This document outlines a quality assurance surveillance plan for concrete work at Rock Island Arsenal under solicitation number W519TC23R2057. The plan details performance standards and acceptance levels for various tasks including site conferences, maintaining a daily work roster and project timeline, conducting daily site inspections, and a final inspection to verify all work meets contract requirements. Materials will also be inspected randomly to ensure compliance with industry standards and contracted specifications. Surveillance methods include visual, written, and measurement checks, with most tasks requiring a 90-100% performance level. The Army Materiel Command Contracting Command at Rock Island Arsenal is the contracting agency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 0001 7 axis 211 Concrete (23-06-16).pdf | ||
| W519TC23R2057.pdf | ||
| Visitor Safety Brief.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QASP
| Task | Contract Reference | Freq | Performance Standard | Acceptable Quality Level | Surveil Method | Surveil Date(s) | Perform Level | Notes |
| Site Conference | Sheet 1 - Security Notes | Once | Each individual working at the site must receive this information for safety and accountability purposes. May be updated if additional personnel come to the work site. May be performed as part of the badging process. | 100% | Visual/ Roster | |||
| Work Roster | Sheet 1 - Security Notes | Daily | Must be maintained for safety and security purposes. Must show who is at the work-site at any given time. | 90% | Written Roster | |||
| Project Timeline | Dictated by contract | Once | To be provided within 1-week of award of the contract. Must show plan for completion prior to the date stated in the contract. May be adjusted during performance provided within project completion date. | 100% | Visual/ Written | |||
| Site Inspection | Sheet 1 - Security Notes | Daily | Observe work is being performed safely and in accordance with the contractor provided timeline and IAW the contracted Scope of Work | 90% | Visual | |||
| Materials Inspections | Sheet 1 - Notes 1-17 | Random | Materials provided by the contractor may be inspected to ensure that they meet the contracted Scope of Work and minimum industry and design standards. (e.g. slump or temperature tests of incoming concrete) | 100% | Visual/ Measure | |||
| Final Inspection | Sheet 1 - Notes 1-17 | Once | Verify that all work is completed IAW the contracted Scope of Work | 100% | Visual |
&LRock Island Arsenal Quality Assurance Surveillance Plan&CConcrete Work (Concrete Mounting Pad)&RTARA-LGC 24-1-06 DATE: 12-Jun-2023