This is a pricing template for the Independent Government Estimate (IGE) for automatic door maintenance services at Arlington National Cemetery. The template is structured to capture labor costs (supervisor and automatic door technician roles), materials and equipment costs (contractor truck/van with tools, grease and oil), and other direct costs across a phase-in period, base year, and four option years. Labor rates must be fully burdened, and option years require an inflation rate adjustment. The template includes pre-populated other direct costs ranging from $60,205.96 in the base period to $67,762.34 in option year four, with line items for overhead, G&A, and profit calculations. Door prices should be included in the estimate. The preparer is identified as Dalwuan R. Williams (dalwuan.r.williams.civ@army.mil), and the template provides placeholder percentages for labor, overhead, G&A, and profit calculations that appear to require completion.

This template supports the ANC Automatic Doors Maintenance Services solicitation (W91QV126RA031) issued by the Department of the Army Materiel Command Mission and Installation Contracting Command Fort Sam Houston. The solicitation is a competitive, 100% small business set-aside seeking a single firm-fixed-price contractor to provide maintenance, repair, and inspection services for automatic doors at the Welcome Center and Administrative Building. A mandatory site visit is scheduled for June 1, 2026, from 10:00 AM to 11:30 AM EST. Award will be made to the lowest price technically acceptable offeror, with the contract covering a phase-in period, base year, and up to four option years.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

INDEPENDENT GOVERNMENT ESTIMATE (IGE)
Automatic Door Maintenance
PERIOD OF PERFORMANCE: Phase In, Base Year, Option Year One (OY1)-Option Year Four (OY4), -8 (6-months)
DATE PREPARED:___________
ItemBase Period%Option Period%Option Period 2%Option Period 3%Option Period 4%
Labor__%__%__%__%__%
Supervisor
Automatic Door tech
Total direct labor$ - 0$ - 0$ - 0$ - 0
Materials & Equipment
Contractor Truck/Van (with tools)
Grease & Oil
Total Materials/Equipment$ - 0
Total Direct Costs$ - 0$ - 0$ - 0$ - 0
Total Other Direct Cost
Total
Original ODC$ 60,205.96$ 62,012.14$ 63,872.50$ 65,788.68$ 67,762.34
Overhead (__%)
G&A (__%)$ 4,068.30
Profit (__%)
Total$0.00$ 8.00$0.00$0.00$0.00$0.00
Grand Total Estimate$0.00
Labor Rates must be the fully burdened rate. Option years must be calculated by adding a % inflation rate per year. Door prices should be included in the estimate.