Attachment 0001 7 axis 211 Concrete (23-06-16).pdf
PDF 2 MB Posted
- Attached to
- Bldg 211 Concrete Work - Rock Island Arsenal
- Solicitation number
- W519TC23R2057
About this file
This document package includes plans and specifications for a concrete work project at Building 211 of Rock Island Arsenal. The project involves excavating and pouring new concrete for machine foundations, floor slabs, and approaches in the building. Key requirements include saw cutting existing floors; installing rebar mesh and expansion joints; pouring concrete pads to a minimum strength of 4,000 psi; backfilling and compacting soils; and cleaning up the worksite upon completion. The specifications provide construction details such as foundation dimensions and reinforcement, concrete mix requirements, and general safety and security notes for working on the Arsenal site.
The related federal contract opportunity is solicitation number W519TC23R2057 for concrete work at Building 211 of Rock Island Arsenal, issued by the Department of the Army Materiel Command Contracting Command. The solicitation seeks a contractor to perform the excavation and concrete work described in the included plans and specifications for the building.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W519TC23R2057.pdf | ||
| Visitor Safety Brief.pdf | ||
| A02 24-1-06 Quality Assurance Surveillance Plan.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OVERVIEW 7 AXIS CONCRETE
SHEET- 1 OF 7
DRAWN BY
SCALE DATE
APPROVED
ROCK ISLAND ARSENAL
NA
PLANT ENGINEERING DIRECTORATE
NO.
DRAWING
DRAWN BY
SCALE DATE
APPROVED
ROCK ISLAND ARSENAL
NA
PLANT ENGINEERING DIRECTORATE
NO.
DRAWING
TARA-LGC
B. NILESR. MCCLURE
06-08-23 DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
Level I awareness training and assuring the training is completed.
training. The COR will be provided a copy of the RIA-JMTC AT controlled access areas shall complete AT Level I awareness requiring access to Army installations, facilities, or
All contractor employees including subcontractor employees
SECURITY NOTES
access pass being issued.
Operations Center prior to a RIA-JMTC electronic key and/or contractor employee and subcontractor employee to the RIA-JMTC
The contractor shall sign a Memorandum of Record for each require changes in contractor security matter or processes.
individual facility or installation change, the Government may contract, should the Force Protection Condition (FPCON) at any changes otherwise aurhorized by the change clasue of this directed by DoD HQDA and/or local policy. In addition to the
Personal Identity verification of Contractor Personnel) as identity verification requirements (FAR clause 52.204-9
The contractor workforce must comply with all personal the installation Director of Emergency Services.
to meet installation access requirements to be accomplished by shall provide all information required for background checks
The contractor and all associated subcontractor employees through the RIA Directorate of Emergency Services.
to complete the Access Control Records Check request form the Government recpresentative). The COR will provide guidance access and local security policies and procedures (provided by Directive 2014-05/AR 190-13), appIicable installation facility (NCIC-III) and Terrorist Screening Database (TSDB) (Army NotionaI Crime Information Center interstate identification Index comply with adjudication standards and procedures using the Contractor and aII associated subcontractor empIoyees shoII contractor's employment.
at the end of the contract or the last day of the individual access passes. Use FAR 52.204-9 or PADDS Clause (F00015) Government Common Access Cards, installation badges, and/or Contractor will acquire and need to return all issued U.S.
box at the RIA-JMTC access point.
needed. Items will be returned to the COR or placed in a drop items and will be returned within 24-hrs of no longer being RIA-JMTC electronic keys and access passes are accountable be issued them in support of any future contract.
Contractors who routinely fail to return these tiems will not training will be provided in the RIA-JMTC AT training.
all employees on the local iWatch program. The iWatch The contractor and all associated subcontracotrs shall brief
The FPCON descriptions will be provided in the RIA-JMTC AT training.
threat. Services will resume when FPCON level is reduced to level Bravo or lower.
During FPCONs Charlie and Delta, services may be discontinued/postponed due to higher
Department. The RAMP program is discussed inthe RIA-JMTC AT training.
Contractors will comply with any instruction given by the Rock Island Arsenal Police installation RAMP security program (e.g. vehicle searches, wearing of ID badges, etc).
Contractor personnel working on Rock Island Arsenal are subject to participation in
B.211 7 AXIS CONCRETE
618"
D
HV TOOL CHANGER
120 TOOL AUTOMATIC
CUSTOMER SUPPLIED DRAWING
ROOM/STRUCTURE BASED ON
SUPPLIED DRAWING.
