:
- The requestor when speaking to JBMHH
- NEC Representative
- Shop Personnel to enter on their Labor & Equipment (L&E) to confirm completion
7. The Excavation Permit Coordinator is required to enter the Expiration Date of Permit: The
Excavation Permit will expire after 30 days of issuance.
8. The Excavation Permit Coordinator is required to maintain the Dig Permit Tracker located on JBMHH DPW BOID- SharePoint -Dig Permits Folder.
9. Required information for accepting an Excavation Permit:
i. All requestors must fill out the DPW Excavation Permit, form JBMHH-1254, Fields A-E (Attachment 10)
A. Requestor: POC, Organization Name, Telephone# & Email, Date of Clearance Required
B. Excavation Risk *(NA) C. Location of area to be Excavated: Cross Streets, Building (If Applicable)
(NOTE: A to-scale drawing of the excavation site must be submitted along with this form. Excavation route must be staked or flagged by the Requester every 30 feet.)
D. Type of work to be performed: Detailed description of the work to be executed.
E. Additional Information:
- The requestor is to read 1-9 and sign “I HAVE FULLY READ AND
UNDERSTAND THE ABOVE)”
- The Excavation Permit Coordinator is to enter the following:
a. Permit Initiated on date
b. Work completed on date
ii. Other Supporting documentation required:
A. Miss Utility Reference Number – All requestors are responsible for contacting Miss Utilities to schedule completion of onsite within 48 hours. *(The Contractor shall notify ‘Miss Utility’ 1-800-552-7001 for Natural Gas, Electric c, Telephone and Cable TV at minimum 48 hours prior to digging.)
*If the customer does not have a Miss Utility Number to reference *DO NOT move forward with processing* Follow up with the requestor to provide.
B. If Shop Personnel is requesting the Excavation Permit, the Shop Foremen is responsible for contacting Miss Utilities.
C. Clearly Defined Map Drawing/Schematics in color that mark the area(s) in which the excavation will take place. *Illegible drawings and maps cannot be used by Shop Personnel and should be requested by the Excavation Permit Coordinator for resubmission.
iii. O&M / NEC / Environmental Performed Activities DPW Excavation Permit, form JBMHH-
1254, Field F
1. O&M: Excavation Permit Coordinator is to enter the following statement once markings are complete prior to providing back to the requestor: Dig Permit has been fully executed based on the below signatures and date.
2. Environmental: Environmental Personnel to sign off markings have been complete and date. *(If applicable.)
3. Plumbing Shop: JMBHH DPW Plumber to sign off markings have been complete and date. *(If applicable.)
4. Electric Shop: JMBHH DPW Electrician to sign off markings have been complete and date. *(If applicable.)
5. Utility HVAC: JMBHH DPW HVAC to sign off markings have been complete and date. *(If applicable.)
6. NEC Representative: NEC Representative to sign off markings have been complete and date. *(If applicable.)
iv. Precautionary Measures DPW Excavation Permit, form JBMHH-1254, Field G
This line will be filled out by JBMHH DPW personnel whereas applicable.
10. Once approved the Excavation Permit will be emailed back to the requestor by the Excavation Permit Coordinator or picked up in person. Once the fully Executed Permit is provided, it is the requestors responsibility for the upkeep of all markings.
11. For more information on Excavation Permits please call: 703-696-8852/3401.
The Uniform Color Codes for temporary marking of underground utilities are listed below:
Red electric power lines, cables, conduit, and lighting cables
Orange telecommunication, alarm or signal lines, cables, or conduit
Yellow natural gas, oil, steam, petroleum, or other gaseous or flammable material
Green sewers and drain lines
Blue drinking water
Violet reclaimed water, irrigation, and slurry lines
Pink temporary survey markings, unknown/unidentified facilities
White proposed excavation limits or route http://en.wikipedia.org/wiki/Electric_power_transmission http://en.wikipedia.org/wiki/Telecommunication http://en.wikipedia.org/wiki/Reclaimed_water http://en.wikipedia.org/wiki/Slurry
Attachment 10
Example 1: Miss Utility Ticket
F.irom:
Sent Tot Subject:
·d::itts@va811.com Wedne!roay, J.anua,ry18, 2023 1l09 PM EddieSt�d;:i;
vt1 S EMLC:FM 2023/01/18 #-02791 A3018Cl1286-00A NORM NEW LREQ
EMLCFM 02791 vuesa 01/18/23 13:09':19 �..301B012S6-00A NORM.1\L
Ticket No: A3018012B6-00A Transmit Date: 01/18/23 Tine: 01:09' � Call Date; 01118/23 1'icne: 01:04 .f'i,l Due �:t D111:e: Dl/23/23 ti e: 07 :00 AM Update sy· Da e: D2/06/23 'i' 11:59 PM E:icpires Date: 02/09/23 Time; 07:00 AM Old Tkt No,; A.301801286 Odginal CalL Dat,e: Ol/18/23 Time; 0 :Od PK
.N.E;:W -GP.ID NOR!'l LRBQ Op: lJSA
Op� lJSA
Cicy/Co:AH� GTON Add:r-QSS:
CroS5 1: MACOMB FL Crose 2: JACKSON AVE
!?lace:
Street: SHERIDAN AVF.
