This Statement of Work (SOW) outlines requirements for installing carbon monoxide detection devices at Building 2080 at Fairchild Air Force Base, WA. The contractor must replace twenty-four (24) ceiling mount smoke/carbon monoxide detectors and troubleshoot/repair an associated map fault on the existing EST 3 fire alarm panel system.
The work includes removing existing detectors, installing new multisensor smoke/carbon monoxide detectors compatible with the EST 3 Fire Alarm System, and testing all components to ensure proper operation and NFPA compliance. The government will provide site access, electrical power, and two zone expansion cards. Work must be performed during standard hours (0700-1630 Monday-Friday, excluding federal holidays) unless otherwise approved, and the project cannot exceed 30 days after contract award. The salient characteristics specify requirements for the detectors, including operating voltage of 15.20-19.95 VDC, specific CO alarm levels per UL 2034/CAN/CSA 6.19, and compatibility with the existing Edwards EST3 fire alarm panels. Building layouts showing detector locations on first and second floors are included.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend 03 - SF30 QandA.pdf | ||
| Amend 02 - Extend Due date.pdf | ||
| Amend 01 - SF30 QandA.pdf | ||
| 25QA926 COMBO (Amend 01).pdf | ||
| 25QA926 COMBO.pdf | ||
| Attach. 2 - WD 15-5537 (Rev 24) 23Dec24.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA462024QA926 – CES CO Detectors Attach. 1 – Statement of Work (SOW)
STATEMENT OF WORK
FOR
Bldg 2080 Carbon Monoxide Detection Device Install/Panel Troubleshoot
January 2025
Statement of Work (SOW) For
Bldg 2080 Carbon Monoxide Detector Install / Panel Troubleshoot
Fairchild AFB, WA
1. DESCRIPTION OF SERVICE: The contractor shall provide all necessary tools, equipment, labor and materials required to replace twenty-four (24) ceiling mount smoke/carbon monoxide detectors and troubleshoot and repair associated map fault on the system, to include testing of all devices on the system for proper operation and for code compliant operation. See appendix A for locations of devices to be installed. All devices must be compatible with the existing EST 3 fire alarm panel.
2. SCOPE OF WORK: The Contractor shall complete all work, which includes furnishing all supervision, labor, material, equipment and services, unless otherwise specified herein, required under this contract. All work shall be performed in accordance with all Federal, State, local laws, regulations, manufacturer’s recommendations, NFPA and this Statement of Work (SOW).
1. Remove and dispose of existing detectors, purchase and install twenty-four (24) new ceiling mount multisensor smoke/carbon monoxide detectors. All associated detectors and hardware must be compatible with the EST 3 Fire Alarm System at Bldg. 2080
2. Contractor shall troubleshoot and repair existing map fault on fire alarm panel.
3. Upon completion of install, contractor shall test all new equipment to ensure proper operation and reporting to D-21. Contractor shall ensure all components are functioning as designed and are compliant with all applicable NFPA regulations before final acceptance
3. GOVERNMENT FURNISHED PROPERTY AND SERVICES: The government shall furnish site access, electrical power, and two (2) zone expansion cards. In the event of an emergency, dial 911.
4. GENERAL INFORMATION
4.1. HOURS OF OPERATION: Hours of operation are 0700-1630 Monday through Friday, excluding Federal Holidays and any other designated down day. Work can be done at other than the normal hours of operation with the approval of the Contracting Officer. The contractor shall coordinate in advance all hours of work and any service interruptions with Civil Engineering points of contact.
January 1 New Year’s Day
3rd Monday in January Martin Luther King, Jr. Day 3rd Monday in February President’s Day Last Monday in May Memorial Day June 19 Juneteenth July 4 Independence Day 1st Monday in September Labor Day 2nd Monday in October Columbus Day November 11 Veterans Day 4th Thursday in November Thanksgiving Day December 25 Christmas
4.2. SECURITY REQUIREMENTS: All personnel employed by the Contractor in the performance of this contract, or any representative of the Contractor entering the government installation, shall abide by all Fairchild Air Force Base security regulations.
5. PERFORMANCE PERIOD: Project shall not exceed 30 days after contract award.
6. APPENDICES:
Appendix A: Building Layouts:
Appendix B: Salient Characteristics:
SALIENT CHARACTERISTICS
(Brand Name or Equal)
The 92nd Civil Engineering Squadron (CES) has a requirement for twenty-four (24) addressable Multisensor smoke/carbon monoxide detectors. The salient characteristics listed below are derived from detectors that are specific to a sensor that is proprietary to Edwards. However, both brand name and brand name or equal detectors are acceptable in response to this solicitation if the equal detectors meet or exceed all salient characteristics listed below and are compatible with the existing Edwards EST3 fire alarm panels.
ITEM 1: Brand Name Addressable Multisensor smoke/carbon monoxide detector (P/N: SIGA- OSCD), or Equal
Operating voltage: 15.20 to 19.95 VDC Normal operating current: 32 µA Alarm current: 45 µA Smoke sensitivity range: UL/ULC: 0.5 to 4.36 %/ft. (1.6 to 13.6 %/m) obscuration Vibration level: 10 to 35 Hz, with an amplitude of 0.01 in.
Wall mounting: 12 in. (305 mm) max. from ceiling Compatible detector testers: Testifire 1000, Testifire 2000 Operating environment: 32 to 120°F (0 to 49°C), 0 to 90% RH, noncondensing Construction: High Impact Engineering Polymer, White Storage temperature: -4 to 140 °F (-20 to 60°C) Environment compensation: Automatic UL CO alarm level per UL 2034, CAN/CSA 6.19
70 ppm 60 to 240 minutes 150 ppm 10 to 50 minutes.
400 ppm 4 to 15 minutes.
UL CO false alarm level per UL 2034, CAN/CSA 6.19 o 30 ppm – 30 days o 70 ppm – 60 minutes
Agency Listings: UL 268-7, UL 2075