Attach J.3 - Maps - 10 Pages.pdf
PDF 2 MB Posted
- Attached to
- Pipeline Reconstruction - Salmon-Challis NF - ID Federal contract opportunity
- Solicitation number
- 1240LT25Q0009
- Issued by
- Department of Agriculture Forest Service
About this file
This is a set of maps and photographs documenting the K-Mountain Pipeline Reconstruction project location in the Salmon-Challis National Forest. The pipeline originates from headboxes within a wooden jackleg fence enclosure in the Kadletz Creek drainage at 6,473' elevation and traverses approximately 7,443 total feet through three distinct segments.
The documents show aerial views, topographical maps, and ground-level photographs of the pipeline route and three trough locations. The first segment runs 2,025 feet from the headbox through Douglas fir timber to the first trough at 6,200' elevation. The second segment continues 3,618 feet through open sagebrush/grassland to the second trough at 6,140' elevation. The final segment extends 1,800 feet to the third trough and pipeline termination at 6,071' elevation. The photographs detail the headbox enclosure, pipeline origin area, and all three trough locations, with the troughs consisting of wooden-framed water collection structures positioned along the descending elevation gradient.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF30 MOD 0001 1240LT25Q0009.pdf | ||
| K-MtnPipeline-PreBid Qs and As.pdf | ||
| RV1 -K-MtnPipelineReconstruct_Attachement 1_Maps.pdf | ||
| RV1 - K-MtnPipelineReconstruct_SOW.pdf | ||
| Attach J.4 - WD ID20240053 dtd 11-15-24 - 6 Pages.pdf | ||
| Attach J.1 - SOW - Pipeline Reconstruct - 21 Pages.pdf | ||
| Attach J.2 - SOI - MtnPipelineReconstruct.pdf | ||
| Attach J.5 Experience Questionnaire_3 pages.pdf | ||
| SF1442 - 1240LT25Q0009- Final.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
K-Mountain Pipeline Reconstruction
The pipeline originates from headboxes within a wooden jackleg fence enclosure in the Kadletz Creek drainage at 6,473’ in elevation.
The pipeline climbs out of the shallow drainage to the bench, and then follows the bench downslope to the first trough location, which is located approximately 2025 feet from the headbox, at an elevation of 6200’. The pipeline generally follows an old two-track road through a Douglas fir timber stand. At the first trough location, the pipeline emerges into open sagebrush/grassland and remains in that vegetation type for the remainder of the pipeline. The second trough location is approximately 3618 feet further, at an elevation of 6,140’. The final trough location and termination of the pipeline is approximately 1800 feet further, at an elevation of 6,071’.
Overview showing origin of pipeline in Kadletz creek drainage and the locations of the 3 trough sites
Overview showing origin of pipeline in Kadletz creek drainage and the locations of the 3 trough sites
Overview showing origin of pipeline in Kadletz creek drainage and the locations of the 3 trough sites
Overview showing origin of pipeline in Kadletz creek drainage and the locations of the 3 trough sites, along with road identification and topography lines
Map of project area
Photo of headbox and pipeline origin from within the wooden jackleg exclosure, looking down the Kadletz creek drainage. The pipeline climbs the slope to the right of the photo through the timber.
Drainage immediately outside of spring exclosure and pipeline origin.
Trough location #2 in open sage and grass
Trough location #3
Trough location #3