This statement of work describes a design-build project to construct approximately 880 linear feet of new ADA-compliant concrete sidewalk at El Portal de El Yunque Visitor Center in Puerto Rico. Key requirements include furnishing 35%, 85%, and 100% design plans; constructing the 5-foot wide sidewalk with 4-inch aggregate base and 4-inch concrete; installing drainage, curb and gutter, ADA ramps, and crosswalks; removing and resetting signs and landscaping; and establishing new turf by grading, placing topsoil and sod, and watering. The contractor must adhere to Forest Service, FHWA, and standard drawing specifications and obtain government approval of the design and construction work.

View the file

Other files for this federal contract opportunity

Other files attached to EYNF Facilities Maintenance & Construction IDIQ, newest first.
File Type Posted
Attach J 12445223R0019 Questions Asked As Of 08.24.2023.pdf PDF
Sol_12445223R0019_Amd_0002.pdf PDF
Attach I 12445223R0019 Questions Asked As Of 08.15.2023.doc DOC document
Solicitation Body_Clauses Updated 08.18.2023.docx DOCX document
Sol_12445223R0019_Amd_0001 (1).pdf PDF
Attach E -Statement of Work_FY24-FY28 EYNF Facilities IDIQ.docx DOCX document
Attach 6 Statement of Work - Catalina Entrance_ PSL_July2023.pdf PDF
Attach 9 Wage Determination 01-06-2023 Construction-Catalina Entrance.txt TXT text file
Summary of Attachments.docx DOCX document
Attach C-Past Performance Questionnaire.docx DOCX document
Attach F-ParticipationGoals.pdf PDF
Attach 5 Catalina Entrance Schedule Of Items.xlsx XLSX spreadsheet
Attach 7 Catalina Entrance Drawings.pdf PDF
Solicitation_12445223R0019.pdf PDF
Attach A- Construction Experience Project Data Sheet.docx DOCX document
Attach B-Design Experience Project Data Sheet.docx DOCX document
Attach D-Resume Form for Key Personnel.docx DOCX document
Attach 3 Sketch Drawings_ Appendix 2 El Portal Sidewalk.pdf PDF
Attach 4 Wage Determination 01-06-2023- Construction El Portal Sidewalk.txt TXT text file
Attach 8 Specifications_ Catalina Entrance Accessibility.pdf PDF
Attach 10 Service Contract Act Catalina Entrance.txt TXT text file
Attach G-Scoring Rubric.docx DOCX document
Attach H Municipalities within the EL Yunque National Forest Boundaries.docx DOCX document
Attach 1 Schedule of Items_El Portal DB Sidewalk Project.xlsx XLSX spreadsheet
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation 12******

Statement of Work

El Portal Design-Build Sidewalk Ext. Project

EL PORTAL DESIGN-BUILD SIDEWALK EXTENSION PROJECT

DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

This project is a Design-Build (DB) which consists of constructing approximately 880 linear feet x 5-feet wide of new ADA concrete sidewalk to enable and provide safer pedestrian access to El

Portal de El Yunque’s Visitor Center. The proposed sidewalk is located within the Administrative

Site footprint of El Portal that was analyzed for the El Portal Revitalization Project in 2019/2020.

The proposed sidewalk to be constructed will run parallel and adjacent to an existing asphalt surfaced road and shall connect to an existing 5-feet wide sidewalk, located at the fee booth. The proposed sidewalk shall then continue to the egress off El Portal (see Appendix 2).

Installation of the proposed ADA sidewalk shall include all erosion control measures and BMPs, temporary traffic control measures, removal of topsoil, removal and re-planting of shrubs, removal and resetting of boulders, removal of two (2) existing trees, removal and resetting signs, sidewalk drainages, sidewalk construction around existing trees near El Portal’s entrance, new curb and gutter in specified area, ADA curb ramp(s) with detectable warning surface, installation and paintings of two (2) street crossings, and turf establishment.

