This is a Request for Proposal (RFP) for ship repair and maintenance services for the USS JOHN FINN (DDG-113) during a Fiscal Year 2027 Surface Incremental Availability (6J1 Bundle 2). The solicitation is issued by NAVSUP Fleet Logistics Center Yokosuka and is designated as negotiated procurement N6264927RA002, with a deadline of October 19, 2026 at 10:00 AM Japan Standard Time.

The contractor must possess an active U.S. Navy Master Ship Repair Agreement (MSRA) or Agreement for Boat Repair (ABR) as a prime contractor to be eligible for award. The work specification package, accessible only through DoD SAFE, includes six Task Group Instructions (TGIs) numbered 38BC112335A01 through 38BC163409A01, covering repair and maintenance tasks to be performed aboard the vessel at Commander Fleet Activities Yokosuka Naval Base. The period of performance runs from January 11, 2027 to May 7, 2027. The contract consists of two line items: CLIN 0001 for the primary repair work at firm fixed price, and CLIN 0002 as a growth reservation representing 10.82 percent of CLIN 0001's cost for anticipated additional work discovered during execution. Award will be made to the responsible, technically acceptable offeror offering the lowest evaluated price, with price having a dominant role in source selection. Technical acceptability is determined by evaluating whether proposed labor hours and material costs are sufficient to complete the scope of work. All work must comply with 29 CFR 1915 (Shipyard Employment Safety Standards), NAVSEA Standard Items (FY26 CH1), and SRF-JRMC Local Standard Items. The contractor must maintain a quality management system per NAVSEA Standard Item 009-04, submit production schedules at specified milestones, and coordinate daily with the SRF-JRMC Project Manager. Condition Found Reports must be submitted within five working days for undiscovered deficiencies, with growth work negotiated using the contractor's fully burdened ship repair labor rate. The contract applies only to firms authorized to operate and conduct business in Japan, and performance will be subject to comprehensive security requirements, installation access procedures, and various international protocols including Japanese conciliation procedures and consumption tax exemptions.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION

15A. NAME AND

ADDRESS

OF OFFEROR

SOLICITATION, OFFER, AND AWARD 1. This Contract is a Rated Order under the Defense Priorities and Allocations System (DPAS) - Code of Federal Regulations - at 15 CFR 700.

RATING PAGE OF PAGES

2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER

CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision Number 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR

INFORMATION

CALL:

A. NAME B. TELEPHONE (NO COLLECT CALLS)

AREA CODE NUMBER EXTENSION

C. EMAIL ADDRESS

11. TABLE OF CONTENTS

(X) DESCRIPTION PAGE(S) (X) SECTION PAGE(S)DESCRIPTION

A B C D E F G H

I

J

K

L

M EVALUATION FACTORS FOR AWARD

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

REPRESENTATIONS, CERTIFICATIONS AND OTHER

STATEMENTS OF OFFERORS

PART IV - REPRESENTATIONS AND INSTRUCTIONS

LIST OF ATTACHMENTS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

CONTRACT CLAUSESSOLICITATION/CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/COSTS

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

PACKAGING AND MARKING

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

CONTRACT ADMINISTRATION DATA

SPECIAL CONTRACT REQUIREMENTS

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

OFFER (Must be fully completed by offeror)

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause Number 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS (%)

DATEAMENDMENT NUMBERAMENDMENT NUMBER DATE

CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

15B. TELEPHONE NUMBER

AREA CODE NUMBER EXTENSION

15C. CHECK IF REMITTANCE ADDRESS IS

DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

17. SIGNATURE 18. OFFER DATE

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION UNDER THE

UNITED STATES CODE AT:

10 U.S.C. 3204(a) ( )41 U.S.C. 3304(a)

24. ADMINISTERED BY (If other than Item 7)

26. NAME OF CONTRACTING OFFICER (Type or print)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is unusable

23. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

25. PAYMENT WILL BE MADE BY

27. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

28. AWARD DATE

CODE

ITEM

STANDARD FORM 33 (REV. 12/2022)

Prescribed by GSA - FAR (48 CFR) 53.214 (c)

SEALED BID (IFB) INVITATION FOR BID

NEGOTIATED (RFP) REQUEST FOR

PROPOSAL

(Hour) (Date)

PART I - THE SCHEDULE PART II - CONTRACT CLAUSES

Section A - Solicitation/Contract Form

USS JOHN FINN (DDG-113) FY27 6J1 BUNDLE 2

MASTER AGREEMENT FOR THE REPAIR AND ALTERATION OF VESSELS (MARAV): In the event the successful offeror possesses a Master Agreement for Repair and Alteration of Vessels (MARAV) with the U.S. Navy in the form of either a Master Ship Repair Agreement (MSRA) or an Agreement for Boat Repair (ABR), award for this requirement will be made in the form of a firm fixed price job order under the applicable agreement and all of the terms and conditions of the offer's existing MARAV will apply.

MSRA/ABR Number: ___________________

Firms who do not possess an active U.S MSRA/ABR as a Prime Contractor are ineligible for award. Non MSRA/ABR holders may request an application for an MSRA or an ABR certification by requesting an application package from: flcy_msra_abr_group@us.navy.mil. Pleas note that the MSRA/ABR Certification process may require a year to complete. This solicitation is intended only for sources duly authorized to operate and do business in Japan as prescribed by DFARS 252.225-7042.

