Attach(A)_N4008423R8701_ELINs.xlsx
XLSX spreadsheet 85 KB Posted
- Solicitation number
- N4008423R8701
About this file
This document contains pricing information for the maintenance and repair of a jet engine test cell at Naval Air Facility Atsugi in Japan under solicitation number N4008423R8701 issued by the Department of the Navy Naval Facilities Engineering Command. Offerors are required to provide firm fixed prices on a monthly, lump sum, or per unit basis for recurring maintenance including emergency service orders, preventative maintenance programs, and non-recurring work such as unit priced labor and materials. Pricing is included for four option periods following the base year. Services include grounds maintenance and fence installation, repair, and removal. Temporary fencing rental rates are also specified.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend0002_23R8701_SF30.pdf | ||
| Amend0001_23R8701_SF30.pdf | ||
| Attach(F)_PIEE_Vendor_Access_Instruction.pdf | ||
| Attach(C)_ExhibitB(PPQ).docx | DOCX document | |
| Attach(E)_PreProposal_InquiryForm.xlsx | XLSX spreadsheet | |
| Attach(D)_SiteVisit_Request.xlsx | XLSX spreadsheet | |
| Attach(B)_ExhibitA(ExperienceProjectDataSheet).docx | DOCX document | |
| SF33_N4008423R8701_TestCell.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base FFP
| ATTACHMENT J-0200000-08 |
| EXHIBIT LINE ITEM NUMBERS |
| SRN 19831755 / e-Project Number 1689770 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0001 Recurring Work - Base Period | |||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | |||||
| ELINs A001 | |||||
| Name of Offeror/Contractor: | |||||
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price ¥ | Total ¥ |
| A001 | NAF ATSUGI STATION FUND, Spec Item 3 | ||
| A001AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | M |
| A001AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | M |
| A001AC | Routine Service Orders, Spec Item 3.1.3 | 12 | M |
| A001AD | Preventive Maintenance (PM) Program, Blast Deflector, Spec Item 3.2.1.1 | 1 | LS |
| A001AE | Preventive Maintenance (PM) Program, Air Intake Door System, Spec Item 3.2.1.2 | 1 | LS |
| A001AF | Preventive Maintenance (PM) Program, Engine Air Starter System, Spec Item 3.2.1.3 | 1 | LS |
| A001AG | Preventive Maintenance (PM) Program, Engine Test Fueling System, Spec Item 3.2.1.4 | 1 | LS |
| A001AH | Preventive Maintenance (PM) Program, Monitor Camera System, Spec Item 3.2.1.5 | 1 | LS |
| A001AJ | Preventive Maintenance (PM) Program, Facility Console, Spec Item 3.2.1.6 | 1 | LS |
| A001 NAF ATSUGI STATION FUNDS, Total (¥) (TOTAL RECURRING WORK LINE ITEMS, BASE PERIOD) | ¥0 | |
| NOTES: | ||
| (1) Abbreviation - M = Monthly LS = Lump Sum | ||
| (2) The Offerors/Contractor will be requested to submit approximate cost breakdown for "Preventive Maintenance (PM) Program" for detail. |
J-0200000-08 Page 1
CUI//FEDCON
SECTION J
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6'
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height, Free-Standing
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
With Barbwire, 7' Fence Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height, Free-Standing
Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
Base IQ
| ATTACHMENT J-0200000-08 |
| EXHIBIT LINE ITEM NUMBERS |
| SRN 19831755 / e-Project Number 1689770 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0002 Non-Recurring Work - Base Period | |||||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||||
| ELINs A700 through A702 | |||||||
| Name of Offeror/Contractor: | |||||||
| ELIN | Product Name | Description Extended | Estimated Quantity (Maximum) | Unit of Issue | Price TBD | Unit Price (¥) | Extended (Total) Price (¥) |
| A700 | Unit Priced Labor Work - During Regular Working Hours | Provide labor to perform all Unit Priced Labor work (during regular working hours) per the scope and delivery schedule specified in the order. | |||||
| 2,200 | HR | ¥0 | |||||
| A701 | Unit Priced Labor Work - Outside Regular Working Hours | Provide labor to perform all Unit Priced Labor work (outside regular working hours) per the scope and delivery schedule specified in the order. | |||||
| 400 | HR | ¥0 | |||||
| A703 | Material Costs - | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. | 15,000,000 | Yen | ¥0 | ||
| Coefficient (see Note 1) | |||||||
| TOTAL NON-RECURRING WORK BASE PERIOD (Line Item 0002) | TOTAL (Max Amount) | ¥0 |
| Notes: | |
| Note 1: The "Coefficient" is an adjustment to the material cost to allow for all associated costs including but not limited to ordering, handling, stockpiling, overhead, and profits. | |
| Only "Coefficient" will be used for these associated costs. | |
| Extend the coefficient to no more than two (2) decimal places. | |
| For example, if the offeror's coefficient for material is 1.20, then; 12,000,000 Yen x 1.20 = ¥ 14,400,000 |
Note 2: Unit Price Column - Unit Prices must be expressed in whole yen. Extended Price must equal Estimated Quantity times Unit Price.
Note 3: Abbreviation - EA = Each HR = Hour
J-0200000-08 Page 2
CUI//FEDCON &9
1st FFP
| ATTACHMENT J-0200000-08 |
| EXHIBIT LINE ITEM NUMBERS |
| SRN 19831755 / e-Project Number 1689770 |
| EXHIBIT B - CLIN 9001 |
| Line Item 0003 Recurring Work - First Option Period | |||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | |||||
| ELINs B001 | |||||
| Name of Offeror/Contractor: | |||||
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price ¥ | Total ¥ |
| B001 | NAF ATSUGI STATION FUND, Spec Item 3 | ||
| B001AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | M |
| B001AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | M |
| B001AC | Routine Service Orders, Spec Item 3.1.3 | 12 | M |
| B001AD | Preventive Maintenance (PM) Program, Blast Deflector, Spec Item 3.2.1.1 | 1 | LS |
| B001AE | Preventive Maintenance (PM) Program, Air Intake Door System, Spec Item 3.2.1.2 | 1 | LS |
| B001AF | Preventive Maintenance (PM) Program, Engine Air Starter System, Spec Item 3.2.1.3 | 1 | LS |
| B001AG | Preventive Maintenance (PM) Program, Engine Test Fueling System, Spec Item 3.2.1.4 | 1 | LS |
| B001AH | Preventive Maintenance (PM) Program, Monitor Camera System, Spec Item 3.2.1.5 | 1 | LS |
| B001AJ | Preventive Maintenance (PM) Program, Facility Console, Spec Item 3.2.1.6 | 1 | LS |
| B001 NAF ATSUGI STATION FUNDS, Total (¥) (TOTAL RECURRING WORK LINE ITEMS, FIRST OPTION PERIOD) | ¥0 | |
| NOTES: | ||
| (1) Abbreviation - M = Monthly LS = Lump Sum | ||
| (2) The Offerors/Contractor will be requested to submit approximate cost breakdown for "Preventive Maintenance (PM) Program" for detail. |
J-0200000-08 Page 3
CUI//FEDCON
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
1st IQ
| ATTACHMENT J-0200000-08 |
| EXHIBIT LINE ITEM NUMBERS |
| SRN 19831755 / e-Project Number 1689770 |
| EXHIBIT B - CLIN 9001 |
| Line Item 0004 Non-Recurring Work - First Option Period | |||||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||||
| ELINs B700 through B702 | |||||||
| Name of Offeror/Contractor: | |||||||
| ELIN | Product Name | Description Extended | Estimated Quantity (Maximum) | Unit of Issue | Price TBD | Unit Price (¥) | Extended (Total) Price (¥) |
| B700 | Unit Priced Labor Work - During Regular Working Hours | Provide labor to perform all Unit Priced Labor work (during regular working hours) per the scope and delivery schedule specified in the order. | |||||
| 2,200 | HR | ¥0 | |||||
| B701 | Unit Priced Labor Work - Outside Regular Working Hours | Provide labor to perform all Unit Priced Labor work (outside regular working hours) per the scope and delivery schedule specified in the order. | |||||
| 400 | HR | ¥0 | |||||
| B702 | Material Costs - | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. | 15,000,000 | Yen | ¥0 | ||
| Coefficient (see Note 1) | |||||||
| TOTAL NON-RECURRING WORK FIRST OPTION PERIOD (Line Item 0004) | TOTAL (Max Amount) | ¥0 |
| Notes: | |
| Note 1: The "Coefficient" is an adjustment to the material cost to allow for all associated costs including but not limited to ordering, handling, stockpiling, overhead, and profits. | |
| Only "Coefficient" will be used for these associated costs. | |
| Extend the coefficient to no more than two (2) decimal places. | |
| For example, if the offeror's coefficient for material is 1.20, then; 12,000,000 Yen x 1.20 = ¥ 14,400,000 |
Note 2: Unit Price Column - Unit Prices must be expressed in whole yen. Extended Price must equal Estimated Quantity times Unit Price.
