Attach 4 - Mission Essential Plan Template.pdf

PDF 574 KB Posted

Attached to
Hoist and Crane Maintenance Services Federal contract opportunity
Solicitation number
FA485520Q0007
Issued by
Department of the Air Force Special Operations Command

View the file

Other files for this federal contract opportunity

Other files attached to Hoist and Crane Maintenance Services, newest first.
File Type Posted
Questions and Answers.docx DOCX document
Pricing Worksheet.xlsx XLSX spreadsheet
Instruction to Offerors.pdf PDF
Appendix E--CAFB-MAFR Contractor Guide_2018.pdf PDF
Attach 5 - PPE Questionaire.pdf PDF
Appendix D--Deliverables.pdf PDF
Appendix B--Publications.pdf PDF
Appendix C--Work Request Form.pdf PDF
Appendix F--Hazardous Materials Forms.pdf PDF
Attach 1 -27 SOW Hoist and Crane Maint SVS PWS 20 Mar 20.pdf PDF
Attach 2 - Clauses.pdf PDF
Appendix A--29 May 19.pdf PDF
Attach 3 - Wage Determination 2015-5458 Rev 13.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Source Selection Sensitive Information (See FAR 2.101 & 3.104)

Page 1 of 3 Attachment 4 Solicitation No: FA4855-20-Q-0007

Mission-Essential Contractor Services Plan for

Hoist and Crane Maintenance Service

Cannon AFB NM

20 March 2020

Attachment 4 Solicitation No: FA4855-20-Q-0007

1. INTRODUCTION. This Mission-Essential Contractor Services Plan has been developed in accordance with DFARS Clause 252.237-7023 – Continuation of Essential Contractor Services.

It addresses how [Insert Name of Contractor] will continue providing the mission-essential wastewater treatment plant (WWTP) operation and maintenance services identified in the solicitation during periods of crisis, upon notification by the Contracting Officer (CO) to activate the plan.

2. OBJECTIVE. In support of the 27th Special Operations Civil Engineer Squadron, the objective is to provide mission-essential WWTP services for Cannon AFB, NM during a crisis.

The essential contractor services are identified below and will be performed at the prices in the contract at the time the plan is activated.

3. CONTRACTOR PROCEDURES. Contractor MUST answer the following in this plan:

a. Identify provisions made for the acquisition of essential personnel and resources, if necessary, for continuity of operations for up to 30 days or until normal operations can be resumed;

b. How you will address challenges associated with maintaining essential contractor services during an extended event, such as a pandemic that occurs in repeated waves (i.e. list efforts taken to maintain sufficient level of staff and ensure adequate supplies);

c. How you will address the time lapse associated with the initiation of the acquisition of essential personnel and resources and their actual availability on site (i.e. discuss actions/time needed to get personnel and resources in place, actions to expedite the process, ability to work extended hours if base access is restricted);

d. How you will address components, processes, and requirements for the identification, training, and preparedness of personnel who are capable of relocating to alternate facilities or performing work from home (i.e. list actions that can be performed remotely, contract manager duty location, etc);

e. How you will establish an alert and notification procedure for mobilizing identified “essential contractor service” personnel (i.e. explain if alert/notification will be made after Government direction and means of notification, etc); and

f. The approach you will use for communicating expectations to contractor employees regarding their roles and responsibilities during a crisis (i.e. explain means of communication, use of a Quality Control Plan, checklists, or other additional duties).

g. Identify how you will conduct plant operations to overcome adverse conditions and situations, such as significant weather situations, employee illnesses, or unexpected vacancies (i.e. explain means of maintaining operations if weather limits travel or loss of employees).

4. PRICING. The mission-essential WWTP services are identified in Table 1 below and will be paid at the prices in the contract at the time the Plan is activated. The prices will also be used as the basis for any equitable adjustments resulting from the activation of the Plan.

Attachment 4 Solicitation No: FA4855-20-Q-0007

5. Mission-Essential Contractor Services.

CLIN Description of Service Qty Unit Unit Price Total Price

X001 Operation and Maintenance of Plant 12 MO Current Price Current Price

X002 Monthly Rate for Maintenance (costs borne by contractor); see PWS para 1.3. 12 MO Current Price Current Price

6. QUALITY CONTROL PLAN (QCP). The contractor shall utilize its own internal QCP during the performance of this plan.

7. DEACTIVATION OF PLAN. [Insert Name of Contractor] shall perform the mission-essential contractor services during a crisis until notified by the CO to cease performance of the

Plan.

SIGNATURE PAGE

Contractor Point of Contact:_______________________________________

Phone Number(s):_______________________________________

Email Address:_______________________________________

Date:_____________________________