ACCORDING TO CUSTOMER
COLUMN STRUCTURES
5.91[]"
CUSTOMER SUPPLIED DRAWING
WALL BASED ON
.5
.9
(3
72.01)"
(1829
10001250
1250 1250
1250 1250
D
62 64
102 104
157120144
301-G
314 312
220210
332333
204203
R O
C K
IS
L
A N
D
U .S
G O
V E
R N
M E
N T
B R
ID
G E
PARKING
RODMAN
D A
V
EN
P O R T
G
IL
L E
S P
IE
KINGSBURY
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
TERRACE
PARKING PARKING PARKING
HEDGE
LANE
SOUTH AVENUE
NORTHAVENUE
PARKING
PARKING
PARKING
PARKING
E A
S T
RODMAN
DRIVE
BECK
SYLVAN
A
VEN
U E
KING
DRIVE
SHED
B
LU
N T
R O
A D
PROSP
ECT
DRIV
E
D R
IV
E
C
EM
ETE
R
Y
D R
IV
E
DYKE
ROAD
R O
D M
A N
BLUNT
PARKING
PARKING
PARKING
PARKING
PARKING
79 83
S Y
V N
R
IV
E
AVE
BAUMBECK AVENUE
216212
LO
CK
A N
D
DA
M
N O
BETTENDORF
DAVENPORT
MOLINE
ROCK ISLAND
C A N A L
M
O
L
I
E
S L O U G H
E. RIVER DR. GRANT ST.
21 29
30-G
70-G
2-G 3-G
4-G
6-G
X
X
X
X
X
X
X
X
X X
X X
X
X X
X
X X X X X X X X X X X
X X
X
X X
X
X
X
X
X
X X
X
X X
X
X
X
X
X
X
X
X
X X
X X
X
X X
X
X X X X X X X X X X X
X X
X
X X
X
X
X
X
X
X X
X
X X
X
X
62 64
102 104
157120144
301-G
314 312
220210
332333
204203
R O
C K
IS
L
A N
D
U .S
G O
V E
R N
M E
ID
G E
PARKING
RODMAN
D A
V
EN
P O R T
G
IL
L E
S P
IE
KINGSBURY
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
TERRACE
PARKING PARKING PARKING
HEDGE
LANE
SOUTH AVENUE
NORTHAVENUE
PARKING
PARKING
PARKING
PARKING
E A
S T
RODMAN
DRIVE
BECK
SYLVAN
A
VEN
U E
KING
DRIVE
SHED
B
LU
N T
R O
A D
PROSP
ECT
DRIV
E
D R
IV
E
C
EM
ETE
R
Y
D R
IV
E
DYKE
ROAD
R O
D M
A N
BLUNT
PARKING
PARKING
PARKING
PARKING
PARKING
79 83
S Y
V N
R
IV
E
AVE
216212
LO
CK
A N
D
DA
M
N O
BETTENDORF
DAVENPORT
MOLINE
ROCK ISLAND
E. RIVER DR. GRANT ST.
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X X
X
X
X
X
X
X
X
X
X
X
LOCATION ON ROCK ISLAND ARSENAL
PC
X
X
X X X
X
X
X
X
X
XX
X
X
X
X
X
X X
X
X X
X
X X
X X
X
X
X
X
X
X X
X
X
X
2ND ST.
4TH ST.
3RD ST.
STATE ST.
PC
X
X
X X X
X
X
X
X
X
XX
X
X
X
X
X
X X
X
X X
X
X X
X X
X
X
X
X
X
X X
X
X
BLDG. 211 7-AXIS
REFERENCE AREA
MIS
SIS
SIP
PI R
IVER
2ND ST.
4TH ST.
3RD ST.
STATE ST.
21 29
30-G
70-G
2-G 3-G
4-G
6-G
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X X
X
X
X
X
X
X
X
X
X
X
LOCATION ON ROCK ISLAND ARSENAL
X
X
NOTES
REPRESENTATIVE FOR GATE PASS AND FUCTIONALITY
11. CONTRACTOR WILL COORDINATE WITH CONTRACTING OFFICER
CONSTRUCTION PROCESSES.
