The file is a detailed architectural and engineering set of construction documents for a comprehensive fire alarm system replacement project at the Fargo VA Health Care System. The project involves replacing the entire existing fire alarm system across multiple campus buildings, including Buildings 1, 9, 46, 3, 10, 11, 12, 13, 40, 51, 52, 56, 57, and the Primary Care Addition. The replacement will upgrade the current analog system to a new digital, addressable voice notification system with enhanced capabilities, including new fire alarm control panels, transponders, annunciator panels, notification devices, pull stations, and detectors.
The documents specify a phased implementation approach, with the new system to be installed and fully operational before the existing system is decommissioned. Key components include establishing a new Fire Command Center, integrating existing campus communication infrastructure, and ensuring continuous fire protection during the transition. The project will require extensive work across multiple floors and buildings, with careful coordination to maintain operational continuity. The design incorporates specific requirements for different building types, including mental health wards and medical facilities, with considerations for unique architectural and safety needs. The total project performance period is 540 days, with the work to be executed by a contractor selected through VA solicitation 36C26326B0004.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
COR / Project Engineer
CONSULTANT
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 of
Office of Construction and Facilities Management
Phase
DESIGNER OF RECORD
U.S. Department of Veterans Affairs
STAMP
VERITAS FIRE ENGINEERING, INC
12364 WEST ALAMEDA PARKWAY, SUITE 135
LAKEWOOD, COLORADO 80228
PH: (303) 985-3300
WWW.VERITAS.COM
517 7TH STREET
RAPID CITY, SD 57701
PH: (605) 342-9470
POC: JARED LOTT
FFD PROJECT NO:
19.2481.M18
DES IGN INC
DateRevisions 91
VOLUME 1 OF 2
/1
/2
:3
:5
P
M
6/12/2025
COVER SHEET
G-000
FARGO REPLACE FIRE ALARM
SYSTEM
TB, KZKP, RD
2101 ELM STREET
FARGO, NORTH DAKOTA 58102
TODD DALZELL
CONSTRUCTION
DOCUMENTS
437-23-105
FARGO REPLACE FIRE ALARM SYSTEM
FARGO VA HEALTH CARE SYSTEM
2101 ELM STREET
FARGO, NORTH DAKOTA 58102
PROJECT NUMBER: 437-23-105
VA
U.S DEPARTMENT OF VETERAN'S AFFAIRS
VETERAN'S HEALTH ADMINISTRATION
# POUND OR NUMBER
& AND
@ AT
AB ANCHOR BOLT
ACI AMERICAN CONCRETE INSTITUTE
ACT ACOUSTIC CEILING TILE
AD AREA DRAIN
AFF ABOVE FINISH FLOOR
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
AISI AMERICAN IRON AND STEEL INSTITUTE
ALUM ALUMINUM
ANOD ANODIZED
ASD ALTERNATE STRESS DESIGN
ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS
AWS AMERICAN WELDING SOCIETY
BD BOARD
BLK BLOCK
BM BEAM
B.O. BOTTOM OF
BOT BOTTOM
BRG BEARING
BRKT BRACKET
BSMT BASEMENT
BLDG BUILDING
BYND BEYOND
CAB CABINET
CER CERAMIC
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
COMPR COMPRESSIBLE
CONC CONCRETE
CONST JT CONSTRUCTION JOINT
CONT CONTINUOUS
CPT CARPET
CRSI CONCRETE REINFORCING STEEL INSTITUTE
CT CERAMIC TILE
DBL DOUBLE
DEMO DEMOLISH OR DEMOLITION
DET DETAIL
DIA DIAMETER
DIM DIMENSION
DIR DIRECTION
DN DOWN
DR DOOR
DWG DRAWING
EA EACH
EE EACH END
EF EACH FACE
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR OR ELEVATION
EPDM ETHYLENE PROPYLENE DIENE M-CLASS (ROOFING)
EQ EQUAL
ES EACH SIDE
EXIST EXISTING
EXP Bolt EXPANSION BOLT
EXP JT EXPANSION JOINT
EXT EXTERIOR
FD FLOOR DRAIN OR FIRE DEPARTMENT
FEC FIRE EXTINGUISHER CABINET
FIN FINISH
FIXT FIXTURE
FLR FLOOR
FM FILLED METAL
FND FOUNDATION
F.O. FACE OF
FT FOOT OR FEET
FTG FOOTING
GA GAUGE
GALV GALVANIZED
GB GRADE BEAM
GP GUSSET PLATE
GR GRADE
GYP GYPSUM
HC HOLLOW CORE
HDR HEADER
HEF HORIZONTAL EACH FACE
HI HIGH
HIF HORIZONTAL INSIDE FACE
HM HOLLOW METAL
HOF HORIZONTAL OUTSIDE FACE
HOR HORIZONTAL
HP HIGH POINT
HR HOUR
HS HIGH STRENGTH
HT HEIGHT
HVAC HEATING, VENTILATING, AND AIR
CONDITIONING
ICBO INTERNATIONAL CONFERENCE OF BUILDING
OFFICIALS
ID INSIDE DIAMETER
ILO IN LIEU OF
IN INCH
INCL INCLUDE
INSUL INSULATED OR INSULATION
INT INTERIOR
INV INVERT
IRGWB IMPACT RESISTANT GYPSUM WALL BOARD
JST JOIST
JT JOINT
K KIP (1000 POUNDS)
LLV LONG LEG VERTICAL
LP LOW POINT
LVL LEVEL
LW LIGHT WEIGHT
LWC LIGHT WEIGHT CONCRETE
MAS MASONRY
MAX MAXIMUM
MCB METAL CORNER BEAD
MECH MECHANICAL
MEMBR MEMBRANE
MEZZ MEZZANINE
MFR MANUFACTURED
MIN MINIMUM
MO MASONRY OPENING
MRGWB MOISTURE-RESISTANT GYPSUM WALL BOARD
MTL METAL
NF NEAR FACE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
NWC NORMAL WEIGHT CONCRETE
OC ON CENTER
OD OUTSIDE DIAMETER
OH OPPOSITE HAND
OPNG OPENING
OZ OUNCE
PC PILE CAP
PCC PRE-CAST CONCRETE
PL PLATE
P.LAM PLASTIC LAMINATE
PLUMB PLUMBING
PLY PLYWOOD
PORC PORCELAIN
PNL PANEL
PNT PAINT OR PAINTED
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
PT POINT
PR PAIR
PROP PROPERTY
PVC POLYVINYL CHLORIDE
R RADIUS
RBR RUBBER
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
RE RIGHT END
REINF REINFORCED
REF REFERENCE
REQD REQUIRED
RET RETURN
RETG RETAINING
RM ROOM
R.O. ROUGH OPENING
ROW RIGHT OF WAY
SC SOLID CORE
SDI STEEL DECK INSTITUTE
SECT SECTION
SF STEP FOOTING OR SQUARE FOOT
SHT SHEET
SIM SIMILAR
SL SPLICE LENGTH
SLV SHORT LEG VERTICAL
SOG SLAB ON GRADE
SPEC SPECIFIED OR SPECIFICATION
SPK SPRINKLER OR SPEAKER
SQ SQUARE
SSTL STAINLESS STEEL
STC SOUND TRANSMISSION CLASS
STD STANDARD
STIFF STIFFENER
STL STEEL
STR STAIR
STRUCT STRUCTURE OR STRUCTURAL
SUP SUPPORT
SYM SYMMETRICAL
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TBD TO BE DETERMINED
T/D TELEPHONE/DATA
TEL TELEPHONE
TEMP TEMPERATURE
THK THICK OR THICKNESS
THRD THREADED
TLT TOILET
T.O. TOP OF
T.O.C TOP OF CONCRETE
T.O.F TOP OF FRAMING
T.O.S TOP OF STEEL/STUD
T.O.W TOP OF WALL
TPD TOILET PAPER DISPENSER
TYP TYPICAL
U/S UNDERSIDE
UNO UNLESS NOTED OTHERWISE
US UNDERSIDE
VB VAPOR BARRIER
VCT VINYL COMPOSITE TILE
VEF VERTICAL EACH FACE
VERT VERTICAL
VIF VERIFY IN FIELD
VOF VERTICAL OUTSIDE FACE
VTR VENT THROUGH ROOF
VWC VINYL WALL COVERING
W/ WITH
WD WOOD
WDW WINDOW
WP WORKING POINT
WRB WEATHER RESISTANT BARRIER
WWF WELDED WIRE FABRIC
ABBREVIATIONS
STEEL/METAL
WOOD (ROUGH) BLOCKING OR SHIM
BRICK
GRAVEL
EARTH/ENGINEERED FILL
CONCRETE MASONRY
PLAN AND SECTION
WOOD (ROUGH)
ACOUSTIC CEILING TILE
GYPSUM BOARD
CEILING
CONCRETE
ELEVATION
CENTER LINE
LINE SYMBOLS
GRID LINE
PROPERTY LINE
CUT LINE
BATT INSULATION
WOOD SUBSTRATE
RIGID INSULATION
MATERIAL LEGEND
WM - WALK OFF MAT
EF - EPOXY FLOORING (TROWELED)
FLOORING
BID ALTERNATE
CPT - CARPET
CONC - CONCRETE
PT - PORCELAIN TILE
FIBER CEMENT PANEL SIDING
CORRUGATED METAL PANEL
STANDING SEAM METAL ROOF/
