This is a site plans document for the Building Exterior Repair Project at the FDA Pacific Southwest Laboratory in Irvine, California. The document provides visual representations and technical drawings of the facility's exterior layout, identifying the specific areas requiring repair and maintenance work. The site plans illustrate the locations of structural steel components including exterior stairs, sunshades, roof access stairs, entrance canopies, and the chemical storage shed that will require surface preparation and corrosion-resistant coating applications. The plans also depict areas designated for interior and exterior non-structural concrete crack repairs and resilient flooring replacement. These drawings serve as reference materials for contractors preparing proposals and conducting the mandatory site visit scheduled for July 1, 2026, at 8:30 AM Pacific Time at the facility located at 19701 Fairchild Road, Irvine, California 92612. The site plans are essential technical documentation supporting the solicitation 75F40126R00047, a 100 percent Small Business Set-Aside competitive solicitation for a Firm-Fixed-Price construction contract with a 180-calendar-day completion timeline and one-year workmanship warranty requirement.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AutoCAD SHX Text

MATCHLINE - SHEET C5.3

AutoCAD SHX Text

FAIRCHILD ROAD

AutoCAD SHX Text

MATCHLINE - THIS SHEET

AutoCAD SHX Text

MATCHLINE-THIS SHEET

AutoCAD SHX Text Plotted with H:\HDRCAD\USTNSTD\00COMMON\plotcfg\hp_100M.plt

AutoCAD SHX Text 28.603m N 49%%d08'12" W

AutoCAD SHX Text 30.614m N 82%%d40'31" W

AutoCAD SHX Text 49.542m N 54%%d00'38" W

AutoCAD SHX Text 37.592m N 72%%d37'06" W

AutoCAD SHX Text 95.697m N 82%%d55'19" W

AutoCAD SHX Text 193.272m S 40%%d44'49" E

AutoCAD SHX Text = 47%%d52'20"