ALL GROUND GUIDES AND OR FIRE WATCH DURING DEMO
19. CONTRACTOR WILL BE RESPONSIBLE FOR PROVIDING
of Discharge F (C) Concrete Temperature at Point
50-64 (10-17.5)
65-90 (18-32) - without retarder
65-90 (18-32) - with retarder
Haul Time
Hours Minutes
WITH LOCAL REGULATIONS.
BLOCKS, CONCRETE AND REBAR OFF RIA IN ACCORDANCE
AS BOLTS, PAPER, PLASTIC, CONDUIT, PLATES, PIPES, WOOD
4. THE CONTRACTOR SHALL REMOVE ALL DEBRIS SUCH
STOCK PILE AT JMCT'S DESIRED LOCATION.
3 FT DOWN AND 6 FT OUSIDE OF FOUNDATION SLAB DIMENSIONS
5. CONTRACTOR WILL EXCAVATE EXISTING GRAVEL BANK
AND RAMPS.
THE NEW UNIFORM THICKNESS CONCRETE SCALE PAD, APPROACHES
BASE LAYER THAT IS COMPACTED AND LEVELED TO ACCEPT
A MIN. 4000 PSI. THERE WILL BE A 6 INCH ROAD ROCK
6. NEW CONCRETE FOR SCALE FOUNDATION SHALL BE
AFTER COMPLETION OF THE PROJECT.
7. THE CONTRACTOR SHALL CLEANUP THE WORKSITE
OR TRUCK AGITATORS SHALL BE ACCORDING TO THE FOLLOWING:
THE MAXIMUM HAUL TIME FOR CONCRETE TRANSPORTED IN TRUCK MIXERS
DISCHARGING.
WITHOUT THE ADDITION OF WATER. OR WATER AND CEMENT PRIOR TO
WORKABLE CONDITION. SATISFACTORY FOR PLACEMENT IN THE WORK
SHALL BE DELIVERED TO THE SITE OF THE WORK IN A PLASTIC AND
10. CONCRETE TRANSPORTED IN TRUCK MIXERS OR TRUCK AGITATORS
SCALE SLAB AND SEALED BEFORE COMPLETE.
BETWEEN THE RAMPS, APPROACHES AND
8. EXPANSION JOINT MATERIAL WILL BE PLACED
STARTING FROM 06:00 TILL 14:00 MONDAY - FRIDAY.
9. JACK HAMMERING / REMOVAL WILL BE DONE ON 1ST SHIFT
AND PEDESTRIAN INTERACTIONS WILL BE MADE.
DURING ENTIRE PROJECT TO ENSURE SAFE TRAFFIC
*TRAFFIC CONTROL AND GROUND GUIDE WILL BE USED
OR POWER DOLLY OR MANUAL PROCESSES.
WORK SITE ACCESS WITH COMMERCIAL CONCRETE PUMPING
12. CONTRACTOR WILL BE RESPONSIBLE FOR COORDINATING
SITE UNDER CONSTRUCTION.
13. CONTRACTOR SHALL PROVIDE BARRICADES AROUND JOB
15. THE SUMP PIT WILL BE SOLID POUR AND SEALED TO AVOID LEAKAGE FROM OIL INTO SUBGRADE.
AND INTO FORMS.
IS WORKED AROUND REINFORCING AND OTHER EMBEDDED ITEMS
EQUIPMENT WITH HAND RODDING AND TAMPING SO THAT CONCRETE
16. CONSOLIDATE PLACED CONCRETE USING MECHANICAL VIBRATING
QUALIFIED WORKMEN.
WORK SHALL BE PERFORMED BY COMPETENT, EXPERIENCED,
CONSTRUCTION (AISC) STANDARDS AND SPECIFICATIONS. ALL
SHALL COMPLY WITH LATEST AMERICAN INSTITUTE OF STEEL
17. FABRICATION AND INSTALLATION OF STRUCTURAL STEEL
ROCK ISLAND ARSENAL JMTC
PLANT ENGINEERING
GENERAL NOTES
NOTES
of Discharge F (C) Concrete Temperature at Point
50-64 (10-17.5)
65-90 (18-32) - without retarder
65-90 (18-32) - with retarder
Haul Time
Hours Minutes
SWEEPING AS NECESSARY
IN THE TRAFFIC FLOW LANES BY MEANS OF WATER AND
WILL BE TAKEN TO ELIMINATE ACCESS DUST AND DEBRI
USE ACCESS CONTROL GATE. ALL NECESSARY PRECAUTIONS
1. THE CONSTRUCTION WILL BE OUTSIDE NEAR A HEAVY
MINIMALLY IMPACTED DURING CONSTRUCTION.