SIDING PANEL
Room name
1t
VIEW NAME
1/8" = 1'-0"1 DRAWING TITLE
SCALE
BUILDING SECTION
DIRECTION OF SIGHT
DRAWING NUMBER
SHEET NUMBER
WALL SECTION
DETAIL CUT
A101
DETAIL CALLOUT
A101
A101
A101
A101
DIRECTION OF SIGHT
DRAWING NUMBER
SHEET NUMBER
DRAWING NUMBER
SHEET NUMBER
DRAWING NUMBER
SHEET NUMBER
INTERIOR ELEVATION
DRAWING NUMBER
DIRECTION OF SIGHT
SHEET NUMBER
ROOM TAG
ROOM NAME
ROOM NUMBER
KEYNOTE TAG
5-04 KEYNOTE DESIGNATION
1 DOOR TAG
DOOR NUMBER
PARTITION TAG
WALL DESIGNATION
WINDOW TAG
WINDOW DESIGNATION
ELEVATION MARKER
HEIGHT
NORTH ARROW
TRUE NORTH
PLAN NORTH
ARCHITECTURAL SYMBOLS
M3A
V.A. PLAN REFERENCE SYMBOLS
FIRE RESISTIVE RATED LINE, 1 HOUR
FIRE RESISTIVE RATED LINE, 2 HOUR
FIRE RESISTIVE RATED LINE, 3 HOUR
FIRE RESISTIVE RATED LINE, 4 HOUR
FIRE-RATED, SMOKE BARRIER LINE, 1 HOUR
FIRE-RATED, SMOKE BARRIER LINE, 2 HOUR
FIRE-RATED, SMOKE BARRIER LINE, 3 HOUR
FIRE-RATED, SMOKE BARRIER LINE, 4 HOUR
V V ITEM - VA SUPPLIED AND INSTALLED
VC ITEM - VA SUPPLIED AND CONTRACTOR INSTALLED
CC ITEM - CONTRACTOR SUPPLIED AND INSTALLED
A
COLUMN GRID
DIMENSION LINE
NORTH ARROW
CL CENTER LINE
N
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
COR / Project Engineer
CONSULTANT
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 of
Office of Construction and Facilities Management
Phase
DESIGNER OF RECORD
U.S. Department of Veterans Affairs
STAMP
VERITAS FIRE ENGINEERING, INC
12364 WEST ALAMEDA PARKWAY, SUITE 135
LAKEWOOD, COLORADO 80228
PH: (303) 985-3300
WWW.VERITAS.COM
517 7TH STREET
RAPID CITY, SD 57701
PH: (605) 342-9470
POC: JARED LOTT
FFD PROJECT NO:
19.2481.M18
DES IGN INC
DateRevisions 91
VOLUME 1 OF 2
/1
/2
:2
:3
P
M
6/12/2025
ABREVIATIONS, LEGENDS,
SYMBOLS AND SHEET INDEX
G-001
FARGO REPLACE FIRE ALARM
SYSTEM
TB, KZKP, RD
2101 ELM STREET
FARGO, NORTH DAKOTA 58102
TODD DALZELL
CONSTRUCTION
DOCUMENTS
437-23-105
SHEET INDEX - VOLUME 1
GENERAL
G-000 COVER SHEET
G-001 ABREVIATIONS, LEGENDS, SYMBOLS AND SHEET INDEX
G-100 CAMPUS MAP
G-200 ICRA REQUIREMENTS
G-300 OVERALL SITE PHASING PLAN
G-301 MAIN HOSPITAL BUILDING PHASING PLANS
G-302 AREAS OF CEILING CONGESTION KEY PLANS
G-303 MAIN HOSPITAL ROOM LIST - BASEMENT AND 1ST FLOORS
G-304 MAIN HOSPITAL ROOM LIST - 2ND AND 3RD FLOORS
G-305 MAIN HOSPITAL ROOM LIST - 4TH FLOOR AND PENTHOUSE
ARCHITECTURAL
A-100 ARCHITECTURAL NOTES AND TYPICAL DETAILS
ELECTRICAL
E-000 ELECTRICAL LEGENDS AND ABBREVIATIONS
E-001 OVERALL SITE MAP
E-002 ELECTRICAL DETAILS
E-100 EXISTING ELECTRICAL PANEL LOCATIONS
E-101 EXISTING ELECTRICAL PANEL LOCATIONS
E-102 BUILDING 1/9/46 - ENLARGED ELECTRICAL FLOOR PLANS
E-103 BUILDING 1/9/46 - ENLARGED ELECTRICAL FLOOR PLANS
E-300 EXISTING SITE DATA AND COMMUNICATIONS PLAN
FIRE ALARM
FA-000 FIRE ALARM REQUIREMENTS, LEGENDS AND SCHEDULES
FA-001 EXISTING FIRE ALARM RISER DIAGRAMS
FA-002 EXISTING FIRE ALARM RISER DIAGRAMS
FA-003 NEW FIRE ALARM RISER DIAGRAMS
FA-004 NEW FIRE ALARM RISER DIAGRAMS
FA-005 EXISTING FIRE SPRINKLER RISER SCHEMATIC - PART 1
FA-006 EXISTING FIRE SPRINKLER RISER SCHEMATIC - PART 2
FA-007 ENLARGED FIRE ALARM FLOOR PLANS
FA-100 BASEMENT NEW FIRE ALARM PLAN - SECTION 0A
FA-101 BASEMENT NEW FIRE ALARM PLAN - SECTION 0B
FA-102 BASEMENT NEW FIRE ALARM PLAN - SECTION 0C
FA-103 BASEMENT NEW FIRE ALARM PLAN - SECTION 0D
FA-104 BASEMENT NEW FIRE ALARM PLAN - SECTION 0E
FA-105 FIRST FLOOR NEW FIRE ALARM PLAN - SECTION 1A
FA-106 FIRST FLOOR NEW FIRE ALARM PLAN - SECTION 1B
FA-107 FIRST FLOOR NEW FIRE ALARM PLAN - SECTION 1C
FA-108 FIRST FLOOR NEW FIRE ALARM PLAN - SECTION 1D
FA-109 FIRST FLOOR NEW FIRE ALARM PLAN - SECTION 1E
FA-110 SECOND FLOOR NEW FIRE ALARM PLAN - SECTION 2A
FA-111 SECOND FLOOR NEW FIRE ALARM PLAN - SECTION 2B
FA-112 SECOND FLOOR NEW FIRE ALARM PLAN - SECTION 2C
FA-113 SECOND FLOOR NEW FIRE ALARM PLAN - SECTION 2D
FA-114 SECOND FLOOR NEW FIRE ALARM PLAN - SECTION 2E
FA-115 THIRD FLOOR NEW FIRE ALARM PLAN - SECTION 3A
FA-116 THIRD FLOOR NEW FIRE ALARM PLAN - SECTION 3B
FA-117 THIRD FLOOR NEW FIRE ALARM PLAN - SECTION 3C
FA-118 THIRD FLOOR NEW FIRE ALARM PLAN - SECTION 3D
FA-119 THIRD FLOOR NEW FIRE ALARM PLAN - SECTION 3E
FA-120 FOURTH FLOOR NEW FIRE ALARM PLAN - SECTION 4A
FA-121 FOURTH FLOOR NEW FIRE ALARM PLAN - SECTION 4B/D
FA-122 FOURTH FLOOR NEW FIRE ALARM PLAN - SECTION 4C
FA-123 PENTHOUSE NEW FIRE ALARM PLAN - SECTION PA
FA-124 PENTHOUSE NEW FIRE ALARM PLAN - SECTION PC
FA-125 BUILDINGS 10, 11, & 12 NEW FIRE ALARM PLANS
FA-126 BUILDINGS 13, 51, 56 & 57 NEW FIRE ALARM PLANS
FA-127 BUILDING 40 FIRST FLOOR NEW FIRE ALARM PLANS
FA-128 BUILDING 40 SECOND FLOOR NEW FIRE ALARM PLANS
FA-129 BUILDINGS 3 & 52 NEW FIRE ALARM PLANS
FA-130 BUILDING 52 ADDITION NEW FIRE ALARM PLANS
FA-131 PRIMARY CARE ADDITION BSMT NEW FIRE ALARM PLAN
FA-132 PRIMARY CARE ADDITION 1ST FLOOR NEW FIRE ALARM PLAN
SHEET INDEX - VOLUME 2
FAD-100 BASEMENT FIRE ALARM DEMO PLAN - SECTION 0A
FAD-101 BASEMENT FIRE ALARM DEMO PLAN - SECTION 0B
FAD-102 BASEMENT FIRE ALARM DEMO PLAN - SECTION 0C
FAD-103 BASEMENT FIRE ALARM DEMO PLAN - SECTION 0D
FAD-104 BASEMENT FIRE ALARM DEMO PLAN - SECTION 0E
FAD-105 FIRST FLOOR FIRE ALARM DEMO PLAN - SECTION 1A
FAD-106 FIRST FLOOR FIRE ALARM DEMO PLAN - SECTION 1B
FAD-107 FIRST FLOOR FIRE ALARM DEMO PLAN - SECTION 1C
FAD-108 FIRST FLOOR FIRE ALARM DEMO PLAN - SECTION 1D
FAD-109 FIRST FLOOR FIRE ALARM DEMO PLAN - SECTION 1E
FAD-110 SECOND FLOOR FIRE ALARM DEMO PLAN - SECTION 2A
FAD-111 SECOND FLOOR FIRE ALARM DEMO PLAN - SECTION 2B
FAD-112 SECOND FLOOR FIRE ALARM DEMO PLAN - SECTION 2C
FAD-113 SECOND FLOOR FIRE ALARM DEMO PLAN - SECTION 2D
FAD-114 SECOND FLOOR FIRE ALARM DEMO PLAN - SECTION 2E
FAD-115 THIRD FLOOR FIRE ALARM DEMO PLAN - SECTION 3A
FAD-116 THIRD FLOOR FIRE ALARM DEMO PLAN - SECTION 3B
FAD-117 THIRD FLOOR FIRE ALARM DEMO PLAN - SECTION 3C
FAD-118 THIRD FLOOR FIRE ALARM DEMO PLAN - SECTION 3D
FAD-119 THIRD FLOOR FIRE ALARM DEMO PLAN - SECTION 3E
FAD-120 FOURTH FLOOR FIRE ALARM DEMO PLAN - SECTION 4A
FAD-121 FOURTH FLOOR FIRE ALARM DEMO PLAN - SECTION 4B/D
FAD-122 FOURTH FLOOR FIRE ALARM DEMO PLAN - SECTION 4C
FAD-123 PENTHOUSE FIRE ALARM DEMO PLAN - SECTION PA
FAD-124 PENTHOUSE FIRE ALARM DEMO PLAN - SECTION PC
FAD-125 BUILDINGS 10, 11, & 12 FIRE ALARM DEMO PLANS
FAD-126 BUILDINGS 13, 51, 56, & 57 FIRE ALARM DEMO PLANS
FAD-127 BUILDING 40 FIRST FLOOR FIRE ALARM DEMO PLAN
FAD-128 BUILDING 40 SECOND FLOOR FIRE ALARM DEMO PLAN
FAD-129 BUILDINGS 3 & 52 FIRE ALARM DEMO PLANS
FAD-130 BUILDING 52 ADDITION FIRE ALARM DEMO PLANS
6/12/2025
L
WS
WSWS
D
D
D
D
D
D
D
D
BO
TTO
M O
F D
IK
E S
LO
PE
TO
P O
F E
AR
TH
EN
D
IK
E
T O
P O
F E
A R
T H
E N
D
IK
E
B O
T T
O M
O F
D I K
E S
L O
P E
19th AVE. N.