Sta.Ce;VA
Type O woe PARKI�G OT - �"'O��TRUCTIO, REPAIR OR REl?LACE WO DOnitl For: US GOV' 'l' Excnvation area:STARTING AT B INTERSECTIO SHERIDAN AVE AND MACOMB PL, WORKI �
�ORTij ALONG SHERIDAN AVE 975rT TO JACKSON AV. 150F'l' EAST FROI THI;; CE�TER LINE OE' BE. STREE'l', PICTURE ID+ VEH.CLs R GlSTRATIOP � PROOF Oo INSURANCE MAt BE REQUI:t:t.:O 'l'() Gl\IN A.CCESS AND Vl!:RICLE SUBJ CT TO SEARCH
Excavation !tap Link: Click 'Ibis Link To View Your Ticket Ciap Arc.1a
Instructions;
Whit lined.: Y
Co:npany:
Co. Address;
Cll.y;
CompaAy Phone:
Contact 1,11am,e:
email:
Rlaating: N Boring: N
SMITH BROS LLC yps: CONT POB 26�7 First Time; N llENDE!lSOt'l'lll LE Stale;TN Zip:37077 571-480-3329 COD¥ ]l()GGS Contact �hon�:571-480-3]29 eddie�am.:thb.roallr:..com
Mapbook.: 5527G9 Gr.ids: .3B52A7'104A.
M:£>.mbe:,::·e :
CMC502 = COMCAST (a-lC} VZNi03 = VERIZON (VZNl
Seq No: 2'190 A
3852A7705D 385.30770�"- 3853JJ7i05D
DOMINION ENERGY FT ME��� (DOM)
�1ASHrNGTOM GM {\olGL)
• UPDATE If you exca ation work will continue beyond the EXPIRES date and time-on the ticket mailto:itts@va811.com
Example 1: Continued. Miss Utility Ticket
Example 2: Schematic Outline
Example 2 Continued.: Schematic Outline
Example 3: Color Map
Example 4: Service Request Ticket
04/27/2023 Operati0:n C0:ntr0l Ticket 1048823!.l n Origina.l
Or,dei::
Da!icriptirm tart date E,u} date Priori Status Fu11clc /,,.,..,tu,,i Equip1?11iaut
As:;.embry Loctui,m
400000631042 Ordsrtyp1' A004 Ope�lioDSWork 01..!.ec DP/B422/LOCATE FOJt. 2 VERTICAL SOIL BORJ:N 04/27/2023 04/27/2023 3 Routine REL l>.1M..Zl.T PRC SETC 513 7 5. GR.NDS BDGGRNDS-IMP G!NiDS
M"mif:aclrJTer mia/J\lo.
Room
PMpfomN<rg,p M.,;,, wo,il; center M.,;i,1.,,,a,rnc pltm .Rv1i1'.sio11 �2.1.mbs.r
1001 ,rlER
DP\V
UTILITIES
PMplan.t
Mai"t. p1..,,, it<mr
MYER
DP/8422/LOC'.l;!;.TR FOR 2 VERTIC'�l;!;.L SOIL BORINGS 8422/LOC:.�TE FOiR. 2 VERTIC:.ll SOIL BOiR.ING8/NO GREATER THAN 50 FERT/IN SUPPORT OF BUILDINGS 422 .AND 423/SHERID.Mi Jl_VENUE/CROSS: MORG.� L.l;!;.NE/POC
MARK SIMONDS/410-403-6_76/
MARK. H. SIMONDS@USACE ..ARMY. MIL/CS167 9589 /PREPARED BY J.AH
Defoc�:
c. ,,,...,_-
Operation Status Worf,c.,,,tsr
GEM
GEM
10010
RBL
IYER
Dig�Clearanae Dig�Clearanae
DP/B422 /LOCATE F10R 2 VERTIC'AL SOU. B10!Rl:N
UI'llITIES
Control�, Operntiw, :k Fu11c1, lorutwr, Equipl'l16'1'I Wo.rk Dwmt.m Earli&st Jilart date L"te:;.t ,e,.,1 date A,ctual labor
A400
0. 0 HR
0 D 04/27/2023 04/27/2023
0. 0 HiR
Co,if"l171M1iro, number ilii/e:;to,i,:
.Activity type N,tmb"'· Srart lime
Ei,dtime 'fotalfloo.t
22859275
11900 00:00:00 00:00:00
0 HR
O,dcr. Opsratio11: 4 000 0 0631042 0010 IIIIIIIIIIIIIIIIIIDUIIIIIIIIIIIIIIIIIIIIIIII IHI IIIIIIIIIIHIIIIII Co'lfi=atio11: 22 859 2 75 lllm11111lllllll□IUlllrnlllllllllll
| JBMHH Directorate of Public Works (DPW) Excavation Permit Standard Operating Procedures |
| i. All requestors must fill out the DPW Excavation Permit, form JBMHH-1254, Fields A-E (Attachment 10) |
| ii. Other Supporting documentation required: |
| iii. O&M / NEC / Environmental Performed Activities DPW Excavation Permit, form JBMHH-1254, Field F |
| iv. Precautionary Measures DPW Excavation Permit, form JBMHH-1254, Field G |
File details come from the government source that posted it. Updated .