Attach 4 - Mission Essential Plan Template.pdf
PDF 574 KB Posted
- Attached to
- Hoist and Crane Maintenance Services Federal contract opportunity
- Solicitation number
- FA485520Q0007
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers.docx | DOCX document | |
| Pricing Worksheet.xlsx | XLSX spreadsheet | |
| Instruction to Offerors.pdf | ||
| Appendix E--CAFB-MAFR Contractor Guide_2018.pdf | ||
| Attach 5 - PPE Questionaire.pdf | ||
| Appendix D--Deliverables.pdf | ||
| Appendix B--Publications.pdf | ||
| Appendix C--Work Request Form.pdf | ||
| Appendix F--Hazardous Materials Forms.pdf | ||
| Attach 1 -27 SOW Hoist and Crane Maint SVS PWS 20 Mar 20.pdf | ||
| Attach 2 - Clauses.pdf | ||
| Appendix A--29 May 19.pdf | ||
| Attach 3 - Wage Determination 2015-5458 Rev 13.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Source Selection Sensitive Information (See FAR 2.101 & 3.104)
Page 1 of 3 Attachment 4 Solicitation No: FA4855-20-Q-0007
Mission-Essential Contractor Services Plan for
Hoist and Crane Maintenance Service
Cannon AFB NM
20 March 2020
Attachment 4 Solicitation No: FA4855-20-Q-0007
1. INTRODUCTION. This Mission-Essential Contractor Services Plan has been developed in accordance with DFARS Clause 252.237-7023 – Continuation of Essential Contractor Services.
It addresses how [Insert Name of Contractor] will continue providing the mission-essential wastewater treatment plant (WWTP) operation and maintenance services identified in the solicitation during periods of crisis, upon notification by the Contracting Officer (CO) to activate the plan.
2. OBJECTIVE. In support of the 27th Special Operations Civil Engineer Squadron, the objective is to provide mission-essential WWTP services for Cannon AFB, NM during a crisis.
The essential contractor services are identified below and will be performed at the prices in the contract at the time the plan is activated.
3. CONTRACTOR PROCEDURES. Contractor MUST answer the following in this plan:
a. Identify provisions made for the acquisition of essential personnel and resources, if necessary, for continuity of operations for up to 30 days or until normal operations can be resumed;
b. How you will address challenges associated with maintaining essential contractor services during an extended event, such as a pandemic that occurs in repeated waves (i.e. list efforts taken to maintain sufficient level of staff and ensure adequate supplies);
c. How you will address the time lapse associated with the initiation of the acquisition of essential personnel and resources and their actual availability on site (i.e. discuss actions/time needed to get personnel and resources in place, actions to expedite the process, ability to work extended hours if base access is restricted);
d. How you will address components, processes, and requirements for the identification, training, and preparedness of personnel who are capable of relocating to alternate facilities or performing work from home (i.e. list actions that can be performed remotely, contract manager duty location, etc);
e. How you will establish an alert and notification procedure for mobilizing identified “essential contractor service” personnel (i.e. explain if alert/notification will be made after Government direction and means of notification, etc); and
f. The approach you will use for communicating expectations to contractor employees regarding their roles and responsibilities during a crisis (i.e. explain means of communication, use of a Quality Control Plan, checklists, or other additional duties).
g. Identify how you will conduct plant operations to overcome adverse conditions and situations, such as significant weather situations, employee illnesses, or unexpected vacancies (i.e. explain means of maintaining operations if weather limits travel or loss of employees).
4. PRICING. The mission-essential WWTP services are identified in Table 1 below and will be paid at the prices in the contract at the time the Plan is activated. The prices will also be used as the basis for any equitable adjustments resulting from the activation of the Plan.
Attachment 4 Solicitation No: FA4855-20-Q-0007
5. Mission-Essential Contractor Services.
CLIN Description of Service Qty Unit Unit Price Total Price
X001 Operation and Maintenance of Plant 12 MO Current Price Current Price
X002 Monthly Rate for Maintenance (costs borne by contractor); see PWS para 1.3. 12 MO Current Price Current Price
6. QUALITY CONTROL PLAN (QCP). The contractor shall utilize its own internal QCP during the performance of this plan.
7. DEACTIVATION OF PLAN. [Insert Name of Contractor] shall perform the mission-essential contractor services during a crisis until notified by the CO to cease performance of the
Plan.
SIGNATURE PAGE
Contractor Point of Contact:_______________________________________
Phone Number(s):_______________________________________
Email Address:_______________________________________
Date:_____________________________