Attach-3-_Price_Sheet.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- EUFAULA REHAB UNIT PUMP Federal contract opportunity
- Solicitation number
- 140F0122R0037
About this file
This document contains a price sheet and details for a federal contract opportunity to rehabilitate the Bradly Pump Station. The price sheet lists estimated quantities and unit pricing for various work items required to rebuild an existing pump with extended direct drive, replace the diesel engine and add new fuel lines and oil drain extension, provide solar power equipment, repaint and apply rust inhibiting coating, repair roof joists and install lightning protection, install a chain link fence, and provide 15% overhead and 10% profit. The related federal contract opportunity is solicitation number 140F0122R0037 from the Department of the Interior Fish and Wildlife Service to rehabilitate a pump unit at the Eufaula Rehab Unit. Pricing is to be provided using the attached price sheet, with the government estimate included for reference.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140F0122R0037_Amd_0001.pdf | ||
| Attach-5-Past_Performance_and_Clauses.pdf | ||
| Attach-1-Drawings.pdf | ||
| Sol_140F0122R0037.pdf | ||
| Attach-4-DBA_Min__Wage_Rates.pdf | ||
| Attach-2-Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule
| REHABILITATION OF THE BRADLY PUMP STATION |
| Attach-3-Price Sheer RFP 140F0122R0037 |
| ITEM NO. | DESCRIPTION OF OFFERED ITEM | Est. QUANTITY | UNIT | AMOUNT |
| 1 | Insurance & Bonds | 1 | LS | |
| 2 | Mobilization | 1 | LS | |
| 3 | Install perimeter and in-water erosion control | 1 | LS | |
| 4 | Remove existing diesel engine driver & Exisiting Pump | 1 | LS | |
| 5 | Rebuild & Install pump with extended direct drivel | 1 | LS | |
| 6 | Replace diesel engine Replace Muffler, Install shaft drive Add New Fule Lines & Add oil drain extension | |||
| Provide solar battery, & solar trickle charger to power the engine | 1 | LS | ||
| 7 | Repaint concrete fuel tank and relabel | 1 | LS | |
| 8 | Apply rust inhibiting coating to exposed discharge pipe and pump shaft connection | 1 | LS | |
| 9 | Provide solar powered LED lighting and lighting protection | 1 | LS | |
| 10 | Provide bird deterrent solar designs and wildlife deterrent wiring designs | 1 | LS | |
| 11 | Repair roof joists that were damaged in kind; Install lightning protection, grounding | 1 | LS | |
| 12 | Install Chain Link Fence | 1 | LS | |
| Total Direct Cost | $ - 0 | |||
| 13 | O/H | 0.15 | $ - 0 | |
| Subtotal | $ - 0 | |||
| 14 | Profit | 0.1 | $ - 0 | |
| TOTAL PRICE | 1 | $ - 0 |
&"Arial,Bold"&12Government Estimate
File details come from the government source that posted it. Updated .