1. REQUIREMENT: NAVSUP Fleet Logistics Center Yokosuka (NAVSUP FLCY) has a new requirement in support of the USS JOHN FINN (DDG-113). The repair and maintenance package of work items are included as Attachment (I) Work Specification(s) for TGIs.

2. PERIOD OF PERFORMANCE: From 11 Jan 2027 to 07 May 2027

3. PLACE OF PERFORMANCE: Commander, Fleet Activities Yokosuka (CFAY) Naval Base

4. OFFER: Offerors must provide all information required by this solicitation no later than 19 Oct 2026 at 10:00 AM Japan Standard Time (JST).

5. WORK ITEM INFORMATION: Access to the work specification package listed in Section J as Attachment (I) may only be accessed through DoD SAFE. DoD SAFE is a secure U.S. Government repository which enables the sharing of large files and requires outside users to receive a drop-off request from the U.S. Government. Therefore, any offeror intending to provide a proposal to this solicitation shall request access by sending an email to: by 13 Oct 2026 10:00 am JST. Once the U.S. Government receives the offeror's access request, the U.S. takayo.shiba.ln@us.navy.mil Government will provide the offeror with a link and instructions to retrieve Attachment (I). Offerors shall note that access is only available for 14 days once sent.

N6264927RA002

Section B - Supplies or Services & Prices or Costs

Additional Information/Notes

Item Supplies/Service Quantity Unit Unit Price Amount

The Contractor shall accomplish the work specification package requirements listed in Attachment (I) of Section J onboard USS JOHN FINN (DDG-113) during FY27 6J1 Surface Incremental Availability.

The Contractor is required to submit an itemized breakdown of the total price proposal using Attachment (II) Price Proposal Breakdown Sheet provided in Section J. Failure to properly complete and submit Attachment (II) by the specified closing date may cause rejection of the proposal.

Note: The U.S. Dollar amounts shown are for the Government administrative purpose only. FY27 Budget Exchange rate of JPY

153.2542 per USD 1.00 applies.

Pricing Arrangement: Firm Fixed Price

1 Job

Growth Reservation associated with CLIN 0001. This growth CLIN amount represents 10.82 percent of the total proposed cost for CLIN 0001.

Note: The U.S. Dollar amounts shown are for the Government administrative purpose only. FY27 Budget Exchange Rate of JPY

153.2542 per USD 1.00 applies.

Pricing Arrangement: Firm Fixed Price

1 Job

Section C - Description/Specifications/Statement of Work

C-1.0 : General Requirements The Contractor, under the direction of the U.S. Naval Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC) as an independent Contractor and not as an agent of the Government, shall furnish the material, support (electrical, crane, rigging, etc.) and facilities (except those furnished by the Government under express provisions of this contract) and provide the management, technical, procurement, production, testing and quality assurance necessary to prepare and accomplish the repairs and maintenance required to complete the USS JOHN FINN (DDG-113) FY27 6J1 Surface Incremental in accordance with the requirements stated in this Section, the Work Item Specifications / Task Group Instructions (TGIs) Availability and Work Item Plans, Drawings, and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract

C-1.1 Technical Description and Specifications: The work to be performed hereunder shall conform to the description of work /work specification described in Section B. The Contractor shall accomplish the contract requirements listed in Attachment (I) of Section J. Actual physical shipboard work shall begin and end in accordance with the dates listed in Section F of this solicitation.

C-1.2 Applicable Reference Documents: The Contractor shall accomplish all work in accordance with applicable NAVSEA Standard Items (NSIs) and SRF-JRMC Local Standard Items (LSIs). SRF-JRMC will determine which NSIs and LSI versions are applicable for all Chief of Naval Operations (CNO) availabilities to include Selected Repair Availability (SRA), Docking SRA (DSRA), and Extended DSRA (EDSRA); Continuous Maintenance Availability (CMAV); Emergent Maintenance (EM); and Surface Incremental Availability (SIA) scheduled for each ship. The same version continues to apply until the completion of each availability and maintenance regardless of whether the work crosses fiscal years.

CATEGORY-I items are invoked for all work resulting from this solicitation under the Master Agreement for Agreement for Repair and Alteration of Vessels; Master Ship Repair Agreement (MSRA) or Agreement for Boat Repair (ABR). CATEGORY-II items are invoked only to the extent specifically indicated within Attachment (I). Ship repair contractors are also subject to the applicable laws and regulations of the Host Nation.

Category I NAVSEA Fiscal Year Standard Items are applicable to all items without further reference. Category II 2026 (FY26) CH1 NAVSEA Standard Items are applicable when invoked and/or referenced in individual Task Group Instruction (TGI) FY26 CH1 specified in Attachment (I). NSIs may be found at:

https://www.navsea.navy.mil/Home/RMC/CNRMC/Our-Programs/SSRAC/

Category I U.S. Naval Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC) Local Standard Items (LSI), FY26 SRF- JRMC LSI (Original) are applicable to all items without further reference. Category II SRF-JRMC LSI (Original) FY26 FY26 are applicable when invoked and/or referenced in individual TGIs specified in Attachment (I). LSIs and subsequent Changes FY26 have been distributed to all MSRA/ABR holders. Please refer to Section A of this Solicitation when requesting copy of these references.