21st AVE. N.
E L M
S T
R E
E T
E L M
S T
R E
E T
N
R E D
R
IV
E R
O F T
H E N
O R
T H
CAMPUS MAP LEGEND
PROJECT LOCATIONS
CONTRACTOR SHARED PARKING
AND STAGING AREA
B
B
O
B
B
B
B
B
S
B
B
S
B
B
S
B
B
B
B
B
B
B
NO. B/S/O ASSET SCHEDULE
MEDICAL CENTER
ADMINISTRATION OFFICE
FLAGPOLE
MEDICAL CENTER
BOILER PLANT
MAINTENANCE GARAGE
WAREHOUSE
LAUNDRY
GATE WELL
XCEL ENERGY BUILDING (NATURAL GAS)
MEDICAL CENTER
COLD STORAGE BUILDING
PICNIC SHELTER AND PATIO
VBA REGIONAL OFFICE
OXYGEN STORAGE TANK
UND SCHOOL OF MEDICINE
HIGH VOLTAGE SWITCHGEAR BUILDING
PANDEMIC FLU STORAGE BUILDING
HAZMAT STORAGE BUILDING
HRMS
CHILLER PLANT
ADMINISTRATION OFFICE
B = BUILDINGS S = STRUCTURE O = OTHER
30 B ADMINISTRATION OFFICE
BUILDING
BUILDING 39
BUILDING 54
BUILDING
BUILDING
BUILDING
BUILDING 10
BUILDING
BUILDING 50
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING 41
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING 57
CONTRACTOR
ENTRANCE
CONTRACTOR SHARED PARKING
AND STAGING AREA
57 B ELECTRICAL SWITCHGEAR BUILDING
1. SHEET SIZE FOR PROPER SCALE IS 30X42. CONTRACTOR SHALL
NOT SCALE DRAWINGS BUT SHALL REQUEST THE DESIRED
DIMENSIONS FROM THE ARCHITECT.
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
COR / Project Engineer
CONSULTANT
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 of
Office of Construction and Facilities Management
Phase
DESIGNER OF RECORD
U.S. Department of Veterans Affairs
STAMP
VERITAS FIRE ENGINEERING, INC
12364 WEST ALAMEDA PARKWAY, SUITE 135
LAKEWOOD, COLORADO 80228
PH: (303) 985-3300
WWW.VERITAS.COM
517 7TH STREET
RAPID CITY, SD 57701
PH: (605) 342-9470
POC: JARED LOTT
FFD PROJECT NO:
19.2481.M18
DES IGN INC
DateRevisions 91
VOLUME 1 OF 2
/1
/2
:2
:0
P
M
6/12/2025
CAMPUS MAP
G-100
FARGO REPLACE FIRE ALARM
SYSTEM
TB, KZKP, RD
2101 ELM STREET
FARGO, NORTH DAKOTA 58102
TODD DALZELL
CONSTRUCTION
DOCUMENTS
437-23-105
1/64" = 1'-0"1
CAMPUS MAP
GENERAL NOTES:
Appendix A: Alternative To Outdoor Exhaust Requirements
This Appendix provides an equivalent ICRA control measure to requirements detailed in this VHA ICRA template (Table 5 Level III, item 5) that would allow interior construction space exhaust.
Interior Construction Space Exhaust:
If the facility is not able to exhaust to the building exterior, the Healthcare Environment and Facilities program office has identified an alternate industry-recognized standard interior exhaust procedure that is accepted as providing an equivalent level of infection prevention and control (IPC), and safety. The alternate interior exhaust procedure is implemented by completing the following:
a. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, including assembly of the ICRA barriers, initial baseline air sampling measurements for particulate levels must be taken in the planned area of discharge. Once containment is erected and completed, HEPA filtration must then be verified by particulate measurement, using a particle counter with multi-channel capabilities to measure down to 0.3 microns, to confirm that the discharge of the HEPA unit does not exceed the baseline particulate count of the area to which the exhaust is directed. Verification must continue at least three times per day (once every 8 hours), 7 days per week, during the use of the negative air machine and HEPA filter. Any exceedance must trigger a work stoppage and an immediate response and resolution. All particulate measurements, including the baseline measurement, must be documented and retrievable.
b. To accommodate the sampling, the negative air pressure machine must be fitted with a 2 ft section of ridged ductwork at the discharge. The sample port for monitoring must be in the ridged ductwork section.
c. Vapor generating processes must be assessed and appropriate filtration must be installed to mitigate transmission to the facility.
d. Engineering must do a complete flow and pressure analysis and document the area to which the air is being discharged to ensure the flow and pressure relationships in that area are not being adversely impacted by the additional flow.
Ideally, this is done as part of the construction package to ensure the design is implementable and no additional HVAC changes are required to accommodate the exhaust from the negative air equipment.
e. Install device on exterior of work containment to continually monitor negative pressurization. To ensure proper pressure is continuously maintained, the device(s) shall have a visual pressure indicator, data collection and alarm.
f. Exhaust must be directed to Low Risk areas as defined in Table 3 in this VHA ICRA template. Ideally this discharge must be located so as not to impinge on high traffic areas or create a nuisance with noise or excessive airflow.
NOTE: Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (e.g. bathroom exhaust) is not acceptable.
VHA-ICRA-2024-1.2-10.25.2024
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
COR / Project Engineer
CONSULTANT
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 of
Office of Construction and Facilities Management
Phase
DESIGNER OF RECORD
U.S. Department of Veterans Affairs
STAMP
VERITAS FIRE ENGINEERING, INC
12364 WEST ALAMEDA PARKWAY, SUITE 135
LAKEWOOD, COLORADO 80228
PH: (303) 985-3300
WWW.VERITAS.COM
517 7TH STREET
RAPID CITY, SD 57701
PH: (605) 342-9470
POC: JARED LOTT
FFD PROJECT NO:
19.2481.M18
DES IGN INC
DateRevisions 91
VOLUME 1 OF 2
/1
/2
:2
:2
P
M
6/12/2025
ICRA REQUIREMENTS
G-200
FARGO REPLACE FIRE ALARM
SYSTEM
TB, KZKP, RD
2101 ELM STREET
FARGO, NORTH DAKOTA 58102
TODD DALZELL
CONSTRUCTION
DOCUMENTS
437-23-105
N
RE
D
RI
VE
R
OF
TH
E
NO
RT
H
BOTTOM O
F D
IKE SLO
PE
BLDG. NO.
1 MEDICAL CENTER
3 ADMINISTRATION OFFICE
8 FLAGPOLE
9 MEDICAL CENTER
10 BOILER PLANT
11 MAINTENANCE GARAGE
12 WAREHOUSE
13 LAUNDRY
30 ADMINISTRATION OFFICE
39 HIGH VOLTAGE SWITCHGEAR BLDG
42 UND SCHOOL OF MEDICINE
46 MEDICAL CENTER
40 VA REGIONAL OFFICE
41 OXYGEN STORAGE TANK
43 PICNIC SHELTER AND PATIO
20 GATE WELL
50 COLD STORAGE BUILDING
51 HRMS
52 ADMINISTRATION OFFICE
53 HAZMAT STORAGE BUILDING
54 PANDEMIC FLU STORAGE BUILDING
56 CHILLER PLANT
12 13
CITY
LIFT
STATION
(STORM
SEWER)
57 ELECTRICAL SERVICE SWITCHGEAR
1 PRIMARY CARE ADDITION (UNDER CONSTRUCTION)
PRIMARY
CARE
ADDITION
52 MENTAL HEALTH ADDITION (UNDER CONSTRUCTION)
MENTAL
HEALTH
ADDITION
PHASING ORDER METHODOLOGY
THE PHASING PLAN FOR THE MAIN HOSPITAL BUILDING HAS BEEN
ORDERED BASED ON THE LOGIC OF WORKING FROM THE TOP OF
THE BUILDING TOWARDS THE GROUND FLOOR, UNOCCUPIED
FLOORS, TO STAFF ONLY OCCUPIED FLOORS, AND THEN PATIENT
OCCUPIED FLOORS.
FINAL PHASING PLAN SHALL BE SUBMITTED FOR APPROVAL BY THE
INSTALLING CONTRACTOR PRIOR TO THE START OF
CONSTRUCTION.
ACCEPTANCE AND COMMISSIONING WILL OCCUR AFTER EACH
PHASE IS COMPLETED. DEMO OPERATIONS WILL OCCUR AFTER
COMMISSIONING IS COMPLETE.
PHASING ORDER
PHASE 1: CAMPUS COMMUNICATION LOOP INSTALLATION AND
TESTING. INSTALL COMMUNICATIONS BACKBONE CABLING
BETWEEN NEW PANEL LOCATIONS.
PHASE 2: INSTALL FACP'S AND TRANSPONDERS IN NEW LOCATIONS.
CONNECT PANELS TO CAMPUS-WIDE COMMUNICATIONS LOOP.
INSTALL NEW POWER SUPPLIES, INCLUDING POWER AND SIGNAL
CONDUCTORS. BRING NEW PRIMARY SYSTEM COMPONENTS
ONLINE.
