This document is a Nationwide Permit (NWP) verification letter issued by the U.S. Army Corps of Engineers (USACE), Portland District, to the Oregon Department of Fish and Wildlife (ODFW) for construction of boating access improvements at Coyote Creek in the Fern Ridge Wildlife Area near Eugene, Lane County, Oregon. The project authorization, designated as Corps No. NWP-2024-00392, was issued on February 3, 2026, and is valid until March 14, 2026, with an extended completion deadline of March 14, 2027, if work has commenced by the initial expiration date. The project involves construction of a parking lot, paddle craft launch dock, gangway, boat slide, sheet pile retaining wall, and stormwater outfall. Authorized work includes permanent discharge of 18.5 cubic yards (cy) of fill within 64 square feet of Coyote Creek below the ordinary high-water mark (OHWM) and 45 cy of fill within 896 square feet of wetlands, along with temporary discharge of up to 10 cy of fill within 140 square feet of channel to isolate the work area during construction. The authorization is contingent upon compliance with NWP 42 (Recreational Facilities) terms and conditions and Oregon Department of Environmental Quality Section 401 Water Quality Certification Conditions.
The permit authorization requires the applicant to obtain all local, state, and other federal permits applicable to the project and to comply with extensive general conditions and regional conditions established by the Portland District. Key requirements include implementation of bioengineering techniques and natural materials for bank stabilization, work area isolation and dewatering best management practices, erosion and sediment controls, mechanized equipment protections, and contractor notification of permit requirements prior to work commencement. The applicant must submit a Certification of Compliance with Department of the Army Permit form within 30 days of project completion. The permit incorporates environmental reviews pursuant to the Endangered Species Act, Magnuson-Stevens Fishery Conservation and Management Act, and National Historic Preservation Act, with determination that the project complies with these requirements. Pre-construction notification requirements, agency coordination protocols, and specifications for temporary fill duration (not to exceed six months without District Engineer approval) and impacts (limited to one-half acre unless otherwise approved) are detailed in the regional conditions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE ARMY
U.S. ARMY CORPS OF ENGINEERS, PORTLAND DISTRICT
P.O. BOX 2946
PORTLAND, OR 97208-2946
February 3, 2026
Regulatory Branch Corps No. NWP-2024-00392
Mr. David Speten Oregon Department of Fish and Wildlife 26969 Cantrell Road Eugene, Oregon 97402 david.a.speten@odfw.oregon.gov
Dear Mr. Speten:
The U.S. Army Corps of Engineers (Corps) received your request for Department of the Army authorization to place fill in 0.001-acre of channel and 0.02-acre of wetland for the construction of a parking lot, boat dock, and stormwater outfall. The project is proposed in Coyote Creek located at Cantrell Road near Eugene, Lane County, Oregon at Latitude/Longitude: 44.041776°, -123.2684376°. This letter verifies your project as depicted on the enclosed drawings (Enclosure 1) is authorized by Nationwide Permit (NWP) No. 42, Recreational Facilities (Federal Register, January 13, 2021, Vol. 86, No.
8).
You are authorized to permanently discharge 18.5 cubic yards (cy) of fill within 64 square feet of Coyote Creek below the ordinary high-water mark (OHWM), and 45 cy of fill within 896 square feet of wetlands to construct a parking lot, boat dock, stabilize a streambank and construct a stormwater outfall. You are also authorized to temporarily discharge up to 10 CY of fill within 140 square feet of channel below the OHWM to isolate the work area during construction.
In order for this authorization to be valid, you must ensure the work is performed in accordance with the enclosed Nationwide Permit 42 Terms and Conditions (Enclosure 2), and the Oregon Department of Environmental Quality (DEQ) Section 401 Water Quality Certification Conditions (Enclosure 3).
We have reviewed your project pursuant to the requirements of the Endangered Species Act, the Magnuson-Stevens Fishery Conservation and Management Act and the National Historic Preservation Act. We have determined the project complies with the requirements of these laws provided you comply with all of the permit general and regional conditions.
- 2 -
The DEQ has issued a Section 401 Water Quality Certification for this project. No further coordination with DEQ is required provided the work is performed in accordance with all of the enclosed conditions.
The Corps did not prepare a jurisdictional determination for this project. The Corps has treated the aquatic resources to be affected by this project as jurisdictional waters of the United States.
As stated in Part D of the enclosed NWP Terms and Conditions, this NWP verification does not grant any property rights or exclusive privileges, to include Corps property. If you require access to Corps property to complete the project, please contact the Corps Real Estate Division at joseph.s.tucker@usace.army.mil for any necessary authorizations.
The verification of this NWP is valid until March 14, 2026, unless the NWP is modified, reissued, or revoked prior to that date. If the authorized work has not been completed by that date and you have commenced or are under contract to commence this activity before March 14, 2026, you will have until March 14, 2027, to complete the activity under the enclosed terms and conditions of this NWP. If the work cannot be completed by March 14, 2027, you will need to obtain a new NWP verification or authorization by another type of Department of the Army permit.
Our verification of this NWP is based on the project description and construction methods provided in your permit application. If you propose changes to the project, you must submit revised plans to this office and receive our approval of the revisions prior to performing the work. Failure to comply with all terms and conditions of this NWP verification invalidates this authorization and could result in a violation of Section 404 of the Clean Water Act. You must also obtain all local, state, and other federal permits that apply to this project.
Upon completing the authorized work, you must fill out and return the enclosed Certification of Compliance with Department of the Army Permit form (Enclosure 4). We would like to hear about your experience working with the Portland District, Regulatory Branch. Please complete a customer service survey form available on our website (https://regulatory.ops.usace.army.mil/customer-service-survey/).
- 3 -
If you have any questions regarding this NWP verification, please contact Katrina Stanek by telephone at (402) 896-0896 or by email at katrina.g.stanek@usace.army.mil.