During the duration of construction, the Contractor shall preserve and protect all existing structures, existing asphalt surfaced road, and protect vegetation (such as trees, shrubs, and grass) adjacent to the work site not found within the clearing limits, which are not to be removed and which do not unreasonably interfere with the work required under this solicitation.

Operations shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.).

The DB contractor shall consider using rubber tire equipment to prevent damage to existing asphalt surfaced road. At no cost to the Government, the contractor shall be responsible and repair any damage to the existing asphalt surfaced road that deemed at fault by DB contractor.

The DB Contractor will be responsible for furnishing a 35%, 85% and 100% professional engineered design deliverable planset drawings for the Contracting Officer’s (C.O.) approval with finalized construction cost as reflected in the Schedule of Items. The 100% design deliverable shall be stamped and/or sealed by a certified Professional Engineer licensed in Puerto

Rico. Government final acceptance of the 100% design deliverable shall be approved in writing only by the C.O. before commencing of any construction work or activities.

The proposed ADA sidewalk design shall be designed and constructed to Forest Service

Supplemental Specification (FSSS), Standard Specifications for Construction of Roads and

Bridges on Federal Highway Projects per FP-14 Specifications, and USFS Standard Drawings.

All specifications, concrete design strength etc shall be reflected into the DB contractor’s design package as a submittal for government approval. The proposed sidewalk shall match the existing sidewalk in color and finished surface. Proposed sidewalk expansion and contraction joints shall be reflected in finished design and construction.

Prior to beginning work, the Contractor is responsible for identifying all appropriate commercial sources of material and equipment.

At all times during the performance of this contract and until the work is completed and accepted, the Contractor shall directly supervise the work or assign and have on the work site a competent superintendent who is satisfactory to the Contracting Officer and has authority to act for the Contractor. The superintendent shall be designated in writing to the Contracting Officer prior to the commencement of work. This individual shall be able to read, speak, and understand

English.

PROJECT LOCATION

Begin Project Coordinates: 18.3395295, -65.7600374

End Project Coordinates: 18.3392450, -65.7626067

WORKING HOURS

Normal operational hours are approximately from 06:30 am to 5:30 PM Eastern Standard Time, Monday through Friday (Federal Holidays excluded). Weekend work may be permitted with written approval from the Contracting Officer (C.O.) at a minimum of 7 business prior.

• Federal Holidays

1. New Year’s Day – January 1st

2. Martin Luther King Junior’s Birthday – Third Monday in January

3. President’s Day – Third Monday in February

4. Memorial Day – Last Monday in May

5. Juneteenth National Independence Day - Third Monday in June

6. Independence Day – July 4th

7. Labor Day – First Monday in September

8. Columbus Day – Second Monday in October

9. Veteran’s Day – November 11th

10. Thanksgiving Day – Fourth Thursday in November

11. Christmas Day – December 25th

DESIGN-BUILD REQUIREMENTS

Existing and Proposed Conditions and Requirements

• Remove and Reset:

o (9) - 6 to 8 feet diameter boulders o (1) Stop sign o (1) Speed Limit sign o (1) Do Not Enter sign o (1) One Way sign o (1) Parking orientation sign o (8) Hedges & Shrubs o (1) – 3 feet diameter log

Requires Removal and Disposal From Project Location into an Approved Landfill o (1) - 20” dbh Palm Tree w/ Rootwad o (1) - 8” dbh Yagrumo Tree w/ Rootwad o Excessive excavation material

Design and Construction Requirements o Mow and brush vegetation in proposed sidewalk prism prior to beginning the topographic survey. Mowing shall be done to a minimum of 4-inches and maximum of 6-inches in height… Mowing and brushing width shall include a minimum and maximum of 5-feet On-Center of proposed sidewalk centerline alignment (on both sides).

o Do not cut the Hedges & Shrubs. Hedges and shrubs shall be removed and reset before and after construction o Furnish a topographic survey of proposed sidewalk. Survey shall include the below at minimum:

➢ Proposed sidewalk centerline alignment and a minimum of 20-feet offset shots from proposed sidewalk centerline alignment (20’ offset shots on both sides of sidewalk centerline).

