Attach F 437-23-105 100 CD Drawings Vol 1 - Fargo-Replace Fire Alarm System.pdf

PDF 39 MB Posted

Attached to
Y1DA--437-23-105 Replace Fire Alarm System 437-26-1-6690-0001
Solicitation number
36C26326B0004
Issued by

About this file

The file is a detailed architectural and engineering set of construction documents for a comprehensive fire alarm system replacement project at the Fargo VA Health Care System. The project involves replacing the entire existing fire alarm system across multiple campus buildings, including Buildings 1, 9, 46, 3, 10, 11, 12, 13, 40, 51, 52, 56, 57, and the Primary Care Addition. The replacement will upgrade the current analog system to a new digital, addressable voice notification system with enhanced capabilities, including new fire alarm control panels, transponders, annunciator panels, notification devices, pull stations, and detectors.

The documents specify a phased implementation approach, with the new system to be installed and fully operational before the existing system is decommissioned. Key components include establishing a new Fire Command Center, integrating existing campus communication infrastructure, and ensuring continuous fire protection during the transition. The project will require extensive work across multiple floors and buildings, with careful coordination to maintain operational continuity. The design incorporates specific requirements for different building types, including mental health wards and medical facilities, with considerations for unique architectural and safety needs. The total project performance period is 540 days, with the work to be executed by a contractor selected through VA solicitation 36C26326B0004.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

COR / Project Engineer

CONSULTANT

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 of

Office of Construction and Facilities Management

Phase

DESIGNER OF RECORD

U.S. Department of Veterans Affairs

STAMP

VERITAS FIRE ENGINEERING, INC

12364 WEST ALAMEDA PARKWAY, SUITE 135

LAKEWOOD, COLORADO 80228

PH: (303) 985-3300

WWW.VERITAS.COM

517 7TH STREET

RAPID CITY, SD 57701

PH: (605) 342-9470

POC: JARED LOTT

FFD PROJECT NO:

19.2481.M18

DES IGN INC

DateRevisions 91

VOLUME 1 OF 2

/1

/2

:3

:5

P

M

6/12/2025

COVER SHEET

G-000

FARGO REPLACE FIRE ALARM

SYSTEM

TB, KZKP, RD

2101 ELM STREET

FARGO, NORTH DAKOTA 58102

TODD DALZELL

CONSTRUCTION

DOCUMENTS

437-23-105

FARGO REPLACE FIRE ALARM SYSTEM

FARGO VA HEALTH CARE SYSTEM

2101 ELM STREET

FARGO, NORTH DAKOTA 58102

PROJECT NUMBER: 437-23-105

VA

U.S DEPARTMENT OF VETERAN'S AFFAIRS

VETERAN'S HEALTH ADMINISTRATION

# POUND OR NUMBER

& AND

@ AT

AB ANCHOR BOLT

ACI AMERICAN CONCRETE INSTITUTE

ACT ACOUSTIC CEILING TILE

AD AREA DRAIN

AFF ABOVE FINISH FLOOR

AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION

AISI AMERICAN IRON AND STEEL INSTITUTE

ALUM ALUMINUM

ANOD ANODIZED

ASD ALTERNATE STRESS DESIGN

ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS

AWS AMERICAN WELDING SOCIETY

BD BOARD

BLK BLOCK

BM BEAM

B.O. BOTTOM OF

BOT BOTTOM

BRG BEARING

BRKT BRACKET

BSMT BASEMENT

BLDG BUILDING

BYND BEYOND

CAB CABINET

CER CERAMIC

CIP CAST-IN-PLACE

CJ CONTROL JOINT

CLG CEILING

CLR CLEAR

CMU CONCRETE MASONRY UNIT

COL COLUMN

COMPR COMPRESSIBLE

CONC CONCRETE

CONST JT CONSTRUCTION JOINT

CONT CONTINUOUS

CPT CARPET

CRSI CONCRETE REINFORCING STEEL INSTITUTE

CT CERAMIC TILE

DBL DOUBLE

DEMO DEMOLISH OR DEMOLITION

DET DETAIL

DIA DIAMETER

DIM DIMENSION

DIR DIRECTION

DN DOWN

DR DOOR

DWG DRAWING

EA EACH

EE EACH END

EF EACH FACE

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRICAL

ELEV ELEVATOR OR ELEVATION

EPDM ETHYLENE PROPYLENE DIENE M-CLASS (ROOFING)

EQ EQUAL

ES EACH SIDE

EXIST EXISTING

EXP Bolt EXPANSION BOLT

EXP JT EXPANSION JOINT

EXT EXTERIOR

FD FLOOR DRAIN OR FIRE DEPARTMENT

FEC FIRE EXTINGUISHER CABINET

FIN FINISH

FIXT FIXTURE

FLR FLOOR

FM FILLED METAL

FND FOUNDATION

F.O. FACE OF

FT FOOT OR FEET

FTG FOOTING

GA GAUGE

GALV GALVANIZED

GB GRADE BEAM

GP GUSSET PLATE

GR GRADE

GYP GYPSUM

HC HOLLOW CORE

HDR HEADER

HEF HORIZONTAL EACH FACE

HI HIGH

HIF HORIZONTAL INSIDE FACE

HM HOLLOW METAL

HOF HORIZONTAL OUTSIDE FACE

HOR HORIZONTAL

HP HIGH POINT

HR HOUR

HS HIGH STRENGTH

HT HEIGHT

HVAC HEATING, VENTILATING, AND AIR

CONDITIONING

ICBO INTERNATIONAL CONFERENCE OF BUILDING

OFFICIALS

ID INSIDE DIAMETER

ILO IN LIEU OF

IN INCH

INCL INCLUDE

INSUL INSULATED OR INSULATION

INT INTERIOR

INV INVERT

IRGWB IMPACT RESISTANT GYPSUM WALL BOARD

JST JOIST

JT JOINT

K KIP (1000 POUNDS)

LLV LONG LEG VERTICAL

LP LOW POINT

LVL LEVEL

LW LIGHT WEIGHT

LWC LIGHT WEIGHT CONCRETE

MAS MASONRY

MAX MAXIMUM

MCB METAL CORNER BEAD

MECH MECHANICAL

MEMBR MEMBRANE

MEZZ MEZZANINE

MFR MANUFACTURED

MIN MINIMUM

MO MASONRY OPENING

MRGWB MOISTURE-RESISTANT GYPSUM WALL BOARD

MTL METAL

NF NEAR FACE

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

NWC NORMAL WEIGHT CONCRETE

OC ON CENTER

OD OUTSIDE DIAMETER

OH OPPOSITE HAND

OPNG OPENING

OZ OUNCE

PC PILE CAP

PCC PRE-CAST CONCRETE

PL PLATE

P.LAM PLASTIC LAMINATE

PLUMB PLUMBING

PLY PLYWOOD

PORC PORCELAIN

PNL PANEL

PNT PAINT OR PAINTED

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PRESSURE TREATED

PT POINT

PR PAIR

PROP PROPERTY

PVC POLYVINYL CHLORIDE

R RADIUS

RBR RUBBER

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

RE RIGHT END

REINF REINFORCED

REF REFERENCE

REQD REQUIRED

RET RETURN

RETG RETAINING

RM ROOM

R.O. ROUGH OPENING

ROW RIGHT OF WAY

SC SOLID CORE

SDI STEEL DECK INSTITUTE

SECT SECTION

SF STEP FOOTING OR SQUARE FOOT

SHT SHEET

SIM SIMILAR

SL SPLICE LENGTH

SLV SHORT LEG VERTICAL

SOG SLAB ON GRADE

SPEC SPECIFIED OR SPECIFICATION

SPK SPRINKLER OR SPEAKER

SQ SQUARE

SSTL STAINLESS STEEL

STC SOUND TRANSMISSION CLASS

STD STANDARD

STIFF STIFFENER

STL STEEL

STR STAIR

STRUCT STRUCTURE OR STRUCTURAL

SUP SUPPORT

SYM SYMMETRICAL

T&B TOP AND BOTTOM

T&G TONGUE AND GROOVE

TBD TO BE DETERMINED

T/D TELEPHONE/DATA

TEL TELEPHONE

TEMP TEMPERATURE

THK THICK OR THICKNESS

THRD THREADED

TLT TOILET

T.O. TOP OF

T.O.C TOP OF CONCRETE

T.O.F TOP OF FRAMING

T.O.S TOP OF STEEL/STUD

T.O.W TOP OF WALL

TPD TOILET PAPER DISPENSER

TYP TYPICAL

U/S UNDERSIDE

UNO UNLESS NOTED OTHERWISE

US UNDERSIDE

VB VAPOR BARRIER

VCT VINYL COMPOSITE TILE

VEF VERTICAL EACH FACE

VERT VERTICAL

VIF VERIFY IN FIELD

VOF VERTICAL OUTSIDE FACE

VTR VENT THROUGH ROOF

VWC VINYL WALL COVERING

W/ WITH

WD WOOD

WDW WINDOW

WP WORKING POINT

WRB WEATHER RESISTANT BARRIER

WWF WELDED WIRE FABRIC

ABBREVIATIONS

STEEL/METAL

WOOD (ROUGH) BLOCKING OR SHIM

BRICK

GRAVEL

EARTH/ENGINEERED FILL

CONCRETE MASONRY

PLAN AND SECTION

WOOD (ROUGH)

ACOUSTIC CEILING TILE

GYPSUM BOARD

CEILING

CONCRETE

ELEVATION

CENTER LINE

LINE SYMBOLS

GRID LINE

PROPERTY LINE

CUT LINE

BATT INSULATION

WOOD SUBSTRATE

RIGID INSULATION

MATERIAL LEGEND

WM - WALK OFF MAT

EF - EPOXY FLOORING (TROWELED)

FLOORING

BID ALTERNATE

CPT - CARPET

CONC - CONCRETE

PT - PORCELAIN TILE

FIBER CEMENT PANEL SIDING

CORRUGATED METAL PANEL

STANDING SEAM METAL ROOF/

SIDING PANEL

Room name

1t

VIEW NAME

1/8" = 1'-0"1 DRAWING TITLE

SCALE

BUILDING SECTION

DIRECTION OF SIGHT

DRAWING NUMBER

SHEET NUMBER

WALL SECTION

DETAIL CUT

A101

DETAIL CALLOUT

A101

A101

A101

A101

DIRECTION OF SIGHT

DRAWING NUMBER

SHEET NUMBER

DRAWING NUMBER

SHEET NUMBER

DRAWING NUMBER

SHEET NUMBER

INTERIOR ELEVATION

DRAWING NUMBER

DIRECTION OF SIGHT

SHEET NUMBER

ROOM TAG

ROOM NAME

ROOM NUMBER

KEYNOTE TAG

5-04 KEYNOTE DESIGNATION

1 DOOR TAG

DOOR NUMBER

PARTITION TAG

WALL DESIGNATION

WINDOW TAG

WINDOW DESIGNATION

ELEVATION MARKER

HEIGHT

NORTH ARROW

TRUE NORTH

PLAN NORTH

ARCHITECTURAL SYMBOLS

M3A

V.A. PLAN REFERENCE SYMBOLS

FIRE RESISTIVE RATED LINE, 1 HOUR

FIRE RESISTIVE RATED LINE, 2 HOUR

FIRE RESISTIVE RATED LINE, 3 HOUR

FIRE RESISTIVE RATED LINE, 4 HOUR

FIRE-RATED, SMOKE BARRIER LINE, 1 HOUR

FIRE-RATED, SMOKE BARRIER LINE, 2 HOUR

FIRE-RATED, SMOKE BARRIER LINE, 3 HOUR

FIRE-RATED, SMOKE BARRIER LINE, 4 HOUR

V V ITEM - VA SUPPLIED AND INSTALLED

VC ITEM - VA SUPPLIED AND CONTRACTOR INSTALLED

CC ITEM - CONTRACTOR SUPPLIED AND INSTALLED

A

COLUMN GRID

DIMENSION LINE

NORTH ARROW

CL CENTER LINE

N

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

COR / Project Engineer

CONSULTANT

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 of

Office of Construction and Facilities Management

Phase

DESIGNER OF RECORD

U.S. Department of Veterans Affairs

STAMP

VERITAS FIRE ENGINEERING, INC

12364 WEST ALAMEDA PARKWAY, SUITE 135

LAKEWOOD, COLORADO 80228

PH: (303) 985-3300

WWW.VERITAS.COM

517 7TH STREET

RAPID CITY, SD 57701

PH: (605) 342-9470

POC: JARED LOTT

FFD PROJECT NO:

19.2481.M18

DES IGN INC

DateRevisions 91

VOLUME 1 OF 2

/1

/2

:2

:3

P

M

6/12/2025

ABREVIATIONS, LEGENDS,

SYMBOLS AND SHEET INDEX

G-001

FARGO REPLACE FIRE ALARM

SYSTEM

TB, KZKP, RD

2101 ELM STREET

FARGO, NORTH DAKOTA 58102

TODD DALZELL

CONSTRUCTION

DOCUMENTS

437-23-105

SHEET INDEX - VOLUME 1

GENERAL

G-000 COVER SHEET

G-001 ABREVIATIONS, LEGENDS, SYMBOLS AND SHEET INDEX

G-100 CAMPUS MAP

G-200 ICRA REQUIREMENTS

G-300 OVERALL SITE PHASING PLAN

G-301 MAIN HOSPITAL BUILDING PHASING PLANS

G-302 AREAS OF CEILING CONGESTION KEY PLANS

G-303 MAIN HOSPITAL ROOM LIST - BASEMENT AND 1ST FLOORS

G-304 MAIN HOSPITAL ROOM LIST - 2ND AND 3RD FLOORS

G-305 MAIN HOSPITAL ROOM LIST - 4TH FLOOR AND PENTHOUSE

ARCHITECTURAL

A-100 ARCHITECTURAL NOTES AND TYPICAL DETAILS

ELECTRICAL

E-000 ELECTRICAL LEGENDS AND ABBREVIATIONS

E-001 OVERALL SITE MAP

E-002 ELECTRICAL DETAILS

E-100 EXISTING ELECTRICAL PANEL LOCATIONS

E-101 EXISTING ELECTRICAL PANEL LOCATIONS

E-102 BUILDING 1/9/46 - ENLARGED ELECTRICAL FLOOR PLANS

E-103 BUILDING 1/9/46 - ENLARGED ELECTRICAL FLOOR PLANS

E-300 EXISTING SITE DATA AND COMMUNICATIONS PLAN

FIRE ALARM

FA-000 FIRE ALARM REQUIREMENTS, LEGENDS AND SCHEDULES

FA-001 EXISTING FIRE ALARM RISER DIAGRAMS

FA-002 EXISTING FIRE ALARM RISER DIAGRAMS

FA-003 NEW FIRE ALARM RISER DIAGRAMS

FA-004 NEW FIRE ALARM RISER DIAGRAMS

FA-005 EXISTING FIRE SPRINKLER RISER SCHEMATIC - PART 1

FA-006 EXISTING FIRE SPRINKLER RISER SCHEMATIC - PART 2

FA-007 ENLARGED FIRE ALARM FLOOR PLANS

FA-100 BASEMENT NEW FIRE ALARM PLAN - SECTION 0A

FA-101 BASEMENT NEW FIRE ALARM PLAN - SECTION 0B

FA-102 BASEMENT NEW FIRE ALARM PLAN - SECTION 0C

FA-103 BASEMENT NEW FIRE ALARM PLAN - SECTION 0D

FA-104 BASEMENT NEW FIRE ALARM PLAN - SECTION 0E

FA-105 FIRST FLOOR NEW FIRE ALARM PLAN - SECTION 1A

FA-106 FIRST FLOOR NEW FIRE ALARM PLAN - SECTION 1B

FA-107 FIRST FLOOR NEW FIRE ALARM PLAN - SECTION 1C

FA-108 FIRST FLOOR NEW FIRE ALARM PLAN - SECTION 1D

FA-109 FIRST FLOOR NEW FIRE ALARM PLAN - SECTION 1E

FA-110 SECOND FLOOR NEW FIRE ALARM PLAN - SECTION 2A

FA-111 SECOND FLOOR NEW FIRE ALARM PLAN - SECTION 2B

FA-112 SECOND FLOOR NEW FIRE ALARM PLAN - SECTION 2C

FA-113 SECOND FLOOR NEW FIRE ALARM PLAN - SECTION 2D

FA-114 SECOND FLOOR NEW FIRE ALARM PLAN - SECTION 2E

FA-115 THIRD FLOOR NEW FIRE ALARM PLAN - SECTION 3A

FA-116 THIRD FLOOR NEW FIRE ALARM PLAN - SECTION 3B

FA-117 THIRD FLOOR NEW FIRE ALARM PLAN - SECTION 3C

FA-118 THIRD FLOOR NEW FIRE ALARM PLAN - SECTION 3D

FA-119 THIRD FLOOR NEW FIRE ALARM PLAN - SECTION 3E

FA-120 FOURTH FLOOR NEW FIRE ALARM PLAN - SECTION 4A

FA-121 FOURTH FLOOR NEW FIRE ALARM PLAN - SECTION 4B/D

FA-122 FOURTH FLOOR NEW FIRE ALARM PLAN - SECTION 4C

FA-123 PENTHOUSE NEW FIRE ALARM PLAN - SECTION PA

FA-124 PENTHOUSE NEW FIRE ALARM PLAN - SECTION PC

FA-125 BUILDINGS 10, 11, & 12 NEW FIRE ALARM PLANS

FA-126 BUILDINGS 13, 51, 56 & 57 NEW FIRE ALARM PLANS

FA-127 BUILDING 40 FIRST FLOOR NEW FIRE ALARM PLANS

FA-128 BUILDING 40 SECOND FLOOR NEW FIRE ALARM PLANS

FA-129 BUILDINGS 3 & 52 NEW FIRE ALARM PLANS

FA-130 BUILDING 52 ADDITION NEW FIRE ALARM PLANS

FA-131 PRIMARY CARE ADDITION BSMT NEW FIRE ALARM PLAN

FA-132 PRIMARY CARE ADDITION 1ST FLOOR NEW FIRE ALARM PLAN

SHEET INDEX - VOLUME 2

FAD-100 BASEMENT FIRE ALARM DEMO PLAN - SECTION 0A

FAD-101 BASEMENT FIRE ALARM DEMO PLAN - SECTION 0B

FAD-102 BASEMENT FIRE ALARM DEMO PLAN - SECTION 0C

FAD-103 BASEMENT FIRE ALARM DEMO PLAN - SECTION 0D

FAD-104 BASEMENT FIRE ALARM DEMO PLAN - SECTION 0E

FAD-105 FIRST FLOOR FIRE ALARM DEMO PLAN - SECTION 1A

FAD-106 FIRST FLOOR FIRE ALARM DEMO PLAN - SECTION 1B

FAD-107 FIRST FLOOR FIRE ALARM DEMO PLAN - SECTION 1C

FAD-108 FIRST FLOOR FIRE ALARM DEMO PLAN - SECTION 1D

FAD-109 FIRST FLOOR FIRE ALARM DEMO PLAN - SECTION 1E

FAD-110 SECOND FLOOR FIRE ALARM DEMO PLAN - SECTION 2A

FAD-111 SECOND FLOOR FIRE ALARM DEMO PLAN - SECTION 2B

FAD-112 SECOND FLOOR FIRE ALARM DEMO PLAN - SECTION 2C

FAD-113 SECOND FLOOR FIRE ALARM DEMO PLAN - SECTION 2D

FAD-114 SECOND FLOOR FIRE ALARM DEMO PLAN - SECTION 2E

FAD-115 THIRD FLOOR FIRE ALARM DEMO PLAN - SECTION 3A

FAD-116 THIRD FLOOR FIRE ALARM DEMO PLAN - SECTION 3B

FAD-117 THIRD FLOOR FIRE ALARM DEMO PLAN - SECTION 3C

FAD-118 THIRD FLOOR FIRE ALARM DEMO PLAN - SECTION 3D

FAD-119 THIRD FLOOR FIRE ALARM DEMO PLAN - SECTION 3E

FAD-120 FOURTH FLOOR FIRE ALARM DEMO PLAN - SECTION 4A

FAD-121 FOURTH FLOOR FIRE ALARM DEMO PLAN - SECTION 4B/D

FAD-122 FOURTH FLOOR FIRE ALARM DEMO PLAN - SECTION 4C

FAD-123 PENTHOUSE FIRE ALARM DEMO PLAN - SECTION PA

FAD-124 PENTHOUSE FIRE ALARM DEMO PLAN - SECTION PC

FAD-125 BUILDINGS 10, 11, & 12 FIRE ALARM DEMO PLANS

FAD-126 BUILDINGS 13, 51, 56, & 57 FIRE ALARM DEMO PLANS

FAD-127 BUILDING 40 FIRST FLOOR FIRE ALARM DEMO PLAN

FAD-128 BUILDING 40 SECOND FLOOR FIRE ALARM DEMO PLAN

FAD-129 BUILDINGS 3 & 52 FIRE ALARM DEMO PLANS

FAD-130 BUILDING 52 ADDITION FIRE ALARM DEMO PLANS

6/12/2025

L

WS

WSWS

D

D

D

D

D

D

D

D

BO

TTO

M O

F D

IK

E S

LO

PE

TO

P O

F E

AR

TH

EN

D

IK

E

T O

P O

F E

A R

T H

E N

D

IK

E

B O

T T

O M

O F

D I K

E S

L O

P E

19th AVE. N.

21st AVE. N.

E L M

S T

R E

E T

E L M

S T

R E

E T

N

R E D

R

IV

E R

O F T

H E N

O R

T H

CAMPUS MAP LEGEND

PROJECT LOCATIONS

CONTRACTOR SHARED PARKING

AND STAGING AREA

B

B

O

B

B

B

B

B

S

B

B

S

B

B

S

B

B

B

B

B

B

B

NO. B/S/O ASSET SCHEDULE

MEDICAL CENTER

ADMINISTRATION OFFICE

FLAGPOLE

MEDICAL CENTER

BOILER PLANT

MAINTENANCE GARAGE

WAREHOUSE

LAUNDRY

GATE WELL

XCEL ENERGY BUILDING (NATURAL GAS)

MEDICAL CENTER

COLD STORAGE BUILDING

PICNIC SHELTER AND PATIO

VBA REGIONAL OFFICE

OXYGEN STORAGE TANK

UND SCHOOL OF MEDICINE

HIGH VOLTAGE SWITCHGEAR BUILDING

PANDEMIC FLU STORAGE BUILDING

HAZMAT STORAGE BUILDING

HRMS

CHILLER PLANT

ADMINISTRATION OFFICE

B = BUILDINGS S = STRUCTURE O = OTHER

30 B ADMINISTRATION OFFICE

BUILDING

BUILDING 39

BUILDING 54

BUILDING

BUILDING

BUILDING

BUILDING 10

BUILDING

BUILDING 50

BUILDING

BUILDING

BUILDING

BUILDING

BUILDING

BUILDING

BUILDING

BUILDING

BUILDING 41

BUILDING

BUILDING

BUILDING

BUILDING

BUILDING 57

CONTRACTOR

ENTRANCE

CONTRACTOR SHARED PARKING

AND STAGING AREA

57 B ELECTRICAL SWITCHGEAR BUILDING

1. SHEET SIZE FOR PROPER SCALE IS 30X42. CONTRACTOR SHALL

NOT SCALE DRAWINGS BUT SHALL REQUEST THE DESIRED

DIMENSIONS FROM THE ARCHITECT.

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

COR / Project Engineer

CONSULTANT

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 of

Office of Construction and Facilities Management

Phase

DESIGNER OF RECORD

U.S. Department of Veterans Affairs

STAMP

VERITAS FIRE ENGINEERING, INC

12364 WEST ALAMEDA PARKWAY, SUITE 135

LAKEWOOD, COLORADO 80228

PH: (303) 985-3300

WWW.VERITAS.COM

517 7TH STREET

RAPID CITY, SD 57701

PH: (605) 342-9470

POC: JARED LOTT

FFD PROJECT NO:

19.2481.M18

DES IGN INC

DateRevisions 91

VOLUME 1 OF 2

/1

/2

:2

:0

P

M

6/12/2025

CAMPUS MAP

G-100

FARGO REPLACE FIRE ALARM

SYSTEM

TB, KZKP, RD

2101 ELM STREET

FARGO, NORTH DAKOTA 58102

TODD DALZELL

CONSTRUCTION

DOCUMENTS

437-23-105

1/64" = 1'-0"1

CAMPUS MAP

GENERAL NOTES:

Appendix A: Alternative To Outdoor Exhaust Requirements

This Appendix provides an equivalent ICRA control measure to requirements detailed in this VHA ICRA template (Table 5 Level III, item 5) that would allow interior construction space exhaust.

Interior Construction Space Exhaust:

If the facility is not able to exhaust to the building exterior, the Healthcare Environment and Facilities program office has identified an alternate industry-recognized standard interior exhaust procedure that is accepted as providing an equivalent level of infection prevention and control (IPC), and safety. The alternate interior exhaust procedure is implemented by completing the following:

a. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, including assembly of the ICRA barriers, initial baseline air sampling measurements for particulate levels must be taken in the planned area of discharge. Once containment is erected and completed, HEPA filtration must then be verified by particulate measurement, using a particle counter with multi-channel capabilities to measure down to 0.3 microns, to confirm that the discharge of the HEPA unit does not exceed the baseline particulate count of the area to which the exhaust is directed. Verification must continue at least three times per day (once every 8 hours), 7 days per week, during the use of the negative air machine and HEPA filter. Any exceedance must trigger a work stoppage and an immediate response and resolution. All particulate measurements, including the baseline measurement, must be documented and retrievable.

b. To accommodate the sampling, the negative air pressure machine must be fitted with a 2 ft section of ridged ductwork at the discharge. The sample port for monitoring must be in the ridged ductwork section.

c. Vapor generating processes must be assessed and appropriate filtration must be installed to mitigate transmission to the facility.

d. Engineering must do a complete flow and pressure analysis and document the area to which the air is being discharged to ensure the flow and pressure relationships in that area are not being adversely impacted by the additional flow.

Ideally, this is done as part of the construction package to ensure the design is implementable and no additional HVAC changes are required to accommodate the exhaust from the negative air equipment.

e. Install device on exterior of work containment to continually monitor negative pressurization. To ensure proper pressure is continuously maintained, the device(s) shall have a visual pressure indicator, data collection and alarm.

f. Exhaust must be directed to Low Risk areas as defined in Table 3 in this VHA ICRA template. Ideally this discharge must be located so as not to impinge on high traffic areas or create a nuisance with noise or excessive airflow.

NOTE: Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (e.g. bathroom exhaust) is not acceptable.

VHA-ICRA-2024-1.2-10.25.2024

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

COR / Project Engineer

CONSULTANT

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 of

Office of Construction and Facilities Management

Phase

DESIGNER OF RECORD

U.S. Department of Veterans Affairs

STAMP

VERITAS FIRE ENGINEERING, INC

12364 WEST ALAMEDA PARKWAY, SUITE 135

LAKEWOOD, COLORADO 80228

PH: (303) 985-3300

WWW.VERITAS.COM

517 7TH STREET

RAPID CITY, SD 57701

PH: (605) 342-9470

POC: JARED LOTT

FFD PROJECT NO:

19.2481.M18

DES IGN INC

DateRevisions 91

VOLUME 1 OF 2

/1

/2

:2

:2

P

M

6/12/2025

ICRA REQUIREMENTS

G-200

FARGO REPLACE FIRE ALARM

SYSTEM

TB, KZKP, RD

2101 ELM STREET

FARGO, NORTH DAKOTA 58102

TODD DALZELL

CONSTRUCTION

DOCUMENTS

437-23-105

N

RE

D

RI

VE

R

OF

TH

E

NO

RT

H

BOTTOM O

F D

IKE SLO

PE

BLDG. NO.

1 MEDICAL CENTER

3 ADMINISTRATION OFFICE

8 FLAGPOLE

9 MEDICAL CENTER

10 BOILER PLANT

11 MAINTENANCE GARAGE

12 WAREHOUSE

13 LAUNDRY

30 ADMINISTRATION OFFICE

39 HIGH VOLTAGE SWITCHGEAR BLDG

42 UND SCHOOL OF MEDICINE

46 MEDICAL CENTER

40 VA REGIONAL OFFICE

41 OXYGEN STORAGE TANK

43 PICNIC SHELTER AND PATIO

20 GATE WELL

50 COLD STORAGE BUILDING

51 HRMS

52 ADMINISTRATION OFFICE

53 HAZMAT STORAGE BUILDING

54 PANDEMIC FLU STORAGE BUILDING

56 CHILLER PLANT

12 13

CITY

LIFT

STATION

(STORM

SEWER)

57 ELECTRICAL SERVICE SWITCHGEAR

1 PRIMARY CARE ADDITION (UNDER CONSTRUCTION)

PRIMARY

CARE

ADDITION

52 MENTAL HEALTH ADDITION (UNDER CONSTRUCTION)

MENTAL

HEALTH

ADDITION

PHASING ORDER METHODOLOGY

THE PHASING PLAN FOR THE MAIN HOSPITAL BUILDING HAS BEEN

ORDERED BASED ON THE LOGIC OF WORKING FROM THE TOP OF

THE BUILDING TOWARDS THE GROUND FLOOR, UNOCCUPIED

FLOORS, TO STAFF ONLY OCCUPIED FLOORS, AND THEN PATIENT

OCCUPIED FLOORS.

FINAL PHASING PLAN SHALL BE SUBMITTED FOR APPROVAL BY THE

INSTALLING CONTRACTOR PRIOR TO THE START OF

CONSTRUCTION.

ACCEPTANCE AND COMMISSIONING WILL OCCUR AFTER EACH

PHASE IS COMPLETED. DEMO OPERATIONS WILL OCCUR AFTER

COMMISSIONING IS COMPLETE.

PHASING ORDER

PHASE 1: CAMPUS COMMUNICATION LOOP INSTALLATION AND

TESTING. INSTALL COMMUNICATIONS BACKBONE CABLING

BETWEEN NEW PANEL LOCATIONS.

PHASE 2: INSTALL FACP'S AND TRANSPONDERS IN NEW LOCATIONS.

CONNECT PANELS TO CAMPUS-WIDE COMMUNICATIONS LOOP.

INSTALL NEW POWER SUPPLIES, INCLUDING POWER AND SIGNAL

CONDUCTORS. BRING NEW PRIMARY SYSTEM COMPONENTS

ONLINE.

