This is a Statement of Work (SOW) from the US Forest Service (USFS) for the Palmetto Trail Enoree Passage Rehabilitation Design-Construction project. The project involves restoring aged trail structures and replacing a damaged trail bridge along the 36-mile Enoree Passage portion of the Palmetto Trail in the Francis Marion & Sumter National Forest (FMSNF).

The contractor must complete work at three specific locations: Indian Creek 3.00 Bridge & Boardwalk (requiring removal/replacement of a damaged pedestrian fiberglass bridge and concrete abutment), and two Sispring Creek Bridge & Boardwalk locations (requiring timber boardwalk and pedestrian bridge repairs). The contract period is 180 days from Notice to Proceed. Key deliverables include project schedule, safety plan, quality control plan, construction submittals, and as-built drawings. Work must occur Monday-Friday 7:00 AM - 6:00 PM, with prior approval needed for alternative hours. The contractor must attend a pre-bid site visit and coordinate with USFS on instream work, ground disturbance, and heavy equipment usage. The USFS will provide design specifications, standard trail plans, bridge design guides, and other technical documentation to support the work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .