Appendix D--Deliverables.pdf
PDF 79 KB Posted
- Attached to
- Hoist and Crane Maintenance Services Federal contract opportunity
- Solicitation number
- FA485520Q0007
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Pricing Worksheet.xlsx | XLSX spreadsheet | |
| Questions and Answers.docx | DOCX document | |
| Instruction to Offerors.pdf | ||
| Appendix B--Publications.pdf | ||
| Appendix C--Work Request Form.pdf | ||
| Attach 4 - Mission Essential Plan Template.pdf | ||
| Appendix F--Hazardous Materials Forms.pdf | ||
| Attach 1 -27 SOW Hoist and Crane Maint SVS PWS 20 Mar 20.pdf | ||
| Attach 2 - Clauses.pdf | ||
| Appendix A--29 May 19.pdf | ||
| Attach 3 - Wage Determination 2015-5458 Rev 13.pdf | ||
| Appendix E--CAFB-MAFR Contractor Guide_2018.pdf | ||
| Attach 5 - PPE Questionaire.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation #: FA4855-xxxx Appendix D Contract # FA4855-xxxx 29 May 2019
D-1
APPENDIX D
DELIVERABLES
All deliverables must meet professional standards and the requirements set forth in the applicable contractual documents. The Contractor shall be responsible for delivering all end items specified.
The following items are outputs, which fall within the scope of this effort and which are illustrative of the type of work the Government expects to require. The following table lists deliverables.
Title Date Submission As of Date Distribution Copies
(Electronic)
Inspection Schedule (PWS para 1.2.1, 1.2.1.1.)
14 calendar days prior to inspection
April, September CO 1 Each
Initial Inspection & Load Test Reports (PWS para 1.6.1, 1.6.1.1, 1.6.2.)
Before departing CAFB April CO 1 Each
Formalized Reports (PWS para 1.6.1, 1.6.1.1, 1.6.2.)
NLT 10 business days after visit
April, September, and scheduled/ unscheduled visits
CO 1 Each
Load Test Certificates (PWS para 1.6.1, 1.6.1.1, 1.6.2.)
NLT 10 business days after visit
April, and applicable scheduled/ unscheduled visits
CO 1 Each
Hazmat Worksheet (PWS para 4.7.1, 4.7.2.)
30 calendar days prior to Hazardous Material being brought on CAFB
Award Date CO 1 Each
Hazmat Usage Worksheet (PWS para 4.7.2.)
Monthly, by the 5th business day
After completed month
CO 1 Each
EMS Awareness Training Certificate (PWS para 4.9.1.)
Prior to any on-base performance under this contract
Award Date CO 1 Each
Contractor’s Mission Essential Services Plan (PWS para 4.10, 4.10.1, 4.10.2.)
Within 30 calendar days after contract award
Award Date CO 1 Each
Personnel Qualification Certificate (PWS para 4.12.3.1)
Prior to any work on CAFB Award Date CO 1 Each