Attachment 0001 - IaaMS Price Evaluation Spreadsheet DRAFT.xlsx
XLSX spreadsheet 44 KB Posted
- Attached to
- DA01--Infrastructure as a Managed Service (IaaMS) Federal contract opportunity
- Solicitation number
- 36C10B21R0001
About this file
This document contains a draft performance work statement and associated documentation for the Department of Veterans Affairs' Infrastructure as a Managed Service contract. The PWS outlines requirements for providing managed IT infrastructure services including storage, compute, and backup capabilities. Services will be acquired through a full and open competition set aside for small businesses under NAICS 541512. The incumbent contractor was not identified. Interested offerors are invited to submit feedback on the draft requirements by November 4, 2020. Award is anticipated but not guaranteed through solicitation 36C10B21R0025. Pricing will be evaluated using the attached sample price proposal template which calculates total price based on unit rates for infrastructure resources and blended hourly rates for professional services.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C10B21R0001_1.docx | DOCX document | |
| 36C10B21R0001_2.docx | DOCX document | |
| Attachment B - IaaMS Solution Infrastructure Requirements DRAFT.docx | DOCX document | |
| Attachment A - Facility-Specific Quantities Capacities and Locations DRAFT.xlsx | XLSX spreadsheet | |
| Price Schedule IaaMS - DRAFT.docx | DOCX document | |
| 36C10B21R0001.docx | DOCX document | |
| Attachment C _ IaaMS Storage Modeling Requirements DRAFT.docx | DOCX document | |
| PWS - Infrastructure as a Managed Service DRAFT.docx | DOCX document | |
| DRAFT 36C10B20R0025 Cover Page - IaaMS.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions Instructions Tab
Evaluated Price Summary Tab Instructions -
(1) Offeror shall make no inputs in this tab. Evaluated Price Summary tab automatically calculates the total evaluated price.
Proposed Rate Tables Tab Instructions -
(1) Offeror Name: In YELLOW shaded cell B2, the Offeror shall enter the name of the Prime Offeror.
(2) Tasks and Labor: Each Task and labor category specified by the Government must be addressed (i.e., no un-addressed tasks or labor categories).
(a) For each task specified by the Government the Offeror shall enter unit rates (no more than two decimal places) for the Base Period and Option Periods (all YELLOW shaded cells). If unit rates are entered with more than two decimal places, cells are formatted to be flagged and will be shaded ORANGE. Ensure all unit rate cells are corrected so no color shading is remaining before submitting the proposal.
(i) Quantities:
(A) Terabyte-months – One terabyte of storage capacity provisioned for one month. For example, 100TB of capacity provisioned for one year would be expressed as 1,200 terabyte-months.
(B) Foundation-months – One computing foundation package (consisting of multiple server nodes and ancillary hardware) for one month.
(C) Node-months – One additional server node for one month.
(b) For each labor category specified by the Government the Offeror shall enter hourly fully loaded blended labor rates (no more than two decimal places) for the Base Period and Option Periods (all YELLOW shaded cells). If loaded labor rates are entered with more than two decimal places, cells are formatted to be flagged and will be shaded ORANGE. *Ensure all fully loaded blended labor rate cells are corrected so no color shading is remaining before submitting the proposal*
Evaluated Detailed Tab Instructions - *The estimated quantities and hours contained in the Evaluated Detailed tab are for evaluation purposes only and do not obligate the Government to award such hours or quantities*
(1) FFP Base Tasks 5.3 & 5.5 Unit rates will automatically populate when the Unit rates are inserted on the Proposed Rate Tables tab. The FFP costs for the Base period will automatically calculate based on the Unit rates.
(2) FFP Optional Tasks 5.3 & 5.5 Unit rates will automatically populate when the Unit rates are inserted on the Proposed Rate Tables tab. The FFP costs for each period will automatically calculate based on the Unit rates.
(3) FFP Optional Tasks 5.10.1 through 5.10.21 Unit rates will automatically populate when the Unit rates are inserted on the Proposed Rate Tables tab. The FFP costs for each period will automatically calculate based on the Unit rates.
(4) LH Optional Tasks 5.15 (1 through 5) Offerors should insert fully loaded blended hourly labor rates on the Proposed Rate Tables Tab. The LH labor costs for Optional Tasks 5.15 will automatically populate and be included in the totals costs.
(5) FFP Optional Task 5.16 - Offerors should insert a fully loaded blended hourly labor rate in cel J42 on the Proposed Rate Tables Tab. The FFP labor costs for Optional Task 5.16 will automatically populate and be included in the totals costs.
&"-,Bold"&20DRAFT
DRAFT
Evaluated Price Summary
| Evaluated Price Summary Tab | |||||||||
| *This tab is linked to the Evaluated Detailed tab and will automatically populate* | |||||||||
| Category | Base | ||||||||
| Period | Option | ||||||||
| Period 1 | Option | ||||||||
| Period 2 | Option | ||||||||
| Period 3 | Option | ||||||||
| Period 4 | Option | ||||||||
| Period 5 | Option | ||||||||
| Period 6 | Total | ||||||||
| FFP Base Task - 5.3 - Vista Imaging Capacity (NTE) | $ - 0 | $ - 0 | |||||||
| FFP Base Task - 5.5 - Installation Cost (NTE) | $ - 0 | $ - 0 | |||||||
| FFP Optional Task - 5.3 - Vista Imaging Capacity (NTE) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| FFP Optional Task - 5.5 - Installation Cost (NTE) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| FFP Optional Tasks - 5.10.1 - 5.10.21 (NTE) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| FFP Optional Task - 5.11 - Hyperconverged Compute Foundation (VI) (NTE) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| FFP Optional Task - 5.12 - Hyperconverged Compute Node Expansion (VI) (NTE) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| FFP Optional Task - 5.13 - Converged Compute Foundation (VI) (NTE) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| FFP Optional Task - 5.14 - Converged Compute Node Expansion (VI) (NTE) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| LH Optional Task - 5.15 (1) - Network Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| LH Optional Task - 5.15 (2) - Platforms Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| LH Optional Task - 5.15 (3) - Storage Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| LH Optional Task - 5.15 (4) - Cloud Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| LH Optional Task - 5.15 (5) - VistA Imaging Residency | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| FFP Optional Task -5.16 - Contract Transition - Storage Engineer (NTE) | $ - 0 | $ - 0 | |||||||
| Task Order Evaluated Price | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
&20DRAFT
Proposed Rate Tables Tab
| *Offeror Name: In YELLOW shaded cell B2, the Offeror shall enter the name of the Prime Offeror.* |
| Prime Contractor: |
| *Each Task and labor category specified by the Government must be addressed (i.e., no un-addressed tasks or labor categories). |
(1) For each task specified by the Government the Offeror shall enter unit rates (no more than two decimal places) for the Base Period and Option Periods (all YELLOW shaded cells). If unit rates are entered with more than two decimal places, cells are formatted to be flagged and will be shaded ORANGE. Ensure all unit rate cells are corrected so no color shading is remaining before submitting the proposal
| RATES | ||||||||
| FFP Rates (Base & Optional Tasks) | PROPOSED UNIT RATES | |||||||
| Task | Description | BP | OP1 | OP2 | OP3 | OP4 | OP5 | OP6 |
| FFP Base Task - 5.3 - Vista Imaging Capacity | Unit Price per Terabyte-months | |||||||
| FFP Base Task - 5.5 - Installation Cost | One time per site | |||||||
| FFP Optional Task - 5.3 - Vista Imaging Capacity | Unit Price per Terabyte-months | |||||||
| FFP Optional Task - 5.5 - Installation Cost | Unit Price per Terabyte-months | |||||||