FOR THE COMMANDER, LARRY D. CASWELL, JR., PE, PMP, COLONEL, U.S. ARMY,
DISTRICT COMMANDER and DISTRICT ENGINEER:
For: William D. Abadie Chief, Regulatory Branch
Enclosures cc:
AKS Engineering and Forestry (Julie Wirth-McGee, wirthmcgeej@aks-eng.com) Oregon Department of State Lands (Rebecca Loiselle, rebecca.loiselle@dsl.oregon.gov) Oregon Department of Environmental Quality (Delia Negru, delia.negru@deq.oregon.gov)
O H
W O
H W
O H
W O
H W
O H
W O
HW
OHW
OHW
OHW
OHW OHW
OHW
O
HW
O H
W
OHW
O H
W
OHW
O
HW
OHW
OHW
OHW
T T T T T T T T
370375380
38038
SHEET OF
SHEET NUMBER
DATE:
DRAFTER:
SHEET STATUS
DESIGNER:
SH
EE
T
DE
SC
RI
PT
IO
N:
PR
OJ
EC
T
LO
CA
TI
ON
, W
AT
ER
BO
DY
F
AC
ILI
TY
O W
NE
R:
DRAWING NO.
EX
IS
TI
NG
C
ON
DI
TI
ON
S
CO
YO
TE
C
RE
EK
B
OA
TI
NG
A
CC
ES
S
OD
FW
02 07
1998 - NG - 02
T. MARIN
T. MARIN
PERMIT REVIEW
NOT FOR CONSTRUCTION
ENGINEER
74326PE
OREGONJO S H U A B . T A C C H I N IJ U L Y 11, 2 0 0 6
REG
ISTERED PROFESSIONAL E
N G I N E E R
EXPIRES : 6 - 30 - 26
Feet 0 40 80
NWP-2024-00392 Page 1 of 5 Enclosure 2
AutoCAD SHX Text
COYOTE CREEK
AutoCAD SHX Text
WIRE FENCE
AutoCAD SHX Text
BRIDGE ABUTMENT
AutoCAD SHX Text
GUARD RAIL
AutoCAD SHX Text
PARK SIGN IN CONCRETE SLAB
AutoCAD SHX Text
BENCH
AutoCAD SHX Text
PICNIC TABLE
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
TREES OF VARYING SIZES
AutoCAD SHX Text
UNDERGROUND CABLE
AutoCAD SHX Text
CANTRELL RD.
AutoCAD SHX Text
BRIDGE
AutoCAD SHX Text
DIRT PATH
AutoCAD SHX Text
LOCATION OF PREVIOUS RIVER ACCESS
AutoCAD SHX Text
TOP OF BANK ELEV.=378'
AutoCAD SHX Text
BENCH
AutoCAD SHX Text SURVEYED IN MAY 2021, NOV 2021 & NOV 2024 BY OSMB STAFF. WETLANDS A & B AND COYOTE CREEK DELINEATED BY AKS ENGINEERING AND FORESTRY, LLC ON JUNE 5, 2024 AND JANUARY 15, 2025 (DSL FILE NO. WD2024-0439) COORDINATES BASED ON OREGON STATE PLANE SOUTH, NAD 83, INT'L FEET, VERTICAL BASED ON NAVD 88. 1' COUNTOUR LINES SHOWN & REPRESENT EXISTING GROUND CONDITIONS
AutoCAD SHX Text
COYOTE CREEK DHW ELEV.=377.1'
AutoCAD SHX Text
USACE MONUMENT
AutoCAD SHX Text
PARK TRAIL
AutoCAD SHX Text
FLOOD BOUNDARY
AutoCAD SHX Text
PROJECT AREA BOUNDARY
AutoCAD SHX Text
WETLAND A PFO/FLATS
AutoCAD SHX Text
WETLAND B PEM/FLATS
AutoCAD SHX Text
STEEL POST
AutoCAD SHX Text
TAX LOT BOUNDARY
AutoCAD SHX Text
TLID 1705350000700
AutoCAD SHX Text
TAX MAP 17053400
AutoCAD SHX Text
EXISTING CONDITIONS
W O
H W
O H
W O
H W
O H
W O
HW
OHW
OHW
OHW
OHW OHW
OHW
O
HW
O H
W
OHW
O H
W
OHW
O
HW
OHW
OHW
OHW
T T T T T T T T
SHEET OF
SHEET NUMBER
DATE:
DRAFTER:
SHEET STATUS
DESIGNER:
SH
EE
T
DE
SC
RI
PT
IO
N:
PR
OJ
EC
T
LO
CA
TI
ON
, W
AT
ER
BO
DY
F
AC
ILI
TY
O W
NE
R:
DRAWING NO.
SI
TE
P
LA
N
CO
YO
TE
C
RE
EK
B
OA
TI
NG
A
CC
ES
S
OD
FW
03 07
1998 - NG - 03
T. MARIN
T. MARIN
HATCH LEGEND
VEGETATED SWALE
ASPHALT PARKING LOT
GRAVEL
ADA TACTILE PAD
WETLAND
CONCRETE
DIRECT PERM. IMPACTS
CATCHMENT A
CATCHMENT B
PERMIT REVIEW
NOT FOR CONSTRUCTION
DESIGN ENGINEER
74326PE
OREGONJO S H U A B . T A C C H I N IJ U L Y 11, 2 0 0 6
REG
ISTERED PROFESSIONAL E
N G I N E E R
EXPIRES : 6 - 30 - 26
Feet 0 40 80
NWP-2024-00392 Page 2 of 5 Enclosure 2
AutoCAD SHX Text
COYOTE CREEK
AutoCAD SHX Text
NO PARKING
AutoCAD SHX Text
NO PARKING
AutoCAD SHX Text
VEHICLE WITH TRAILER ONLY
AutoCAD SHX Text
VEHICLE WITH TRAILER ONLY
AutoCAD SHX Text
VEHICLE WITH TRAILER ONLY
AutoCAD SHX Text
VEHICLE WITH TRAILER ONLY
AutoCAD SHX Text
15 MINUTE LOADING ZONE
AutoCAD SHX Text
NO PARKING
AutoCAD SHX Text
PADDLE BOATS ONLY
AutoCAD SHX Text
NO PARKING
AutoCAD SHX Text
NO PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
NO
AutoCAD SHX Text
WETLAND A
AutoCAD SHX Text
5' CONC. PATH, WITH 2' SHOULDER
AutoCAD SHX Text
RIPRAP OUTFALL
AutoCAD SHX Text
USACE MONUMENT
AutoCAD SHX Text
TOP OF BANK ELEV.=378'
AutoCAD SHX Text
40' GANGWAY
AutoCAD SHX Text
40' PADDLE CRAFT SLIDE
AutoCAD SHX Text
PADDLE CRAFT LAUNCH DOCK
AutoCAD SHX Text
12-INCH STEEL PILE (TYP,4)
AutoCAD SHX Text
VAULT RESTROOM
AutoCAD SHX Text
11'X56' VEGETATED SWALE
AutoCAD SHX Text
BOULDERS SURROUNDING PARKING LOT
AutoCAD SHX Text
TYP SPILLWAY
AutoCAD SHX Text
PFD LOANER KIOSK
AutoCAD SHX Text
SIDES SLOPED 3:1
AutoCAD SHX Text
ABUTMENT ELEV.=377.9'
AutoCAD SHX Text
STAIRS
AutoCAD SHX Text
COYOTE CREEK OHW ELEV.=377.1'
AutoCAD SHX Text 8" PVC SD L=83' S=0.005ft/ft
AutoCAD SHX Text 6" PVC SD L=117' S=0.005ft/ft
AutoCAD SHX Text
FLOOD BOUNDARY
AutoCAD SHX Text
SHEET PILE RETAINING WALL TOP ELEV.=377.9'
AutoCAD SHX Text
SWALE OVERFLOW
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text DIRECT PERMANENT IMPACTS (DPI) RIVER 1 SCOUR PROTECTION- 43 SQ FT. (0.001 ACRES) 1 SCOUR PROTECTION- 43 SQ FT. (0.001 ACRES) 2 PILES- 4 SQ.FT. 3 OUTFALL- 3 SQ.FT. WETLANDS 4 WETLAND B-896 SQ.FT. (0.02 ACRES)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
PROJECT AREA BOUNDARY
AutoCAD SHX Text
SITE PLAN
AutoCAD SHX Text
AREAS OF CATCHMENTS A-9358 SQ FT 9358 SQ FT B-3160 SQ FT 3160 SQ FT
NOTE: COUNTOURS WITHIN PARKING LOT ARE 1' WHILE COUNTOURS OUTSIDE OF PARKING LOT & IN SWALE ARE ' TO ACCENT GRADING110' TO ACCENT GRADING
W O
H W
O H
W O
H W
O H
W O
HW
OHW
OHW
OHW
OHW OHW
OHW
O
HW
O H
W
OHW
O H
W
OHW
O
HW
OHW
OHW
SHEET OF
SHEET NUMBER
DATE:
DRAFTER:
SHEET STATUS
DESIGNER:
SH
EE
T
DE
SC
RI
PT
IO
N:
PR
OJ
EC
T
LO
CA
TI
ON
, W
AT
ER
BO
DY
F
AC
ILI
TY
O W
NE
R:
DRAWING NO.
GR
AD
IN
G
ER
OS
IO
N
CO
NT
RO
L P
LA
N
CO
YO
TE
C
RE
EK
B
OA
TI
NG
A
CC
ES
S
OD
FW
04 07
1998 - NG - 04
T. MARIN
T. MARIN
PERMIT REVIEW
NOT FOR CONSTRUCTION
ENGINEER
74326PE
OREGONJO S H U A B . T A C C H I N IJ U L Y 11, 2 0 0 6
REG
ISTERED PROFESSIONAL E
N G I N E E R
EXPIRES : 6 - 30 - 26
DESIGN
25.0
75.0
95.0
20.0
Feet 0 40 80
NWP-2024-00392 Page 3 of 5 Enclosure 2
AutoCAD SHX Text
COYOTE CREEK
AutoCAD SHX Text TEMPORARY WORK ISOLATION SEDIMENT FENCE ROCKED CONSTRUCTION ENTRANCE EXISTING DRAINAGE PATTERN ROADSIDE STAGING AREA
AutoCAD SHX Text
SEDIMENT FENCE
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
PROJECT AREA BOUNDARY
AutoCAD SHX Text x4, PILE LOCATIONS (DPI)
AutoCAD SHX Text
DIRECT PERM. WATER IMPACTS
AutoCAD SHX Text
SHEET PILE, DOCK SCOUR PROTECTION
AutoCAD SHX Text
WETLAND A
AutoCAD SHX Text
WETLAND B
AutoCAD SHX Text
TEMPORARY WORK ISOLATION 86 SF
AutoCAD SHX Text
RIPRAP OUTFALL
AutoCAD SHX Text
FLOOD BOUNDARY
AutoCAD SHX Text
TEMPORARY WORK ISOLATION 46.5 SF
AutoCAD SHX Text
COYOTE CREEK DHW ELEV.=379.1'
AutoCAD SHX Text
GRADING & EROSION CONTROL PLAN
NOTE: COUNTOURS WITHIN PARKING LOT ARE 1' WHILE COUNTOURS OUTSIDE OF PARKING LOT & IN SWALE IS ' TO ACCENT GRADING110' TO ACCENT GRADING
0+00 0+25
OHW OHW OHW OHW
OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW
1+25 1+50 1+75 1+90.12
Horizontal
OLW OLW OLW OLW OLW OLW OLW OLW OLW OLW OLW OLW
DLW DLW DLW DLW DLW DLW DLW DLW DLW DLW DLW DLW
-1:22
0 100-10
0 100-10
OHW
SHEET OF
SHEET NUMBER
DATE:
DRAFTER:
SHEET STATUS
DESIGNER:
SH
EE
T
DE
SC
RI
PT
IO
N:
PR
OJ
EC
T
LO
CA
TI
ON
, W
AT
ER
BO
DY
F
AC
ILI
TY
O W
NE
R:
DRAWING NO.
SE
CT
IO
N
VI
EW
S
CO
YO
TE
C
RE
EK
B
OA
TI
NG
A
CC
ES
S
OD
FW
05 07
1998 - NG - 05
T. MARIN
T. MARIN
PERMIT REVIEW
NOT FOR CONSTRUCTION
DESIGN ENGINEER
74326PE
OREGONJO S H U A B . T A C C H I N IJ U L Y 11, 2 0 0 6
REG
ISTERED PROFESSIONAL E
N G I N E E R
EXPIRES : 6 - 30 - 26
Feet 0 10 20
Feet20
Feet10
Feet 0 10 20Feet
0 10 20
Feet10
NWP-2024-00392 Page 4 of 5 Enclosure 2
AutoCAD SHX Text 8'
AutoCAD SHX Text 2'
AutoCAD SHX Text 1'-6"
AutoCAD SHX Text 6'
AutoCAD SHX Text
WIDTH VARIES
AutoCAD SHX Text
0.20 CY RIPRAP PERM. FILL BELOW OHW
AutoCAD SHX Text
SD OUTFALL STA 0+20.30 10"IE OUT=377.10
AutoCAD SHX Text
0.77 CY PERM. CONCRETE & ROCK FILL BELOW OHW
AutoCAD SHX Text
SHEET PILE RETAINING WALL
AutoCAD SHX Text
OUTFALL SECTION - 10" STORMDRAIN
AutoCAD SHX Text
ABUTMENT SECTION - SHEET PILE/SCOUR PROTECTION RETAINING WALL
AutoCAD SHX Text
0.60 CY PERM. REMOVAL BELOW OHW
AutoCAD SHX Text
0.87 CY PERM. REMOVAL BELOW OHW
AutoCAD SHX Text
EMBED PILES 10' INTO EXISTING RIVERBED PERM. FILL 2.5 CY BELOW OHW
AutoCAD SHX Text
12" STEEL PILES (X4), CUT OFF ELEV.=386.33'
AutoCAD SHX Text SHEET PILE RETAINING WALL EMBED 10' INTO EXISTING RIVERBED PERM. FILL 0.65 CY BELOW OHW
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text
PILING SECTION
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text
PILE STOPS TO PREVENT DOCK GROUNDING
AutoCAD SHX Text
RIPRAP SLOPE PROTECTION
AutoCAD SHX Text
TEMP. FILL FOR IN-WATER ISOLATION 5.93 CY
AutoCAD SHX Text
TEMP. FILL FOR IN-WATER ISOLATION 3.33 CY
AutoCAD SHX Text
ABUTMENT ELEV.=377.9'
AutoCAD SHX Text
EXISTING GROND
AutoCAD SHX Text 4'x40' GANGWAY & 4'X40' SHUTE
16'x15' DOCKS
0 100-10
SHEET OF
SHEET NUMBER
DATE:
DRAFTER:
SHEET STATUS
DESIGNER:
SH
EE
T
DE
SC
RI
PT
IO
N:
PR
OJ
EC
T
LO
CA
TI
ON
, W
AT
ER
BO
DY
F
AC
ILI
TY
O W
NE
R:
DRAWING NO.
W
ET
LA
ND
B S
EC
TI
ON
V
IE
W
CO
YO
TE
C
RE
EK
B
OA
TI
NG
A
CC
ES
S
OD
FW
06 07
1998 - NG - 06
T. MARIN
T. MARIN
PERMIT REVIEW
NOT FOR CONSTRUCTION
DESIGN ENGINEER
74326PE
OREGONJO S H U A B . T A C C H I N IJ U L Y 11, 2 0 0 6
REG
ISTERED PROFESSIONAL E
N G I N E E R
EXPIRES : 6 - 30 - 26
Feet10
Feet 0 5 10
NWP-2024-00392 Page 5 of 5 Enclosure 2
AutoCAD SHX Text
WETLAND B SECTION
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text
EXISTING WETLAND B BOUNDARY
AutoCAD SHX Text
EXISTING GROUND
AutoCAD SHX Text
6"CURB
AutoCAD SHX Text
12" AGGREGATE BASE
AutoCAD SHX Text
4" ASPHALT PARKING LOT (F.G.)
AutoCAD SHX Text
6" OFFSET & SLOPE 2:1 BACK TO E.G.
AutoCAD SHX Text
EXISTING WETLAND B
EFFECT ON WETLAND B TOTAL REMOVAL =4.40CY TOTAL FILL=6.66CY
A. Description of Activities Authorized by Nationwide Permit 42 B. Nationwide Permit General Conditions C. District Engineer’s Decision D. Further Information E. Portland District Regional General Conditions F. Portland District Nationwide Permit Specific Regional Condition
In addition to any special conditions that may be required on a case-by-case basis by the District Engineer, the following terms and conditions must be met, as applicable, for a Nationwide Permit authorization to be valid in Oregon.
A. Description of Activities Authorized by Nationwide Permit (NWP) 42
42. Recreational Facilities. Discharges of dredged or fill material into non-tidal waters of the United States for the construction or expansion of recreational facilities. Examples of recreational facilities that may be authorized by this NWP include playing fields (e.g., football fields, baseball fields), basketball courts, tennis courts, hiking trails, bike paths, golf courses, ski areas, horse paths, nature centers, and campgrounds (excluding recreational vehicle parks). This NWP also authorizes the construction or expansion of small support facilities, such as maintenance and storage buildings and stables that are directly related to the recreational activity, but it does not authorize the construction of hotels, restaurants, racetracks, stadiums, arenas, or similar facilities.
The discharge must not cause the loss of greater than 1/2-acre of non-tidal waters of the United States. This NWP does not authorize discharges of dredged or fill material into non-tidal wetlands adjacent to tidal waters.
Notification: The permittee must submit a pre-construction notification to the district engineer prior to commencing the activity. (See general condition 32.) (Authority:
Section 404)
B. Nationwide Permit General Conditions Note: To qualify for NWP authorization, the prospective permittee must comply with the following general conditions, as applicable, in addition to any regional or case-specific conditions imposed by the division engineer or district engineer. Prospective permittees should contact the appropriate Corps district office to determine if regional conditions have been imposed on an NWP. Prospective permittees should also contact the appropriate Corps district office to determine the status of Clean Water Act Section 401 water quality certification and/or Coastal Zone Management Act consistency for an NWP. Every person who may wish to obtain permit authorization under one or more NWPs, or who is currently relying on an existing or prior permit authorization under one
Nationwide Permit 42 Terms and Conditions
Effective Date: March 15, 2021
NWP-2024-00392 Page 1 of 23 Enclosure 2 or more NWPs, has been and is on notice that all of the provisions of 33 CFR 330.1 through 330.6 apply to every NWP authorization. Note especially 33 CFR 330.5 relating to the modification, suspension, or revocation of any NWP authorization.
1. Navigation. (a) No activity may cause more than a minimal adverse effect on navigation.
(b) Any safety lights and signals prescribed by the U.S. Coast Guard, through regulations or otherwise, must be installed and maintained at the permittee's expense on authorized facilities in navigable waters of the United States.
(c) The permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structure or work herein authorized, or if, in the opinion of the Secretary of the Army or his or her authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal or alteration.
2. Aquatic Life Movements. No activity may substantially disrupt the necessary life cycle movements of those species of aquatic life indigenous to the waterbody, including those species that normally migrate through the area, unless the activity's primary purpose is to impound water. All permanent and temporary crossings of waterbodies shall be suitably culverted, bridged, or otherwise designed and constructed to maintain low flows to sustain the movement of those aquatic species. If a bottomless culvert cannot be used, then the crossing should be designed and constructed to minimize adverse effects to aquatic life movements.
3. Spawning Areas. Activities in spawning areas during spawning seasons must be avoided to the maximum extent practicable. Activities that result in the physical destruction (e.g., through excavation, fill, or downstream smothering by substantial turbidity) of an important spawning area are not authorized.
4. Migratory Bird Breeding Areas. Activities in waters of the United States that serve as breeding areas for migratory birds must be avoided to the maximum extent practicable.
5. Shellfish Beds. No activity may occur in areas of concentrated shellfish populations, unless the activity is directly related to a shellfish harvesting activity authorized by NWPs 4 and 48, or is a shellfish seeding or habitat restoration activity authorized by
NWP 27.
6. Suitable Material. No activity may use unsuitable material (e.g., trash, debris, car bodies, asphalt, etc.). Material used for construction or discharged must be free from toxic pollutants in toxic amounts (see Section 307 of the Clean Water Act).
NWP-2024-00392 Page 2 of 23 Enclosure 2
7. Water Supply Intakes. No activity may occur in the proximity of a public water supply intake, except where the activity is for the repair or improvement of public water supply intake structures or adjacent bank stabilization.
8. Adverse Effects from Impoundments. If the activity creates an impoundment of water, adverse effects to the aquatic system due to accelerating the passage of water, and/or restricting its flow must be minimized to the maximum extent practicable.
9. Management of Water Flows. To the maximum extent practicable, the pre-construction course, condition, capacity, and location of open waters must be maintained for each activity, including stream channelization, storm water management activities, and temporary and permanent road crossings, except as provided below. The activity must be constructed to withstand expected high flows. The activity must not restrict or impede the passage of normal or high flows, unless the primary purpose of the activity is to impound water or manage high flows. The activity may alter the pre-construction course, condition, capacity, and location of open waters if it benefits the aquatic environment (e.g., stream restoration or relocation activities).
10. Fills Within 100-Year Floodplains. The activity must comply with applicable FEMA-approved state or local floodplain management requirements.
11. Equipment. Heavy equipment working in wetlands or mudflats must be placed on mats, or other measures must be taken to minimize soil disturbance.
12. Soil Erosion and Sediment Controls. Appropriate soil erosion and sediment controls must be used and maintained in effective operating condition during construction, and all exposed soil and other fills, as well as any work below the ordinary high water mark or high tide line, must be permanently stabilized at the earliest practicable date.
Permittees are encouraged to perform work within waters of the United States during periods of low-flow or no-flow, or during low tides.
13. Removal of Temporary Structures and Fills. Temporary structures must be removed, to the maximum extent practicable, after their use has been discontinued.
Temporary fills must be removed in their entirety and the affected areas returned to pre-construction elevations. The affected areas must be revegetated, as appropriate.
14. Proper Maintenance. Any authorized structure or fill shall be properly maintained, including maintenance to ensure public safety and compliance with applicable NWP general conditions, as well as any activity-specific conditions added by the district engineer to an NWP authorization.
15. Single and Complete Project. The activity must be a single and complete project.
The same NWP cannot be used more than once for the same single and complete project.
NWP-2024-00392 Page 3 of 23 Enclosure 2
16. Wild and Scenic Rivers. (a) No NWP activity may occur in a component of the National Wild and Scenic River System, or in a river officially designated by Congress as a “study river” for possible inclusion in the system while the river is in an official study status, unless the appropriate Federal agency with direct management responsibility for such river, has determined in writing that the proposed activity will not adversely affect the Wild and Scenic River designation or study status.
(b) If a proposed NWP activity will occur in a component of the National Wild and Scenic River System, or in a river officially designated by Congress as a “study river” for possible inclusion in the system while the river is in an official study status, the permittee must submit a pre-construction notification (see general condition 32). The district engineer will coordinate the PCN with the Federal agency with direct management responsibility for that river. Permittees shall not begin the NWP activity until notified by the district engineer that the Federal agency with direct management responsibility for that river has determined in writing that the proposed NWP activity will not adversely affect the Wild and Scenic River designation or study status.
(c) Information on Wild and Scenic Rivers may be obtained from the appropriate Federal land management agency responsible for the designated Wild and Scenic River or study river (e.g., National Park Service, U.S. Forest Service, Bureau of Land Management, U.S. Fish and Wildlife Service). Information on these rivers is also available at: http://www.rivers.gov/.
17. Tribal Rights. No activity or its operation may impair reserved tribal rights, including, but not limited to, reserved water rights and treaty fishing and hunting rights.
18. Endangered Species. (a) No activity is authorized under any NWP which is likely to directly or indirectly jeopardize the continued existence of a threatened or endangered species or a species proposed for such designation, as identified under the Federal Endangered Species Act (ESA), or which will directly or indirectly destroy or adversely modify designated critical habitat or critical habitat proposed for such designation. No activity is authorized under any NWP which “may affect” a listed species or critical habitat, unless ESA Section 7 consultation addressing the consequences of the proposed activity on listed species or critical habitat has been completed. See 50 CFR
402.02 for the definition of “effects of the action” for the purposes of ESA Section 7 consultation, as well as 50 CFR 402.17, which provides further explanation under ESA Section 7 regarding “activities that are reasonably certain to occur” and “consequences caused by the proposed action.”
(b) Federal agencies should follow their own procedures for complying with the requirements of the ESA (see 33 CFR 330.4(f)(1)). If pre-construction notification is required for the proposed activity, the Federal permittee must provide the district engineer with the appropriate documentation to demonstrate compliance with those requirements. The district engineer will verify that the appropriate documentation has been submitted. If the appropriate documentation has not been submitted, additional
NWP-2024-00392 Page 4 of 23 Enclosure 2
ESA Section 7 consultation may be necessary for the activity and the respective federal agency would be responsible for fulfilling its obligation under Section 7 of the ESA.
(c) Non-federal permittees must submit a pre-construction notification to the district engineer if any listed species (or species proposed for listing) or designated critical habitat (or critical habitat proposed such designation) might be affected or is in the vicinity of the activity, or if the activity is located in designated critical habitat or critical habitat proposed for such designation, and shall not begin work on the activity until notified by the district engineer that the requirements of the ESA have been satisfied and that the activity is authorized. For activities that might affect Federally-listed endangered or threatened species (or species proposed for listing) or designated critical habitat (or critical habitat proposed for such designation), the pre-construction notification must include the name(s) of the endangered or threatened species (or species proposed for listing) that might be affected by the proposed activity or that utilize the designated critical habitat (or critical habitat proposed for such designation) that might be affected by the proposed activity. The district engineer will determine whether the proposed activity “may affect” or will have “no effect” to listed species and designated critical habitat and will notify the non-Federal applicant of the Corps’ determination within 45 days of receipt of a complete pre-construction notification. For activities where the non-Federal applicant has identified listed species (or species proposed for listing) or designated critical habitat (or critical habitat proposed for such designation) that might be affected or is in the vicinity of the activity, and has so notified the Corps, the applicant shall not begin work until the Corps has provided notification that the proposed activity will have “no effect” on listed species (or species proposed for listing or designated critical habitat (or critical habitat proposed for such designation), or until ESA Section 7 consultation or conference has been completed. If the non-Federal applicant has not heard back from the Corps within 45 days, the applicant must still wait for notification from the Corps.
(d) As a result of formal or informal consultation or conference with the FWS or NMFS the district engineer may add species-specific permit conditions to the NWPs.
(e) Authorization of an activity by an NWP does not authorize the “take” of a threatened or endangered species as defined under the ESA. In the absence of separate authorization (e.g., an ESA Section 10 Permit, a Biological Opinion with “incidental take” provisions, etc.) from the FWS or the NMFS, the Endangered Species Act prohibits any person subject to the jurisdiction of the United States to take a listed species, where "take" means to harass, harm, pursue, hunt, shoot, wound, kill, trap, capture, or collect, or to attempt to engage in any such conduct. The word “harm” in the definition of “take'' means an act which actually kills or injures wildlife. Such an act may include significant habitat modification or degradation where it actually kills or injures wildlife by significantly impairing essential behavioral patterns, including breeding, feeding or sheltering.
(f) If the non-federal permittee has a valid ESA Section 10(a)(1)(B) incidental take permit with an approved Habitat Conservation Plan for a project or a group of projects
NWP-2024-00392 Page 5 of 23 Enclosure 2 that includes the proposed NWP activity, the non-federal applicant should provide a copy of that ESA Section 10(a)(1)(B) permit with the PCN required by paragraph (c) of this general condition. The district engineer will coordinate with the agency that issued the ESA Section 10(a)(1)(B) permit to determine whether the proposed NWP activity and the associated incidental take were considered in the internal ESA Section 7 consultation conducted for the ESA Section 10(a)(1)(B) permit. If that coordination results in concurrence from the agency that the proposed NWP activity and the associated incidental take were considered in the internal ESA Section 7 consultation for the ESA Section 10(a)(1)(B) permit, the district engineer does not need to conduct a separate ESA Section 7 consultation for the proposed NWP activity. The district engineer will notify the non-federal applicant within 45 days of receipt of a complete pre-construction notification whether the ESA Section 10(a)(1)(B) permit covers the proposed NWP activity or whether additional ESA Section 7 consultation is required.
(g) Information on the location of threatened and endangered species and their critical habitat can be obtained directly from the offices of the FWS and NMFS or their world wide web pages at http://www.fws.gov/ or http://www.fws.gov/ipac and http://www.nmfs.noaa.gov/pr/species/esa/ respectively.
19. Migratory Birds and Bald and Golden Eagles. The permittee is responsible for ensuring that an action authorized by an NWP complies with the Migratory Bird Treaty Act and the Bald and Golden Eagle Protection Act. The permittee is responsible for contacting the appropriate local office of the U.S. Fish and Wildlife Service to determine what measures, if any, are necessary or appropriate to reduce adverse effects to migratory birds or eagles, including whether "incidental take" permits are necessary and available under the Migratory Bird Treaty Act or Bald and Golden Eagle Protection Act for a particular activity.
20. Historic Properties. (a) No activity is authorized under any NWP which may have the potential to cause effects to properties listed, or eligible for listing, in the National Register of Historic Places until the requirements of Section 106 of the National Historic Preservation Act (NHPA) have been satisfied.
(b) Federal permittees should follow their own procedures for complying with the requirements of Section 106 of the National Historic Preservation Act (see 33 CFR 330.4(g)(1)). If pre-construction notification is required for the proposed NWP activity, the Federal permittee must provide the district engineer with the appropriate documentation to demonstrate compliance with those requirements. The district engineer will verify that the appropriate documentation has been submitted. If the appropriate documentation is not submitted, then additional consultation under Section 106 may be necessary. The respective federal agency is responsible for fulfilling its obligation to comply with Section 106.
(c) Non-federal permittees must submit a pre-construction notification to the district engineer if the NWP activity might have the potential to cause effects to any historic properties listed on, determined to be eligible for listing on, or potentially eligible for
NWP-2024-00392 Page 6 of 23 Enclosure 2 listing on the National Register of Historic Places, including previously unidentified properties. For such activities, the pre-construction notification must state which historic properties might have the potential to be affected by the proposed NWP activity or include a vicinity map indicating the location of the historic properties or the potential for the presence of historic properties. Assistance regarding information on the location of, or potential for, the presence of historic properties can be sought from the State Historic Preservation Officer, Tribal Historic Preservation Officer, or designated tribal representative, as appropriate, and the National Register of Historic Places (see 33 CFR 330.4(g)). When reviewing pre-construction notifications, district engineers will comply with the current procedures for addressing the requirements of Section 106 of the National Historic Preservation Act. The district engineer shall make a reasonable and good faith effort to carry out appropriate identification efforts commensurate with potential impacts, which may include background research, consultation, oral history interviews, sample field investigation, and/or field survey. Based on the information submitted in the PCN and these identification efforts, the district engineer shall determine whether the proposed NWP activity has the potential to cause effects on the historic properties. Section 106 consultation is not required when the district engineer determines that the activity does not have the potential to cause effects on historic properties (see 36 CFR 800.3(a)). Section 106 consultation is required when the district engineer determines that the activity has the potential to cause effects on historic properties. The district engineer will conduct consultation with consulting parties identified under 36 CFR 800.2(c) when he or she makes any of the following effect determinations for the purposes of Section 106 of the NHPA: no historic properties affected, no adverse effect, or adverse effect.
(d) Where the non-Federal applicant has identified historic properties on which the proposed NWP activity might have the potential to cause effects and has so notified the Corps, the non-Federal applicant shall not begin the activity until notified by the district engineer either that the activity has no potential to cause effects to historic properties or that NHPA Section 106 consultation has been completed. For non-federal permittees, the district engineer will notify the prospective permittee within 45 days of receipt of a complete pre-construction notification whether NHPA Section 106 consultation is required. If NHPA Section 106 consultation is required, the district engineer will notify the non-Federal applicant that he or she cannot begin the activity until Section 106 consultation is completed. If the non-Federal applicant has not heard back from the Corps within 45 days, the applicant must still wait for notification from the Corps.
(e) Prospective permittees should be aware that Section 110k of the NHPA (54 U.S.C.
306113) prevents the Corps from granting a permit or other assistance to an applicant who, with intent to avoid the requirements of Section 106 of the NHPA, has intentionally significantly adversely affected a historic property to which the permit would relate, or having legal power to prevent it, allowed such significant adverse effect to occur, unless the Corps, after consultation with the Advisory Council on Historic Preservation (ACHP), determines that circumstances justify granting such assistance despite the adverse effect created or permitted by the applicant. If circumstances justify granting the assistance, the Corps is required to notify the ACHP and provide documentation
NWP-2024-00392 Page 7 of 23 Enclosure 2 specifying the circumstances, the degree of damage to the integrity of any historic properties affected, and proposed mitigation. This documentation must include any views obtained from the applicant, SHPO/THPO, appropriate Indian tribes if the undertaking occurs on or affects historic properties on tribal lands or affects properties of interest to those tribes, and other parties known to have a legitimate interest in the impacts to the permitted activity on historic properties.
21. Discovery of Previously Unknown Remains and Artifacts. Permittees that discover any previously unknown historic, cultural or archeological remains and artifacts while accomplishing the activity authorized by an NWP, they must immediately notify the district engineer of what they have found, and to the maximum extent practicable, avoid construction activities that may affect the remains and artifacts until the required coordination has been completed. The district engineer will initiate the Federal, Tribal, and state coordination required to determine if the items or remains warrant a recovery effort or if the site is eligible for listing in the National Register of Historic Places.
22. Designated Critical Resource Waters. Critical resource waters include, NOAA-managed marine sanctuaries and marine monuments, and National Estuarine Research Reserves. The district engineer may designate, after notice and opportunity for public comment, additional waters officially designated by a state as having particular environmental or ecological significance, such as outstanding national resource waters or state natural heritage sites. The district engineer may also designate additional critical resource waters after notice and opportunity for public comment.
(a) Discharges of dredged or fill material into waters of the United States are not authorized by NWPs 7, 12, 14, 16, 17, 21, 29, 31, 35, 39, 40, 42, 43, 44, 49, 50, 51, 52, 57 and 58 for any activity within, or directly affecting, critical resource waters, including wetlands adjacent to such waters.
(b) For NWPs 3, 8, 10, 13, 15, 18, 19, 22, 23, 25, 27, 28, 30, 33, 34, 36, 37, 38, and 54, notification is required in accordance with general condition 32, for any activity proposed by permittees in the designated critical resource waters including wetlands adjacent to those waters. The district engineer may authorize activities under these NWPs only after she or he determines that the impacts to the critical resource waters will be no more than minimal.
23. Mitigation. The district engineer will consider the following factors when determining appropriate and practicable mitigation necessary to ensure that the individual and cumulative adverse environmental effects are no more than minimal:
(a) The activity must be designed and constructed to avoid and minimize adverse effects, both temporary and permanent, to waters of the United States to the maximum extent practicable at the project site (i.e., on site).
NWP-2024-00392 Page 8 of 23 Enclosure 2
(b) Mitigation in all its forms (avoiding, minimizing, rectifying, reducing, or compensating for resource losses) will be required to the extent necessary to ensure that the individual and cumulative adverse environmental effects are no more than minimal.
(c) Compensatory mitigation at a minimum one-for-one ratio will be required for all wetland losses that exceed 1/10-acre and require pre-construction notification, unless the district engineer determines in writing that either some other form of mitigation would be more environmentally appropriate or the adverse environmental effects of the proposed activity are no more than minimal, and provides an activity-specific waiver of this requirement. For wetland losses of 1/10-acre or less that require pre-construction notification, the district engineer may determine on a case-by-case basis that compensatory mitigation is required to ensure that the activity results in only minimal adverse environmental effects.
(d) Compensatory mitigation at a minimum one-for-one ratio will be required for all losses of stream bed that exceed 3/100-acre and require pre-construction notification, unless the district engineer determines in writing that either some other form of mitigation would be more environmentally appropriate or the adverse environmental effects of the proposed activity are no more than minimal, and provides an activity-specific waiver of this requirement. This compensatory mitigation requirement may be satisfied through the restoration or enhancement of riparian areas next to streams in accordance with paragraph (e) of this general condition. For losses of stream bed of 3/100-acre or less that require pre-construction notification, the district engineer may determine on a case-by-case basis that compensatory mitigation is required to ensure that the activity results in only minimal adverse environmental effects. Compensatory mitigation for losses of streams should be provided, if practicable, through stream rehabilitation, enhancement, or preservation, since streams are difficult-to-replace resources (see 33 CFR 332.3(e)(3)).
(e) Compensatory mitigation plans for NWP activities in or near streams or other open waters will normally include a requirement for the restoration or enhancement, maintenance, and legal protection (e.g., conservation easements) of riparian areas next to open waters. In some cases, the restoration or maintenance/protection of riparian areas may be the only compensatory mitigation required. If restoring riparian areas involves planting vegetation, only native species should be planted. The width of the required riparian area will address documented water quality or aquatic habitat loss concerns. Normally, the riparian area will be 25 to 50 feet wide on each side of the stream, but the district engineer may require slightly wider riparian areas to address documented water quality or habitat loss concerns. If it is not possible to restore or maintain/protect a riparian area on both sides of a stream, or if the waterbody is a lake or coastal waters, then restoring or maintaining/protecting a riparian area along a single bank or shoreline may be sufficient. Where both wetlands and open waters exist on the project site, the district engineer will determine the appropriate compensatory mitigation (e.g., riparian areas and/or wetlands compensation) based on what is best for the aquatic environment on a watershed basis. In cases where riparian areas are determined to be the most appropriate form of minimization or compensatory mitigation, NWP-2024-00392 Page 9 of 23 Enclosure 2 the district engineer may waive or reduce the requirement to provide wetland compensatory mitigation for wetland losses.
(f) Compensatory mitigation projects provided to offset losses of aquatic resources must comply with the applicable provisions of 33 CFR part 332.
(1) The prospective permittee is responsible for proposing an appropriate compensatory mitigation option if compensatory mitigation is necessary to ensure that the activity results in no more than minimal adverse environmental effects. For the NWPs, the preferred mechanism for providing compensatory mitigation is mitigation bank credits or in-lieu fee program credits (see 33 CFR 332.3(b)(2) and (3)). However, if an appropriate number and type of mitigation bank or in-lieu credits are not available at the time the PCN is submitted to the district engineer, the district engineer may approve the use of permittee-responsible mitigation.
(2) The amount of compensatory mitigation required by the district engineer must be sufficient to ensure that the authorized activity results in no more than minimal individual and cumulative adverse environmental effects (see 33 CFR 330.1(e)(3)). (See also 33 CFR 332.3(f).)
(3) Since the likelihood of success is greater and the impacts to potentially valuable uplands are reduced, aquatic resource restoration should be the first compensatory mitigation option considered for permittee-responsible mitigation.
(4) If permittee-responsible mitigation is the proposed option, the prospective permittee is responsible for submitting a mitigation plan. A conceptual or detailed mitigation plan may be used by the district engineer to make the decision on the NWP verification request, but a final mitigation plan that addresses the applicable requirements of 33 CFR 332.4(c)(2) through (14) must be approved by the district engineer before the permittee begins work in waters of the United States, unless the district engineer determines that prior approval of the final mitigation plan is not practicable or not necessary to ensure timely completion of the required compensatory mitigation (see 33 CFR 332.3(k)(3)). If permittee-responsible mitigation is the proposed option, and the proposed compensatory mitigation site is located on land in which another federal agency holds an easement, the district engineer will coordinate with that federal agency to determine if proposed compensatory mitigation project is compatible with the terms of the easement.
(5) If mitigation bank or in-lieu fee program credits are the proposed option, the mitigation plan needs to address only the baseline conditions at the impact site and the number of credits to be provided (see 33 CFR 332.4(c)(1)(ii)).
(6) Compensatory mitigation requirements (e.g., resource type and amount to be provided as compensatory mitigation, site protection, ecological performance standards, monitoring requirements) may be addressed through conditions added to the NWP
NWP-2024-00392 Page 10 of 23 Enclosure 2 authorization, instead of components of a compensatory mitigation plan (see 33 CFR 332.4(c)(1)(ii)).
(g) Compensatory mitigation will not be used to increase the acreage losses allowed by the acreage limits of the NWPs. For example, if an NWP has an acreage limit of 1/2-acre, it cannot be used to authorize any NWP activity resulting in the loss of greater than 1/2-acre of waters of the United States, even if compensatory mitigation is provided that replaces or restores some of the lost waters. However, compensatory mitigation can and should be used, as necessary, to ensure that an NWP activity already meeting the established acreage limits also satisfies the no more than minimal impact requirement for the NWPs.
(h) Permittees may propose the use of mitigation banks, in-lieu fee programs, or permittee-responsible mitigation. When developing a compensatory mitigation proposal, the permittee must consider appropriate and practicable options consistent with the framework at 33 CFR 332.3(b). For activities resulting in the loss of marine or estuarine resources, permittee-responsible mitigation may be environmentally preferable if there are no mitigation banks or in-lieu fee programs in the area that have marine or estuarine credits available for sale or transfer to the permittee. For permittee-responsible mitigation, the special conditions of the NWP verification must clearly indicate the party or parties responsible for the implementation and performance of the compensatory mitigation project, and, if required, its long-term management.
(i) Where certain functions and services of waters of the United States are permanently adversely affected by a regulated activity, such as discharges of dredged or fill material into waters of the United States that will convert a forested or scrub-shrub wetland to a herbaceous wetland in a permanently maintained utility line right-of-way, mitigation may be required to reduce the adverse environmental effects of the activity to the no more than minimal level.
24. Safety of Impoundment Structures. To ensure that all impoundment structures are safely designed, the district engineer may require non-Federal applicants to demonstrate that the structures comply with established state or federal, dam safety criteria or have been designed by qualified persons. The district engineer may also require documentation that the design has been independently reviewed by similarly qualified persons, and appropriate modifications made to ensure safety.
25. Water Quality. (a) Where the certifying authority (state, authorized tribe, or EPA, as appropriate) has not previously certified compliance of an NWP with CWA Section 401, a CWA Section 401 water quality certification for the proposed discharge must be obtained or waived (see 33 CFR 330.4(c)). If the permittee cannot comply with all of the conditions of a water quality certification previously issued by certifying authority for the issuance of the NWP, then the permittee must obtain a water quality certification or waiver for the proposed discharge in order for the activity to be authorized by an NWP.
NWP-2024-00392 Page 11 of 23 Enclosure 2
(b) If the NWP activity requires pre-construction notification and the certifying authority has not previously certified compliance of an NWP with CWA Section 401, the proposed discharge is not authorized by an NWP until water quality certification is obtained or waived. If the certifying authority issues a water quality certification for the proposed discharge, the permittee must submit a copy of the certification to the district engineer.
The discharge is not authorized by an NWP until the district engineer has notified the permittee that the water quality certification requirement has been satisfied by the issuance of a water quality certification or a waiver.
(c) The district engineer or certifying authority may require additional water quality management measures to ensure that the authorized activity does not result in more than minimal degradation of water quality.
26. Coastal Zone Management. In coastal states where an NWP has not previously received a state coastal zone management consistency concurrence, an individual state coastal zone management consistency concurrence must be obtained, or a presumption of concurrence must occur (see 33 CFR 330.4(d)).