MONDAY THROUGH FRIDAY. INBOUND AND OUT BOUND TRAFFIC WILL BE
2. CONSTRUCTION HOURS WILL BE LIMITED TO 0600 TO 1430 HOURS
CONSTRUCTION.
THE ROAD OR THE UNDERLYING SOIL CAUSED BY THE
3. THE CONTRACTOR SHALL REPAIR ANY DAMAGE TO
ROCK ISLAND ARSENAL JMTC
PLANT ENGINEERING
GENERAL NOTES
FOR FOUNDATION AT 6 INCHES FROM THE TOP AND BOTTOM OF THE SURFACE ON THE BASE OF EACH LEVEL .
14. 2 - LAYERS OF #8 REBAR MESH (1"), 12" X-W SPACING
RIA REPRESENTATIVE ROBERT MCCLURE / JEFF MERRY IMMEDIATELY.
SPECIFICATIONS, SHALL BE BROUGHT TO THE ATTENTION OF
18. ANY DISCREPANCIES IN PLANS, OR BETWEEN PLANS AND
21. DRAWING NOT TO SCALE.
SHEET- 2 OF 7
DRAWN BY
SCALE DATE
APPROVED
ROCK ISLAND ARSENAL
NA
PLANT ENGINEERING DIRECTORATE
NO.
DRAWING
B.211 7 AXIS CONCRETE
DRAWN BY
SCALE DATE
APPROVED
ROCK ISLAND ARSENAL
NA
PLANT ENGINEERING DIRECTORATE
NO.
DRAWING
TARA-LGC
B. NILESR. MCCLURE
06-08-23
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
AVENUERODMAN
MACHINING
RAMP
CRANEWAY
LOADING DOCKS
12345
PROJECT AREA IN BUILDING 211
7-AXIS FIVES
AND ENSURE ALL PRESONNEL ARE WEARING AND UTILIZING PROPER PPE. .
20. CONTRACTOR WILL FOLLOW AND APPLY ALL STANDARD SAFETY RULES OF THE TRADE
DRAWN BY
SCALE DATE
APPROVED
ROCK ISLAND ARSENAL
NA
PLANT ENGINEERING DIRECTORATE
NO.
DRAWING
IV
E
AVE
216212
LO
CK
A N
D
DA
M
N O
BETTENDORF
DAVENPORT
MOLINE
ROCK ISLAND
E. RIVER DR. GRANT ST.
2ND ST.
4TH ST.
3RD ST.
STATE ST.
X
X
X
X
X
X
X
X
X X
X X
X
X X
X
X X X X X X X X X X X
X X
X
X X
X
X
X
X
X
X X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X X
X
X
X
X
X
X
X
X
X
X
M I S
S I P P
I
R I V
E R
AVENUERODMAN
MACHINING
RAMP
CRANEWAY
LOADING DOCKS
12345
MACHINE PAD FOR BLDG 211
SHEET- 3 OF 7
LOCATION ON ROCK ISLAND ARSENAL
PROJECT AREA IN BUILDING 211
06-08-23
ALLOW FOR PROPERGROUNDING OF MACHINE
FOUNDATION AND LEFT EXPOSED 6 INCHES ABOVE GRADE TO
11. CONTRACTOR WILL PROVIDE ONE GROUND ROD DRIVEN INTO
21. DRAWING NOT TO SCALE.
of Discharge F (C) Concrete Temperature at Point
50-64 (10-17.5)
65-90 (18-32) - without retarder
65-90 (18-32) - with retarder
Haul Time
Hours Minutes
DUST DURING ENTIRE CONSTRUCTION.
1. THE CONTRACTOR WILL USE WATER TO ELIMINATE
WITH SAW CUTS.
REBAR WILL BE PRESENT AND MUST BE CUT OFF EVEN
2. SAW CUT FLOOR AROUND FOUNDATION & FLATWORK
CONSTRUCTION.
FLOOR OR THE UNDERLYING SOIL CAUSED BY THE
3. THE CONTRACTOR SHALL REPAIR ANY DAMAGE TO
WITH LOCAL REGULATIONS.