| FFP 5.10.1 - Option 1 – High Performance File Storage – Minimally Managed | Unit Price per Terabyte-months | |||||||
| FFP 5.10.2 - Option 2 – High Performance Block Storage – Minimally Managed | Unit Price per Terabyte-months | |||||||
| FFP 5.10.3 - Option 3 – High Performance Object Storage – Minimally Managed | Unit Price per Terabyte-months | |||||||
| FFP 5.10.4 - Option 4 – Mixed Performance/Capacity File Storage – Minimally Managed | Unit Price per Terabyte-months | |||||||
| FFP 5.10.5 - Option 5 – Mixed Performance/Capacity Block Storage – Minimally Managed | Unit Price per Terabyte-months | |||||||
| FFP 5.10.6 - Option 6 – Mixed Performance/Capacity Object Storage – Minimally Managed | Unit Price per Terabyte-months | |||||||
| FFP 5.10.7 - Option 7 – High Capacity File Storage – Minimally Managed | Unit Price per Terabyte-months | |||||||
| FFP 5.10.8 - Option 8 – High Capacity Block Storage – Minimally Managed | Unit Price per Terabyte-months | |||||||
| FFP 5.10.9 - Option 9 – High Capacity Object Storage – Minimally Managed | Unit Price per Terabyte-months | |||||||
| FFP 5.10.10 - Option 10 – High Performance File Storage – Fully Managed | Unit Price per Terabyte-months | |||||||
| FFP 5.10.11 - Option 11 – High Performance Block Storage – Fully Managed | Unit Price per Terabyte-months | |||||||
| FFP 5.10.12 - Option 12 – High Performance Object Storage – Fully Managed | Unit Price per Terabyte-months | |||||||
| FFP 5.10.13 - Option 13 – Mixed Performance/Capacity File Storage – Fully Managed | Unit Price per Terabyte-months | |||||||
| FFP 5.10.10 - Option 10 – Mixed Performance/Capacity Block Storage – Fully Managed | Unit Price per Terabyte-months | |||||||
| FFP 5.10.15 - Option 15 – Mixed Performance/Capacity Object Storage – Fully Managed | Unit Price per Terabyte-months | |||||||
| FFP 5.10.16 - Option 16 – High Capacity File Storage – Fully Managed | Unit Price per Terabyte-months | |||||||
| FFP 5.10.17 - Option 17 – High Capacity Block Storage – Fully Managed | Unit Price per Terabyte-months | |||||||
| FFP 5.10.18 - Option 18 – High Capacity Object Storage – Fully Managed | Unit Price per Terabyte-months | |||||||
| FFP 5.10.19 - Option 19 – High Performance Backup Storage – Minimally Managed | Unit Price per Terabyte-months | |||||||
| FFP 5.10.20 - Option 20 – Mixed Performance/Capacity Backup Storage – Minimally Managed | Unit Price per Terabyte-months | |||||||
| FFP 5.10.21 - Option 21 – High Capacity Backup Storage – Minimally Managed | Unit Price per Terabyte-months | |||||||
| FFP Optional Task - 5.11 - Hyperconverged Compute Foundation (VI) | Unit Price per Foundation-months | |||||||
| FFP Optional Task - 5.12 - Hyperconverged Compute Node Expansion (VI) | Unit Price per Node-months | |||||||
| FFP Optional Task - 5.13 - Converged Compute Foundation (VI) | Unit Price per Foundation-months | |||||||
| FFP Optional Task - 5.14 - Converged Compute Node Expansion (VI) | Unit Price per Node-months | |||||||
| (2) For each labor category specified by the Government the Offeror shall enter hourly fully loaded blended labor rates (no more than two decimal places) for the Base Period and Option Periods (all YELLOW shaded cells). If loaded labor rates are entered with more than |
two decimal places, cells are formatted to be flagged and will be shaded ORANGE. Ensure all fully loaded blended labor rate cells are corrected so no color shading is remaining before submitting the proposal*
| FFP/LH Labor Rates (Optional Tasks) | PROPOSED FULLY LOADED BLENDED RATES | ||||||||
| Labor category | Description | Location | BP | OP1 | OP2 | OP3 | OP4 | OP5 | OP6 |
| LH Optional Task - 5.15 (1) - Network Engineer | Fully Loaded Blended Rate | Off -Site or On-Site | |||||||
| LH Optional Task - 5.15 (2) - Platforms Engineer | Fully Loaded Blended Rate | Off -Site or On-Site | |||||||
| LH Optional Task - 5.15 (3) - Storage Engineer | Fully Loaded Blended Rate | Off -Site or On-Site | |||||||
| LH Optional Task - 5.15 (4) - Cloud Engineer | Fully Loaded Blended Rate | Off -Site or On-Site | |||||||
| LH Optional Task - 5.15 (5) - VistA Imaging Residency | Fully Loaded Blended Rate | Off -Site or On-Site | |||||||
| FFP Optional Task -5.16 - Contract Transition - Storage Engineer (NTE) | Fully Loaded Blended Rate | Off -Site or On-Site |
&20DRAFT
DRAFT
Evaluated Detailed
| *This tab is linked and will automatically populate when rates are inputted into the Rate Input Tab* |
| *The estimated quantities and hours are for evaluation purposes only and do not obligate the Government to award such hours or quantities* |
Task Description Base Period Quantity Base Period Rate Base Period Total Dollars Option Period 1 Quantity Option Period 1 Rate Option Period 1 Total Dollars Option Period 2 Quantity Option Period 2 Rate Option Period 2 Total Dollars Option Period 3 Quantity Option Period 3 Rate Option Period 3 Total Dollars Option Period 4 Quantity Option Period 4 Rate Option Period 4 Total Dollars Option Period 5 Quantity Option Period 5 Rate Option Period 5 Total Dollars Option Period 6 Quantity Option Period 6 Rate Option Period 6 Total Dollars TOTAL QTY TOTAL DOLLARS
| FFP - Base Tasks | |||||||
| FFP Base Task - 5.3 - Vista Imaging Capacity | Unit Price per Terabyte-months | 74,000 | $ - 0 | $ - 0 | 74,000 | $ - 0 | |
| FFP Base Task - 5.5 - Installation Cost | One time per site | 150 | $ - 0 | $ - 0 | $ - 0 | 150 | $ - 0 |
Total Base Tasks 74,150 $ - 0 74,150 $ - 0
| FFP - Optional Tasks | ||||||||||||||||||||||||
| FFP Optional Task - 5.3 - Vista Imaging Capacity | Unit Price per Terabyte-months | 74,372 | $ - 0 | $ - 0 | 177,396 | $ - 0 | $ - 0 | 212,098 | $ - 0 | $ - 0 | 253,588 | $ - 0 | $ - 0 | 303,194 | $ - 0 | $ - 0 | 362,504 | $ - 0 | $ - 0 | 433,417 | $ - 0 | $ - 0 | 1,816,569 | $ - 0 |
| FFP Optional Task - 5.5 - Installation Cost | Unit Price per Terabyte-months | 75 | $ - 0 | $ - 0 | 20 | $ - 0 | $ - 0 | 20 | $ - 0 | $ - 0 | 20 | $ - 0 | $ - 0 | 5 | $ - 0 | $ - 0 | 5 | $ - 0 | $ - 0 | 5 | $ - 0 | $ - 0 | 150 | $ - 0 |
| FFP 5.10.1 - Option 1 – High Performance File Storage – Minimally Managed | Unit Price per Terabyte-months | 29,115 | $ - 0 | $ - 0 | 100,509 | $ - 0 | $ - 0 | 123,771 | $ - 0 | $ - 0 | 152,416 | $ - 0 | $ - 0 | 187,691 | $ - 0 | $ - 0 | 231,130 | $ - 0 | $ - 0 | 284,623 | $ - 0 | $ - 0 | 1,109,255 | $ - 0 |
| FFP 5.10.2 - Option 2 – High Performance Block Storage – Minimally Managed | Unit Price per Terabyte-months | 12,288 | $ - 0 | $ - 0 | 48,876 | $ - 0 | $ - 0 | 150,837 | $ - 0 | $ - 0 | 212,344 | $ - 0 | $ - 0 | 299,826 | $ - 0 | $ - 0 | 423,348 | $ - 0 | $ - 0 | 597,758 | $ - 0 | $ - 0 | 1,745,277 | $ - 0 |
| FFP 5.10.3 - Option 3 – High Performance Object Storage – Minimally Managed | Unit Price per Terabyte-months | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 86,016 | $ - 0 |