Note 3: Abbreviation - EA = Each HR = Hour
J-0200000-08 Page 4
CUI//FEDCON
2nd FFP
| ATTACHMENT J-0200000-08 |
| EXHIBIT LINE ITEM NUMBERS |
| SRN 19831755 / e-Project Number 1689770 |
| EXHIBIT C - CLIN 9002 |
| Line Item 0005 Recurring Work - Second Option Period | |||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | |||||
| ELINs C001 | |||||
| Name of Offeror/Contractor: | |||||
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price ¥ | Total ¥ |
| C001 | NAF ATSUGI STATION FUND, Spec Item 3 | ||
| C001AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | M |
| C001AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | M |
| C001AC | Routine Service Orders, Spec Item 3.1.3 | 12 | M |
| C001AD | Preventive Maintenance (PM) Program, Blast Deflector, Spec Item 3.2.1.1 | 1 | LS |
| C001AE | Preventive Maintenance (PM) Program, Air Intake Door System, Spec Item 3.2.1.2 | 1 | LS |
| C001AF | Preventive Maintenance (PM) Program, Engine Air Starter System, Spec Item 3.2.1.3 | 1 | LS |
| C001AG | Preventive Maintenance (PM) Program, Engine Test Fueling System, Spec Item 3.2.1.4 | 1 | LS |
| C001AH | Preventive Maintenance (PM) Program, Monitor Camera System, Spec Item 3.2.1.5 | 1 | LS |
| C001AJ | Preventive Maintenance (PM) Program, Facility Console, Spec Item 3.2.1.6 | 1 | LS |
| C001 NAF ATSUGI STATION FUNDS, Total (¥) (TOTAL RECURRING WORK LINE ITEMS, SECOND OPTION PERIOD) | ¥0 | |
| NOTES: | ||
| (1) Abbreviation - M = Monthly LS = Lump Sum | ||
| (2) The Offerors/Contractor will be requested to submit approximate cost breakdown for "Preventive Maintenance (PM) Program" for detail. |
J-0200000-08 Page 5
CUI//FEDCON
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
2nd IQ
| ATTACHMENT J-0200000-08 |
| EXHIBIT LINE ITEM NUMBERS |
| SRN 19831755 / e-Project Number 1689770 |
| EXHIBIT C - CLIN 9002 |
| Line Item 0006 Non-Recurring Work - Second Option Period | |||||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||||
| ELINs C700 through C702 | |||||||
| Name of Offeror/Contractor: | |||||||
| ELIN | Product Name | Description Extended | Estimated Quantity (Maximum) | Unit of Issue | Price TBD | Unit Price (¥) | Extended (Total) Price (¥) |
| C700 | Unit Priced Labor Work - During Regular Working Hours | Provide labor to perform all Unit Priced Labor work (during regular working hours) per the scope and delivery schedule specified in the order. | |||||
| 2,200 | HR | ¥0 | |||||
| C701 | Unit Priced Labor Work - Outside Regular Working Hours | Provide labor to perform all Unit Priced Labor work (outside regular working hours) per the scope and delivery schedule specified in the order. | |||||
| 400 | HR | ¥0 | |||||
| C702 | Material Costs - | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. | 15,000,000 | Yen | ¥0 | ||
| Coefficient (see Note 1) | |||||||
| TOTAL NON-RECURRING WORK SECOND OPTION PERIOD (Line Item 0006) | TOTAL (Max Amount) | ¥0 |
| Notes: | |
| Note 1: The "Coefficient" is an adjustment to the material cost to allow for all associated costs including but not limited to ordering, handling, stockpiling, overhead, and profits. | |
| Only "Coefficient" will be used for these associated costs. | |
| Extend the coefficient to no more than two (2) decimal places. | |
| For example, if the offeror's coefficient for material is 1.20, then; 12,000,000 Yen x 1.20 = ¥ 14,400,000 |
Note 2: Unit Price Column - Unit Prices must be expressed in whole yen. Extended Price must equal Estimated Quantity times Unit Price.