C-1.3 The contractor is to coordinate the delivery and/or pick-up of all Government Furnished Government Furnished Material:

Material (GFM) as cited in work specification(s), supporting drawings, references and/or Statement of Work (SOW). The Contractor is required to manage all GFM upon receipt which includes monitoring, inspecting, segregating, determining nonconformance, and returning unused or nonconforming material o the Government for final disposition.

C-1.4 : The Contractor shall accomplish planning and scheduling to ensure a rational, integrated Contractor Furnished Material and timely plan for procurement, receipt, storage and installation of Contractor Furnished Material (CFM). All materials must meet the specified standard military performance specifications, Federal performance standards, and may require to be listed on a Qualified Products List (QPL) for shipboard installations.

C-1.5 : The Contractor is required to submit a production schedule encompassing, to the Integrated Production Schedule maximum extent possible, all contractor work requirements to the Government at the following milestones:

(1) Work Package Execution Review;

(2) Start of the Availability;

(3) 25% complete conference;

(4) 50% complete conference;

(5) 75% complete conference;

(6) Production Completion Date (PCD);

N6264927RA002

https://www.navsea.navy.mil/Home/RMC/CNRMC/Our-Programs/SSRAC/

(7) Work Completion;

(8) Pre-Sea Trials requirements.

C-2.0 : Availability Preparation and Meeting Participation The Contractor, under the direction of SRF-JRMC shall complete the following efforts after contract award in preparation to execute the ship's availability. The Contractor shall include meetings attendance as part of their fully-burdened ship repair labor rates.

(a) The contractor shall attend and support the Integrated Project Team Development (IPTD) Work Package Integration Conference (WPIC) as needed prior to the scheduled availability. The contractor shall support the conference by evaluating the Availability Work Package and pinpointing work requirements or issues that conflict, prevent or impact other work items from being accomplished.

(b) The contractor shall conduct final ship-checks and coordination with assigned Zone Managers (ZMs) and Work Integration Managers (WIMs) who will liaison with the project team.

(c) The contractor shall attend and support the IPTD Work Package Execution Review (WPER) and Schedule Model Review (SMR) events as needed prior to availability. The contractor shall support the mandated conference executed during planning period leading up to execution of an availability to review work, schedule, and ensure material and resource availability.

(d) The contractor shall support the early start period of availability at the time of award. Contractor is required to begin work and therefore needs time to coordinate and stage materials and equipment prior to starting the physical work.

(e) The contractor is required to order all long lead time structural materials some of which has long duration for fabrication and shipping from United States manufacturers.

(f) The contractor is required to ensure the schedule is submitted to the project team in order to integrate with existing project schedule and mitigate risks due to space/location constraints to avoid work stoppages.

C-3.0 : Identification of Condition Found In accordance with the requirements of NSI 009-01, the Contractor shall identify needed repairs and recommend corrective action during contract performance for work/deficiencies discovered which are not covered by the existing work package. For conditions that impact the critical path(s) /controlling item(s), the Contractor shall notify the Government via electronic media within 24-hours of discovery. This initial notification need not include all content required for a Condition Found Report (CFR), but must include a description of the condition/deficiency and an estimated timeframe for the offeror's professional recommendation for resolution, which shall not exceed five (5) working days as specified below. Recommended repairs and corrective actions shall be submitted to the Government in the form of a CFR (intended to represent the "Work Request" described in DFARS 252.217-7028 "Over and Above Work").

C-3.1 : Condition Found Notification to Government Submit CFRs within five (5) working days via approved electronic media to SRF-JRMC after discovery of the condition. At a minimum, the CFR must include the following:

(1) Identify contract, ship, and hull number

(2) Identification of the applicable Work Item number

(3) Date requirement was discovered

(4) Description of the work requirement

(5) Specific location of the work

(6) Recommendation for corrective action

(7) Recommendation for the appropriate/best time to accomplish the work (i.e. during current availability with or without schedule change, future CNO or Continuous Maintenance Availability). Provide supporting rationale for the recommendation, such as cost efficiencies, availability of work force, availability of material, premium expenditures, etc.

(8) Identification of related changes, if any, to the internal milestones and production and contract completion dates.

C-3.2 : Government Review and Response to CFR The Maintenance Team will review the CFR. If the CFR is inadequate or incomplete, it will be rejected with time continuing to accrue (relative to five (5) working day requirement). As appropriate, the Government and contractor shall meet and discuss the recommendation for corrective action further, conducting ship checks as necessary, to determine the full scope of work required prior to final approval of the CFR. Accuracy of CFR submissions may be evaluated in CPARS and utilized for past performance ratings on future requirements.

C-4.0 Descoping of Requirements: The Government reserves the right to descope any requirement under this contract at any time and for any reason. Descopes are incorporated into the contract via Deficiency List (DLs) and can either be a partial deletion of paragraph(s) from the work specification or deletion of a work item in its entirety. The Government will rely on the fully burdened labor rates for negotiating and settling descope DLs. At no time may the Contractor amend entered in Section H-6.0 GROWTH CLIN its pricing for full or partial work deletion.