➢ All trees (no matter dbh tree size)

➢ All features (drainages, utility boxes, light poles, logs, signs etc)

➢ Main Entry Roadway (edge of roadway on both sides and centerline of roadway)

➢ Existing curb and gutter in proposed sidewalk prism o Design of existing and proposed sidewalk

➢ Erosion Control and BMPs drawings

➢ Temporary Traffic Control

➢ Existing sidewalk ground profile

➢ Proposed sidewalk horizontal alignment which shall go around existing tree and shall be designed for entire length (beginning to ending of project).. No trees shall be removed except the two trees identified in this SOW

➢ Proposed sidewalk ground vertical profile (ADA Compliant) for entire length (beginning to ending of project).

➢ Sidewalk ending point design and construction shall conform to ADA accessibility requirements (the existing ground has a steep gradient at the ending area location. This may require a switchback and/or shallow retaining wall design and construction as deemed necessary by the P.E.

design engineer and construction contractor).

➢ Proposed sidewalk horizontal alignment and vertical profile geometry for entire length (beginning to ending of project).

➢ All detectable warning surfaces in its entirety

➢ Proposed new curb and gutter with supporting detail drawings

➢ Existing and proposed drainages w/ riprap energy dissipation

➢ Include all existing drainages and proposed new multiple drainages with elevations

➢ Proposed concrete sidewalk w/ supporting detail drawings. Sidewalk shall be 5-feet wide and have a minimum thickness of 4-inches with reinforcement or mesh wire.

➢ This project requires aggregate base beneath proposed sidewalk (required).

The proposed aggregate shall be a minimum of 4-inches in compacted thickness and shall be placed beneath new proposed concrete sidewalk for entire length of new sidewalk. This requirement shall also be supported in detail drawings.

➢ Proposed drainage(s) w/ supporting detail drawings

➢ Repair of (1) existing damaged concrete utility box

➢ Balancing of all cuts and fills

➢ Proposed crosswalks with painting detail and type of reflective paint with beads per FP-14 Specifications

➢ Existing ground and finished ground contours

➢ The proposed sidewalk horizontal alignment and vertical profile shall be construction surveyed and staked out for construction before construction can commence (required). Finished design drawings shall reflect a minimum of 5’ on center centerline stakeout nodes and coordinates around all curbs and point of curvatures and a minimum of 20-feet on center centerline construction stakeout nodes on all additional sidewalk horizontal alignment in its entirety. Construction stakeout in the field shall reflect the design information listed above with all cuts and fills and finished grade elevations (required).

➢ Turf establishment

I. Design and Construction shall include furnishing and placement of topsoil at a minimum depth of 6-inches.

II. Design and Construction shall include furnishing and placement of sod. At minimum the design and construction shall include furnishing, prepping, and placement of sodding a minimum of 3-feet on each side of new sidewalk.

III. Sod type shall be Zoysia Manila Sod. Submittal of sod type is required for government approval before contractor’s purchasing of sod.

IV. DB contractor shall be responsible for preparing the disturbed areas, cultivating, disk, or harrow and grading to a depth of 4-inches before placement of topsoil and before furnishing and placement of new sod.

V. Design and construction shall include Sod Watering. Watering requirements shall include DB contractor watering newly placed sod. This work will require the contractor watering the newly placed sod a minimum of four (4) times per week pending rainy weather to a depth of 3-4-inches per supplier’s recommendation for approximately two (2) weeks.

VI. All listed turf establishment requirements in its entirety shall be incidental to the design and construction.

o Construction of proposed sidewalk

➢ Construction shall adhere and conform to the USFS’s approved final drawings which shall reflect all design requirements listed above.

APPENDIX 1

File details come from the government source that posted it. Updated .