AutoCAD SHX Text R = 317.003m

AutoCAD SHX Text L = 264.865m

AutoCAD SHX Text CH = 257.227m

AutoCAD SHX Text

NEW FDA BUILDING

AutoCAD SHX Text

STOP

AutoCAD SHX Text

STOP

AutoCAD SHX Text

STORM MH

AutoCAD SHX Text

RIM EL=15.87

AutoCAD SHX Text

GUARD POST

AutoCAD SHX Text

0.46(18")P GOING N

AutoCAD SHX Text

INV=13.92

AutoCAD SHX Text

0.46(18")P GOING S

AutoCAD SHX Text

WATER METER

AutoCAD SHX Text

CONC C&G

AutoCAD SHX Text

EL=17.11

AutoCAD SHX Text

CONC

AutoCAD SHX Text

AutoCAD SHX Text

BENCHMARK

Prashant.Gongal Polygon

Prashant.Gongal Polygon

Prashant.Gongal Text Box

SITE PLAN

Prashant.Gongal Text Box

IRV-2

Prashant.Gongal

STAIR 3

Prashant.Gongal Text Box

STAIR 4

Prashant.Gongal Rectangle

Rectangle

STAIR 3

Prashant.Gongal Text Box

STAIR 4

Prashant.Gongal Text Box

STAIR 1

Prashant.Gongal Text Box

STAIR 2

Prashant.Gongal Rectangle

Prashant.Gongal Rectangle

Prashant.Gongal Rectangle

Prashant.Gongal Rectangle

Prashant.Gongal Rectangle

Prashant.Gongal Text Box

ENTRANCE CANOPY

Prashant.Gongal Image

Prashant.Gongal Image

Prashant.Gongal Image

Prashant.Gongal Image

Image

Polygon

Prashant.Gongal Polygon

Prashant.Gongal Polygon

Prashant.Gongal Text Box

STAIR 3

Prashant.Gongal Text Box

STAIR 4

Prashant.Gongal Text Box

STAIR 1

Prashant.Gongal Text Box

STAIR 2

Prashant.Gongal Rectangle

Prashant.Gongal Rectangle

Prashant.Gongal Rectangle

Prashant.Gongal Rectangle

Prashant.Gongal Rectangle

Prashant.Gongal Text Box

ENTRANCE CANOPY

Prashant.Gongal Rectangle

Prashant.Gongal Text Box

RAILING

Prashant.Gongal Polygon

Prashant.Gongal Polygon

Prashant.Gongal Polygon

Prashant.Gongal Polygon

Prashant.Gongal Polygon

Prashant.Gongal Polygon

Prashant.Gongal Polygon

Prashant.Gongal Polygon

Prashant.Gongal Polygon

Prashant.Gongal Polygon

Prashant.Gongal Polygon

Prashant.Gongal Polygon

Prashant.Gongal Polygon

Prashant.Gongal Polygon

Prashant.Gongal Polygon

Prashant.Gongal Image

Prashant.Gongal Image

Area Measurement

39.14 sf

Prashant.Gongal Rectangle

Prashant.Gongal Rectangle

Prashant.Gongal Rectangle

Prashant.Gongal Rectangle

Prashant.Gongal Text Box

STAIR 3

Prashant.Gongal Text Box

STAIR 4

Prashant.Gongal Text Box

STAIR 1

Prashant.Gongal Text Box

STAIR 2

Prashant.Gongal Rectangle

Prashant.Gongal Text Box

ENTRANCE CANOPY

Prashant.Gongal Image

Prashant.Gongal Rectangle

Prashant.Gongal Text Box

ROOF STAIR

Prashant.Gongal Image

Building Code Floor Code Room Code

Room Codes

10011002

Irvine - Hazmat 19701 Fairchild

First Floor

FACILITY MANAGEMENT SYSTEM SPACE PLAN

Created By:

PRASHANT.GONGAL@FDA.H

HS.GOV

Title: IRV-2-01CO.dwg

Scale: BARSCALE

Issue Date: 1/26/26

GSA Bldg: 9024

Bldg Code: IRV-2

Floor Code: 01

Prashant.Gongal Text Box

CHEMICAL SHED CANOPY COVER

Prashant.Gongal Rectangle

Prashant.Gongal Image

FDA at IRVINE SPECIAL COATINGS Page 589 Solicitation 223-00-9803 Section 09810 03/06/01

PART 1 - GENERAL

1.1 SUMMARY:

A. Section includes polyurethane coating system applied to metal surfaces specified in other Sections, including surface preparation, prime coats, intermediate coats, and finish coats.

1. Surfaces to be coated include the following:

a. Steel of Exterior Stairs, Guardrails, and Handrails.

b. Steel Structures of Stair Screens, and Sunscreens.

c. Exposed Structural Steel (Exterior and Interior).

d. In the areas specified above, apply also to metal doors and frames, exposed piping, conduit, brackets, bolts, fasteners, supports, except for factory finished items where custom color is specified or stainless steel items.

2. Special coating system is a two-component, pigmented, aliphatic, polyurethane coating.

3. Special coatings may be applied in the shop, before delivery to site, or in the field before or after installation.

B. Colors are specified in Section 09900 Painting.

1.2 SUBMITTALS:

A. Submit the following in accordance with Section 01300.

1. Product Data:

a. Provide the manufacturer's technical information, including label analysis and instructions for handling, storing, and applying each material proposed for use. Show wet and dry film build.

b. List each material and cross-reference the specific coating, finish system, and application. Identify each material by the manufacturer's catalog number and general classification.

AS-BUILT SPEC

FDA at IRVINE SPECIAL COATINGS Page 590

03/06/01

c. Certification by manufacturer that products supplied comply with local regulations controlling use of volatile organic compounds (VOCs).

2. Samples of each color and material to be applied with texture to simulate actual conditions on representative samples of the actual substrate.

a. Provide stepped samples, defining each separate coat, including primers. Use representative colors when preparing samples for review. Resubmit until the required sheen, color, and texture are achieved.

b. Provide a list of material and application for each coat of each sample. Label each sample as to location and application.

c. Submit two 100 mm square samples of each color and finish on ferrous metal for the Architect's review of color and texture.

3. Submit Qualification data for manufacturers and applicators specified in "Quality Assurance" article to demonstrate their capabilities and experience.

1.3 QUALITY ASSURANCE:

A. Applicator Qualifications: Engage an experienced applicator who has successfully completed coating system applications similar in material and extent to those indicated for the Project.

B. Single-Source Responsibility: Provide primers and undercoat material produced by the same manufacturer as the finish coats for each type of coating. Use only thinners recommended by the manufacturer and only within recommended limits.

C. Field Samples: On each type of surface, duplicate finishes of prepared samples. Provide full-coat finish samples on at least 4 square meters of surface until required sheen, color, and texture are obtained.

Provide light exterior natural conditions for reviewing in-place Work.

1. Final acceptance of colors will be from field applied samples.

2. Architect will select one surface to represent surfaces and conditions for each type of coating and substrate to be coated.

Apply coatings on surface according to the sample schedule. After finishes are accepted, sample surface will be used for evaluation of coating systems of a similar nature.

1.4 DELIVERY, STORAGE, AND HANDLING:

FDA at IRVINE SPECIAL COATINGS Page 591

03/06/01

A. Deliver materials to the place of application in the manufacturer's original, new, unopened packages, and containers bearing manufacturer's name and label, and the following information.

1. Name or title of material.

2. Product description (generic classification or binder type).

3. Manufacturer's name, stock number and date of manufacture.

4. Contents by volume, for major pigment and vehicle constituents.

5. Thinning instructions.

6. Application instructions.

7. Color name and number.

8. Handling instructions and precautions.

B. Store materials not in use in tightly covered containers in a well-ventilated area at a minimum ambient temperature of 8° C. Maintain containers used in storage in a clean condition, free of foreign materials and residue.

1.5 PROJECT CONDITIONS:

A. Coatings shall be applied only when the temperature of surfaces to be coated and surrounding air temperatures are between 8° C and 35° C.

B. Do not apply coatings in snow, rain, fog, or mist; when relative humidity exceeds 85 percent; at temperatures less than 3° C above dew point; or to damp or wet surfaces.

1. Allow wet surfaces to dry thoroughly and attain the temperature and conditions specified before proceeding with or continuing the coating operation.

2. Work may continue during inclement weather only if areas and surfaces to be coated are enclosed and the temperature within the area can be maintained within limits specified by the manufacturer during application and drying periods.

PART 2 - PRODUCTS

SECTION DELETED

FDA at IRVINE SPECIAL COATINGS Page 597

PART 3 - EXECUTION

3.1 FIELD APPLICATION:

A. Conform to requirements for shop finishing, above.

B. Preparation: Remove hardware and hardware accessories, plates, machined surfaces, lighting fixtures, and similar items already in place that are not to be coated, or provide surface-applied protection prior to surface preparation and coating. Remove these items, if necessary, to completely coat the items and adjacent surfaces. Following the coating operations in each space or area, have removed items reinstalled by workers skilled in the trades involved.

C. The term "exposed surfaces" includes areas visible when permanent or built-in fixtures, convector covers, covers for finned tube radiation, grilles, and similar components are in place. Extend coatings in these areas, as required, to maintain the system integrity and provide desired protection.

1. Coat surfaces behind movable equipment and furniture the same as similar exposed surfaces.

2. Coat the back sides of access panels, removable or hinged covers, and similar hinged items to match exposed surfaces.

FDA at IRVINE SPECIAL COATINGS Page 598

03/06/01

3. Omit primer on metal surfaces that have been shop-primed and touch-up painted.

3.2 FIELD QUALITY CONTROL:

A. The Owner reserves the right to invoke the following test procedure at any time the Construction Manager deems necessary during coating operations. The Construction Manager can require additional tests, later in the work should the initial test identify products not in complance with the specifications.

B. The Contractor will engage the services of an independent testing agency to sample the coating being used. Samples of material delivered to Project site will be taken, identified, sealed, and certified in the presence of the Contractor and the Construction Manager.

C. The testing agency will perform appropriate tests for the following characteristics as required by the Owner:

1. Quantitative materials analysis.

2. Absorption.

3. Accelerated weathering.

4. Accelerated yellowness.

5. Color retention.

6. Alkali and mildew resistance.

7. Abrasion resistance.

8. Apparent reflectivity.

9. Washability.

10. Dry Opacity.

11. Recoating.

12. Skinning.

D. If results show materials being used do not comply with requirements, the Contractor may be directed to stop work and remove noncomplying materials, pay for additional testing, recoat surfaces coated with rejected materials, or remove rejected materials from previously coated surfaces if, upon recoating with specified materials, the two coatings are not compatible.

FDA at IRVINE SPECIAL COATINGS Page 599

3.3 ADJUSTING AND CLEANING:

A. Cleanup: At the end of each work day, remove rubbish, empty cans, rags, and other discarded materials from the site.

B. After completing work, clean glass and spattered surfaces. Remove spattered coatings by washing, scraping, or other methods. Do not scratch or damage adjacent finished surfaces.

3.4 PROTECTION:

A. Protect work of other trades, whether being coated or not, against damage from coating operation. Correct damage by cleaning, repairing, replacing, and recoating, as acceptable to the Owner. Leave in an undamaged condition.

1. At completion of other trades' construction activities, touch up and restore damaged or defaced coated surfaces.

END OF SECTION

FDA at IRVINE PAINTING Page 601 Solicitation 223-00-9803 Section 09900 6/21/99

PART 1 - GENERAL

1.1 SUMMARY:

A. Section Includes painting and finishing of exterior and interior exposed items and surfaces, unless otherwise indicated.

1. Prefinished items, such as architectural woodwork, aluminum windows, toilet compartments, acoustic material and the like, are not included.

2. Unless otherwise indicated, painting not required on surfaces of concealed areas, or on walls of the Basement Level.

3. Finished metals such as prefinished aluminum, stainless steel, copper and plated metals will not be painted (but paint door closers to match painted doors, and door coordinators to match frames). .

4. Take special care to keep prefinished work, and natural materials, clean and free of spatter.

B. Related Sections:

1. Shop priming of ferrous metal items and fabricated components are included under their respective trades.

2. Moving parts of operating units, equipment identification, performance ratings, name or nomenclature plates or code-required labels do not require additional finishes.

3. Special Coatings, Section 09810.

1.2 SUBMITTALS:

A. Submit a complete, detailed list of proposed materials with request for color schedule, including anticipated minimum dry film thickness.

B. Submit 200 mm x 250 mm "Drawdowns" for Architect's review of color and texture only. Resubmit samples as requested until required sheen, color and texture is achieved.

C. Samples: Paint materials applied to surfaces at job site as specified in Paragraphs 1.3 C and 2.2 D. Give notice by means of Submittal transmittal.

Prashant.Gongal

AS-BUILT SPEC

FDA at IRVINE PAINTING Page 602

6/21/99

D. Apply and reduce materials only as specified or recommended by the manu-facturer's printed instructions. Where manufacturer has made additional recommendations apparently in conflict with these specifications, allow Architect to review additional recommendations before proceeding.

E. Prepare for Owner duplicate drawdowns of each color and gloss combination used, marked with location for use in maintenance. Deliver to site and obtain receipt.

1.3 QUALITY ASSURANCE:

A. Regulatory Requirements: The Quantity of Volatile Organic Compounds (VOC's) in materials supplied under this Section shall not exceed the limits permitted under Regulation 1113 for architectural coatings (in effect on the date bids are received) of the South Coast Air Quality Management District.

B. Include on label of containers: Manufacturer's name and stock number, type of paint, color, instructions for reducing, where applicable and label analysis.

C. Field control "Samples":

1. Request review of first finished room, space, wall, or item of each color scheme required as a sample of each color, finish, texture and to show workmanship; under illumination equal to that expected at occupancy.