PHASE 3: INSTALLATION AND TESTING OF DETECTION AND

NOTIFICATION DEVICES. TESTING WILL BE PERFORMED UPON

COMPLETION OF INSTALLATION WITHIN EACH WORK AREA. WORK

AREA DESIGNATIONS ARE THE SAME AS SMOKE COMPARTMENT

DESIGNATIONS OUTLINED IN THE FARGO VA'S LIFE SAFETY PLANS

DATED OCT. 17, 2024 AND ARE SHOWN IN THE PHASING FLOOR

PLANS.

INSTALLATION SEQUENCE FOR MAIN HOSPITAL BUILDINGS (1,9,46):

WORK ZONE 1: PENTHOUSE FLOOR

WORK ZONE 2: AREAS 4.1, 4.3, 4.4

WORK ZONE 3: AREAS 3.1, 3.2, 3.6

WORK ZONE 4: AREAS 2.1, 2.2, 2.3, 2.4

WORK ZONE 5: AREAS 1.1, 1.2, 1.3

WORK ZONE 6: AREAS 1.4, 1.4.1, 1.5, 1.6

WORK ZONE 7: AREAS 1.7, 1.8. 1.9

WORK ZONE 8: AREA 0.1 (BASEMENT)

WORK ZONE 9: AREA 4.2

WORK ZONE 10: AREAS 3.3, 3.4, 3.5

WORK ZONE 11: AREAS 2.5, 2.6, 2.7

RECOMMENDED WORK ZONE SEQUENCING FOR FARGO VA

OUTBUILDINGS:

WORK ZONE 12: BUILDING 13

WORK ZONE 13: BUILDING 10, BUILDING 56, BUILDING 57

WORK ZONE 14: BUILDING 3, BUILDING 40, BUILDING 51, BUILDING 52

WORK ZONE 15: BUILDING 11, BUILDING 12

WORK ZONE 16 (FUTURE): BUILDING 42

THE WORK ZONE SEQUENCING PRESENTED FOR THE FARGO

VA OUTBUILDINGS REFLECTS A/E RECOMMENDED

APPROACH TO PHASING AND IMPLEMENTATION. THIS

SEQUENCE HAS BEEN DEVELOPED BASED ON DESIGN

PRIORITIES, CONSTRUCTION EFFICIENCY, AND MINIMIZING

OPERATIONAL IMPACTS. FINAL COORDINATION AND

CONFIRMATION OF THIS SEQUENCE WILL BE CONDUCTED

WITH THE VA TO ENSURE ALIGNMENT WITH SITE-SPECIFIC

NEEDS, OPERATIONAL CONSTRAINTS, AND VA

PREFERENCES.

G-300

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

Fi le

P at h

/1 5/

1:

:0

AM

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseDESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FARGO REPLACE FIRE

ALARM SYSTEM

437-23-105

Project Director

06/12/2025 WEW JMSRevisions: Date:

2101 ELM STREET, FARGO, ND 58102

VERITAS FIRE ENGINEERING, INC.

12364 WEST ALAMEDA PARKWAY, SUITE 135

LAKEWOOD, COLORADO 80228

PH: (303) 985-3300FIRE ENGINEERING, INC.

www.veritasfire.com

TODD DALZELL517 7TH STREET

RAPID CITY, SD 57701

PH: (605) 342-9470

POC: JARED LOTT

FFD PROJECT NO:

23.2730.M01 Dwg. of 91

VOLUME 1 OF 2

1 SCALE: 1/64" = 1'

OVERALL SITE PHASING PLAN

CAMPUS

OVERALL SITE

PHASING PLAN

REFER TO SHEET G-301 FOR

PHASING ZONES WITHIN MAIN

HOSPITAL BUILDINGS 1, 9 AND 46.

3.1

3.3

3.2

3.4

3.5 3.6

2.1

2.3

2.2

2.4

2.5

2.62.7

1.1

1.2 1.3

1.4

1.4.1 1.5

1.7

1.6

1.9

1.8

0.1

0.000000000000000

5.1

4.1

4.2

4.4

4.3

PHASING ORDER METHODOLOGY

THE PHASING PLAN FOR THE MAIN HOSPITAL BUILDING HAS BEEN

ORDERED BASED ON THE LOGIC OF WORKING FROM THE TOP OF

THE BUILDING TOWARDS THE GROUND FLOOR, UNOCCUPIED

FLOORS, TO STAFF ONLY OCCUPIED FLOORS, AND THEN PATIENT

OCCUPIED FLOORS.

FINAL PHASING PLAN SHALL BE SUBMITTED FOR APPROVAL BY THE

INSTALLING CONTRACTOR PRIOR TO THE START OF

CONSTRUCTION.

ACCEPTANCE AND COMMISSIONING WILL OCCUR AFTER EACH

PHASE IS COMPLETED. DEMO OPERATIONS WILL OCCUR AFTER

COMMISSIONING IS COMPLETE.

PHASING ORDER

PHASE 1: CAMPUS COMMUNICATION LOOP INSTALLATION AND

TESTING. INSTALL COMMUNICATIONS BACKBONE CABLING

BETWEEN NEW PANEL LOCATIONS.

PHASE 2: INSTALL FACP'S AND TRANSPONDERS IN NEW LOCATIONS.

CONNECT PANELS TO CAMPUS-WIDE COMMUNICATIONS LOOP.

INSTALL NEW POWER SUPPLIES, INCLUDING POWER AND SIGNAL

CONDUCTORS. BRING NEW PRIMARY SYSTEM COMPONENTS

ONLINE.

PHASE 3: INSTALLATION AND TESTING OF DETECTION AND

NOTIFICATION DEVICES. TESTING WILL BE PERFORMED UPON

COMPLETION OF INSTALLATION WITHIN EACH WORK AREA. WORK

AREA DESIGNATIONS ARE THE SAME AS SMOKE COMPARTMENT

DESIGNATIONS OUTLINED IN THE FARGO VA'S LIFE SAFETY PLANS

DATED OCT. 17, 2024 AND ARE SHOWN IN THE PHASING FLOOR

PLANS.

INSTALLATION SEQUENCE FOR MAIN HOSPITAL BUILDINGS (1,9,46):

WORK ZONE 1: PENTHOUSE FLOOR

WORK ZONE 2: AREAS 4.1, 4.3, 4.4

WORK ZONE 3: AREAS 3.1, 3.2, 3.6

WORK ZONE 4: AREAS 2.1, 2.2, 2.3, 2.4

WORK ZONE 5: AREAS 1.1, 1.2, 1.3

WORK ZONE 6: AREAS 1.4, 1.4.1, 1.5, 1.6

WORK ZONE 7: AREAS 1.7, 1.8. 1.9

WORK ZONE 8: AREA 0.1 (BASEMENT)

WORK ZONE 9: AREA 4.2

WORK ZONE 10: AREAS 3.3, 3.4, 3.5

WORK ZONE 11: AREAS 2.5, 2.6, 2.7

RECOMMENDED WORK ZONE SEQUENCING FOR FARGO VA

OUTBUILDINGS:

WORK ZONE 12: BUILDING 13

WORK ZONE 13: BUILDING 10, BUILDING 56, BUILDING 57

WORK ZONE 14: BUILDING 3, BUILDING 40, BUILDING 51, BUILDING 52

WORK ZONE 15: BUILDING 11, BUILDING 12

WORK ZONE 16 (FUTURE): BUILDING 42

THE WORK ZONE SEQUENCING PRESENTED FOR THE FARGO

VA OUTBUILDINGS REFLECTS A/E RECOMMENDED

APPROACH TO PHASING AND IMPLEMENTATION. THIS

SEQUENCE HAS BEEN DEVELOPED BASED ON DESIGN

PRIORITIES, CONSTRUCTION EFFICIENCY, AND MINIMIZING

OPERATIONAL IMPACTS. FINAL COORDINATION AND

CONFIRMATION OF THIS SEQUENCE WILL BE CONDUCTED

WITH THE VA TO ENSURE ALIGNMENT WITH SITE-SPECIFIC

NEEDS, OPERATIONAL CONSTRAINTS, AND VA

PREFERENCES.

PHASE 1: CAMPUS COMMUNICATION LOOP

PHASE 2: FACP AND TRANSPONDER INSTALLATION

PHASE 3 - WORK ZONE 8: BASEMENT

BASEMENT PHASING

PHASE 1: CAMPUS COMMUNICATION LOOP

PHASE 2: FACP AND TRANSPONDER INSTALLATION

PHASE 3 - WORK ZONE 5: AREAS 1.1, 1.2, 1.3

PHASE 3 - WORK ZONE 6: AREAS 1.4, 1.4.1, 1.5, 1.6

PHASE 3 - WORK ZONE 7: AREAS 1.7, 1.8, 1.9

1ST FLOOR PHASING

PHASE 1: CAMPUS COMMUNICATION LOOP

PHASE 2: FACP AND TRANSPONDER INSTALLATION

PHASE 3 - WORK ZONE 4: AREAS 2.1, 2.2, 2.3, 2.4

PHASE 3 - WORK ZONE 11: AREAS 2.5, 2.6, 2.7

2ND FLOOR PHASING

PHASE 1: CAMPUS COMMUNICATION LOOP

PHASE 2: FACP AND TRANSPONDER INSTALLATION

PHASE 3 - WORK ZONE 1: PENTHOUSE/5TH FLOOR

5TH FLOOR/PENTHOUSE PHASING

PHASE 1: CAMPUS COMMUNICATION LOOP

PHASE 2: FACP AND TRANSPONDER INSTALLATION

PHASE 3 - WORK ZONE 2: AREAS 4.1, 4.3, 4.4

PHASE 3 - WORK ZONE 9: AREA 4.2

4TH FLOOR PHASING

PHASE 1: CAMPUS COMMUNICATION LOOP

PHASE 2: FACP AND TRANSPONDER INSTALLATION

PHASE 3 - WORK ZONE 3: AREAS 3.1, 3.2, 3.6

PHASE 3 - WORK ZONE 10: AREAS 3.3, 3.4, 3.5

3RD FLOOR PHASING

G-301

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

Fi le

P at h

/1 5/

1:

:0

AM

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseDESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FARGO REPLACE FIRE

ALARM SYSTEM

437-23-105

Project Director

06/12/2025 WEW JMSRevisions: Date:

2101 ELM STREET, FARGO, ND 58102

VERITAS FIRE ENGINEERING, INC.

12364 WEST ALAMEDA PARKWAY, SUITE 135

LAKEWOOD, COLORADO 80228

PH: (303) 985-3300FIRE ENGINEERING, INC.

www.veritasfire.com

TODD DALZELL517 7TH STREET

RAPID CITY, SD 57701

PH: (605) 342-9470

POC: JARED LOTT

FFD PROJECT NO:

23.2730.M01 Dwg. of 91

VOLUME 1 OF 2

1,9,46

MAIN HOSPITAL BUILDING

PHASING PLANS

4 SCALE: 1/64" = 1'

MAIN HOSPITAL - THIRD FLOOR - PHASING PLAN

1 SCALE: 1/64" = 1'

MAIN HOSPITAL - BASEMENT - PHASING PLAN 2 SCALE: 1/64" = 1'

MAIN HOSPITAL - FIRST FLOOR - PHASING PLAN 3 SCALE: 1/64" = 1'

MAIN HOSPITAL - SECOND FLOOR - PHASING PLAN

5 SCALE: 1/64" = 1'

MAIN HOSPITAL - FOURTH FLOOR - PHASING PLAN 6 SCALE: 1/64" = 1'

MAIN HOSPITAL - FIFTH FLOOR - PHASING PLAN

IMAGE #1

IMAGE #2

IMAGE #5

IMAGE #3

IMAGE #4

IMAGE #6

CONGESTED CEILING CONDITIONS WERE OBSERVED IN

MANY AREAS OF THE MAIN HOSPITAL WHICH WILL

REQUIRE SPECIAL CONSIDERATION WHEN ROUTING NEW

FIRE ALARM AND ELECTRICAL CONDUITS. THE IMAGES

SHOWN ON THIS SHEET PROVIDE A LIMITED SAMPLE OF

THE CEILING SPACE CONDITIONS THAT CAN BE

EXPECTED. THE CEILING SPACES WITHIN THE CLOUDED

REGIONS ON THE CEILING CONGESTION KEY PLANS ARE

BELIEVED TO HAVE DENSELY PACKED EXISTING PIPES

AND CONDUIT. SPECIAL CONSIDERATION TO CONDUIT

ROUTING AND CAREFUL FIELD COORDINATION WILL BE

REQUIRED IN THE IDENTIFIED AREAS. SIMILAR

CONGESTED CEILING CONDITIONS MAY EXIST IN

ADDITION TO AREAS IDENTIFIED ON DRAWINGS. IT IS THE

RESPONSIBILITY OF THE CONTRACTOR VERIFY

CONDITIONS AND TO DETERMINE VIABLE CONDUIT

PATHWAYS.

NOTE THAT IMAGES HAVE NOT BEEN PROVIDED FOR THE

AREAS WITH A GRID STYLE CEILING AS THE CEILING

SPACE IS CONCEALED FROM VIEW IN THOSE AREAS.

GENERAL CEILING CONDITION NOTE

G-302

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

Fi le

P at h

/1 5/

1:

:0

AM

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseDESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FARGO REPLACE FIRE

ALARM SYSTEM

437-23-105

Project Director

06/12/2025 WEW JMSRevisions: Date:

2101 ELM STREET, FARGO, ND 58102

VERITAS FIRE ENGINEERING, INC.

12364 WEST ALAMEDA PARKWAY, SUITE 135

LAKEWOOD, COLORADO 80228

PH: (303) 985-3300FIRE ENGINEERING, INC.

www.veritasfire.com

TODD DALZELL517 7TH STREET

RAPID CITY, SD 57701

PH: (605) 342-9470

POC: JARED LOTT

FFD PROJECT NO:

23.2730.M01 Dwg. of 91

VOLUME 1 OF 2

1,9,46

AREAS OF CEILING

CONGESTION KEY PLANS

2 SCALE: 1/64" = 1'

MAIN HOSPITAL - BASEMENT

AREAS OF CONGESTION KEY PLAN 3 SCALE: 1/64" = 1'

MAIN HOSPITAL - 1ST FLOOR

AREAS OF CONGESTION KEY PLAN

1 SCALE: 1/4" = 1'

MAIN HOSPITAL - CEILING SPACE PHOTOS

4 SCALE: 1/64" = 1'

MAIN HOSPITAL - 2ND FLOOR

AREAS OF CONGESTION KEY PLAN 5 SCALE: 1/64" = 1'

MAIN HOSPITAL - 3RD FLOOR

AREAS OF CONGESTION KEY PLAN

IMAGE #1 IMAGE #2 IMAGE #3 IMAGE #4 IMAGE #5 IMAGE #6

THE ROOM LIST ON THIS SHEET IS BEING PROVIDED AS

SUPPLEMENTAL INFORMATION TO THE FIRE ALARM

PLANS. MATCHING THE ROOM NUMBERS SHOWN ON THE

FLOOR PLANS WITH THE DESCRIPTIONS IN THE ROOM

LIST WILL PROVIDE INFORMATION NECESSARY FOR THE

CONTRACTOR TO PREPARE A FULL DEFERRED

SUBMITTAL FOR THE PROJECT.

ROOM LIST WAS CREATED BASED ON INFORMATION

PROVIDED BY VA DURING DESIGN AND HAS NOT BEEN

VERIFIED FOR ACCURACY. IT IS THE RESPONSIBILITY OF

CONTRACTOR TO VERIFY ROOM USAGE AND REPORT

ANY DISCREPANCIES TO THE A/E AT THE TIME OF

PROJECT CONSTRUCTION STARTING.

GENERAL NOTE

G-303

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

Fi le

P at h

/1 5/

1:

:0

AM

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseDESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FARGO REPLACE FIRE

ALARM SYSTEM

437-23-105

Project Director

06/12/2025 WEW JMSRevisions: Date:

2101 ELM STREET, FARGO, ND 58102

VERITAS FIRE ENGINEERING, INC.

12364 WEST ALAMEDA PARKWAY, SUITE 135

LAKEWOOD, COLORADO 80228

PH: (303) 985-3300FIRE ENGINEERING, INC.

www.veritasfire.com

TODD DALZELL517 7TH STREET

RAPID CITY, SD 57701

PH: (605) 342-9470

POC: JARED LOTT

FFD PROJECT NO:

23.2730.M01 Dwg. of 91

VOLUME 1 OF 2

1,9,46

MAIN HOSPITAL ROOM LIST

BASEMENT AND 1ST FLOORS

PLANS. MATCHING THE ROOM NUMBERS SHOWN ON THE

FLOOR PLANS WITH THE DESCRIPTIONS IN THE ROOM

LIST WILL PROVIDE INFORMATION NECESSARY FOR THE

CONTRACTOR TO PREPARE A FULL DEFERRED

SUBMITTAL FOR THE PROJECT.

ROOM LIST WAS CREATED BASED ON INFORMATION

PROVIDED BY VA DURING DESIGN AND HAS NOT BEEN

VERIFIED FOR ACCURACY. IT IS THE RESPONSIBILITY OF

CONTRACTOR TO VERIFY ROOM USAGE AND REPORT

ANY DISCREPANCIES TO THE A/E AT THE TIME OF

PROJECT CONSTRUCTION STARTING.

GENERAL NOTE

G-304

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

Fi le

P at h

/1 5/

1:

:0

AM

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseDESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FARGO REPLACE FIRE

ALARM SYSTEM

437-23-105

Project Director

06/12/2025 WEW JMSRevisions: Date:

2101 ELM STREET, FARGO, ND 58102

VERITAS FIRE ENGINEERING, INC.

12364 WEST ALAMEDA PARKWAY, SUITE 135

LAKEWOOD, COLORADO 80228

PH: (303) 985-3300FIRE ENGINEERING, INC.

www.veritasfire.com

TODD DALZELL517 7TH STREET

RAPID CITY, SD 57701

PH: (605) 342-9470

POC: JARED LOTT

FFD PROJECT NO:

23.2730.M01 Dwg. of 91

VOLUME 1 OF 2

1,9,46

MAIN HOSPITAL ROOM LIST

2ND AND 3RD FLOORS

PLANS. MATCHING THE ROOM NUMBERS SHOWN ON THE

FLOOR PLANS WITH THE DESCRIPTIONS IN THE ROOM

LIST WILL PROVIDE INFORMATION NECESSARY FOR THE

CONTRACTOR TO PREPARE A FULL DEFERRED

SUBMITTAL FOR THE PROJECT.

ROOM LIST WAS CREATED BASED ON INFORMATION

PROVIDED BY VA DURING DESIGN AND HAS NOT BEEN

VERIFIED FOR ACCURACY. IT IS THE RESPONSIBILITY OF

CONTRACTOR TO VERIFY ROOM USAGE AND REPORT

ANY DISCREPANCIES TO THE A/E AT THE TIME OF

PROJECT CONSTRUCTION STARTING.

GENERAL NOTE

G-305

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

Fi le

P at h

/1 5/

1:

:0

AM

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseDESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FARGO REPLACE FIRE

ALARM SYSTEM

437-23-105

Project Director

06/12/2025 WEW JMSRevisions: Date:

2101 ELM STREET, FARGO, ND 58102

VERITAS FIRE ENGINEERING, INC.

12364 WEST ALAMEDA PARKWAY, SUITE 135

LAKEWOOD, COLORADO 80228

PH: (303) 985-3300FIRE ENGINEERING, INC.

www.veritasfire.com

TODD DALZELL517 7TH STREET

RAPID CITY, SD 57701

PH: (605) 342-9470

POC: JARED LOTT

FFD PROJECT NO:

23.2730.M01 Dwg. of 91

VOLUME 1 OF 2

1,9,46

MAIN HOSPITAL ROOM LIST

4TH FLOOR AND PENTHOUSE

9' - 0", V.I.F.

CEILING HEIGHT

TYPICAL DEVICE TO BE REMOVED, SEE FIRE

PROTECTION DRAWINGS FOR LOCATIONS; PATCH

AND REPAIR WALL AS REQUIRED AFTER REMOVAL

OF DEVICE, SEE GENERAL ARCHITECTURAL NOTES

V.I.F.

DOOR FRAME TO DOOR FRAME

PAINT WALL FROM DOOR FRAME TO DOOR FRAME,

SEE ARCHITECTURAL GENERAL NOTES AND

SPECIFICATIONS

TYPICAL DEVICE TO BE REMOVED, SEE FIRE

PROTECTION DRAWINGS FOR LOCATIONS; PATCH

AND REPAIR WALL AS REQUIRED AFTER REMOVAL

OF DEVICE, SEE GENERAL ARCHITECTURAL NOTES

PAINT WALL FROM DOOR FRAME TO CORNER, SEE

ARCHITECTURAL GENERAL NOTES AND

SPECIFICATIONS

V.I.F.

DOOR FRAME TO CORNER

9' - 0", V.I.F.

CEILING HEIGHT

TYPICAL DEVICE TO BE REMOVED,

SEE FIRE PROTECTION DRAWINGS

FOR LOCATIONS; PATCH AND

REPAIR WALL AS REQUIRED AFTER

REMOVAL OF DEVICE, SEE

GENERAL ARCHITECTURAL NOTES

V.I.F.

LENGTH OF WALL

PAINT ENTIRE WALL, FROM

CORNER TO CORNER, SEE

ARCHITECTURAL GENERAL NOTES

AND SPECIFICATIONS

AREA TO BE PAINTED, SEE

GENERAL ARCHITECTURAL

NOTES AND SPECIFICATIONS

LEGEND:

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

COR / Project Engineer

CONSULTANT

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 of

Office of Construction and Facilities Management

Phase

DESIGNER OF RECORD

U.S. Department of Veterans Affairs

STAMP

VERITAS FIRE ENGINEERING, INC

12364 WEST ALAMEDA PARKWAY, SUITE 135

LAKEWOOD, COLORADO 80228

PH: (303) 985-3300

WWW.VERITAS.COM

517 7TH STREET

RAPID CITY, SD 57701

PH: (605) 342-9470

POC: JARED LOTT

FFD PROJECT NO:

19.2481.M18

DES IGN INC

DateRevisions 91

VOLUME 1 OF 2

/1

/2

:2

:1

P

M

6/12/2025

ARCHITECTURAL NOTES AND

TYPICAL DETAILS

A-100

FARGO REPLACE FIRE ALARM

SYSTEM

KZKP

2101 ELM STREET

FARGO, NORTH DAKOTA 58102

TODD DALZELL

CONSTRUCTION

DOCUMENTS

437-23-105

GENERAL ARCHITECTURAL NOTES:

1. SEE FIRE ALARM DRAWINGS FOR DEMOLITION OF EXISTING FIRE ALARM PANELS, CONTROLLERS, AND

DEVICES ALONG WITH ALL ASSOCIATED CONDUIT AND WIRING.

2. SEE FIRE ALARM DRAWINGS FOR LOCATION AND INSTALLATION OF NEW FIRE ALARM SYSTEM.

3. AT PAINTED WALLS, PATCH AND REPAIR GYPSUM BOARD AFTER REMOVAL OF DEVICE. PAINT EXISTING

WALL SURFACE TO MATCH ADJACENT. INTENT IS TO PAINT FROM DOOR FRAME TO DOOR FRAME, OR CORNER TO CORNER. CEILING HEIGHT IS 9'-0" TYPICAL. CONTRACTOR TO MASK ALL FIXED WALL MOUNTED EQUIPMENT AND FURNISHING AND TEMPORARILY REMOVE NON-FIXED WALL ITEMS (SUCH AS ARTWORK) FOR REPAINTING BEHIND. SEE SPECIFICATIONS FOR PAINTING MATERIALS AND PREP WORK

REQUIRED PRIOR TO APPLICATION. COORDINATE COLOR WITH VA COR.

4. AT NON-PAINTED WALL SURFACES, PROVIDE A STAINLESS STEEL COVER PLATE TO COVER HOLE AFTER

REMOVAL OF DEVICE. COORDINATE WITH VA COR.

5. AT REMOVAL OF CEILING MOUNTED DEVICES IN GYPSUM BOARD CEILINGS, PATCH AND REPAIR GYPSUM BOARD AFTER REMOVAL OF DEVICE. PAINT ENTIRE CEILING TO MATCH TO THE NEAREST INSIDE OR

OUTSIDE CORNER. COORDINATE WITH VA COR.

6. AT REMOVAL OF CEILING MOUNTED DEVICES IN ACT CEILINGS, REPLACE CEILING TILE AFTER REMOVAL OF

DEVICE TO MATCH ADJACENT TILE. COORDINATE WITH VA COR.

7. AT ALL RATED ASSEMBLIES WHERE DEVICES OR CONDUITS ARE REMOVED, REPAIR HOLES TO MAINTAIN THE RATED ASSEMBLY AND FINISH TO MATCH ADJACENT MATERIAL. PAINT CORNER TO CORNER.

8. AT ALL CONCRETE, PLASTER, ETC. SURFACES WHERE DEVICES OR CONDUITS ARE REMOVED, PATCH ALL

SURFACES TO MATCH ADJACENT TEXTURE, FINISH TO MATCH ADJACENT SURFACES.

9. AT ALL MASONRY, CLAY TILE, OR SIMILAR SURFACE, REPAIR BY REMOVING MASONRY UNITS AFFECTED BY EQUIPMENT INSTALLATION AND REPLACE WITH SIMILAR MASONRY UNITS, FINISH TO MATCH ADJACENT

SURFACES.

10. AT ALL HOLES IN THE FLOORS WHERE DEVICES OR CONDUITS ARE REMOVED, PATCH ALL SURFACES TO MATCH ADJACENT CONSTRUCTION, TEXTURE, AND FIRE RATING. FINISH TO MATCH ADJACENT SURFACES

AS APPROVED BY THE VA COR.

1/4" = 1'-0"

TYPICAL CORRIDOR ELEVATION

1/4" = 1'-0"

TYPICAL ROOM ELEVATION

GENERAL NOTES:

1. SHEET SIZE FOR PROPER SCALE IS 30 X 42. CONTRACTOR SHALL NOT SCALE DRAWINGS BUT SHALL

REQUEST THE DESIRED DIMENSIONS FROM THE ARCHITECT.

2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VISIT THE PROJECT AND VERIFY EXISTING

CONDITIONS/DIMENSIONS AND PROPOSED CONDITIONS. COORDINATE DEMOLITION BETWEEN ALL

TRADES. NOTIFY A/E IMMEDIATELY OF ANY CONFLICTS OR DISCREPANCIES.

3. THE VA PREFERS TO HAVE CONCEALED INSTALLATION OF DEVICES WHERE POSSIBLE. USE OF SURFACE

MOUNT DEVICES REQUIRE VA COR APPROVAL.

ELECTRICAL ABBREVIATIONS

1PH SINGLE-PHASE

1P SINGLE POLE

2/C TWO-CONDUCTOR

3/C THREE-CONDUCTOR

3PH THREE-PHASE

4/C FOUR-CONDUCTOR

4W FOUR-WIRE

AAP ALARM ANNUNCIATOR PANEL

AC ALTERNATING CURRENT OR ARMORED

CABLE

ACC ACCESSIBLE

ADO AUTOMATIC DOOR OPENER

AFC ABOVE FINISHED COUNTER, AUTOMATIC

FREQUENCY CONTROL, OR AVAILABLE

FAULT CURRENT

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AH AMPERE HOUR

AHJ AUTHORITY HAVING JURISDICTION

AIC AMPERE INTERRUPTING CAPACITY

AMP AMPERE

ASC AMPS SHORT CIRCUIT

AT AMPERE TRIP

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AV AUDIO VISUAL

BAS BUILDING AUTOMATION SYSTEM

BFF BELOW FINISH FLOOR

BLDG BUILDING

BPIP BOILER PLANT INSTRUMENTATION PANEL

BRKR BREAKER

BYP BYPASS

C CONDUIT

CAB CABINET

CALC CALCULATE

CAP CAPACITY

CAT CATALOG

CATV COMMUNITY ANTENNA TELEVISION

CCR CONTROL CONTACTOR

CCTV CLOSED CIRCUIT TELEVISION

cd CANDELA

CD CONSTRUCTION DOCUMENTS

CF CONTRACTOR FURNISHED

CF/CI CONTRACTOR FURNISHED/CONTRACTOR

INSTALLED

CF/OI CONTRACTOR FURNISHED/OWNER

INSTALLED

CHW CHILLED WATER

CHWP CHILLED WATER PUMP

CKT CIRCUIT

CKT BRKR CIRCUIT BREAKER

CLF CURRENT LIMITING FUSE

CLG CEILING

CMU CONCRETE MASONRY UNIT

COAX COAX CABLE

COMM COMMUNICATION

CONC CONCRETE

CONT CONTINUE

CONTR CONTRACTOR

COORD COORDINATE

CPT CONTROL POWER TRANSFORMER

CRI COLOR RENDERING INDEX

CT CURRENT TRANSFORMER

CTV CABLE TELEVISION

CU COPPER

CU FT CUBIC FEET

CUR CURRENT

DAS DISTRIBUTED ANTENNA SYSTEM

DB DECIBEL

DC DIRECT CURRENT

DCP DIMMER CONTROL PANEL

DEG C DEGREES CELSIUS

DEG F DEGREES FAHRENHEIT

DEMO DEMOLITION

DIAG DIAGRAM

DISC DISCONNECT

DISTR DISTRIBUTION

DISTR PNL DISTRIBUTION PANEL

DMR SW DIMMER SWITCH

DN DOWN

DPDT DOUBLE POLE, DOUBLE THROW

DPST DOUBLE POLE, SINGLE THROW

DRSW DOOR SWITCH

DS DISCONNECT SWITCH

DWG DRAWING

EC EMPTY CONDUIT

EG EQUIPMENT GROUND

EL ELEVATION

ELEC ELECTRIC OR ELECTRICAL

ELEV ELEVATOR

EMCP EMERGENCY MONITORING CONTROL

PANEL

EMER EMERGENCY

EMI ELECTROMAGNETIC INTERFERENCE

EMT ELECTRICAL METALLIC TUBING

ENCL ENCLOSURE

EPO EMERGENCY POWER OFF

EPRF EXPLOSION PROOF

ESMT EASEMENT

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

EXIST EXISTING

FA FIRE ALARM

FAAP FIRE ALARM ANNUNCIATOR PANEL

FABL FIRE ALARM BELL

FABX FIRE ALARM BOX

FACP FIRE ALARM CONTROL PANEL

FC FOOTCANDLE

FIXT FIXTURE

FLA FULL LOAD AMPS

FLEX FLEXIBLE METALLIC CONDUIT

FLT FLOODLIGHT

FLUOR FLUORESCENT

FLUOR FIX FLUORESCENT FIXTURE

FOUTT TELEPHONE FLOOR OUTLET

FP FIRE PROTECTION

FT FEET OR FOOT

FU SW FUSED SWITCH

FVNR FULL VOLTAGE NON-REVERSING

FVR FULL VOLTAGE REVERSING

G OR GND GROUND

GEN GENERATOR

GFCI GROUND FAULT CIRCUIT INTERRUPTER

GTB GROUND TERMINAL BOX

HID HIGH INTENSITY DISCHARGE

HOA HAND-OFF-AUTOMATIC

HP HORSEPOWER

HT HEIGHT

HZ HERTZ

IESNA ILLUMINATION ENGINEERING SOCIETY OF

NORTH AMERICA

IMC INTERMEDIATE METAL CONDUIT

INCAND INCANDESCENT

IR INFRARED

IWH INSTANTANEOUS WATER HEATER

J-BOX JUNCTION BOX

kV KILOVOLT kVA KILOVOLT AMPERE kVAH KILOVOLT AMPERE PER HOUR kVAR KILOVOLT AMPERE REACTIVE kW KILOWATT kWH KILOWATT HOUR kWHM KILOWATT HOUR METER

LED LIGHT EMITTING DIODE

LF LINEAR FEET (FOOT)

LM LUMEN

LP LIGHT POLE

LPS LOW PRESSURE SODIUM

LRA LOCKED ROTOR AMPS

LTCP LOCAL TEMPERATURE CONTROL PANEL

LT LIGHT

LTG LIGHTING

LTG PNL LIGHTING PANEL

LTNG LIGHTNING

LV LOW VOLTAGE

MATV MASTER ANTENNA TELEVISION SYSTEM

MAX MAXIMUM

MC METAL-CLAD

MCA MINIMUM CIRCUIT AMPS

MCB MAIN CIRCUIT BREAKER

MCC MOTOR CONTROL CENTER

MDP MAIN DISTRIBUTION PANEL

MECH MECHANICAL

MG MOTOR GENERATOR

MH MANHOLE

MIN MINIMUM

MOCP MAXIMUM OVERCURRENT PROTECTION

MLO MAIN LUGS ONLY

MT MOUNT

MTD MOUNTED

MTG MOUNTING

MTS MANUAL TRANSFER SWITCH

MVA MEGAVOLT-AMPERE

MW MEGAWATT MICROWAVE

NA NOT APPLICABLE

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECTRICAL

MANUFACTURERS ASSOCIATION

NEUT OR N NEUTRAL

NFPA NATIONAL FIRE PROTECTION

ASSOCIATION

NIC NOT IN CONTRACT

NL NIGHT LIGHT

NO NORMALLY OPEN

NS NO SCALE

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER

OF OWNER FURNISHED

OF/CI OWNER FURNISHED/CONTRACTOR

INSTALLED

OF/OI OWNER FURNISHED/OWNER INSTALLED

OL OVERLOAD

OS OCCUPANCY SENSOR

P POLE

PA PUBLIC ADDRESS

PB PANELBOARD, PULL BOX, OR

PUSHBUTTON

PBPU PREFABRICATED BEDSIDE PATIENT UNIT

PCB POLYCHLORINATED BIPHENYL

PEC PHOTOELECTRIC CELL

PED PEDESTAL

PEND PENDANT

PF POWER FACTOR

PH PHASE

PNL PANEL

POD POWER OPERATED DAMPER

PT POTENTIAL TRANSFORMER

PTRV POWER TYPE ROOF VENTILATION

PVC POLYVINYL CHLORIDE (PLASTIC)

PWR POWER

RCP REFLECTED CEILING PLAN

REC RECESSED

RECPT RECEPTACLE

RGS RIGID GALVANIZED STEEL

RM ROOM

RMS ROOT MEAN SQUARE

REQD REQUIRED

SCC SHORT CIRCUIT CAPACITY

SES SERVICE ENTRANCE SECTION

SD SMOKE DETECTOR

SF SQUARE FOOT (FEET)

SHT SHEET

SI INTERNATIONAL SYSTEM OF UNITS

SPEC SPECIFICATION

SPST SINGLE POLE, SINGLE THROW

SPDT SINGLE POLE, DOUBLE THROW

SURF SURFACE

SW SWITCH

SWBD SWITCHBOARD

SWGR SWITCHGEAR

TC TIME CLOCK

TEL TELEPHONE

TP TWISTED PAIR

TPS TWISTED PAIR SHIELDED

TTB TELEPHONE TERMINAL BOARD

TV TELEVISION

TYP TYPICAL

UFD UNDERFLOOR DUCT

UGND UNDERGROUND

UL UNDERWRITERS LABORATORY

UON UNLESS OTHERWISE NOTED

UPS UNINTERRUPTIBLE POWER SUPPLY

UTIL UTILITY

V VOLT

VA VOLT AMPERE

VAR VOLT AMPERE REACTIVE

VFD VARIABLE FREQUENCY DRIVE

VOLT VOLTAGE

VS VACANCY SENSOR

W WATT

WH WATER HEATER

WP WEATHERPROOF

XFER TRANSFER

XFMR TRANSFORMER

SWITCH, MULTIPOSITION

SWITCH, NORMALLY CLOSED FLOAT

SWITCH, NORMALLY CLOSED FOOT OPERATED

SWITCH, NORMALLY CLOSED LIMIT

SWITCH, NORMALLY CLOSED TIME DELAY

SWITCH, NORMALLY OPEN FLOAT

SWITCH, NORMALLY OPEN LIMIT

SWITCH, NORMALLY OPEN TEMPERATURE ACTIVATED

SWITCH, NORMALLY OPEN TIME DELAY

SWITCH, SINGLE BREAK

FUSE WITH RATING

NORMALLY CLOSED RELAY CONTACT

NORMALLY OPEN RELAY CONTACT

MOLDED CASE CIRCUIT BREAKER

LOW-VOLTAGE DRAWOUT AIR CIRCUIT BREAKER

HIGH-VOLTAGE OIL CIRCUIT BREAKER

HIGH-VOLTAGE DRAWOUT AIR CIRCUIT BREAKER

O.C.B.

SWITCH AND FUSE UNIT

FUSED DRAWOUT POTENTIAL TRANSFORMER

MOTOR, SINGLE-PHASE

MOTOR, THREE-PHASE

DELTA CONNECTION

TRANSFORMER

WYE CONNECTION

EARTH GROUND

JUNCTION BOX

PULL BOX

PRESSURE SWITCH-CLOSE ON INCREASE

PRESSURE SWITCH-OPEN ON INCREASE

FUSIBLE LINK

TIME CLOCK

GENERATOR, POWERG

BATTERY

CAPACITOR

LIGHTNING ARRESTOR

R

RECTIFIER, CATHODIC PROTECTION SANITARY

INSTANTANEOUS OVERCURRENT RELAY

DISCONNECT SWITCH, FUSED

DISCONNECT SWITCH, UNFUSED

STARTER, COMBINATION WITH DISCONNECT SWITCH

STARTER OR MOTOR CONTROLLER

POTHEAD

STRESS CONE

M METER

A AMMETER

V VOLTMETER

W WATTMETER

WH WATT-HOUR METER

J

PB

R

AC-TIME OVERCURRENT RELAYR

AC-DIRECTIONAL OVERCURRENT RELAYR

LOCKING OUT RELAYR

TC

SYMBOL

SWITCH, NORMALLY CLOSED

TEMPERATURE ACTIVATED

DESCRIPTION

ELECTRICAL LEGEND

(DETAILS)

DUCT, CELL FLOOR HEADER

T T DUCT, TROLLEY

DUCT, UNDERFLOOR JUNCTION BOX

RC RIGID CONDUIT LINE = RC

SUBSTATION

DISTRIBUTION PANEL

LIGHTING PANEL

PANELBOARD CABINET, FLUSH MOUNTED

PANELBOARD CABINET, SURFACE MOUNTED

C RECEPTACLE, CLOCK HANGER

RECEPTACLE, DUPLEX

RECEPTACLE, DUPLEX ON EMERGENCY POWER

RECEPTACLE, GFCI DUPLEX

RECEPTACLE, QUADRAPLEX

DB DIRECT BURIAL CABLE = DB

P POWER DUCT = P

HI VOLTAGE SWITCH ON CONCRETE PAD

LOW VOLTAGE SWITCH ON CONCRETE PAD

DUAL POWER AND TELECOMMUNICATIONS MANHOLE

MOTOR, SINGLE-PHASE

MOTOR, THREE-PHASE

TRANSFORMER

WYE CONNECTION

EARTH GROUND

JUNCTION BOX

PULL BOX

J

PB

SYMBOL DESCRIPTION

ELECTRICAL LEGEND

(FLOORPLAN)

C C LADDER CABLE TRAY

BRANCH CIRCUIT HOMERUN. LINES INDICATE

NUMBER OF CIRCUITS, NEUTRAL, AND SWITCH LEG

CONDUCTORS. ONE SEPARATE GREEN GROUNDING

CONDUCTOR SHALL BE PROVIDED FOR EACH

HOMERUN; NOT SHOWN

W W WIREWAY

T P

LVS

HVS

S

B B BUSWAY

LP

DP#__

A

B

C

D

RECEPTACLE, SPECIAL PURPOSE 208V,

20A, 1 PHASE, 2-POLE, 3W, NEMA 6-20R.

RECEPTACLE, SPECIAL PURPOSE 120V,

30A, 1 PHASE, 2-POLE, 3W, NEMA 5-30R.

RECEPTACLE, SPECIAL PURPOSE 208V,

30A, 1 PHASE, 2-POLE, 3W, NEMA 6-30R.

RECEPTACLE, SPECIAL PURPOSE 120V,

20A, 1 PHASE, 2-POLE, 3W, NEMA 5-20R.