| FFP 5.10.4 - Option 4 – Mixed Performance/Capacity File Storage – Minimally Managed | Unit Price per Terabyte-months | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 86,016 | $ - 0 |
| FFP 5.10.5 - Option 5 – Mixed Performance/Capacity Block Storage – Minimally Managed | Unit Price per Terabyte-months | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 86,016 | $ - 0 |
| FFP 5.10.6 - Option 6 – Mixed Performance/Capacity Object Storage – Minimally Managed | Unit Price per Terabyte-months | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 86,016 | $ - 0 |
| FFP 5.10.7 - Option 7 – High Capacity File Storage – Minimally Managed | Unit Price per Terabyte-months | 4,476 | $ - 0 | $ - 0 | 15,042 | $ - 0 | $ - 0 | 17,808 | $ - 0 | $ - 0 | 21,083 | $ - 0 | $ - 0 | 24,960 | $ - 0 | $ - 0 | 29,550 | $ - 0 | $ - 0 | 34,984 | $ - 0 | $ - 0 | 147,903 | $ - 0 |
| FFP 5.10.8 - Option 8 – High Capacity Block Storage – Minimally Managed | Unit Price per Terabyte-months | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 86,016 | $ - 0 |
| FFP 5.10.9 - Option 9 – High Capacity Object Storage – Minimally Managed | Unit Price per Terabyte-months | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 86,016 | $ - 0 |
| FFP 5.10.10 - Option 10 – High Performance File Storage – Fully Managed | Unit Price per Terabyte-months | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 86,016 | $ - 0 |
| FFP 5.10.11 - Option 11 – High Performance Block Storage – Fully Managed | Unit Price per Terabyte-months | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 86,016 | $ - 0 |
| FFP 5.10.12 - Option 12 – High Performance Object Storage – Fully Managed | Unit Price per Terabyte-months | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 86,016 | $ - 0 |
| FFP 5.10.13 - Option 13 – Mixed Performance/Capacity File Storage – Fully Managed | Unit Price per Terabyte-months | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 86,016 | $ - 0 |
| FFP 5.10.10 - Option 10 – Mixed Performance/Capacity Block Storage – Fully Managed | Unit Price per Terabyte-months | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 86,016 | $ - 0 |
| FFP 5.10.15 - Option 15 – Mixed Performance/Capacity Object Storage – Fully Managed | Unit Price per Terabyte-months | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 86,016 | $ - 0 |
| FFP 5.10.16 - Option 16 – High Capacity File Storage – Fully Managed | Unit Price per Terabyte-months | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 86,016 | $ - 0 |
| FFP 5.10.17 - Option 17 – High Capacity Block Storage – Fully Managed | Unit Price per Terabyte-months | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 86,016 | $ - 0 |
| FFP 5.10.18 - Option 18 – High Capacity Object Storage – Fully Managed | Unit Price per Terabyte-months | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 86,016 | $ - 0 |
| FFP 5.10.19 - Option 19 – High Performance Backup Storage – Minimally Managed | Unit Price per Terabyte-months | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 86,016 | $ - 0 |
| FFP 5.10.20 - Option 20 – Mixed Performance/Capacity Backup Storage – Minimally Managed | Unit Price per Terabyte-months | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 12,288 | $ - 0 | $ - 0 | 86,016 | $ - 0 |
| FFP 5.10.21 - Option 21 – High Capacity Backup Storage – Minimally Managed | Unit Price per Terabyte-months | 61,398 | $ - 0 | $ - 0 | 253,820 | $ - 0 | $ - 0 | 390,016 | $ - 0 | $ - 0 | 499,047 | $ - 0 | $ - 0 | 642,283 | $ - 0 | $ - 0 | 831,592 | $ - 0 | $ - 0 | 1,083,272 | $ - 0 | $ - 0 | 3,761,428 | $ - 0 |
Total FFP Optional Tasks - 5.10.1- 5.10.21 390,620 $ - 0 804,559 $ - 0 1,103,446 $ - 0 1,347,394 $ - 0 1,666,855 $ - 0 2,087,025 $ - 0 2,642,955 $ - 0 10,042,854 $ - 0
| FFP Optional Task - 5.11 - Hyperconverged Compute Foundation (VI) | Unit Price per Foundation-months | 1,980 | $ - 0 | $ - 0 | 2,340 | $ - 0 | $ - 0 | 2,700 | $ - 0 | $ - 0 | 3,060 | $ - 0 | $ - 0 | 3,420 | $ - 0 | $ - 0 | 3,780 | $ - 0 | $ - 0 | 4,140 | $ - 0 | $ - 0 | 21,420 | $ - 0 |
| FFP Optional Task - 5.12 - Hyperconverged Compute Node Expansion (VI) | Unit Price per Node-months | 7,260 | $ - 0 | $ - 0 | 8,340 | $ - 0 | $ - 0 | 9,420 | $ - 0 | $ - 0 | 10,500 | $ - 0 | $ - 0 | 11,580 | $ - 0 | $ - 0 | 12,660 | $ - 0 | $ - 0 | 13,740 | $ - 0 | $ - 0 | 73,500 | $ - 0 |
| FFP Optional Task - 5.13 - Converged Compute Foundation (VI) | Unit Price per Foundation-months | 192 | $ - 0 | $ - 0 | 336 | $ - 0 | $ - 0 | 432 | $ - 0 | $ - 0 | 456 | $ - 0 | $ - 0 | 480 | $ - 0 | $ - 0 | 504 | $ - 0 | $ - 0 | 528 | $ - 0 | $ - 0 | 2,928 | $ - 0 |
| FFP Optional Task - 5.14 - Converged Compute Node Expansion (VI) | Unit Price per Node-months | 1,320 | $ - 0 | $ - 0 | 5,640 | $ - 0 | $ - 0 | 7,800 | $ - 0 | $ - 0 | 8,160 | $ - 0 | $ - 0 | 8,520 | $ - 0 | $ - 0 | 8,880 | $ - 0 | $ - 0 | 9,240 | $ - 0 | $ - 0 | 49,560 | $ - 0 |
Total FFP Optional Tasks - 5.11 5.14 10,752 $ - 0 16,656 $ - 0 20,352 $ - 0 22,176 $ - 0 24,000 $ - 0 25,824 $ - 0 27,648 $ - 0 147,408 $ - 0
| Labor Hour Optional Tasks - Ad Hoc Professional Services | ||||||||||||||||||||||||
| LH Optional Task - 5.15 (1) - Network Engineer | Fully Loaded Blended Rate | 2,080 | $ - 0 | $ - 0 | 2,080 | $ - 0 | $ - 0 | 2,080 | $ - 0 | $ - 0 | 2,080 | $ - 0 | $ - 0 | 2,080 | $ - 0 | $ - 0 | 2,080 | $ - 0 | $ - 0 | 2,080 | $ - 0 | $ - 0 | 14,560 | $ - 0 |
| LH Optional Task - 5.15 (2) - Platforms Engineer | Fully Loaded Blended Rate | 4,160 | $ - 0 | $ - 0 | 4,160 | $ - 0 | $ - 0 | 4,160 | $ - 0 | $ - 0 | 4,160 | $ - 0 | $ - 0 | 4,160 | $ - 0 | $ - 0 | 4,160 | $ - 0 | $ - 0 | 4,160 | $ - 0 | $ - 0 | 29,120 | $ - 0 |
| LH Optional Task - 5.15 (3) - Storage Engineer | Fully Loaded Blended Rate | 2,080 | $ - 0 | $ - 0 | 2,080 | $ - 0 | $ - 0 | 2,080 | $ - 0 | $ - 0 | 2,080 | $ - 0 | $ - 0 | 2,080 | $ - 0 | $ - 0 | 2,080 | $ - 0 | $ - 0 | 2,080 | $ - 0 | $ - 0 | 14,560 | $ - 0 |
| LH Optional Task - 5.15 (4) - Cloud Engineer | Fully Loaded Blended Rate | 2,080 | $ - 0 | $ - 0 | 2,080 | $ - 0 | $ - 0 | 2,080 | $ - 0 | $ - 0 | 2,080 | $ - 0 | $ - 0 | 2,080 | $ - 0 | $ - 0 | 2,080 | $ - 0 | $ - 0 | 2,080 | $ - 0 | $ - 0 | 14,560 | $ - 0 |
| LH Optional Task - 5.15 (5) - VistA Imaging Residency | Fully Loaded Blended Rate | 2,080 | $ - 0 | $ - 0 | 2,080 | $ - 0 | $ - 0 | 2,080 | $ - 0 | $ - 0 | 2,080 | $ - 0 | $ - 0 | 2,080 | $ - 0 | $ - 0 | 2,080 | $ - 0 | $ - 0 | 2,080 | $ - 0 | $ - 0 | 14,560 | $ - 0 |
Total LH Optional Task - 5.15 12,480 $ - 0 12,480 $ - 0 12,480 $ - 0 12,480 $ - 0 12,480 $ - 0 12,480 $ - 0 12,480 $ - 0 87,360 $ - 0
| FFP 5.16 - Optional Task - Contract Transition | ||||||
| FFP Optional Task -5.16 - Contract Transition - Storage Engineer | Fully Loaded Blended Rate | 480 | $ - 0 | $ - 0 | 480 | $ - 0 |
| $ - 0 | $ - 0 | |||||
| Total FFP Optional Task - 5.16 | 480 | $ - 0 | 480 | $ - 0 |
Total Optional Tasks $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Total Evaluated Price $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
&20DRAFT