Note 3: Abbreviation - EA = Each HR = Hour
J-0200000-08 Page 6
CUI//FEDCON
3rd FFP
| ATTACHMENT J-0200000-08 |
| EXHIBIT LINE ITEM NUMBERS |
| SRN 19831755 / e-Project Number 1689770 |
| EXHIBIT D - CLIN 9003 |
| Line Item 0007 Recurring Work - Third Option Period | |||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | |||||
| ELINs D001 | |||||
| Name of Offeror/Contractor: | |||||
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price ¥ | Total ¥ |
| D001 | NAF ATSUGI STATION FUND, Spec Item 3 | ||
| D001AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | M |
| D001AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | M |
| D001AC | Routine Service Orders, Spec Item 3.1.3 | 12 | M |
| D001AD | Preventive Maintenance (PM) Program, Blast Deflector, Spec Item 3.2.1.1 | 1 | LS |
| D001AE | Preventive Maintenance (PM) Program, Air Intake Door System, Spec Item 3.2.1.2 | 1 | LS |
| D001AF | Preventive Maintenance (PM) Program, Engine Air Starter System, Spec Item 3.2.1.3 | 1 | LS |
| D001AG | Preventive Maintenance (PM) Program, Engine Test Fueling System, Spec Item 3.2.1.4 | 1 | LS |
| D001AH | Preventive Maintenance (PM) Program, Monitor Camera System, Spec Item 3.2.1.5 | 1 | LS |
| D001AJ | Preventive Maintenance (PM) Program, Facility Console, Spec Item 3.2.1.6 | 1 | LS |
| D001 NAF ATSUGI STATION FUNDS, Total (¥) (TOTAL RECURRING WORK LINE ITEMS, THIRD OPTION PERIOD) | ¥0 | |
| NOTES: | ||
| (1) Abbreviation - M = Monthly LS = Lump Sum | ||
| (2) The Offerors/Contractor will be requested to submit approximate cost breakdown for "Preventive Maintenance (PM) Program" for detail. |
J-0200000-08 Page 7
CUI//FEDCON
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
3rd IQ
| ATTACHMENT J-0200000-08 |
| EXHIBIT LINE ITEM NUMBERS |
| SRN 19831755 / e-Project Number 1689770 |
| EXHIBIT D - CLIN 9003 |
| Line Item 0008 Non-Recurring Work - Third Option Period | |||||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||||
| ELINs D700 through D702 | |||||||
| Name of Offeror/Contractor: | |||||||
| ELIN | Product Name | Description Extended | Estimated Quantity (Maximum) | Unit of Issue | Price TBD | Unit Price (¥) | Extended (Total) Price (¥) |
| D700 | Unit Priced Labor Work - During Regular Working Hours | Provide labor to perform all Unit Priced Labor work (during regular working hours) per the scope and delivery schedule specified in the order. | |||||
| 2,200 | HR | ¥0 | |||||
| D701 | Unit Priced Labor Work - Outside Regular Working Hours | Provide labor to perform all Unit Priced Labor work (outside regular working hours) per the scope and delivery schedule specified in the order. | |||||
| 400 | HR | ¥0 | |||||
| D702 | Material Costs - | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. | 15,000,000 | Yen | ¥0 | ||
| Coefficient (see Note 1) | |||||||
| TOTAL NON-RECURRING WORK THIRD OPTION PERIOD (Line Item 0008) | TOTAL (Max Amount) | ¥0 |
| Notes: | |
| Note 1: The "Coefficient" is an adjustment to the material cost to allow for all associated costs including but not limited to ordering, handling, stockpiling, overhead, and profits. | |
| Only "Coefficient" will be used for these associated costs. | |
| Extend the coefficient to no more than two (2) decimal places. | |
| For example, if the offeror's coefficient for material is 1.20, then; 12,000,000 Yen x 1.20 = ¥ 14,400,000 |
Note 2: Unit Price Column - Unit Prices must be expressed in whole yen. Extended Price must equal Estimated Quantity times Unit Price.
Note 3: Abbreviation - EA = Each HR = Hour
J-0200000-08 Page 8
CUI//FEDCON
4th FFP
| ATTACHMENT J-0200000-08 |
| EXHIBIT LINE ITEM NUMBERS |
| SRN 19831755 / e-Project Number 1689770 |
| EXHIBIT E - CLIN 9004 |
| Line Item 0009 Recurring Work - Fourth Option Period | |||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | |||||
| ELINs E001 | |||||
| Name of Offeror/Contractor: | |||||
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price ¥ | Total ¥ |
| E001 | NAF ATSUGI STATION FUND, Spec Item 3 | ||
| E001AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | M |
| E001AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | M |
| E001AC | Routine Service Orders, Spec Item 3.1.3 | 12 | M |
| E001AD | Preventive Maintenance (PM) Program, Blast Deflector, Spec Item 3.2.1.1 | 1 | LS |
| E001AE | Preventive Maintenance (PM) Program, Air Intake Door System, Spec Item 3.2.1.2 | 1 | LS |
| E001AF | Preventive Maintenance (PM) Program, Engine Air Starter System, Spec Item 3.2.1.3 | 1 | LS |
| E001AG | Preventive Maintenance (PM) Program, Engine Test Fueling System, Spec Item 3.2.1.4 | 1 | LS |
| E001AH | Preventive Maintenance (PM) Program, Monitor Camera System, Spec Item 3.2.1.5 | 1 | LS |
| E001AJ | Preventive Maintenance (PM) Program, Facility Console, Spec Item 3.2.1.6 | 1 | LS |
| E001 NAF ATSUGI STATION FUNDS, Total (¥) (TOTAL RECURRING WORK LINE ITEMS, FOURTH OPTION PERIOD) | ¥0 | |
| NOTES: | ||
| (1) Abbreviation - M = Monthly LS = Lump Sum | ||
| (2) The Offerors/Contractor will be requested to submit approximate cost breakdown for "Preventive Maintenance (PM) Program" for detail. |
J-0200000-08 Page 9
CUI//FEDCON
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
4th IQ
| ATTACHMENT J-0200000-08 |
| EXHIBIT LINE ITEM NUMBERS |
| SRN 19831755 / e-Project Number 1689770 |
| EXHIBIT E - CLIN 9004 |
| PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||||
| ELINs E700 through E702 | |||||||
| Name of Offeror/Contractor: | |||||||
| ELIN | Product Name | Description Extended | Estimated Quantity (Maximum) | Unit of Issue | Price TBD | Unit Price (¥) | Extended (Total) Price (¥) |
| E700 | Unit Priced Labor Work - During Regular Working Hours | Provide labor to perform all Unit Priced Labor work (during regular working hours) per the scope and delivery schedule specified in the order. | |||||
| 2,200 | HR | ¥0 | |||||
| E701 | Unit Priced Labor Work - Outside Regular Working Hours | Provide labor to perform all Unit Priced Labor work (outside regular working hours) per the scope and delivery schedule specified in the order. | |||||
| 400 | HR | ¥0 | |||||
| E702 | Material Costs - | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. | 15,000,000 | Yen | ¥0 | ||
| Coefficient (see Note 1) | |||||||
| TOTAL NON-RECURRING WORK FOURTH OPTION PERIOD (Line Item 0010) | TOTAL (Max Amount) | ¥0 |
| Notes: | |
| Note 1: The "Coefficient" is an adjustment to the material cost to allow for all associated costs including but not limited to ordering, handling, stockpiling, overhead, and profits. | |
| Only "Coefficient" will be used for these associated costs. | |
| Extend the coefficient to no more than two (2) decimal places. | |
| For example, if the offeror's coefficient for material is 1.20, then; 12,000,000 Yen x 1.20 = ¥ 14,400,000 |
Note 2: Unit Price Column - Unit Prices must be expressed in whole yen. Extended Price must equal Estimated Quantity times Unit Price.
Note 3: Abbreviation - EA = Each HR = Hour
J-0200000-08 Page 10
CUI//FEDCON &9
File details come from the government source that posted it. Updated .