BLOCKS, CONCRETE AND REBAR OFF RIA IN ACCORDANCE
AS BOLTS, CANS, BEAMS, CONDUIT, PLATES, PIPES, WOOD
4. THE CONTRACTOR SHALL REMOVE ALL DEBRIS SUCH
CONVERTER ON ALL DIESEL ENGINES.
*CONTRACTOR SHALL HAVE CATALYTIC*
EQUIPMENT USED ARE GAS ENGINES.
5. CONTRACTOR SHALL VENT EXHAUST OUTSIDE. IF
WORK SHALL BE A MIN. 4000 PSI.
A MIN. 5000 PSI. NEW CONCRETE FOR SURROUNDING FLAT
6. NEW CONCRETE FOR MACHINE FOUNDATION SHALL BE
AFTER COMPLETION OF THE PROJECT.
7. THE CONTRACTOR SHALL CLEANUP THE WORKSITE
OR TRUCK AGITATORS SHALL BE ACCORDING TO THE FOLLOWING:
THE MAXIMUM HAUL TIME FOR CONCRETE TRANSPORTED IN TRUCK MIXERS
DISCHARGING.
WITHOUT THE ADDITION OF WATER. OR WATER AND CEMENT PRIOR TO
WORKABLE CONDITION. SATISFACTORY FOR PLACEMENT IN THE WORK
SHALL BE DELIVERED TO THE SITE OF THE WORK IN A PLASTIC AND
10. CONCRETE TRANSPORTED IN TRUCK MIXERS OR TRUCK AGITATORS
JOINT SEALANT SHALL BE BASF SONOLASTIC SL-1 OR EQUAL.
3/4" RIGID FOAM INSULATION FOR VIBRATION ISOLATION.
AFTER CLEANUP IS COMPLETE, LINE FOUNDATION WITH
8. EXPANSION JOINT MATERIAL UP TO 84" DEEP TYPICAL.
STARTING FROM 2:30 TILL 11:00 AT NIGHT OR SATURDAYS.
9. JACK HAMMERING / REMOVAL WILL BE DONE ON 2nd SHIFT
FRAMING, TYING OF REBAR WILL BE DAY SHIFT WORK.
*POURING OF NEW CONCRETE WILL BE ON SATURDAY*
FOR EQUIPMENT / TRUCKS GOING IN AND OUT OF BLDG.
12. CONTRACTOR WILL PROVIDE SPOTTER / GROUND MAN
SITE UNDER CONSTRUCTION.
13. CONTRACTOR SHALL PROVIDE BARRICADES AROUND JOB
BETWEEN THE ELEMENTS ON EITHER SIDE OF THE JOINT.
BETWEEN MEMBERS AND NO CHANGE IN SURFACE ELEVATION
MITERED OR OTHERWISE FABRICATED TO PROVIDE A TIGHT FIT
INTERSECTIONS OF EMBEDDED EDGE ANGLES SHALL BE CAREFULLY
EVERY 18" ON CENTER AND WILL BE EMBEDDED INTO CONCRETE.
IN CONCRETE EDGE WITH 3/8" x 4" BOLTS WELDED AT 45 DEGREES
WILL HAVE 2" x 2" x 1/4" STEEL ANGLE IRON IMBEDDED FLUSH
15. FOUNDATION EDGE WHERE DECK PLATE WILL BE INSTALLED
AND INTO FORMS.
IS WORKED AROUND REINFORCING AND OTHER EMBEDDED ITEMS
EQUIPMENT WITH HAND RODDING AND TAMPING SO THAT CONCRETE
16. CONSOLIDATE PLACED CONCRETE USING MECHANICAL VIBRATING
QUALIFIED WORKMENT.
WORK SHALL BE PERFORMED BY COMPETENT, EXPERIENCED,
CONSTRUCTION (AISC) STANDARDS AND SPECIFICATIONS. ALL
SHALL COMPLY WITH LATEST AMERICAN INSTITUTE OF STEEL
18. FABRICATION AND INSTALLATION OF STRUCTURAL STEEL
RIA REPRESENTATIVES KENT STONE / MARK BENES IMMEDIATELY.
SPECIFICATIONS, SHALL BE BROUGHT TO THE ATTENTION OF
20. ANY DISCREPANCIES IN PLANS, OR BETWEEN PLANS AND
PROTECT 1000 2 PART EPOXY RESIN
VM-PR CONCRETE MOISTURE VAPOR BLOCKER.
VM-CD WATERPROOFING SOLUTION.
