This document is a Period of Performance (POP) list for a 6J1 SIA contract on the USS John Finn (DDG-113). The contract covers maintenance and repair work scheduled from January 11, 2027 to May 7, 2027, with all individual line items sharing a POP start date of 1/11/2027 and end date of 4/30/2027.
Bundle 2 contains six line items (ICNs 38BC112335, 38BC125908, 38BC125909, 38BC144116, 38BC158803, and 38BC163409), all assigned to KO A01. The required services include structural repairs to the No. 2 SSGTG intake, replacement of electrical cable for incandescent lighting fixtures, cable hanger preservation in compartment 02-186-0-Q, installation and removal of scaffolding for antenna work related to SRF-JRMC maintenance, inspection and repair of the RAST control station in compartment 2-442-3-C0, and preservation of deck plating in the No. 2 uptake engine room. Each line item is designated as a "F/O" (Firm Order) and is part of scheduled unit availability maintenance for the destroyer.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USS John Finn (DDG-113) 6J1 SIA contract POP dates: 1/11/2027 to 5/7/2027
BUNDLE QTY ICN KO TGI (CU Phase) Title POP Start Date POP End Date 2 1 38BC112335 A01 F/O - REPAIR AND PRESERVE STRUCTURAL MEMBER IN NO. 2 SSGTG INTK 1/11/2027 4/30/2027 2 2 38BC125908 A01 F/O – REPLACE ELECTRICAL CABLE FOR INCANDESCENT LIGHTING FIXTURE 1/11/2027 4/30/2027
2 3 38BC125909 A01 F/O – PRESERVE CABLE HANGER IN 02-186-0-Q 1/11/2027 4/30/2027
2 4 38BC144116 A01 F/O - INSTALL AND REMOVE SCAFFOLDING TO/FROM ANTENNA NO. 3-3 FOR SRF-JRMC WORK 1/11/2027 4/30/2027 2 5 38BC158803 A01 F/O - ACOMPLISH INSPECTION AND REPAIR OF RAST CONTROL STATION IN 2-442-3-C0 1/11/2027 4/30/2027 2 6 38BC163409 A01 F/O - PRESERVE DECK PLATING IN UPTAKE ENGINE ROOM NO. 2 1/11/2027 4/30/2027
6J1 POP List Bundle # 2
Sheet1