C-4.1 : Descope DLs The Contractor agrees to price descope DLs at the same labor rate proposed in the original award. Partial or full work item deletion from the original work item or TGI will be processed via the usual contract modification process. Partial or full work item deletion from the settled Growth Management Request (GMR) will be processed as a descope GMR.

C-4.2 : Minimum Technically Required (MTR) repairs deletion MTR refers to the anticipated repairs that could not be clearly defined at the start of availability but were included in the TGI (based upon historical analysis published by Commander Navy Regional Maintenance Center and NAVSEA Contracting) to enable the Contractor to proceed with the work efficiently, if necessary.

In certain instances where the ship's condition were found satisfactory after a thorough inspection, these MTR repair are cancelled and descoped before the end of the availability. As a result of the deletion of work, the Contractor is expected to return the awarded costs in full. The Contractor must be able to demonstrate production cost and provide justification of work incurred to the Administrative Contracting Officer if the proposing cost is different from the awarded amounts. Program management, idle time not worked and other indirect costs will not be considered.

C-5.0 : DELAYS / DISRUPTIONS The Contractor shall coordinate the work effort with SRF-JRMC Project Manager on a daily basis to prevent changing situations from causing delays and disruptions. Disruption due to minor delays in obtaining access to spaces and operation of equipment are to be expected. A minor delay is defined as eight clock (8) hours or less in duration (and is not the cumulative effect of labor hour impact). Minor delays and/or disruptions are considered normal rather than unusual occurrences during the performance of tasks ordered under the resulting contract. The Government will not provide any schedule relief for minor delays /disruptions.

C-6.0 NON-NAVY OWNED CRANES:

Sections 11.1 and 11.2 of NAVSUPFLCYINST 4200.9 series are invoked for the incidental use of non- Navy owned cranes at Navy shore installations.

NAVSUP FLCY STANDARD CONTRACT TEXT "NON-NAVY OWNED CRANES"

CONTRACTOR AND OTHER NON-NAVY OWNED WEIGHT HANDLING EQUIPMENT

11.1 Contractor Operated Cranes (and Multi-Purpose Machines, Materials Handling Equipment (MHE) and Construction Equipment When Used as Cranes to Lift Suspended Loads) and Rigging Equipment. Non-Navy-owned cranes, multi-purpose machines, MHE and construction equipment are frequently used on Navy property to lift suspended loads. Rigging equipment may be used with these machines or by itself in contractor weight handling operations. These cranes and equipment can be from a variety of sources and are generally incidental to construction contracts, ship repair contracts, demolition contracts, maintenance and other service contracts and deliveries of supplies and equipment. Numerous organizations, including tenant activities, ships, supply departments and Facilities engineering and Acquisition Division/Resident Office in Charge of Construction (FEAD/ROICCs) have contracting authority and often the need for cranes is not anticipated when contract documents are written. The following requirements apply to any contracted work utilizing non-Navy-owned cranes (and multi-purpose machines, MHE and construction equipment used to lift loads suspended by rigging gear) and to all rigging equipment used in weight handling operations at a naval activity. These requirements do not apply to shipboard cranes or rigging equipment. These requirements also do not apply to: commercial truck mounted and articulating boom cranes used solely to deliver material and supplies where the lift consists of moving materials and supplies (not prefabricated components, structural steel or components of a systems-engineered metal building) from a truck or trailer to the ground; to cranes installed on mechanic's trucks that are utilized solely in the repair of shore-based equipment; to cranes that enter the activity but are not used for lifting; nor other machines not used to lift loads suspended by rigging equipment. The Public Works Office (PRY33) is responsible for the oversight of all contractor cranes on bases within Commander, Fleet Activities Yokosuka in accordance with COMFEACTINST 11262.1B series. However, any Weight Handling Equipment (WHE) or crane accidents shall be reported in accordance with paragraphs 11.1.h and 11.1.i:

a. The contractor is required to comply with specific activity regulations pertaining to crane safety and operation (including allowable access routes and ground loading limitations) and to notify the PRY33 office, in advance, of any cranes entering the activity or of any multi-purpose machines, MHE or construction equipment that may be used in a crane-like application to lift suspended loads. For contractor-owned cranes, machines and rigging equipment at naval activities in foreign countries, the contractor-owned cranes, machines and rigging equipment shall comply with the appropriate host nation safety standards. For floating cranes and barge-mounted mobile cranes, require a third party certification from an Occupational Safety and Health Administration (OSHA) accredited organization (or a third party certification from a state accredited organization for those states with OSHA approved state plans), a load indicating device, a wind speed indicating device and a marine type list and trim indicator readable in one-half degree increments.

Third party certification is not required for floating cranes and barge-mounted mobile cranes at Navy activities in foreign countries.

b. For cranes (or other machines used to lift suspended loads) and rigging equipment at naval activities in foreign countries, the contractor shall certify that the crane (or other machine) and the rigging equipment conform to the appropriate host nation safety standards. The contractor shall also certify that all of its crane (or other machine) safety devices are enabled and functioning properly, that all personnel working on the naval activity job site have been trained to not stand under or in the fall zone of a suspended load unless specifically allowed by USACE EM 385-1-1, and that operators have been trained to not bypass safety devices (e.g., anti-two block devices, Load Moment Indicator's) during lifting operations. The contractor-owned crane certifications is required to be available on the crane or in the contractor's on-site office for rigging operations.

c. The contractor-owned mobile cranes, commercial truck mounted cranes and articulating boom cranes with Original Equipment Manufacturer (OEM) rated capacities of greater than 2000 pounds, require that the crane operator be designated as qualified by a source that qualifies crane operators (i.e., a union, a government agency or an organization that tests and qualifies crane operators).