"PROTECTIVE INDUSTRIAL POLYMERS"
17. SEAL CLEANED FOUNDATION WITH PRODUCTS FROM:
ROCK ISLAND ARSENAL JMTC
PLANT ENGINEERING
GENERAL NOTES
INDEX
GENERAL NOTES/OVERVIEW
GENERAL NOTES
CONTRACTOR SECURITY NOTES
DRAWING SHEET 3 - FOUNDATION CROSS SECTIONAL DETAILS
DRAWING SHEET 2 - FOUNDATION DIMENSIONAL PLAN
DRAWING SHEET 8 - CAN ANCHOR DETAILS
DRAWING SHEET 1 - MACHINE OVERVIEW
DRAWING SHEET 7 - CAN ANCHOR LOCATION PLAN
OF #4 REBAR MESH (1/2"), 12" X-W SPACING FOR SURROUNDING FLAT WORK.
#8 REBAR MESH (1") FOR FOUNDATION WALLS. SINGLE TIED LAYER
FOR MACHINE FOUNDATION DECK, SINGLE TIED LAYER OF
14. 2 TIED LAYERS OF #8 REBAR MESH (1"), 12" X-W SPACING
X
X
X X X
X
X
X
X
X
XX
X
X
X
X
X
X X
X
X X
X
X X
X X
X
X
X
X
X
X X
X
X
PC
NOTES
TARA-OPF
GIDDINGS & LEWIS BORING MILL
21 29
30-G
70-G
2-G 3-G
4-G
6-G
50 52
62 64
102 104
157120144
301-G
314 312
220210
332333
204203
R O
C K
IS
L
A N
D
U .S
G O
V E
R N
M E
ID
G E
PARKING
RODMAN
D A
V
EN
P O R T
G
IL
L E
S P
IE
KINGSBURY
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
TERRACE
PARKING PARKING PARKING
HEDGE
LANE
SOUTH AVENUE
NORTHAVENUE
PARKING
PARKING
PARKING
PARKING
E A
S T
RODMAN
DRIVE
BECK
SYLVAN
A
VEN
U E
KING
DRIVE
SHED
B
LU
N T
R O
A D
PROSP
ECT
DRIV
E
D R
IV
E
C
EM
ETE
R
Y
D R
IV
E
DYKE
ROAD
R O
D M
A N
BLUNT
PARKING
PARKING
PARKING
PARKING
PARKING
79 83
S Y
V N
R
R. MCCLURE B. NILES
7-AXIS FIVES
WITH CONDUIT LOCATIONS
DRAWING SHEET 4-6 - FOUNDATION CROSS SECTIONAL DETAILS
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
ROCK ISLAND ARSENAL JMTC
PLANT ENGINEERING
SHEET- 4 OF 7
DRAWN BY
SCALE DATE
APPROVED
ROCK ISLAND ARSENAL
NA
PLANT ENGINEERING DIRECTORATE
NO.
DRAWING
B.211 7 AXIS CONCRETE
DRAWN BY
SCALE DATE
APPROVED
ROCK ISLAND ARSENAL
NA
PLANT ENGINEERING DIRECTORATE
NO.
DRAWING
TARA-LGC
B. NILESR. MCCLURE
06-08-23
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
DRAIN DRAIN
F L
O O
R L
E V
E L
F L
O O
R L
E V
E L
A
A
B
B
FLOOR LEVEL FLOOR LEVEL
FLOOR LEVELFLOOR LEVEL
F L
O O
R L
E V
E L
F L
O O
R L
E V
E L
31.5" DEEP
79" DEEP
37.5" DEEP 31.5" DEEP
79" DEEP 79" DEEP 79" DEEP 79" DEEP
79.5" DP 83" DP
DEEP2
TALL2
6" DEEP CABLE TROUGH
FLOOR LEVELFLOOR LEVEL
D R
A
IN
D E
E P
T Y
P
D E
E P
T Y
P
D R
A
IN
D R
A
IN
D
P T
Y P
D
P T
Y P
F L
O O
R L
E V
E L
F L
O O
R L
E V
E L
F L
O O
R L
E V
E
SECTION B-B
PLANT ENGINEERING
SHEET- 5 OF 7
DRAWN BY
SCALE DATE
APPROVED
ROCK ISLAND ARSENAL
NA
PLANT ENGINEERING DIRECTORATE
NO.