VENTILATOR OR FAN COIL UNIT OUTLET

SWITCH, SPST

VARIABLE FREQUENCY DRIVE

TIME CLOCK

R

RECTIFIER, CATHODIC PROTECTION SANITARY

INSTANTANEOUS OVERCURRENT RELAY

DISCONNECT SWITCH, FUSED

DISCONNECT SWITCH, UNFUSED

STARTER, COMBINATION WITH DISCONNECT SWITCH

STARTER OR MOTOR CONTROLLER

R

AC-TIME OVERCURRENT RELAYR

AC-DIRECTIONAL OVERCURRENT RELAYR

LOCKING OUT RELAYR

TC

SYMBOL DESCRIPTION

ELECTRICAL STRIP MOLD (OUTLETS ON 2'-0" [610mm]

CENTERS OR AS DESIGNATED ON DRAWINGS), MTD

3'-6" [1067mm] AFF OR AS INDICATED.

VFD

CONDUIT TERMINATED W/COUPLING

(FLUSH W/FINISHED FLOOR) FOR

EXTENSION TO EQUIPMENT AS DIRECTED.

CONDUIT TERMINATED 6" [152mm] AFF IN STANDARD

BOX FOR EXTENSION TO EQUIPMENT AS DIRECTED.

SWITCH, DPST2

SWITCH, FUSEDF

SWITCH, KEY OPERATEDK

SWITCH, LOCKL

SWITCH, LOW VOLTAGE MASTERLM

SWITCH, MANUAL MOTOR STARTINGM

SWITCH, MOMENTARY CONTACTMC

MP

SWITCH, WITH PILOT LIGHTP

SWITCH, PUSH BUTTONPB

SWITCH, REMOTE CONTROLRC

SWITCH, WEATHER PROOFWP

SWITCH, EXPLOSION PROOFX

SWITCH, THREE WAY3

SWITCH, THREE WAY DIMMER3D

SWITCH, THREE WAY OCCUPANCY SENSOR3OS

SWITCH, FOUR WAY4

SWITCH, DIMMERD

SWITCH, DOOR JAMBDOOR

SWITCH, FOUR WAY OCCUPANCY SENSOR4OS

SWITCH, OCCUPANCY SENSOROS

SWITCH, PHOTOCELLPH

SWITCH, OCCUPANCY SENSOR DIMMEROSD

SWITCH, MOTOR SNAP WITH

PILOT LIGHT (THERMAL TYPE)

E

RECEPTACLE, SPECIAL PURPOSE 208V,

60A, 1 PHASE, 3-POLE, 4W, NEMA 14-60R.

CABLE TELEVISION LINE = CATV

CLOSED CIRCUIT TELEVISION LINE = CCTV

FIBEROPTICS LINE = FO

COMMUNICATIONS FLOOR RECEPTACLE

PAGING SPEAKER, CEILING MOUNTED

PAGING SPEAKER, WALL MOUNTED

CATV

CCTV

FO

COMMUNICATIONS WALL RECEPTACLE

COMMUNICATIONS LINE = COMCOM

INTERCOM LINE = II

NURSE CALL LINE = NCNC

NCS NURSE'S CALL MASTER STATION

NCT NURSE CALL TERMINAL CABINET.

NURSE CALL STATION.

D = DUTY STATION. MTD 5' AFF

E = MTD 6' AFF FOR SHOWER LOCATION

MTD 4'-6" AFF FOR TUB LOCATION

MTD 3' AFF FOR TOILET LOCATION

P = PSYCHIATRIC CORRIDOR STATION WITH KEY

SWITCH

S = AUDIO VISUAL STAFF STATION MTD 5' AFF

U = UTILITY CALL STATION, MTD 5' AFF

NURSE CALL STATION.

D = CORRIDOR DOME LIGHT MTD 6" ABOVE DOOR

I = AUXILIARY INTERSECTIONAL DOME LIGHT

TELECOMMUNICATIONS TERMINAL CABINET

TELECOMMUNICATIONS BACKBOARD (WALL MTD)

TELECOMMUNICATIONS MANHOLE

COMMUNICATIONS CEILING RECEPTACLE

TELEVISION FLOOR RECEPTACLE

C =CAMERA (CCTV SYSTEM)

M =MONITOR (CATV SYSTEM).

AV= AUDIO VISUAL (CONFERENCE ROOM

CONNECTION RECEPTACLES)

M

M

M

S

S

AUDIO VISUAL LINE = AVAV

TTB

N D

N D

RECEPTACLE, SWITCHED DUPLEXS

F

G

H

RECEPTACLE, SPECIAL PURPOSE 208V,

30A, 3 PHASE, 3-POLE 4W, NEMA 15-30R.

RECEPTACLE, SPECIAL PURPOSE 208V,

50A, 3 PHASE, 3 POLE, 4W, NEMA 15-50R.

RECEPTACLE, SPECIAL PURPOSE 208V,

60A, 3 PHASE, 3 POLE, 4W, NEMA 15-60R.

DROP CORD, SINGLE CONVENIENCE OUTLET, 3-WIRE,

GROUNDING TYPE, 20A, W/#12 CONDUCTORS IN

FLEXIBLE CORD (CENTER LINE OF OUTLET: 6'-6"

[1981mm] AFF. MINIMUM).

TELEVISION WALL RECEPTACLE

C =CAMERA (CCTV SYSTEM)

M =MONITOR (CATV SYSTEM).

AV= AUDIO VISUAL (CONFERENCE ROOM

CONNECTION RECEPTACLES)

TELEVISION CEILING RECEPTACLE

C =CAMERA (CCTV SYSTEM)

M =MONITOR (CATV SYSTEM).

AV= AUDIO VISUAL (CONFERENCE ROOM

CONNECTION RECEPTACLES)

SYMBOL DESCRIPTION

J

RECEPTACLE, SPECIAL PURPOSE 208V,

20A, 3 PHASE, 3 POLE, 4W, NEMA 15-20R.

EH ELECTRIC POWER HINGE

DC DOOR CONTACT

MID MOTION INTRUSION DETECTOR

SSTV SECURITY SURVEILLANCE TELEVISION

C CAMERA

C 360 CAMERA

CARD ACCESS READER; LETTER INDICATES AS

FOLLOWS:

M=MOUNT

C-CEILING D-DESK F-FLUSH H-HIDDEN

M-MULLION P-PEDESTAL R-RACK S-SURFACE

W-WALL

T=TECHNOLOGY/TYPE

B-BARCODE M-MAG STRIP

F-ELEVATOR FLOOR CALL P-PROXIMITY

H-ELEVATOR HALL CALL S-SMART CARD

T-TOKEN

DURESS/PANIC ALARM PUSH BUTTON

M

T

M

T

M

T

ELECTROMAGNETIC TYPE DOOR HOLDER OUTLETDH

ELECTRONIC LOCK; LETTER INDICATES AS

FOLLOWS:

M=MOUNT

C-CEILING D-DESK F-FLUSH H-HIDDEN

M-MULLION P-PEDESTAL R-RACK S-SURFACE

W-WALL

T=TECHNOLOGY/TYPE

D-DEADBOLT H-HYBRID L-LATCH SET

M-MAGNETIC S-STRIKE

INTERCOM; LETTER INDICATES AS FOLLOWS:

M=MOUNT

C-CEILING D-DESK F-FLUSH H-HIDDEN

M-MULLION P-PEDESTAL R-RACK S-SURFACE

W-WALL

T=TECHNOLOGY/TYPE

M-MASTER S-SUBSTATION

ITEMS SHOWN IN GRAY ARE EXISTING TO REMAIN

DEMOLITION PLANS: SOLID DARK ITEMS ARE TO BE

REMOVED OR MODIFIED.

NEW PLANS: SOLID DARK ITEMS ARE TO BE

ADDED OR MODIFIED.

DASHED ITEMS ARE INSTALLED BELOW REFERENCED

PLAN

THIS DRAWING SET UTILIZES COLORS TO DIFFERENTIATE

BETWEEN NEW AND EXISTING DEVICES. CONTRACTOR

SHOULD BE AWARE THAT ANY HARD COPIES SHOULD BE

PRINTED IN COLOR SO AS NOT TO LOSE IMPORTANT

DRAWING CLARITY.

GENERAL DRAWING NOTE

DRAWING BACKGROUNDS FOR THESE CONSTRUCTION

DOCUMENTS WERE CREATED UTILIZING VA PROVIDED FILE

INFORMATION FROM LIFE SAFETY PLAN DATED 3/7/2024

AND ARE CONSIDERED TO REFLECT COMPLETE

INFORMATION FOR MOST CRITICAL AREAS FOR FIRE ALARM

NEEDS.

AREAS NOT SPECIFICALLY CALLED OUT BY ROOM NAME

ARE TO BE CONSIDERED AS AREAS OF NO SUBSTANTIAL

CIRCUMSTANCE FOR FIRE ALARM PLANS.

A COMPLETE LIST OF ROOM NUMBERS AND ASSOCIATED

ROOM NAMES HAS BEEN PROVIDED ON SHEETS G-303,

G-304 & G-305 FOR REFERENCE.

GENERAL DRAWING NOTE

IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO

PERFORM INTEGRATION OF ALL NEW DUCT SMOKE

DETECTORS AND FAN SHUT DOWN RELAY MODULES INTO

THE NEW FIRE ALARM SYSTEM. DISCONNECTION,

RECONNECTION, BAS PROGRAMMING ADJUSTMENTS, AND

TESTING OF ALL REQUIRED SUPERVISORY HVAC SHALL BE

PERFORMED IN CONJUNCTION WITH AN APPROVED BAS

CONTROLS CONTRACTOR.

IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO

PERFORM INTEGRATION (WIRING AND PROGRAMMING) OF

EXISTING ELEVATOR FIRE ALARM SIGNALS TO THE NEW

FIRE ALARM SYSTEM AND PERFORM ASSOCIATED TESTING

AND COMMISSIONING SERVICES.

REFER TO SPECIFICATION SECTION 283100.3.3.A FOR A LIST

OF BAS CONTROL CONTRACTORS FAMILIAR WITH THE

FARGO VA FACILITY AND ABLE TO PERFORM ADJUSTMENTS

ON THEIR RESPECTIVE SYSTEMS.

GENERAL BAS INTEGRATION NOTE

IT IS NOT THE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .