ATTACH_4_-_Construction_Schedule.docx

DOCX document 20 KB Posted

Attached to
Fair Oaks AML Reclamation MC-023-001
Solicitation number
140S0325B0005
Issued by

About this file

The file is a construction schedule document for the Fair Oaks AML Reclamation MC-023-001 project, issued by the Department of the Interior's Office of Surface Mining Reclamation and Enforcement. The schedule outlines a 15-day timeline for various construction activities, including site preparation, infrastructure installation, and environmental control measures.

Key activities in the schedule include mobilization, clearing and grubbing, installing an air incinerator, earth filling, fence construction (5-wire and woven wire), laying 8" HDPE pipe with end sections, creating stabilized construction entrances, implementing erosion control measures such as straw wattles and rock check dams, placing rip rap, constructing traffic control elements, and performing deep disking and permanent erosion control. The document provides a day-by-day breakdown of these construction tasks, indicating a comprehensive approach to site development and environmental management.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date:

Feature
Item
Day:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
MC-023-001
Mobilization

Clearing and Grubbing

Air Incinerator

Earth Fill (without pumping)

Fence (5 wire)

Fence (Woven Wire)

8” HDPE (SDR 26) Pipe with 4:1 End Sections

Stabilized Construction Entrance

Straw Wattle

Rock Check Dam

Rip Rap Type IA (12” and 18”)

Constructing Traffic Control

Deep Disking

Permanent Erosion Control

File details come from the government source that posted it. Updated .