Proof of current qualification shall be provided to PRY33. Operators of cranes used in construction at activities under US jurisdiction shall follow the qualification and certification requirements of 29 CFR 1926.1427. For Navy activities in foreign countries, follow host nation requirements as applicable in lieu of the CFR.

d. The contractor is required to certify (appendix P, figure P-1) that the crane operator is qualified and trained for the operation of the crane or machine to be used.

e. For multi-purpose machines, MHE and construction equipment used to lift loads suspended by rigging equipment, the contractor is required to provide proof of authorization from the machine OEM that the machine is capable of making lifts of loads suspended by rigging equipment. Written approval from a qualified registered professional engineer, after a safety analysis is performed, is allowed in lieu of the OEM's approval. The contractor is required to demonstrate that the equipment is properly configured to make such lifts and is equipped with a load chart.

Note: MHE attachments covered by and used in accordance with NAVSEA SW023-AH- WHM-010 have been pre-approved for use with all MHE.

These attachments are exempt from the OEM authorization requirement above.

f. The contractor is required to provide all hooks used on cranes, hoists, other machines and rigging gear shall have self-closing latches or the throat opening shall be "moused" (secured with wire, rope, heavy tape, etc.) or otherwise secured to prevent the attached item from coming free of the hook under a slack condition. The following exceptions apply and shall be approved by the contractor's technical organization (i.e. the Japan Construction Information Center Foundation) with PRY33 coordination: items where the hook throat is fully obstructed and not available for manual securing; and lifts where securing the hook throat increases the danger to personnel, such as forge shop, dip tank or underwater work.

g. The contractor is required to have a critical lift plan for each of the following lifts: lifts over 75 percent of the capacity of the crane, hoist or other machine (lifts over 50 percent of the capacity of a barge- mounted mobile crane's hoists) at any radius of lift; lifts involving more than one crane, hoist or other machine; lifts of personnel (lifts of personnel suspended by rigging equipment from multi-purpose machines, MHE or construction equipment shall not be permitted); lifts made in the vicinity of overhead power lines (see subparagraph (7); erection of cranes; lifts of submerged or partially submerged objects (see exceptions in paragraph 10.4.1.e); lifts involving binding conditions; lifts of hazardous materials (see exceptions in paragraph 10.4.1.a); and lifts involving non-routine rigging or operation, sensitive equipment or unusual safety risks. The plan shall include the following as applicable:

(1) The size and weight of the load to be lifted, including crane (or other machine) equipment and rigging equipment that add to the weight. The OEM's maximum load capacities for the entire range of the lift shall also be provided.

(2) The lift geometry, including the crane (or other machine) position, boom length and angle, height of lift and radius for the entire range of the lift. Applies to both single and multiple-crane/machine lifts.

(3) A rigging plan, showing the lift points, rigging equipment and rigging procedures.

(4) The environmental conditions under which lift operations are to be stopped.

(5) For lifts of personnel, the plan shall demonstrate compliance with the requirements of 29 CFR 1926.1431. For Navy activities in foreign countries follow host nation requirements as applicable in lieu of the CFR.

(6) For barge mounted mobile cranes, barge stability calculations identifying crane placement/footprint; barge list and trim based on anticipated loading; and load charts based on calculated list and trim specific to the barge the crane is mounted on. The amount of list and trim shall be within the crane OEM's requirements.

(7) For lifts in the vicinity of overhead power lines (i.e., if any part of the crane or other machine, including the fully extended boom of a telescoping boom crane or machine or the load could approach the distances noted in figure 10-3 during a proposed operation), the plan shall demonstrate compliance with 29 CFR 1926.1408-1411. For Navy activities in foreign countries follow host nation requirements as applicable in lieu of the CFR.

h. The contractor shall notify the PRY33 office as soon as practical, but not later than four hours, after any WHE accident is identified in NAVFAC P-307 section 12. The contractor is required to secure the accident site and protect evidence until released by the PRY33 office. The contractor shall conduct an investigation to establish the root cause(s) of any WHE accident, near miss or unplanned occurrence. Crane operations shall not proceed until the cause is determined and corrective actions have been implemented to the satisfaction of PRY33 office and/or the contracting officer. The contractor shall certify (appendix P, figure P-1) that the operators, riggers and company officials are aware of the actions required in the event of an accident as specified in the contract.

i. The contractor shall provide a report for an accident or near miss within 30 days to the BSV&E office and the contracting officer using the appropriate form provided in section 12 consisting of a summary of circumstances, an explanation of causes(s), photographs (if available) and corrective actions taken. These notifications and reporting requirements are in addition to those promulgated by OPNAVINST 5100.23 and related command instructions.

j. The contractor shall certify (appendix P, figure P-1) that signal persons employed in construction work are qualified in accordance with 29 CFR 1926.1428. For Navy activities in foreign countries follow host nation requirements as applicable in lieu of the CFR.

k. The contractor shall certify (appendix P, figure P-1) that the riggers are qualified to perform the work by either signing a statement of compliance, providing proof of successful completion of a rigging apprenticeship by a union or other organization providing apprenticeship training or proof of successful completion of training courses from a recognized source such as a trade union, a government agency or an organization that tests and qualifies riggers.

l. The following additional documentation is required for contracts involving tower cranes:

(1) Foundation design and requirements.

