Attach 6 Statement of Work - Catalina Entrance_ PSL_July2023.pdf

PDF 306 KB Posted

Attached to
EYNF Facilities Maintenance & Construction IDIQ Federal contract opportunity
Solicitation number
12445223R0019
Issued by
Department of Agriculture Forest Service

About this file

This statement of work outlines requirements for accessibility renovations to the main entrance of the Catalina Supervisor's Office in El Yunque National Forest, Puerto Rico. The selected contractor shall furnish all labor, materials, equipment, and incidentals needed to remove existing handrails and guardrails, demolish a 10-foot-wide concrete wall, and install new handrails and guardrails meeting Architectural Barriers Act and International Building Code standards. The contractor must have at least three years of experience performing similar rail installation work. All work shall be performed between 7:30 AM and 3:30 PM on weekdays only, unless otherwise approved, to avoid disrupting office operations. The selected awardee will be determined according to terms specified in solicitation number 12445223R0019 for facilities maintenance and construction services across the El Yunque National Forest, issued by the Department of Agriculture Forest Service.

View the file

Other files for this federal contract opportunity

Other files attached to EYNF Facilities Maintenance & Construction IDIQ, newest first.
File Type Posted
Attach J 12445223R0019 Questions Asked As Of 08.24.2023.pdf PDF
Sol_12445223R0019_Amd_0002.pdf PDF
Attach I 12445223R0019 Questions Asked As Of 08.15.2023.doc DOC document
Solicitation Body_Clauses Updated 08.18.2023.docx DOCX document
Sol_12445223R0019_Amd_0001 (1).pdf PDF
Attach E -Statement of Work_FY24-FY28 EYNF Facilities IDIQ.docx DOCX document
Attach 9 Wage Determination 01-06-2023 Construction-Catalina Entrance.txt TXT text file
Summary of Attachments.docx DOCX document
Attach C-Past Performance Questionnaire.docx DOCX document
Attach F-ParticipationGoals.pdf PDF
Attach 2 Statement of Work_El Portal DB Sidewalk Project.pdf PDF
Attach 5 Catalina Entrance Schedule Of Items.xlsx XLSX spreadsheet
Attach 7 Catalina Entrance Drawings.pdf PDF
Solicitation_12445223R0019.pdf PDF
Attach A- Construction Experience Project Data Sheet.docx DOCX document
Attach B-Design Experience Project Data Sheet.docx DOCX document
Attach D-Resume Form for Key Personnel.docx DOCX document
Attach 3 Sketch Drawings_ Appendix 2 El Portal Sidewalk.pdf PDF
Attach 4 Wage Determination 01-06-2023- Construction El Portal Sidewalk.txt TXT text file
Attach 8 Specifications_ Catalina Entrance Accessibility.pdf PDF
Attach 10 Service Contract Act Catalina Entrance.txt TXT text file
Attach G-Scoring Rubric.docx DOCX document
Attach H Municipalities within the EL Yunque National Forest Boundaries.docx DOCX document
Attach 1 Schedule of Items_El Portal DB Sidewalk Project.xlsx XLSX spreadsheet
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Statement of Work

Contents

Project Title

1.0 Purpose

2.0 Scope or Mission

3.0 Period and Place of Performance

4.0 Background

5.0 Performance Objectives

6.0 Deliverables / Schedule

7.0 Operating Constraints

8.0 Attachments

9.0 Award

Project Title

CATALINA ENTRANCE ACCESSIBILITY

1.0 Purpose

Furnish all labor, materials, supplies, equipment, transportation, supervision, tools, safety incidentals, ancillary services, bonding, and all other necessary items and incidentals to bring the Catalina Supervisor’s Office main entrance into Architectural Barr iers Act

Accessibility Standard (ABAAS) code compliance. All work shall meet the requirements noted in the attached design drawings, construction specifications, and following Statement of Work.

2.0 Scope or Mission

A. All work shall conform to the latest version of the Architectural Barriers Act Accessibility Standard (ABAAS) and the International Building Code (IBC).

B. Remove all existing handrails and guardrails from the main entrance.

C. At the mid-level landing, demolish the (approximately 10’ wide; 42” high) concrete/stucco wall that is inboard of the required 5’-0” clearance. It is assumed that this wall is constructed of concrete block, with filled cells. Saw-cut the concrete/stucco wall level with the landing, existing column, and building exterior wall. Refinish the entire landing for smooth, level floor and wall surfaces.

D. Provide surface treatment on affected floor to match existing. Existing crack sealant is Sherwin-Williams Loxon smooth polyurethane sealant. Existing floor coating is Sherwin-Williams Armorseal TreadPlex EX White;

Coordinate with Contracting Officer’s Representative for exact color and sheen. Provide paint manufacturer's standard color chart.

E. Finish walls to match existing cement stucco. Prime and paint (2 coats) all re-finished surfaces to match existing color and sheen.

F. Furnish and install new handrails and guardrails as shown on the attached drawing and specifications. Paint rails per Specifications. Contracting Officer to select color from manufacturer's standard color chart.

G. Contractor shall present documentation showing handrail manufacturer and installer each have at least 3 years of experience regularly performing this type of work.

3.0 Period and Place of Performance

A. Work site is the Catalina Supervisor’s Office, located at PR 191, Rio Grande, Puerto Rico 00987, in El Yunque

National Forest.

B. See solicitation for period of performance.

4.0 Background

Prospective bidders are strongly encouraged to inspect the site prior to submitting a proposal. Bidders should familiarize themselves with all existing conditions prior to submitting bid. Coordinate site visit with Contracting Officer or designated representative.

5.0 Performance Objectives

A. Bring the Catalina Supervisor’s Office main entrance into Architectural Barriers Act Accessibility Standard (ABAAS) code compliance.

B. New railings shall meet all requirements of the ABA (Federal) Standards, for handrails.

C. Guardrails are required where there is a difference in elevation of more than 30”.

D. There is a 1-1/2” minimum clearance required between handrails and any obstruction, which will have to carefully checked at the upper ramp between the rail and the wall (where the storm shutters where installed).

E. The guardrail components’ spacing must not allow a 4” diameter sphere to pass between them, as well as between the lower railing and the walking surface. On stairs, spacing must not allow a 6” diameter sphere to pass between the lower railing and the walking surface.

6.0 Deliverables / Schedule

A. Submit proposed products, installation methods, detailed shop drawings for Contracting Officer review and approval prior to fabrication/installation.

B. Contractor must designate a field representative to coordinate with the Contracting Officer’s Representative (COR) and Government Technical Monitor (GTM).

C. Proceed with fabrication after submittals, shop drawings, etc. are approved by the Contracting Officer.

7.0 Operating Constraints

Work shall be performed only during times when the Office is open for business, typically weekdays between 7:30 AM and 3:30 PM, local time. Work on weekends and federal holidays is only permitted with prior written approval from the Contracting Officer (C.O.). The contract shall anticipate not working on the weekends and federal holidays.

8.0 Attachments

A. Construction Specifications B. Catalina-Existing and Proposed Floor Plan C. Typical Stair and Rail detail D. IBC Complaint rail detail

9.0 Award

Award shall be made as described in the solicitation.

Project Title
1.0 Purpose
2.0 Scope or Mission
3.0 Period and Place of Performance
4.0 Background
5.0 Performance Objectives
6.0 Deliverables / Schedule
7.0 Operating Constraints
8.0 Attachments
9.0 Award