Attach2.1240LU26Q0109ProjectPlans.pdf
PDF 6 MB Posted
- Solicitation number
- 1240LU26Q0109
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a set of repair plans and technical drawings for a wastewater system at the Red River Work Center, a U.S. Department of Agriculture Forest Service facility located in the Nez Perce National Forest in Idaho County, Idaho.
The project involves comprehensive repairs to the sanitary sewer collection system, with a primary focus on manhole sealing. The repair plans include detailed technical drawings for sanitary sewer line installations, sewer profiles, and manhole construction details. The drawings specify the installation of 4-inch HDPE (High-Density Polyethylene) pipe at a 2% slope for all services, with multiple sewer lines designated as Lines A through E. The project includes provisions for removing existing manholes and abandoned sanitary sewer lines, installing new services with specific elevations and depths documented in cross-sectional profiles, and sealing leaking joints at precast concrete manhole barrel sections to prevent high groundwater infiltration. Manhole details specify the use of precast monolithic eccentric cone sections with concrete collar details and manhole steps set at 4-foot maximum intervals. The plans also reference flexible epoxy coating applications (Division 9950) for joint priming and sealing. The project was designed by William Griffith of Morrison Maierle, Inc., and was recommended by Susan Graves, District Ranger for the Nez Perce National Forest. The document set includes 24 sheets total, with the reviewed pages showing detailed sanitary sewer key plans, line-specific sewer plans and profiles, and manhole detail specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1240LU26Q0109Amend001.pdf | ||
| 1240LU26Q0109QandA8_17_2026.pdf | ||
| Attach1.1240LU26Q0109ProjectSpecifications.pdf | ||
| Attach3.1240LU26Q0109WD.pdf | ||
| 1240LU26Q0109.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
i w I
1s i w ii:
UJ
o;:
(Y)
(0 a, L..-------------------------"' ill. Revised _ _ _ Dote £ Revised Dote Lh Revised Dote
PREPARED BY:
• rO-lMORRISON c:dJ MAIERLE,INC, ,fo .lmp(oi,,re-Ownlld t'lnn.JC"'lt'
7. ALL SERVICES SHALL BE 4" HDPE@ 2 % SLOPE. SEE DRAWING D-1 FOR SERVICE INSTALLATION.
-N-
� ,lo 2r
SCALE IN FEET
RED RIVER RANGER STATION
WASTEWATER COLLECTION AND TREATMENT PROJECT
SANITARY SEWER KEY PLAN
Designed _ _Bjyl __ Oesign Checked __ IM__
REGION ONE Drown __ fiJJ2fi__Orawing Checked_Ji'!! __
DRAWINGNO. G-3
SHEET 3 OF 24
WilliamGriffith Oval
WilliamGriffith Oval
WilliamGriffith Oval
WilliamGriffith Oval
WilliamGriffith Oval
WilliamGriffith Oval
WilliamGriffith Oval
WilliamGriffith Oval
WilliamGriffith Oval
WilliamGriffith Oval
WilliamGriffith Oval
WilliamGriffith Oval
WilliamGriffith Oval
WilliamGriffith Oval
WilliamGriffith Oval
WilliamGriffith Oval
WilliamGriffith Oval
WilliamGriffith Oval
WilliamGriffith Line
WilliamGriffith Text Box
SEWER METER VAULT
WilliamGriffith Text Box
SHEET 2
WilliamGriffith Highlight
WilliamGriffith Highlight
WilliamGriffith Highlight
WilliamGriffith Highlight