(2) Installation instructions.

(3) Assembly and disassembly instructions including climbing/jumping instructions if applicable.

(4) Operating manual, limitations and precautions.

(5) Periodic inspection and maintenance requirements. For tower cranes at Navy activities in foreign countries, the tower cranes shall comply with the appropriate host nation safety standards and industry consensus safety standards (e.g., EN or ISO standards).

m. The following additional requirements apply to contracts involving work on telecommunication towers or with personnel hoists on telecommunication towers:

(1) Base mounted drum hoists used in communication tower work shall comply with TIA-1019, TIA- 222G, ASME B30.7 and 29 CFR 1926.552 and 29 CFR 1926.553. For Navy activities in foreign countries follow host nation requirements as applicable in lieu of the CFR.

(2) When used for hoisting personnel, base mounted drum hoists shall comply with OSHA Instruction CPL 02-01-056; National Association of Tower Erectors standard "Base Mounted Hoist Mechanism Design Use Standard for Lifting Personnel While Working on Telecommunication Structures"; ANSI/ASSE A10.22; and AMSE B30.23 (or equivalent host nation safety standards for Navy activities in foreign countries).

(3) The use of a pickup truck or any other equipment besides a base mounted drum hoist for hoisting materials and/or personnel is prohibited.

(4) Rough-terrain forklifts, bulldozers and similar equipment may be utilized for towing and anchorage purposes of guys. The use of such equipment for trolley/tag and load lines is prohibited, with the exception of using construction equipment for the sole purpose of anchorage that will not be moved during operations.

(5) Rigging gear utilized in communication tower work shall comply with the applicable ASME/OSHA standards. Operator, signal person and rigger qualifications shall be in accordance with OSHA standards and this section. For Navy activities in foreign countries, follow host nation requirements as applicable in lieu of the CFR or ASME standards.

n. For construction contracts, follow the Unified Facilities Guide Specification UFGS-01 35 26 and U.S. Army Corps of Engineers EM-385-1-1 in lieu of paragraphs 11.1.a through 11.1.g, 11.1.j through 11.1.m and appendix P, figures P-1 and P-2.

11.2 Contracting Officer Responsibilities

a. The contracting officer will rely on PRY33 office technical expertise for oversight of all contractor-owned crane and rigging operations. Additionally, the PRY33 office to provide oversight of contractor accident investigations and corrective actions. The degree of oversight shall be based upon the risk to personnel and property; however, oversight shall be performed at least once and the minimum periodicity shall be not more than every 30 days. When critical lifts are involved, oversight periodicity shall be not more than every 14 days. Appendix P, figure P-2, provides a checklist that shall be used during oversight of contractor crane and rigging operations. Copies of appendix P, figure P-2, shall be kept on file for one year. Personnel performing oversight shall complete the Contractor Crane Awareness training course (see section 7) or the NAVFAC 40-hr Contract Hazard Awareness Training Course.

b. The PRY33 office will notify the contracting officer via email of any WHE or crane accident upon notification by the contractor.

Additionally, the PRY33 office will consolidate the required documents and reports for the contracting officer concurrence and submission to the Navy Crane Center. Upon receipt of required reporting documents from the PRY33 office, the contracting officer shall notify the Navy Crane Center, by e-mail (m_nfsh_ncc_accident@navy.mil) of an accident involving a fatality, in-patient hospitalization, overturned crane, collapsed boom or any other major damage to the crane or adjacent property as soon as possible when notified by the contractor. For all other accidents, notify the Navy Crane Center as soon as practical but no later than three working days after the accident.

c. The PRY33 office will provide the contracting officer a copy of every accident and near miss report, regardless of severity, upon receipt from the contractor. These requirements are in addition to any notification and reporting requirements promulgated in OPNAVINST 5100.23 and command instructions. Upon receipt of required documents from the PRY33 office, the contracting officer shall sign all crane and rigging accident and near miss reports to indicate that they are satisfied that the contractor's investigation and corrective action are sufficient.

d. For construction contracts, the forms in U.S. Army Corps of Engineers EM-385-1-1 are acceptable in lieu of paragraph appendix P, figure P-2.

11.3 Host Activity Responsibilities. The host activity shall ensure that contracts contain the above requirements, concur with the contracting officer's oversight plan, ensure that the oversight plan is being carried out and provide oversight of contractor accident and near miss investigations and corrective actions.

