This is a Pricing Schedule template for RFP No. 75F40126R00047, the FDA Pacific Southwest Laboratory Building Exterior Repair Project. The document outlines the required cost structure for a Firm-Fixed-Price construction contract with four primary cost line items (CLINs): CLIN 100 covers Mobilization and pre-construction submittals; CLIN 200 addresses Structural Steel Coating Repairs, subdivided into site setup and submittals, surface preparation, coating application (2 units), and quality control/testing; CLIN 300 encompasses Concrete Crack Repair, including documentation/site setup, interior and exterior crack repair, and surface restoration/floor finishes; and CLIN 400 covers final inspection, punch list completion, and closeout documentation. Offerors must provide detailed price breakdowns segregating labor, materials, and equipment costs for all CLINs and SubCLINs, ensuring all incidental costs including travel, equipment, disposal, and logistics are incorporated within the fixed-price structure.

The schedule also includes an optional Unit Price Schedule for evaluation and equitable adjustments, featuring five unit price line items covering steel surface preparation (SF), steel coating systems (SF), railing coating (LF), concrete crack repair (LF), and concrete surface repair (SF). Additionally, a Schedule of Values requires offerors to allocate total contract value across work items with corresponding payment milestones tied to specific acceptance criteria—such as Submittals Approved, Surface Prep Accepted, Primer Accepted, Final Coating Accepted, QC & Testing Accepted, Mapping Approved, Repair Accepted, Restoration Accepted, and Final Acceptance. The schedule incorporates a 10 percent retainage structure with net payment calculations, enabling the Government to track earned value against cumulative work percentages throughout the 180-calendar-day period of performance.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions RFP No. 75F40126R00047 | IRV Exterior Repair Project Instructions and Pricing Schedule

Offerors shall provide pricing for all CLINs and SubCLINs.
Pricing shall include all labor, materials, equipment, supervision, and incidentals.
Submit price breakdowns (labor, materials, equipment).
Pricing shall align with phased milestones and inspection points.
Offeror shall ensure all incidental travel,equipment, disposal, and logistics costs are included within the FFP CLIN pricing.

Pricing Schedule

CLINSUBCLINDESCRIPTIONUNITQTYUNIT PRICEAMOUNT
100Mobilization and pre-construction submittalsLS1$0.00$0.00
200Structural Steel Coating Repairs
200201Site setup and SubmittalsLS1$0.00$0.00
200202Surface Preparation (all steel elements per PWS)LS1$0.00$0.00
200203Coating Application (complete and accepted)LS2$0.00$0.00
200204Quality Control and testingLS1$0.00$0.00
300Concrete Crack Repair
300301Documentation, Site Setup, and SubmittalsLS1$0.00$0.00
300302Concrete Crack Repair (interior and exterior complete)LS1$0.00$0.00
300303Surface Restoration / Floor FinishesLS1$0.00$0.00
400Final inspection, punch list completion, closeout documentation, warrantiesLS1$0.00$0.00
TOTAL$0.00

Unit Prices

Optional Unit Price Schedule (For Evaluation & Equitable Adjustments)
ITEMDESCRIPTIONUNITEST QTYUNIT PRICE
UP-01Steel surface preparationSF$0.00
UP-02Steel coating system (3-coat system)SF$0.00
UP-03Railing coatingLF$0.00
UP-04Concrete crack repairLF$0.00
UP-05Concrete surface repairSF$0.00

Schedule of Values

CLIN/SUBCLINWORK ITEMDESCRIPTIONTOTAL VALUE ($)% OF TOTALCUMULATIVE %PROPOSED PAYMENT MILESTONEAMOUNT EARNED ($)RETAINAGE (10%)NET PAYMENT ($)
100MobilizationMobilization and pre-construction submittals$0.000.00%0.00%Submittals Approved$0.00$0.00$0.00
200Structural Steel Coating Repairs
201Surface PrepSite setup and Submittals$0.000.00%0.00%Surface Prep Accepted$0.00$0.00$0.00
202PrimerSurface Preparation (all steel elements per PWS)$0.000.00%0.00%Primer Accepted$0.00$0.00$0.00
203Final CoatsCoating Application (complete and accepted)$0.000.00%0.00%Final Coating Accepted$0.00$0.00$0.00
204QAQuality Control and testing$0.000.00%0.00%QC & Testing Accepted$0.00$0.00$0.00
300Concrete Crack Repair
301Crack MappingDocumentation, Site Setup, and Submittals$0.000.00%0.00%Mapping Approved$0.00$0.00$0.00
302Concrete RepairConcrete Crack Repair (interior and exterior complete)$0.000.00%0.00%Repair Accepted$0.00$0.00$0.00
303RestorationSurface Restoration / Floor Finishes$0.000.00%0.00%Restoration Accepted$0.00$0.00$0.00
400CloseoutFinal inspection and turnover$0.000.00%0.00%Final Acceptance$0.00$0.00$0.00