PHASE 3: INSTALLATION AND TESTING OF DETECTION AND
NOTIFICATION DEVICES. TESTING WILL BE PERFORMED UPON
COMPLETION OF INSTALLATION WITHIN EACH WORK AREA. WORK
AREA DESIGNATIONS ARE THE SAME AS SMOKE COMPARTMENT
DESIGNATIONS OUTLINED IN THE FARGO VA'S LIFE SAFETY PLANS
DATED OCT. 17, 2024 AND ARE SHOWN IN THE PHASING FLOOR
PLANS.
INSTALLATION SEQUENCE FOR MAIN HOSPITAL BUILDINGS (1,9,46):
WORK ZONE 1: PENTHOUSE FLOOR
WORK ZONE 2: AREAS 4.1, 4.3, 4.4
WORK ZONE 3: AREAS 3.1, 3.2, 3.6
WORK ZONE 4: AREAS 2.1, 2.2, 2.3, 2.4
WORK ZONE 5: AREAS 1.1, 1.2, 1.3
WORK ZONE 6: AREAS 1.4, 1.4.1, 1.5, 1.6
WORK ZONE 7: AREAS 1.7, 1.8. 1.9
WORK ZONE 8: AREA 0.1 (BASEMENT)
WORK ZONE 9: AREA 4.2
WORK ZONE 10: AREAS 3.3, 3.4, 3.5
WORK ZONE 11: AREAS 2.5, 2.6, 2.7
RECOMMENDED WORK ZONE SEQUENCING FOR FARGO VA
OUTBUILDINGS:
WORK ZONE 12: BUILDING 13
WORK ZONE 13: BUILDING 10, BUILDING 56, BUILDING 57
WORK ZONE 14: BUILDING 3, BUILDING 40, BUILDING 51, BUILDING 52
WORK ZONE 15: BUILDING 11, BUILDING 12
WORK ZONE 16 (FUTURE): BUILDING 42
THE WORK ZONE SEQUENCING PRESENTED FOR THE FARGO
VA OUTBUILDINGS REFLECTS A/E RECOMMENDED
APPROACH TO PHASING AND IMPLEMENTATION. THIS
SEQUENCE HAS BEEN DEVELOPED BASED ON DESIGN
PRIORITIES, CONSTRUCTION EFFICIENCY, AND MINIMIZING
OPERATIONAL IMPACTS. FINAL COORDINATION AND
CONFIRMATION OF THIS SEQUENCE WILL BE CONDUCTED
WITH THE VA TO ENSURE ALIGNMENT WITH SITE-SPECIFIC
NEEDS, OPERATIONAL CONSTRAINTS, AND VA
PREFERENCES.
G-300
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h
/1 5/
1:
:0
AM
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FARGO REPLACE FIRE
ALARM SYSTEM
437-23-105
Project Director
06/12/2025 WEW JMSRevisions: Date:
2101 ELM STREET, FARGO, ND 58102
VERITAS FIRE ENGINEERING, INC.
12364 WEST ALAMEDA PARKWAY, SUITE 135
LAKEWOOD, COLORADO 80228
PH: (303) 985-3300FIRE ENGINEERING, INC.
www.veritasfire.com
TODD DALZELL517 7TH STREET
RAPID CITY, SD 57701
PH: (605) 342-9470
POC: JARED LOTT
FFD PROJECT NO:
23.2730.M01 Dwg. of 91
VOLUME 1 OF 2
1 SCALE: 1/64" = 1'
OVERALL SITE PHASING PLAN
CAMPUS
OVERALL SITE
PHASING PLAN
REFER TO SHEET G-301 FOR
PHASING ZONES WITHIN MAIN
HOSPITAL BUILDINGS 1, 9 AND 46.
3.1
3.3
3.2
3.4
3.5 3.6
2.1
2.3
2.2
2.4
2.5
2.62.7
1.1
1.2 1.3
1.4
1.4.1 1.5
1.7
1.6
1.9
1.8
0.1
0.000000000000000
5.1
4.1
4.2
4.4
4.3
PHASING ORDER METHODOLOGY
THE PHASING PLAN FOR THE MAIN HOSPITAL BUILDING HAS BEEN
ORDERED BASED ON THE LOGIC OF WORKING FROM THE TOP OF
THE BUILDING TOWARDS THE GROUND FLOOR, UNOCCUPIED
FLOORS, TO STAFF ONLY OCCUPIED FLOORS, AND THEN PATIENT
OCCUPIED FLOORS.
FINAL PHASING PLAN SHALL BE SUBMITTED FOR APPROVAL BY THE
INSTALLING CONTRACTOR PRIOR TO THE START OF
CONSTRUCTION.
ACCEPTANCE AND COMMISSIONING WILL OCCUR AFTER EACH
PHASE IS COMPLETED. DEMO OPERATIONS WILL OCCUR AFTER
COMMISSIONING IS COMPLETE.
PHASING ORDER
PHASE 1: CAMPUS COMMUNICATION LOOP INSTALLATION AND
TESTING. INSTALL COMMUNICATIONS BACKBONE CABLING
BETWEEN NEW PANEL LOCATIONS.
PHASE 2: INSTALL FACP'S AND TRANSPONDERS IN NEW LOCATIONS.
CONNECT PANELS TO CAMPUS-WIDE COMMUNICATIONS LOOP.
INSTALL NEW POWER SUPPLIES, INCLUDING POWER AND SIGNAL
CONDUCTORS. BRING NEW PRIMARY SYSTEM COMPONENTS
ONLINE.
PHASE 3: INSTALLATION AND TESTING OF DETECTION AND
NOTIFICATION DEVICES. TESTING WILL BE PERFORMED UPON
COMPLETION OF INSTALLATION WITHIN EACH WORK AREA. WORK
AREA DESIGNATIONS ARE THE SAME AS SMOKE COMPARTMENT
DESIGNATIONS OUTLINED IN THE FARGO VA'S LIFE SAFETY PLANS
DATED OCT. 17, 2024 AND ARE SHOWN IN THE PHASING FLOOR
PLANS.
INSTALLATION SEQUENCE FOR MAIN HOSPITAL BUILDINGS (1,9,46):
WORK ZONE 1: PENTHOUSE FLOOR
WORK ZONE 2: AREAS 4.1, 4.3, 4.4
WORK ZONE 3: AREAS 3.1, 3.2, 3.6
WORK ZONE 4: AREAS 2.1, 2.2, 2.3, 2.4
WORK ZONE 5: AREAS 1.1, 1.2, 1.3
WORK ZONE 6: AREAS 1.4, 1.4.1, 1.5, 1.6
WORK ZONE 7: AREAS 1.7, 1.8. 1.9
WORK ZONE 8: AREA 0.1 (BASEMENT)
WORK ZONE 9: AREA 4.2
WORK ZONE 10: AREAS 3.3, 3.4, 3.5
WORK ZONE 11: AREAS 2.5, 2.6, 2.7
RECOMMENDED WORK ZONE SEQUENCING FOR FARGO VA
OUTBUILDINGS:
WORK ZONE 12: BUILDING 13
WORK ZONE 13: BUILDING 10, BUILDING 56, BUILDING 57
WORK ZONE 14: BUILDING 3, BUILDING 40, BUILDING 51, BUILDING 52
WORK ZONE 15: BUILDING 11, BUILDING 12
WORK ZONE 16 (FUTURE): BUILDING 42
THE WORK ZONE SEQUENCING PRESENTED FOR THE FARGO
VA OUTBUILDINGS REFLECTS A/E RECOMMENDED
APPROACH TO PHASING AND IMPLEMENTATION. THIS
SEQUENCE HAS BEEN DEVELOPED BASED ON DESIGN
PRIORITIES, CONSTRUCTION EFFICIENCY, AND MINIMIZING
OPERATIONAL IMPACTS. FINAL COORDINATION AND
CONFIRMATION OF THIS SEQUENCE WILL BE CONDUCTED
WITH THE VA TO ENSURE ALIGNMENT WITH SITE-SPECIFIC
NEEDS, OPERATIONAL CONSTRAINTS, AND VA
PREFERENCES.
PHASE 1: CAMPUS COMMUNICATION LOOP
PHASE 2: FACP AND TRANSPONDER INSTALLATION
PHASE 3 - WORK ZONE 8: BASEMENT
BASEMENT PHASING
PHASE 1: CAMPUS COMMUNICATION LOOP
PHASE 2: FACP AND TRANSPONDER INSTALLATION
PHASE 3 - WORK ZONE 5: AREAS 1.1, 1.2, 1.3
PHASE 3 - WORK ZONE 6: AREAS 1.4, 1.4.1, 1.5, 1.6
PHASE 3 - WORK ZONE 7: AREAS 1.7, 1.8, 1.9
1ST FLOOR PHASING
PHASE 1: CAMPUS COMMUNICATION LOOP
PHASE 2: FACP AND TRANSPONDER INSTALLATION
PHASE 3 - WORK ZONE 4: AREAS 2.1, 2.2, 2.3, 2.4
PHASE 3 - WORK ZONE 11: AREAS 2.5, 2.6, 2.7
2ND FLOOR PHASING
PHASE 1: CAMPUS COMMUNICATION LOOP
PHASE 2: FACP AND TRANSPONDER INSTALLATION
PHASE 3 - WORK ZONE 1: PENTHOUSE/5TH FLOOR
5TH FLOOR/PENTHOUSE PHASING
PHASE 1: CAMPUS COMMUNICATION LOOP
PHASE 2: FACP AND TRANSPONDER INSTALLATION
PHASE 3 - WORK ZONE 2: AREAS 4.1, 4.3, 4.4
PHASE 3 - WORK ZONE 9: AREA 4.2
4TH FLOOR PHASING
PHASE 1: CAMPUS COMMUNICATION LOOP
PHASE 2: FACP AND TRANSPONDER INSTALLATION
PHASE 3 - WORK ZONE 3: AREAS 3.1, 3.2, 3.6
PHASE 3 - WORK ZONE 10: AREAS 3.3, 3.4, 3.5
3RD FLOOR PHASING
G-301
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h
/1 5/
1:
:0
AM
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FARGO REPLACE FIRE
ALARM SYSTEM
437-23-105
Project Director
06/12/2025 WEW JMSRevisions: Date:
2101 ELM STREET, FARGO, ND 58102
VERITAS FIRE ENGINEERING, INC.