11.4 Other non-Navy-owned cranes and rigging equipment at Naval Activities.

11.4.1 Rented or leased cranes or other WHE Operated by Navy or Base Operation Support (BOS) contractors and cranes and rigging equipment owned and operated by BOS contractors and by contractors engaged in NAVSEA OP-5 operations in the United States and its territories. Any rented or leased cranes shall be inspected, load tested and certified to the requirements of section 4 prior to use (except for appendix E hook NDT requirements). Other WHE shall be inspected, tested and marked in accordance with section 14 requirements. For third party certified mobile cranes that cannot be load tested to the specified overload tests of this publication due to OEM restrictions or designs that prevent periodic overload tests, the cranes shall be down rated to 90 percent of the OEM's rated capacity (80 percent for non-mobile cranes) and tested to the requirements of this publication. For long term-leases (over 4 months) and for BOS contractor owned cranes, the maintenance and inspection requirements of section 3 and appendix E hook NDT requirements shall also apply. Additionally, an equipment history file in accordance with section 5, containing those documents required by sections 3 and 4 and their applicable appendices, shall be maintained on each crane. These history files shall be retained for one year after the end of the lease (seven years if the crane is involved in a crane or rigging accident). These requirements shall be included in applicable contracts. See paragraph 4.8 for third party certification requirements. Crane operators shall be licensed /qualified in accordance with the requirements of section 8 (this includes BOS contractor personnel). Crane operations and accident reporting shall be in accordance with sections 9, 10, and 12 (BOS contractor crane and rigging accidents shall be treated and reported as Navy crane and rigging accidents). Rigging equipment and usage practices shall be in accordance with section 14.

C-7.0 SECURITY REQUIREMENTS

INSTALLATION

The Contractor and all associated personnel shall comply with the application requirements delineated in COMFLEACT YOKOSUKA INSTRUCTION 5700.1 (CFAYINST 5700.1) to conduct business within the Commander, Fleet Activities (FLEACT) Yokosuka jurisdiction. The Contractor shall submit all installation access applications to the FLEACT Yokosuka Visitor Control Center (VCC).

The Contractor shall ensure all personnel are registered in the Defense Biometrics Identification System (DBIDS) via the VCC. The Contractor shall direct any questions, administrative issues, or security concerns regarding the installation access and badging process to the FLEACT Yokosuka VCC office.

REGISTRATION AND DE-REGISTRATION PROCEDURE

1. Upon acceptance of any contract renewal or subsequent purchase orders, the Contractor shall immediately confirm its active registration status with the FLEACT Yokosuka VCC.

2. The Contractor shall immediately notify the FLEACT Yokosuka VCC in writing of any changes to company details, to include change of company name, address, corporate officials, or personnel who no longer require installation access.

3. Upon expiration or termination of a valid contract or purchase order, the Contractor's registration status shall be automatically terminated. All associated access passes shall expire immediately.

4. Following contract expiration or de-registration, the Contractor shall immediately return all issued access passes to the FLEACT Yokosuka VCC. Failure to return passes shall result in the responsible individuals, the Contractor, or both being placed on the installation access denial list.

5. The Contractor may voluntarily request company de-registration at any time by submitting a written request and returning all issued access passes to the FLEACT Yokosuka VCC.

SECURITY REQUIREMENTS FOR PERSONNEL HAVING ACCESS TO U.S. NAVAL FORCES/NAVY REGION JAPAN

INSTALLATIONS

In accordance with COMNAVFORJAPAN/COMNAVREGJAPAN INSTRUCTION 5500.7, all non-exempt Contractor personnel requiring installation access shall be subject to comprehensive security and background screening. Appropriate security and background checks will be conducted utilizing any available resources, on all Contractor employees requiring access within FLEACT Yokosuka or its jurisdiction. The Contractor shall submit all prescribed documents (listed below) to the Government to facilitate the required security checks for all personnel requesting access.

a. Required documents pertaining to Japanese Nationals who are not specifically exempted:

(1) One copy of the Personal History Statement.

(2) Valid and accepted proof of residency (i.e., passport, resident alien card or GoJ Alien Registration) in accordance with local policy.

(3) Valid and accepted proof of ID in accordance with local policy (i.e., driver's license).

(4) One copy of SECNAV Form 5512/1.

b. Required documents pertaining to U.S. citizens who are not specifically exempted:

(1) One copy of the SECNAV Form 5512/1.

(2) Proof of current and valid visa/residency status.

(3) Valid and accepted proof of identification per USFJ Instruction 31-206.

c. Third Country Nationals who are not specifically exempted or addressed as designated Third Country Nationals in USFJ Instruction 31-204:

(1) One copy of the Statement of Personal History.

(2) Proof of current and valid visa/residency status.

(3) Valid and accepted proof of ID in accordance with reference (c).

(4) One copy of SECNAV Form 5512/1.

Investigative and security agencies may occasionally require additional documentation or information to complete background checks.

Upon notification by the appropriate security agency, the Contractor, or individual Contractor employee shall promptly provide all requested documentation and information to facilitate the security review process.

SRF-JRMC SECURITY

Per NAVSHIPREPFAC M-5500.1, all visitors entering SRF-JRMC spaces must check-in with the C1110 security office to receive visitor badges as applicable. Foreign nationals who fall outside of the Master Labor Agreement are not authorized to access, generate, or destroy CUI information or materials. Access to classified information or systems is not authorized for foreign nationals at SRF-

JRMC.

Per NAVSHIPREPFAC Yokosuka M- 5239.3, access to the SRF network or other command IT systems requires the member to possess a valid clearance, verified need-to-know, and a CAC. As such, foreign national contractors who do not meet the above criteria are not authorized to access SRF systems.