DRAWING
B.211 7 AXIS CONCRETE
DRAWN BY
SCALE DATE
APPROVED
ROCK ISLAND ARSENAL
NA
PLANT ENGINEERING DIRECTORATE
NO.
DRAWING
TARA-LGC
B. NILESR. MCCLURE
06-08-23 distribution is unlimited.
DISTRIBUTION STATEMENT A: Approved for public release;
SECTION A-A
CONVEYOR
89 CHIP
DRAIN
98 COOLANT90 2
DRAIN DRAIN
SUPPLIED BY CUSTOMER.
TRENCH TO HOLD CONCRETE FORM,
STEEL PLATES FOR CHIP CONVEYOR
F L
O O
R L
E V
E L
F L
O O
R L
E V
E L
A
A
B
B
2265 DEEP [89.17"]
2265 DEEP [89.17"]
2265 DEEP [89.17"]
FLOOR LEVEL FLOOR LEVEL
MANUAL FOR MORE DETAIL.
FOR CONSTRUCTION OF FOUNDATION'
CONSULT 'RECOMMENDED GUIDELINES
DEPENDING ON FOUNDATION DEPTH.
SIZE AND LOCATION VARIES
REBAR SIZE AND LOCATION. REBAR
: SHOWN IS AN EXAMPLE OF NOTE
FLOOR LEVELFLOOR LEVEL
F L
O O
R L
E V
E L
F L
O O
R L
E V
E L
2265 DEEP [89.17"]
2290 DEEP [90.16"] 2485 DEEP [97.83"]
6 TYP 4x
31.5" DEEP
79" DEEP
37.5" DEEP 31.5" DEEP
114 58
TYP
79" DEEP 79" DEEP 79" DEEP 79" DEEP
150" DEEP
SUMP
COOLANT
79.5" DP 83" DP
DEEP2
TALL2
6" DEEP CABLE TROUGH
FLOOR LEVELFLOOR LEVEL
6 TYP
D R
A
IN
D E
E P
T Y
P
D E
E P
T Y
P
D R
A
IN
2 TYP
D R
A
IN
D
P T
Y P
D
P T
Y P
WALL
8 TYP
31 86
F L
O O
R L
E V
E L
F L
O O
R L
E V
E L
F L
O O
R L
E V
E L
SECTION B-B
12 MIN
12" X-W SPACING
MATTING #25 (1") REBAR MESH
BOTTOM LAYER REBAR
12" X-W SPACING
#25 (1") REBAR MESH
TOP LAYER REBAR MATTING
79" DEEP
DEEP2
TALL2
6" DEEP CABLE TROUGH
FLOOR LEVEL
FLOOR LEVEL
F L
O O
R L
E V
E L
F L
O O
R L
E V
E L
F L
O O
R L
E V
E L
SECTION B-B
ROCK ISLAND ARSENAL JMTC
PLANT ENGINEERING
SHEET- 6 OF 7
DRAWN BY
SCALE DATE
APPROVED
ROCK ISLAND ARSENAL
NA
PLANT ENGINEERING DIRECTORATE
NO.
DRAWING
B.211 7 AXIS CONCRETE
DRAWN BY
SCALE DATE
APPROVED
ROCK ISLAND ARSENAL
NA
PLANT ENGINEERING DIRECTORATE
NO.
DRAWING
TARA-LGC
B. NILESR. MCCLURE
06-08-23
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
F L
O O
R L
E V
E L
F L
O O
R L
E V
E L
A
A
B
B
FLOOR LEVEL FLOOR LEVEL
FLOOR LEVELFLOOR LEVEL
F L
O O
R L
E V
E L
F L
O O
R L
E V
E L
10 TYP 4x
10 115
CONDUIT DETAIL
3 TYP ABOVE SURFACE
6 DIA TYP
R30 TYPR
SHEET- 7 OF 7
DRAWN BY
SCALE DATE
APPROVED
ROCK ISLAND ARSENAL
NA
PLANT ENGINEERING DIRECTORATE
NO.
DRAWING
B.211 7 AXIS CONCRETE
DRAWN BY
SCALE DATE
APPROVED
ROCK ISLAND ARSENAL
NA
PLANT ENGINEERING DIRECTORATE
NO.
DRAWING
TARA-LGC
B. NILESR. MCCLURE
06-08-23
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
BUILDING ORIENTATION
PLANT ENGINEERING
EXISTING MACHINE PROFILE
File details come from the government source that posted it. Updated .