12364 WEST ALAMEDA PARKWAY, SUITE 135
LAKEWOOD, COLORADO 80228
PH: (303) 985-3300FIRE ENGINEERING, INC.
www.veritasfire.com
TODD DALZELL517 7TH STREET
RAPID CITY, SD 57701
PH: (605) 342-9470
POC: JARED LOTT
FFD PROJECT NO:
23.2730.M01 Dwg. of 91
VOLUME 1 OF 2
1,9,46
MAIN HOSPITAL BUILDING
PHASING PLANS
4 SCALE: 1/64" = 1'
MAIN HOSPITAL - THIRD FLOOR - PHASING PLAN
1 SCALE: 1/64" = 1'
MAIN HOSPITAL - BASEMENT - PHASING PLAN 2 SCALE: 1/64" = 1'
MAIN HOSPITAL - FIRST FLOOR - PHASING PLAN 3 SCALE: 1/64" = 1'
MAIN HOSPITAL - SECOND FLOOR - PHASING PLAN
5 SCALE: 1/64" = 1'
MAIN HOSPITAL - FOURTH FLOOR - PHASING PLAN 6 SCALE: 1/64" = 1'
MAIN HOSPITAL - FIFTH FLOOR - PHASING PLAN
IMAGE #1
IMAGE #2
IMAGE #5
IMAGE #3
IMAGE #4
IMAGE #6
CONGESTED CEILING CONDITIONS WERE OBSERVED IN
MANY AREAS OF THE MAIN HOSPITAL WHICH WILL
REQUIRE SPECIAL CONSIDERATION WHEN ROUTING NEW
FIRE ALARM AND ELECTRICAL CONDUITS. THE IMAGES
SHOWN ON THIS SHEET PROVIDE A LIMITED SAMPLE OF
THE CEILING SPACE CONDITIONS THAT CAN BE
EXPECTED. THE CEILING SPACES WITHIN THE CLOUDED
REGIONS ON THE CEILING CONGESTION KEY PLANS ARE
BELIEVED TO HAVE DENSELY PACKED EXISTING PIPES
AND CONDUIT. SPECIAL CONSIDERATION TO CONDUIT
ROUTING AND CAREFUL FIELD COORDINATION WILL BE
REQUIRED IN THE IDENTIFIED AREAS. SIMILAR
CONGESTED CEILING CONDITIONS MAY EXIST IN
ADDITION TO AREAS IDENTIFIED ON DRAWINGS. IT IS THE
RESPONSIBILITY OF THE CONTRACTOR VERIFY
CONDITIONS AND TO DETERMINE VIABLE CONDUIT
PATHWAYS.
NOTE THAT IMAGES HAVE NOT BEEN PROVIDED FOR THE
AREAS WITH A GRID STYLE CEILING AS THE CEILING
SPACE IS CONCEALED FROM VIEW IN THOSE AREAS.
GENERAL CEILING CONDITION NOTE
G-302
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h
/1 5/
1:
:0
AM
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FARGO REPLACE FIRE
ALARM SYSTEM
437-23-105
Project Director
06/12/2025 WEW JMSRevisions: Date:
2101 ELM STREET, FARGO, ND 58102
VERITAS FIRE ENGINEERING, INC.
12364 WEST ALAMEDA PARKWAY, SUITE 135
LAKEWOOD, COLORADO 80228
PH: (303) 985-3300FIRE ENGINEERING, INC.
www.veritasfire.com
TODD DALZELL517 7TH STREET
RAPID CITY, SD 57701
PH: (605) 342-9470
POC: JARED LOTT
FFD PROJECT NO:
23.2730.M01 Dwg. of 91
VOLUME 1 OF 2
1,9,46
AREAS OF CEILING
CONGESTION KEY PLANS
2 SCALE: 1/64" = 1'
MAIN HOSPITAL - BASEMENT
AREAS OF CONGESTION KEY PLAN 3 SCALE: 1/64" = 1'
MAIN HOSPITAL - 1ST FLOOR
AREAS OF CONGESTION KEY PLAN
1 SCALE: 1/4" = 1'
MAIN HOSPITAL - CEILING SPACE PHOTOS
4 SCALE: 1/64" = 1'
MAIN HOSPITAL - 2ND FLOOR
AREAS OF CONGESTION KEY PLAN 5 SCALE: 1/64" = 1'
MAIN HOSPITAL - 3RD FLOOR
AREAS OF CONGESTION KEY PLAN
IMAGE #1 IMAGE #2 IMAGE #3 IMAGE #4 IMAGE #5 IMAGE #6
THE ROOM LIST ON THIS SHEET IS BEING PROVIDED AS
SUPPLEMENTAL INFORMATION TO THE FIRE ALARM
PLANS. MATCHING THE ROOM NUMBERS SHOWN ON THE
FLOOR PLANS WITH THE DESCRIPTIONS IN THE ROOM
LIST WILL PROVIDE INFORMATION NECESSARY FOR THE
CONTRACTOR TO PREPARE A FULL DEFERRED
SUBMITTAL FOR THE PROJECT.
ROOM LIST WAS CREATED BASED ON INFORMATION
PROVIDED BY VA DURING DESIGN AND HAS NOT BEEN
VERIFIED FOR ACCURACY. IT IS THE RESPONSIBILITY OF
CONTRACTOR TO VERIFY ROOM USAGE AND REPORT
ANY DISCREPANCIES TO THE A/E AT THE TIME OF
PROJECT CONSTRUCTION STARTING.
GENERAL NOTE
G-303
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h
/1 5/
1:
:0
AM
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FARGO REPLACE FIRE
ALARM SYSTEM
437-23-105
Project Director
06/12/2025 WEW JMSRevisions: Date:
2101 ELM STREET, FARGO, ND 58102
VERITAS FIRE ENGINEERING, INC.
12364 WEST ALAMEDA PARKWAY, SUITE 135
LAKEWOOD, COLORADO 80228
PH: (303) 985-3300FIRE ENGINEERING, INC.
www.veritasfire.com
TODD DALZELL517 7TH STREET
RAPID CITY, SD 57701
PH: (605) 342-9470
POC: JARED LOTT
FFD PROJECT NO:
23.2730.M01 Dwg. of 91
VOLUME 1 OF 2
1,9,46
MAIN HOSPITAL ROOM LIST
BASEMENT AND 1ST FLOORS
PLANS. MATCHING THE ROOM NUMBERS SHOWN ON THE
FLOOR PLANS WITH THE DESCRIPTIONS IN THE ROOM
LIST WILL PROVIDE INFORMATION NECESSARY FOR THE
CONTRACTOR TO PREPARE A FULL DEFERRED
SUBMITTAL FOR THE PROJECT.
ROOM LIST WAS CREATED BASED ON INFORMATION
PROVIDED BY VA DURING DESIGN AND HAS NOT BEEN
VERIFIED FOR ACCURACY. IT IS THE RESPONSIBILITY OF
CONTRACTOR TO VERIFY ROOM USAGE AND REPORT
ANY DISCREPANCIES TO THE A/E AT THE TIME OF
PROJECT CONSTRUCTION STARTING.
GENERAL NOTE
G-304
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h
/1 5/
1:
:0
AM
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FARGO REPLACE FIRE
ALARM SYSTEM
437-23-105
Project Director
06/12/2025 WEW JMSRevisions: Date:
2101 ELM STREET, FARGO, ND 58102
VERITAS FIRE ENGINEERING, INC.
12364 WEST ALAMEDA PARKWAY, SUITE 135
LAKEWOOD, COLORADO 80228
PH: (303) 985-3300FIRE ENGINEERING, INC.
www.veritasfire.com
TODD DALZELL517 7TH STREET
RAPID CITY, SD 57701
PH: (605) 342-9470
POC: JARED LOTT
FFD PROJECT NO:
23.2730.M01 Dwg. of 91
VOLUME 1 OF 2
1,9,46
MAIN HOSPITAL ROOM LIST
2ND AND 3RD FLOORS
PLANS. MATCHING THE ROOM NUMBERS SHOWN ON THE
FLOOR PLANS WITH THE DESCRIPTIONS IN THE ROOM
LIST WILL PROVIDE INFORMATION NECESSARY FOR THE
CONTRACTOR TO PREPARE A FULL DEFERRED
SUBMITTAL FOR THE PROJECT.
ROOM LIST WAS CREATED BASED ON INFORMATION
PROVIDED BY VA DURING DESIGN AND HAS NOT BEEN
VERIFIED FOR ACCURACY. IT IS THE RESPONSIBILITY OF
CONTRACTOR TO VERIFY ROOM USAGE AND REPORT
ANY DISCREPANCIES TO THE A/E AT THE TIME OF
PROJECT CONSTRUCTION STARTING.
GENERAL NOTE
G-305
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h
/1 5/
1:
:0
AM
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FARGO REPLACE FIRE
ALARM SYSTEM
437-23-105
Project Director
06/12/2025 WEW JMSRevisions: Date:
2101 ELM STREET, FARGO, ND 58102
VERITAS FIRE ENGINEERING, INC.
12364 WEST ALAMEDA PARKWAY, SUITE 135
LAKEWOOD, COLORADO 80228
PH: (303) 985-3300FIRE ENGINEERING, INC.
www.veritasfire.com
TODD DALZELL517 7TH STREET
RAPID CITY, SD 57701
PH: (605) 342-9470
POC: JARED LOTT
FFD PROJECT NO:
23.2730.M01 Dwg. of 91
VOLUME 1 OF 2
1,9,46
MAIN HOSPITAL ROOM LIST
4TH FLOOR AND PENTHOUSE
9' - 0", V.I.F.
CEILING HEIGHT
TYPICAL DEVICE TO BE REMOVED, SEE FIRE
PROTECTION DRAWINGS FOR LOCATIONS; PATCH
AND REPAIR WALL AS REQUIRED AFTER REMOVAL
OF DEVICE, SEE GENERAL ARCHITECTURAL NOTES
V.I.F.
DOOR FRAME TO DOOR FRAME
PAINT WALL FROM DOOR FRAME TO DOOR FRAME,
SEE ARCHITECTURAL GENERAL NOTES AND
SPECIFICATIONS
TYPICAL DEVICE TO BE REMOVED, SEE FIRE
PROTECTION DRAWINGS FOR LOCATIONS; PATCH
AND REPAIR WALL AS REQUIRED AFTER REMOVAL
OF DEVICE, SEE GENERAL ARCHITECTURAL NOTES
PAINT WALL FROM DOOR FRAME TO CORNER, SEE
ARCHITECTURAL GENERAL NOTES AND
SPECIFICATIONS
V.I.F.
DOOR FRAME TO CORNER
9' - 0", V.I.F.
CEILING HEIGHT
TYPICAL DEVICE TO BE REMOVED,
SEE FIRE PROTECTION DRAWINGS
FOR LOCATIONS; PATCH AND
REPAIR WALL AS REQUIRED AFTER
REMOVAL OF DEVICE, SEE
GENERAL ARCHITECTURAL NOTES
V.I.F.
LENGTH OF WALL
PAINT ENTIRE WALL, FROM
CORNER TO CORNER, SEE
ARCHITECTURAL GENERAL NOTES
AND SPECIFICATIONS
AREA TO BE PAINTED, SEE
GENERAL ARCHITECTURAL
NOTES AND SPECIFICATIONS
LEGEND:
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
COR / Project Engineer
CONSULTANT
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 of
Office of Construction and Facilities Management
Phase
DESIGNER OF RECORD
U.S. Department of Veterans Affairs
STAMP
VERITAS FIRE ENGINEERING, INC
12364 WEST ALAMEDA PARKWAY, SUITE 135
LAKEWOOD, COLORADO 80228
PH: (303) 985-3300
WWW.VERITAS.COM
517 7TH STREET
RAPID CITY, SD 57701
PH: (605) 342-9470
POC: JARED LOTT
FFD PROJECT NO:
19.2481.M18
DES IGN INC
DateRevisions 91
VOLUME 1 OF 2
/1
/2
:2
:1
P
M
6/12/2025
ARCHITECTURAL NOTES AND
TYPICAL DETAILS
A-100
FARGO REPLACE FIRE ALARM
SYSTEM
KZKP
2101 ELM STREET
FARGO, NORTH DAKOTA 58102
TODD DALZELL
CONSTRUCTION
DOCUMENTS
437-23-105
GENERAL ARCHITECTURAL NOTES:
1. SEE FIRE ALARM DRAWINGS FOR DEMOLITION OF EXISTING FIRE ALARM PANELS, CONTROLLERS, AND
DEVICES ALONG WITH ALL ASSOCIATED CONDUIT AND WIRING.
2. SEE FIRE ALARM DRAWINGS FOR LOCATION AND INSTALLATION OF NEW FIRE ALARM SYSTEM.
3. AT PAINTED WALLS, PATCH AND REPAIR GYPSUM BOARD AFTER REMOVAL OF DEVICE. PAINT EXISTING
WALL SURFACE TO MATCH ADJACENT. INTENT IS TO PAINT FROM DOOR FRAME TO DOOR FRAME, OR CORNER TO CORNER. CEILING HEIGHT IS 9'-0" TYPICAL. CONTRACTOR TO MASK ALL FIXED WALL MOUNTED EQUIPMENT AND FURNISHING AND TEMPORARILY REMOVE NON-FIXED WALL ITEMS (SUCH AS ARTWORK) FOR REPAINTING BEHIND. SEE SPECIFICATIONS FOR PAINTING MATERIALS AND PREP WORK
REQUIRED PRIOR TO APPLICATION. COORDINATE COLOR WITH VA COR.
4. AT NON-PAINTED WALL SURFACES, PROVIDE A STAINLESS STEEL COVER PLATE TO COVER HOLE AFTER
REMOVAL OF DEVICE. COORDINATE WITH VA COR.
5. AT REMOVAL OF CEILING MOUNTED DEVICES IN GYPSUM BOARD CEILINGS, PATCH AND REPAIR GYPSUM BOARD AFTER REMOVAL OF DEVICE. PAINT ENTIRE CEILING TO MATCH TO THE NEAREST INSIDE OR
OUTSIDE CORNER. COORDINATE WITH VA COR.
6. AT REMOVAL OF CEILING MOUNTED DEVICES IN ACT CEILINGS, REPLACE CEILING TILE AFTER REMOVAL OF
DEVICE TO MATCH ADJACENT TILE. COORDINATE WITH VA COR.
7. AT ALL RATED ASSEMBLIES WHERE DEVICES OR CONDUITS ARE REMOVED, REPAIR HOLES TO MAINTAIN THE RATED ASSEMBLY AND FINISH TO MATCH ADJACENT MATERIAL. PAINT CORNER TO CORNER.
8. AT ALL CONCRETE, PLASTER, ETC. SURFACES WHERE DEVICES OR CONDUITS ARE REMOVED, PATCH ALL
SURFACES TO MATCH ADJACENT TEXTURE, FINISH TO MATCH ADJACENT SURFACES.
9. AT ALL MASONRY, CLAY TILE, OR SIMILAR SURFACE, REPAIR BY REMOVING MASONRY UNITS AFFECTED BY EQUIPMENT INSTALLATION AND REPLACE WITH SIMILAR MASONRY UNITS, FINISH TO MATCH ADJACENT
SURFACES.
10. AT ALL HOLES IN THE FLOORS WHERE DEVICES OR CONDUITS ARE REMOVED, PATCH ALL SURFACES TO MATCH ADJACENT CONSTRUCTION, TEXTURE, AND FIRE RATING. FINISH TO MATCH ADJACENT SURFACES
AS APPROVED BY THE VA COR.
1/4" = 1'-0"
TYPICAL CORRIDOR ELEVATION
1/4" = 1'-0"
TYPICAL ROOM ELEVATION
GENERAL NOTES:
1. SHEET SIZE FOR PROPER SCALE IS 30 X 42. CONTRACTOR SHALL NOT SCALE DRAWINGS BUT SHALL
REQUEST THE DESIRED DIMENSIONS FROM THE ARCHITECT.
2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VISIT THE PROJECT AND VERIFY EXISTING
CONDITIONS/DIMENSIONS AND PROPOSED CONDITIONS. COORDINATE DEMOLITION BETWEEN ALL
TRADES. NOTIFY A/E IMMEDIATELY OF ANY CONFLICTS OR DISCREPANCIES.
3. THE VA PREFERS TO HAVE CONCEALED INSTALLATION OF DEVICES WHERE POSSIBLE. USE OF SURFACE
MOUNT DEVICES REQUIRE VA COR APPROVAL.
ELECTRICAL ABBREVIATIONS
1PH SINGLE-PHASE
1P SINGLE POLE
2/C TWO-CONDUCTOR
3/C THREE-CONDUCTOR
3PH THREE-PHASE
4/C FOUR-CONDUCTOR
4W FOUR-WIRE
AAP ALARM ANNUNCIATOR PANEL
AC ALTERNATING CURRENT OR ARMORED
CABLE
ACC ACCESSIBLE
ADO AUTOMATIC DOOR OPENER
AFC ABOVE FINISHED COUNTER, AUTOMATIC
FREQUENCY CONTROL, OR AVAILABLE
FAULT CURRENT
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AH AMPERE HOUR
AHJ AUTHORITY HAVING JURISDICTION
AIC AMPERE INTERRUPTING CAPACITY
AMP AMPERE
ASC AMPS SHORT CIRCUIT
AT AMPERE TRIP
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AV AUDIO VISUAL
BAS BUILDING AUTOMATION SYSTEM
BFF BELOW FINISH FLOOR
BLDG BUILDING
BPIP BOILER PLANT INSTRUMENTATION PANEL
BRKR BREAKER
BYP BYPASS
C CONDUIT
CAB CABINET
CALC CALCULATE
CAP CAPACITY
CAT CATALOG
CATV COMMUNITY ANTENNA TELEVISION
CCR CONTROL CONTACTOR
CCTV CLOSED CIRCUIT TELEVISION
cd CANDELA
CD CONSTRUCTION DOCUMENTS
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED/CONTRACTOR
INSTALLED
CF/OI CONTRACTOR FURNISHED/OWNER
INSTALLED
CHW CHILLED WATER
CHWP CHILLED WATER PUMP
CKT CIRCUIT
CKT BRKR CIRCUIT BREAKER
CLF CURRENT LIMITING FUSE
CLG CEILING
CMU CONCRETE MASONRY UNIT
COAX COAX CABLE
COMM COMMUNICATION
CONC CONCRETE
CONT CONTINUE
CONTR CONTRACTOR
COORD COORDINATE
CPT CONTROL POWER TRANSFORMER
CRI COLOR RENDERING INDEX
CT CURRENT TRANSFORMER
CTV CABLE TELEVISION
CU COPPER
CU FT CUBIC FEET
CUR CURRENT
DAS DISTRIBUTED ANTENNA SYSTEM
DB DECIBEL
DC DIRECT CURRENT
DCP DIMMER CONTROL PANEL
DEG C DEGREES CELSIUS
DEG F DEGREES FAHRENHEIT
DEMO DEMOLITION
DIAG DIAGRAM
DISC DISCONNECT
DISTR DISTRIBUTION
DISTR PNL DISTRIBUTION PANEL
DMR SW DIMMER SWITCH
DN DOWN
DPDT DOUBLE POLE, DOUBLE THROW
DPST DOUBLE POLE, SINGLE THROW
DRSW DOOR SWITCH
DS DISCONNECT SWITCH
DWG DRAWING
EC EMPTY CONDUIT
EG EQUIPMENT GROUND
EL ELEVATION
