ATTACH_4_-_Construction_Schedule.docx
DOCX document 20 KB Posted
- Attached to
- Fair Oaks AML Reclamation MC-023-001
- Solicitation number
- 140S0325B0005
About this file
The file is a construction schedule document for the Fair Oaks AML Reclamation MC-023-001 project, issued by the Department of the Interior's Office of Surface Mining Reclamation and Enforcement. The schedule outlines a 15-day timeline for various construction activities, including site preparation, infrastructure installation, and environmental control measures.
Key activities in the schedule include mobilization, clearing and grubbing, installing an air incinerator, earth filling, fence construction (5-wire and woven wire), laying 8" HDPE pipe with end sections, creating stabilized construction entrances, implementing erosion control measures such as straw wattles and rock check dams, placing rip rap, constructing traffic control elements, and performing deep disking and permanent erosion control. The document provides a day-by-day breakdown of these construction tasks, indicating a comprehensive approach to site development and environmental management.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date:
| Feature |
| Item |
| Day: |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
| 7 |
| 8 |
| 9 |
| 10 |
| 11 |
| 12 |
| 13 |
| 14 |
| 15 |
| MC-023-001 |
| Mobilization |
Clearing and Grubbing
Air Incinerator
Earth Fill (without pumping)
Fence (5 wire)
Fence (Woven Wire)
8” HDPE (SDR 26) Pipe with 4:1 End Sections
Stabilized Construction Entrance
Straw Wattle
Rock Check Dam
Rip Rap Type IA (12” and 18”)
Constructing Traffic Control
Deep Disking
Permanent Erosion Control