SHIPBOARD ACCESS REQUIREMENTS

The Contractor shall comply with all current Senior Officer Present Afloat (SOPA) directives and OPNAVINST 5530.14 requirements for all personnel requiring access to U.S. Navy vessels moored or stationed within the installation.

Requirements

USS JOHN FINN (DDG-113) FY27 6J1 BUNDLE 2

Section D - Packaging and Marking

Section E - Inspection and Acceptance

E-1.0 Inspection of the work accomplished hereunder shall be performed periodically by an authorized representative during the performance of the work and at the final inspection upon completion of the work. The representative will be identified in writing at time of contract award.

E-2.0 Quality Assurance: The Contractor shall provide and maintain a quality management system acceptable to the Government, and shall perform or have performed the inspections and tests pursuant to that system to substantiate that the material and workmanship provided pursuant to the job order conform to the drawings, specifications, job orders, and contract requirements listed herein. For U.S. Naval Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC) Yokosuka/Detachment Sasebo, Japan requirements and Commander, Logistics Group Western Pacific (COMLOGWESTPAC) SRU Singapore requirements, the Contractor's quality management system shall be in accordance with that set forth in NAVSEA Standard Item 009-04. In addition to its rights under DFARS clause 252.217-7005 Inspection and Manner of Doing Work of the Master Agreement for Repair and Alteration of Vessels, the Government shall have the right to deem work or material furnished by the Contractor to be incomplete and not in accordance with the requirements of the job order by reason of the Contractor's failure to comply with the requirements of its quality management system and, as such, the Contractor shall not be entitled to progress payments for said work and material.

Overall Contract Inspection/Acceptance Locations

Inspection and Acceptance Location

Both Destination Instructions: Inspection and Acceptance by Government.

DoDAAC: N62758 CountryCode: USA

SRF AND JRMC YOKOSUKA

PSC 473 BOX 8, FPO AP 96349

FPO, AP 96349

UNITED STATES

Kyle Franklin, SRF-JRMC Business Agent Email: kyle.j.franklin.civ@us.navy.mil Telephone: 046-816-7281

Inspection and Acceptance Location

Both Destination Instructions: Inspection and Acceptance by Government.

DoDAAC: N62758 CountryCode: USA

SRF AND JRMC YOKOSUKA

PSC 473 BOX 8, FPO AP 96349

FPO, AP 96349

UNITED STATES

Kyle Franklin, SRF-JRMC Business Agent Email: kyle.j.franklin.civ@us.navy.mil Telephone: 046-816-7281

Section F - Deliveries or Performance

F-1.0 Time of Performance: The Government has established execution dates for the following milestones and key events as outlined below:

Contractor Work Start Date: 11 Jan 2027

Contractor Work Completion Date: 07 May 2027

The Contractor shall accomplish the work within the Period of Performance (POP) listed in each Task Group Instruction (TGI). A POP extension will only be issued if the POP for any individual TGI exceeds the Contractor Work Completion Date listed above.

F-2.0 Place of Performance: The performance of all work set forth in SECTION B shall be accomplished aboard the vessel at . Commander, Fleet Activities Yokosuka (CFAY) Naval Base

Line Item Delivery Schedule Quantity Address and POC

Delivery Period From 11 Jan 2027 to 07 May 2027

Period of Performance From 11 Jan 2027 To 07 May 2027

1 Job Place of Performance DoDAAC: N62758 CountryCode: JPN

SRF AND JRMC YOKOSUKA

PHONE 011-81-46-816-9177, 1 CHOME HON CHO BLDG A61

YOKOSUKA 238-0041

JAPAN

Kyle Franklin, SRF-JRMC Business Agent Email: kyle.j.franklin.civ@us.navy.mil Telephone: 046-816-7281

Delivery Period From 11 Jan 2027 to 07 May 2027

Period of Performance From 11 Jan 2027 To 07 May 2027

1 Job Place of Performance DoDAAC: N62758 CountryCode: JPN

SRF AND JRMC YOKOSUKA

PHONE 011-81-46-816-9177, 1 CHOME HON CHO BLDG A61

YOKOSUKA 238-0041

JAPAN

Kyle Franklin, SRF-JRMC Business Agent Email: kyle.j.franklin.civ@us.navy.mil Telephone: 046-816-7281

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.242-15 Stop-Work Order. Aug 1989

Section G - Contract Administration Data

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

252.217-7007 Payments. Dec 1991 252.217-7008 Bonds. Dec 1991 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018 252.232-7008 Assignment of Claims (Overseas). Jun 1997

DFARS Clauses Incorporated by Full Text

252.232-7006 Wide Area WorkFlow Payment Instructions. (Tailored) (Jan 2023)

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) As used in this clause- Definitions.

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as Electronic invoicing.

authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) To access WAWF, the Contractor shall- WAWF access.

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice WAWF training.

Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/

(e) Document submissions may be via web entry, Electronic Data Interchange, or File Transfer WAWF methods of document submission.

Protocol.

(f) The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF payment instructions.

WAWF for this contract or task or delivery order:

(1) The Contractor shall submit payment requests using the following document type(s): Document type.

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items-

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

N/A

(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

Invoice 2 in 1

(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]

(3) The Contractor shall use the information in the Routing Data…