WilliamGriffith Oval
WilliamGriffith Text Box
SEWER METER VAULT
WilliamGriffith Text Box
WilliamGriffith Line
WilliamGriffith Oval
WilliamGriffith Oval
WilliamGriffith Oval
WilliamGriffith Oval
WilliamGriffith Highlight
WilliamGriffith Highlight
WilliamGriffith Highlight
WilliamGriffith Highlight
WilliamGriffith Highlight
WilliamGriffith
SHEET 3
WilliamGriffith Highlight
WilliamGriffith Highlight
WilliamGriffith Highlight
WilliamGriffith Oval
WilliamGriffith Oval
WilliamGriffith Oval
WilliamGriffith Oval
WilliamGriffith Highlight
WilliamGriffith Highlight
WilliamGriffith Highlight
WilliamGriffith Highlight
WilliamGriffith
SHEET 4
WilliamGriffith Highlight
WilliamGriffith Oval
WilliamGriffith Oval
WilliamGriffith Oval
WilliamGriffith Highlight
WilliamGriffith Highlight
WilliamGriffith Highlight
WilliamGriffith Highlight
WilliamGriffith
SHEET 5
WilliamGriffith Highlight
WilliamGriffith Highlight
WilliamGriffith Highlight
WilliamGriffith Oval
WilliamGriffith Oval
WilliamGriffith
SHEET 6
WilliamGriffith Highlight
WilliamGriffith Oval
WilliamGriffith Oval
WilliamGriffith Oval
WilliamGriffith Highlight
WilliamGriffith Highlight
WilliamGriffith Highlight
WilliamGriffith Highlight
WilliamGriffith
SHEET 7
WilliamGriffith Highlight
WilliamGriffith Oval
WilliamGriffith Oval
WilliamGriffith Oval
WilliamGriffith Oval
WilliamGriffith Highlight
WilliamGriffith Highlight
WilliamGriffith Highlight
WilliamGriffith Highlight
WilliamGriffith Highlight
WilliamGriffith Highlight
WilliamGriffith
SHEET 8
MANHOLE STEPS
6" MN
MANHOLE STEPS
VARIES
4'-0" MAX
6" FLOOR
CONCRETE COLLAR DETAIL THIS SHEET
PRECAST MONOLITHIC
ECCENTRIC CONE SECTION
SEAL ALL LEAKING JOINTS
PLAN
4' ID _______ __.-1-----1--5• WALLS
SECTION A
PRECAST CONCRETE MANHOLE-
BARREL SECTION - SEAL THESE JOINTS
MANHOLE COLLAR
Scale: N.T.S.
liQIES:.
1. PROVIDE MANHOLE CONCRETE PRIMING AND SEALING AT
JOINTS TO PREVIENT HIGHGROUNDWATER INFILTRATION. REFER
TO DIVISION 9950 FLEXIBLE EPOXY COATING.
SANITARY SEWER MANHOLE DETAIL
Scale: N.T.S.
PLAN
COVER
RED RIVER RANGER STATION
WASTEWATER COLLECTION AND TREATMENT PROJECT
MANHOLE DETAILS
L1 Revised _SRG _ Date 3/25/2023
Sheet 6 of 24
WilliamGriffith
SHEET 9
| 26-RedRiverManholeTitle_.pdf |
| Red River Work Center_manhole sealing project.pdf |
| 26-RedRiverManholeTitle.pdf |
| RedRiverWastewater drawings.pdf |
| RedRiverWastewaterdrawings.pdf |
| Manhole details Drawing.pdf |
| PROJECT LOCATION: | |
| PROJECT: | |
| Row1: | |
| undefined: | |
| undefined_2: | |
| 234: | |
| undefined_3: | |
| SHEET NUMBERRow1: | |
| SHEET TITLE: | |
| LINE E SEWER PLAN PROFILE: | |
| DATE: | |
| DATE_2: | |
| DATE_3: | |
| NORow1: | |
| REVISION DESCRIPTIONRow1: | |
| Row1_2: | |
| Row1_3: | |
| REVISION DESCRIPTIOND: | |
| D: | |
| D_2: | |
| REVISION DESCRIPTION: | |
| fill_25: | |
| fill_26: | |
| REVISION DESCRIPTION_2: | |
| fill_13: | |
| fill_14: | |
| D 1: | |
| undefined_4: | |
| 2026-05-27T10:40:12-0700 | |
| WILLIAM GRIFFITH |
| 2026-06-15T17:18:10-0700 | |
| SUSAN GRAVES |
| 2026-06-16T08:31:55-0700 | |
| ROBYN SMITH |
File details come from the government source that posted it. Updated .