ELEC ELECTRIC OR ELECTRICAL
ELEV ELEVATOR
EMCP EMERGENCY MONITORING CONTROL
PANEL
EMER EMERGENCY
EMI ELECTROMAGNETIC INTERFERENCE
EMT ELECTRICAL METALLIC TUBING
ENCL ENCLOSURE
EPO EMERGENCY POWER OFF
EPRF EXPLOSION PROOF
ESMT EASEMENT
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EXIST EXISTING
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FABL FIRE ALARM BELL
FABX FIRE ALARM BOX
FACP FIRE ALARM CONTROL PANEL
FC FOOTCANDLE
FIXT FIXTURE
FLA FULL LOAD AMPS
FLEX FLEXIBLE METALLIC CONDUIT
FLT FLOODLIGHT
FLUOR FLUORESCENT
FLUOR FIX FLUORESCENT FIXTURE
FOUTT TELEPHONE FLOOR OUTLET
FP FIRE PROTECTION
FT FEET OR FOOT
FU SW FUSED SWITCH
FVNR FULL VOLTAGE NON-REVERSING
FVR FULL VOLTAGE REVERSING
G OR GND GROUND
GEN GENERATOR
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GTB GROUND TERMINAL BOX
HID HIGH INTENSITY DISCHARGE
HOA HAND-OFF-AUTOMATIC
HP HORSEPOWER
HT HEIGHT
HZ HERTZ
IESNA ILLUMINATION ENGINEERING SOCIETY OF
NORTH AMERICA
IMC INTERMEDIATE METAL CONDUIT
INCAND INCANDESCENT
IR INFRARED
IWH INSTANTANEOUS WATER HEATER
J-BOX JUNCTION BOX
kV KILOVOLT kVA KILOVOLT AMPERE kVAH KILOVOLT AMPERE PER HOUR kVAR KILOVOLT AMPERE REACTIVE kW KILOWATT kWH KILOWATT HOUR kWHM KILOWATT HOUR METER
LED LIGHT EMITTING DIODE
LF LINEAR FEET (FOOT)
LM LUMEN
LP LIGHT POLE
LPS LOW PRESSURE SODIUM
LRA LOCKED ROTOR AMPS
LTCP LOCAL TEMPERATURE CONTROL PANEL
LT LIGHT
LTG LIGHTING
LTG PNL LIGHTING PANEL
LTNG LIGHTNING
LV LOW VOLTAGE
MATV MASTER ANTENNA TELEVISION SYSTEM
MAX MAXIMUM
MC METAL-CLAD
MCA MINIMUM CIRCUIT AMPS
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MDP MAIN DISTRIBUTION PANEL
MECH MECHANICAL
MG MOTOR GENERATOR
MH MANHOLE
MIN MINIMUM
MOCP MAXIMUM OVERCURRENT PROTECTION
MLO MAIN LUGS ONLY
MT MOUNT
MTD MOUNTED
MTG MOUNTING
MTS MANUAL TRANSFER SWITCH
MVA MEGAVOLT-AMPERE
MW MEGAWATT MICROWAVE
NA NOT APPLICABLE
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL
MANUFACTURERS ASSOCIATION
NEUT OR N NEUTRAL
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NL NIGHT LIGHT
NO NORMALLY OPEN
NS NO SCALE
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OF OWNER FURNISHED
OF/CI OWNER FURNISHED/CONTRACTOR
INSTALLED
OF/OI OWNER FURNISHED/OWNER INSTALLED
OL OVERLOAD
OS OCCUPANCY SENSOR
P POLE
PA PUBLIC ADDRESS
PB PANELBOARD, PULL BOX, OR
PUSHBUTTON
PBPU PREFABRICATED BEDSIDE PATIENT UNIT
PCB POLYCHLORINATED BIPHENYL
PEC PHOTOELECTRIC CELL
PED PEDESTAL
PEND PENDANT
PF POWER FACTOR
PH PHASE
PNL PANEL
POD POWER OPERATED DAMPER
PT POTENTIAL TRANSFORMER
PTRV POWER TYPE ROOF VENTILATION
PVC POLYVINYL CHLORIDE (PLASTIC)
PWR POWER
RCP REFLECTED CEILING PLAN
REC RECESSED
RECPT RECEPTACLE
RGS RIGID GALVANIZED STEEL
RM ROOM
RMS ROOT MEAN SQUARE
REQD REQUIRED
SCC SHORT CIRCUIT CAPACITY
SES SERVICE ENTRANCE SECTION
SD SMOKE DETECTOR
SF SQUARE FOOT (FEET)
SHT SHEET
SI INTERNATIONAL SYSTEM OF UNITS
SPEC SPECIFICATION
SPST SINGLE POLE, SINGLE THROW
SPDT SINGLE POLE, DOUBLE THROW
SURF SURFACE
SW SWITCH
SWBD SWITCHBOARD
SWGR SWITCHGEAR
TC TIME CLOCK
TEL TELEPHONE
TP TWISTED PAIR
TPS TWISTED PAIR SHIELDED
TTB TELEPHONE TERMINAL BOARD
TV TELEVISION
TYP TYPICAL
UFD UNDERFLOOR DUCT
UGND UNDERGROUND
UL UNDERWRITERS LABORATORY
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER SUPPLY
UTIL UTILITY
V VOLT
VA VOLT AMPERE
VAR VOLT AMPERE REACTIVE
VFD VARIABLE FREQUENCY DRIVE
VOLT VOLTAGE
VS VACANCY SENSOR
W WATT
WH WATER HEATER
WP WEATHERPROOF
XFER TRANSFER
XFMR TRANSFORMER
SWITCH, MULTIPOSITION
SWITCH, NORMALLY CLOSED FLOAT
SWITCH, NORMALLY CLOSED FOOT OPERATED
SWITCH, NORMALLY CLOSED LIMIT
SWITCH, NORMALLY CLOSED TIME DELAY
SWITCH, NORMALLY OPEN FLOAT
SWITCH, NORMALLY OPEN LIMIT
SWITCH, NORMALLY OPEN TEMPERATURE ACTIVATED
SWITCH, NORMALLY OPEN TIME DELAY
SWITCH, SINGLE BREAK
FUSE WITH RATING
NORMALLY CLOSED RELAY CONTACT
NORMALLY OPEN RELAY CONTACT
MOLDED CASE CIRCUIT BREAKER
LOW-VOLTAGE DRAWOUT AIR CIRCUIT BREAKER
HIGH-VOLTAGE OIL CIRCUIT BREAKER
HIGH-VOLTAGE DRAWOUT AIR CIRCUIT BREAKER
O.C.B.
SWITCH AND FUSE UNIT
FUSED DRAWOUT POTENTIAL TRANSFORMER
MOTOR, SINGLE-PHASE
MOTOR, THREE-PHASE
DELTA CONNECTION
TRANSFORMER
WYE CONNECTION
EARTH GROUND
JUNCTION BOX
PULL BOX
PRESSURE SWITCH-CLOSE ON INCREASE
PRESSURE SWITCH-OPEN ON INCREASE
FUSIBLE LINK
TIME CLOCK
GENERATOR, POWERG
BATTERY
CAPACITOR
LIGHTNING ARRESTOR
R
RECTIFIER, CATHODIC PROTECTION SANITARY
INSTANTANEOUS OVERCURRENT RELAY
DISCONNECT SWITCH, FUSED
DISCONNECT SWITCH, UNFUSED
STARTER, COMBINATION WITH DISCONNECT SWITCH
STARTER OR MOTOR CONTROLLER
POTHEAD
STRESS CONE
M METER
A AMMETER
V VOLTMETER
W WATTMETER
WH WATT-HOUR METER
J
PB
R
AC-TIME OVERCURRENT RELAYR
AC-DIRECTIONAL OVERCURRENT RELAYR
LOCKING OUT RELAYR
TC
SYMBOL
SWITCH, NORMALLY CLOSED
TEMPERATURE ACTIVATED
DESCRIPTION
ELECTRICAL LEGEND
(DETAILS)
DUCT, CELL FLOOR HEADER
T T DUCT, TROLLEY
DUCT, UNDERFLOOR JUNCTION BOX
RC RIGID CONDUIT LINE = RC
SUBSTATION
DISTRIBUTION PANEL
LIGHTING PANEL
PANELBOARD CABINET, FLUSH MOUNTED
PANELBOARD CABINET, SURFACE MOUNTED
C RECEPTACLE, CLOCK HANGER
RECEPTACLE, DUPLEX
RECEPTACLE, DUPLEX ON EMERGENCY POWER
RECEPTACLE, GFCI DUPLEX
RECEPTACLE, QUADRAPLEX
DB DIRECT BURIAL CABLE = DB
P POWER DUCT = P
HI VOLTAGE SWITCH ON CONCRETE PAD
LOW VOLTAGE SWITCH ON CONCRETE PAD
DUAL POWER AND TELECOMMUNICATIONS MANHOLE
MOTOR, SINGLE-PHASE
MOTOR, THREE-PHASE
TRANSFORMER
WYE CONNECTION
EARTH GROUND
JUNCTION BOX
PULL BOX
J
PB
SYMBOL DESCRIPTION
ELECTRICAL LEGEND
(FLOORPLAN)
C C LADDER CABLE TRAY
BRANCH CIRCUIT HOMERUN. LINES INDICATE
NUMBER OF CIRCUITS, NEUTRAL, AND SWITCH LEG
CONDUCTORS. ONE SEPARATE GREEN GROUNDING
CONDUCTOR SHALL BE PROVIDED FOR EACH
HOMERUN; NOT SHOWN
W W WIREWAY
T P
LVS
HVS
S
B B BUSWAY
LP
DP#__
A
B
C
D
RECEPTACLE, SPECIAL PURPOSE 208V,
20A, 1 PHASE, 2-POLE, 3W, NEMA 6-20R.
RECEPTACLE, SPECIAL PURPOSE 120V,
30A, 1 PHASE, 2-POLE, 3W, NEMA 5-30R.
RECEPTACLE, SPECIAL PURPOSE 208V,
30A, 1 PHASE, 2-POLE, 3W, NEMA 6-30R.
RECEPTACLE, SPECIAL PURPOSE 120V,
20A, 1 PHASE, 2-POLE, 3W, NEMA 5-20R.