2. For spray or roller application, paint surface of at least 10 sq.m.

3. Consider approved "Samples" as the project standard.

D. The Contractor shall hire an independent testing agency to verify the thickness of the dry paint film at 10%, 30% and 75% intervals of completion of the painting work in five test locations as selected by the Construction Manager. At each test, five readings will be taken to determine the average thickness.

1. An area will be considered deficient where, when compared to the dry film thickness specified by the manufacturer or calculated from the recommended spreading rate, the average of 5 readings is more than 10% low or a single reading is more than 30% low.

2. Paint will be considered testable after twice the manufacturer's recommended time for recoating or 24 hours, whichever is longer.

3. Three additional test locations will be paid for by the Contractor, for each area that fails to comply with the specifications, and the areas determined to be non-compliant will be corrected.

1.4 PRODUCT DELIVERY, STORAGE, AND HANDLING:

A. Deliver materials in original containers, materials specified by name, manufacturer or standard with labels legible and intact.

FDA at IRVINE PAINTING Page 603

6/21/99

B. Store in suitable location as directed, in accord with label instructions.

C. Storage of paint-soiled rags, waste, etc., at premises will not be per-mitted, except where stored in metal containers with tight metal covers.

1.5 PROJECT CONDITIONS:

A. Comply with paint manufacturer's recommendations concerning environmental conditions under which coatings and coating systems may be applied.

1. Apply paint only when surface and air temperatures are above 10 degrees C.

2. Do not apply exterior paint in rainy weather.

3. Do not apply paint in direct sun or when surface is hot or under other conditions which prevent proper application and drying.

B. Do not apply finish in areas where dust is being generated.

C. Protect work of other trades. Correct painting related damage by cleaning, repairing or replacing and refinishing, as directed by Construction Manager.

PART 2 - PRODUCTS

Prashant.Gongal

FDA at IRVINE PAINTING Page 607

6/21/99

PART 3 - EXECUTION

3.1 EXAMINATION:

A. Verify that spaces are broom clean, with surfaces free of foreign matter.

B. Moisture Content:

1. Surfaces: Suitably dry and adequately protected from dampness.

2. Follow recommendations of paint manufacturer for allowable moisture for specific type surfaces.

C. Examine surfaces scheduled to receive paint and finishes for conditions that will adversely affect execution, permanence or quality of work and which cannot be put into an acceptable condition through preparatory work as specified. Allow correction of conditions which are detrimental to the proper and timely completion of the work. Proceed with the Work only after unsatisfactory conditions have been corrected.

D. Proceed with surface preparation and coating application only after conditions are suitable.

3.2 SURFACE PREPARATION:

A. Do not apply finishes until surfaces are dry and clean and in proper condition to receive finish.

B. In addition to painting specified, sand and patch prime coats specified under other Sections.

C. Perform preparation and cleaning procedures in accordance with coating manufacturer's instructions for each substrate condition.

D. Remove hardware and accessories, machined surfaces, plates, lighting fixtures and similar items in place and not to be finish-painted, or provide surface-applied protection. Reinstall removed items.

E. Seal wood required to be job finished. Prime edges, ends, face, undersides and backsides of counters, cases, cabinets, etc. Use spar varnish for backpriming where transparent finish is required.

1. Backprime interior paneling only where masonry, or other wet wall construction occurs on backside.

2. Seal tops, bottoms of wood doors with heavy coat of varnish type finish compatible with final finish immediately upon delivery to job.

3. Sand to smooth and even surface, then remove dust residue. Clean soiled surfaces, using alcohol wash where required.

FDA at IRVINE PAINTING Page 608

6/21/99

4. Putty: Fill nail holes, cracks, open joints and other blemishes with putty compatible with finish system after priming coat has dried.

Color putty to match finish.

F. Plaster and Wallboard Materials:

1. Test plaster with one percent solution of phenolphthalein in alcohol for dryness and excess acid. Treat excess lime with zinc sulfate solution after observation.

2. Rake cracks, scratches and abrasions. Fill with thin layers of patching plaster or joint cement as appropriate.

3. Sand smooth; do not raise "nap" of paper on wallboard.

G. Concrete: Fill minor holes to provide uniform texture over surface as approved. Acid etch concrete surfaces receiving oil-based paints, rinse thoroughly and neutralize with ammonia. Allow to dry thoroughly.

H. Ferrous Metal Surfaces:

1. Remove dirt and grease with mineral spirits.

2. Remove dust, mill scale, and defective paint down to sound surface using scraper, sandpaper or wire brush as necessary. Clean rusted surfaces down to bare metal.

3. Feather edges of sound paint by grinding.

4. Where large areas of bare metal are exposed prime with primer recommended for this exposure.

I. Galvanized Steel and Aluminum Surfaces:

1. Clean surface with solvent to remove oily residue. Dry with clean cloth.

2. Prime with 2-coat primer system recommended for this exposure.

J. For surface preparation of other materials not specifically noted, provide appropriate primers and cleaning agents recommended by paint manufacturer.

3.3 APPLICATION:

A. Paint materials may be applied to fields of walls, ceilings and painted doors with rollers or airless spray equipment. Brush-paint other work except as specifically indicated. Lay off painted doors with roller of acceptable texture after application of paint.

1. Apply each coat evenly, without brush marks, skipped or missed areas;

and without sags, runs or other blemish.

FDA at IRVINE PAINTING Page 609

6/21/99

2. Where spray application is permitted, spray each coat without streaking, lapping or pile up of paint, and lay off with roller for light stippled surface.

B. Omit first coat (primer) on metal surfaces which have been shop-primed and touch-up painted. Apply prime coat to material which is required to be painted or finished, and which has not been prime coated by others.

C. Apply each material at not less than the manufacturer's recommended spreading rate, to provide a total dry film thickness of not less than

0.07 mm thick for the coating systems applied under this section.

D. Completed Work: Match approved samples for color, texture and coverage.

Remove, refinish or repaint work not in compliance with specified requirements.

E. Observation of Surfaces:

1. Do not apply additional coats until completed coat has been reviewed by Architect.

2. Only observed coats of paint will be considered in determining number of coats applied.

F. Paint surfaces behind furniture same as similar exposed surfaces. Paint surfaces behind permanently fixed equipment or furniture with prime coat only, wherever possible.

1. Paint interior surfaces, where visible through registers or grilles, flat, non-specular black.

2. Paint back sides of access panels, and removable or hinged covers to match exposed surfaces.

G. Sand lightly between succeeding coats.

H. Finish door edges, tops and bottoms to match faces.

I. Refinish whole wall where portion of finish has been damaged or is not acceptable.

J. Make edges of paint adjoining other materials or colors clean and sharp without overlapping. Exercise care that paint does not lap or splatter onto surfaces scheduled to receive other finishes or which are not to be painted.

3.4 CLEANING:

A. Remove spilled, splashed or spattered paint.

B. Do not mar surface finish of item being cleaned.

C. Leave storage space clean and in condition required for equivalent spaces in project.

FDA at IRVINE PAINTING Page 610

6/21/99

D. Produce a satisfactory finish by painting or repainting as directed, surfaces from which paint spatters cannot satisfactorily be removed.

3.5 PAINTING SCHEDULE:

Prashant.Gongal

FDA at IRVINE PAINTING Page 611

6/21/99

3.6 PAINT COLORS:

END OF SECTION

Prashant.Gongal

MATCH EXISTING COLORS

PLANS
SITE PLAN
IRV-1-0B BASEMENT PLAN
IRV-1-01 LEVEL 1 PLAN
IRV-1-02 LEVEL 2 PLAN
IRV-1-03 ROOF PLAN
A9.5
IRV-2-01 CHEMICAL SHED
ELEVAIONS
A3.1 ELEVATIONS
A3.2 ELEVATIONS
A3.3 ELEVATIONS
A3.4 ELEVATIONS
STAIRCASE DETAILS
A5.3
A5.4
A5.5
A5.6
A5.10
A5.12
A5.13
AS-BUILT SPECS
09810 SPECIAL COATING
09900 PAINTING