VENTILATOR OR FAN COIL UNIT OUTLET
SWITCH, SPST
VARIABLE FREQUENCY DRIVE
TIME CLOCK
R
RECTIFIER, CATHODIC PROTECTION SANITARY
INSTANTANEOUS OVERCURRENT RELAY
DISCONNECT SWITCH, FUSED
DISCONNECT SWITCH, UNFUSED
STARTER, COMBINATION WITH DISCONNECT SWITCH
STARTER OR MOTOR CONTROLLER
R
AC-TIME OVERCURRENT RELAYR
AC-DIRECTIONAL OVERCURRENT RELAYR
LOCKING OUT RELAYR
TC
SYMBOL DESCRIPTION
ELECTRICAL STRIP MOLD (OUTLETS ON 2'-0" [610mm]
CENTERS OR AS DESIGNATED ON DRAWINGS), MTD
3'-6" [1067mm] AFF OR AS INDICATED.
VFD
CONDUIT TERMINATED W/COUPLING
(FLUSH W/FINISHED FLOOR) FOR
EXTENSION TO EQUIPMENT AS DIRECTED.
CONDUIT TERMINATED 6" [152mm] AFF IN STANDARD
BOX FOR EXTENSION TO EQUIPMENT AS DIRECTED.
SWITCH, DPST2
SWITCH, FUSEDF
SWITCH, KEY OPERATEDK
SWITCH, LOCKL
SWITCH, LOW VOLTAGE MASTERLM
SWITCH, MANUAL MOTOR STARTINGM
SWITCH, MOMENTARY CONTACTMC
MP
SWITCH, WITH PILOT LIGHTP
SWITCH, PUSH BUTTONPB
SWITCH, REMOTE CONTROLRC
SWITCH, WEATHER PROOFWP
SWITCH, EXPLOSION PROOFX
SWITCH, THREE WAY3
SWITCH, THREE WAY DIMMER3D
SWITCH, THREE WAY OCCUPANCY SENSOR3OS
SWITCH, FOUR WAY4
SWITCH, DIMMERD
SWITCH, DOOR JAMBDOOR
SWITCH, FOUR WAY OCCUPANCY SENSOR4OS
SWITCH, OCCUPANCY SENSOROS
SWITCH, PHOTOCELLPH
SWITCH, OCCUPANCY SENSOR DIMMEROSD
SWITCH, MOTOR SNAP WITH
PILOT LIGHT (THERMAL TYPE)
E
RECEPTACLE, SPECIAL PURPOSE 208V,
60A, 1 PHASE, 3-POLE, 4W, NEMA 14-60R.
CABLE TELEVISION LINE = CATV
CLOSED CIRCUIT TELEVISION LINE = CCTV
FIBEROPTICS LINE = FO
COMMUNICATIONS FLOOR RECEPTACLE
PAGING SPEAKER, CEILING MOUNTED
PAGING SPEAKER, WALL MOUNTED
CATV
CCTV
FO
COMMUNICATIONS WALL RECEPTACLE
COMMUNICATIONS LINE = COMCOM
INTERCOM LINE = II
NURSE CALL LINE = NCNC
NCS NURSE'S CALL MASTER STATION
NCT NURSE CALL TERMINAL CABINET.
NURSE CALL STATION.
D = DUTY STATION. MTD 5' AFF
E = MTD 6' AFF FOR SHOWER LOCATION
MTD 4'-6" AFF FOR TUB LOCATION
MTD 3' AFF FOR TOILET LOCATION
P = PSYCHIATRIC CORRIDOR STATION WITH KEY
SWITCH
S = AUDIO VISUAL STAFF STATION MTD 5' AFF
U = UTILITY CALL STATION, MTD 5' AFF
NURSE CALL STATION.
D = CORRIDOR DOME LIGHT MTD 6" ABOVE DOOR
I = AUXILIARY INTERSECTIONAL DOME LIGHT
TELECOMMUNICATIONS TERMINAL CABINET
TELECOMMUNICATIONS BACKBOARD (WALL MTD)
TELECOMMUNICATIONS MANHOLE
COMMUNICATIONS CEILING RECEPTACLE
TELEVISION FLOOR RECEPTACLE
C =CAMERA (CCTV SYSTEM)
M =MONITOR (CATV SYSTEM).
AV= AUDIO VISUAL (CONFERENCE ROOM
CONNECTION RECEPTACLES)
M
M
M
S
S
AUDIO VISUAL LINE = AVAV
TTB
N D
N D
RECEPTACLE, SWITCHED DUPLEXS
F
G
H
RECEPTACLE, SPECIAL PURPOSE 208V,
30A, 3 PHASE, 3-POLE 4W, NEMA 15-30R.
RECEPTACLE, SPECIAL PURPOSE 208V,
50A, 3 PHASE, 3 POLE, 4W, NEMA 15-50R.
RECEPTACLE, SPECIAL PURPOSE 208V,
60A, 3 PHASE, 3 POLE, 4W, NEMA 15-60R.
DROP CORD, SINGLE CONVENIENCE OUTLET, 3-WIRE,
GROUNDING TYPE, 20A, W/#12 CONDUCTORS IN
FLEXIBLE CORD (CENTER LINE OF OUTLET: 6'-6"
[1981mm] AFF. MINIMUM).
TELEVISION WALL RECEPTACLE
C =CAMERA (CCTV SYSTEM)
M =MONITOR (CATV SYSTEM).
AV= AUDIO VISUAL (CONFERENCE ROOM
CONNECTION RECEPTACLES)
TELEVISION CEILING RECEPTACLE
C =CAMERA (CCTV SYSTEM)
M =MONITOR (CATV SYSTEM).
AV= AUDIO VISUAL (CONFERENCE ROOM
CONNECTION RECEPTACLES)
SYMBOL DESCRIPTION
J
RECEPTACLE, SPECIAL PURPOSE 208V,
20A, 3 PHASE, 3 POLE, 4W, NEMA 15-20R.
EH ELECTRIC POWER HINGE
DC DOOR CONTACT
MID MOTION INTRUSION DETECTOR
SSTV SECURITY SURVEILLANCE TELEVISION
C CAMERA
C 360 CAMERA
CARD ACCESS READER; LETTER INDICATES AS
FOLLOWS:
M=MOUNT
C-CEILING D-DESK F-FLUSH H-HIDDEN
M-MULLION P-PEDESTAL R-RACK S-SURFACE
W-WALL
T=TECHNOLOGY/TYPE
B-BARCODE M-MAG STRIP
F-ELEVATOR FLOOR CALL P-PROXIMITY
H-ELEVATOR HALL CALL S-SMART CARD
T-TOKEN
DURESS/PANIC ALARM PUSH BUTTON
M
T
M
T
M
T
ELECTROMAGNETIC TYPE DOOR HOLDER OUTLETDH
ELECTRONIC LOCK; LETTER INDICATES AS
FOLLOWS:
M=MOUNT
C-CEILING D-DESK F-FLUSH H-HIDDEN
M-MULLION P-PEDESTAL R-RACK S-SURFACE
W-WALL
T=TECHNOLOGY/TYPE
D-DEADBOLT H-HYBRID L-LATCH SET
M-MAGNETIC S-STRIKE
INTERCOM; LETTER INDICATES AS FOLLOWS:
M=MOUNT
C-CEILING D-DESK F-FLUSH H-HIDDEN
M-MULLION P-PEDESTAL R-RACK S-SURFACE
W-WALL
T=TECHNOLOGY/TYPE
M-MASTER S-SUBSTATION
ITEMS SHOWN IN GRAY ARE EXISTING TO REMAIN
DEMOLITION PLANS: SOLID DARK ITEMS ARE TO BE
REMOVED OR MODIFIED.
NEW PLANS: SOLID DARK ITEMS ARE TO BE
ADDED OR MODIFIED.
DASHED ITEMS ARE INSTALLED BELOW REFERENCED
PLAN
THIS DRAWING SET UTILIZES COLORS TO DIFFERENTIATE
BETWEEN NEW AND EXISTING DEVICES. CONTRACTOR
SHOULD BE AWARE THAT ANY HARD COPIES SHOULD BE
PRINTED IN COLOR SO AS NOT TO LOSE IMPORTANT
DRAWING CLARITY.
GENERAL DRAWING NOTE
DRAWING BACKGROUNDS FOR THESE CONSTRUCTION
DOCUMENTS WERE CREATED UTILIZING VA PROVIDED FILE
INFORMATION FROM LIFE SAFETY PLAN DATED 3/7/2024
AND ARE CONSIDERED TO REFLECT COMPLETE
INFORMATION FOR MOST CRITICAL AREAS FOR FIRE ALARM
NEEDS.
AREAS NOT SPECIFICALLY CALLED OUT BY ROOM NAME
ARE TO BE CONSIDERED AS AREAS OF NO SUBSTANTIAL
CIRCUMSTANCE FOR FIRE ALARM PLANS.
A COMPLETE LIST OF ROOM NUMBERS AND ASSOCIATED
ROOM NAMES HAS BEEN PROVIDED ON SHEETS G-303,
G-304 & G-305 FOR REFERENCE.
GENERAL DRAWING NOTE
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO
PERFORM INTEGRATION OF ALL NEW DUCT SMOKE
DETECTORS AND FAN SHUT DOWN RELAY MODULES INTO
THE NEW FIRE ALARM SYSTEM. DISCONNECTION,
RECONNECTION, BAS PROGRAMMING ADJUSTMENTS, AND
TESTING OF ALL REQUIRED SUPERVISORY HVAC SHALL BE
PERFORMED IN CONJUNCTION WITH AN APPROVED BAS
CONTROLS CONTRACTOR.
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO
PERFORM INTEGRATION (WIRING AND PROGRAMMING) OF
EXISTING ELEVATOR FIRE ALARM SIGNALS TO THE NEW
FIRE ALARM SYSTEM AND PERFORM ASSOCIATED TESTING
AND COMMISSIONING SERVICES.
REFER TO SPECIFICATION SECTION 283100.3.3.A FOR A LIST
OF BAS CONTROL CONTRACTORS FAMILIAR WITH THE
FARGO VA FACILITY AND ABLE TO PERFORM ADJUSTMENTS
ON THEIR RESPECTIVE SYSTEMS.
GENERAL BAS INTEGRATION NOTE
IT IS NOT THE…