Attach-1-Drawings.pdf
PDF 6 MB Posted
- Attached to
- EUFAULA REHAB UNIT PUMP Federal contract opportunity
- Solicitation number
- 140F0122R0037
About this file
This solicitation is for the rehabilitation of the Bradley Unit pump station located at the Eufaula National Wildlife Refuge. The solicitation seeks the replacement of an existing diesel engine, pump, and associated equipment with a new diesel engine rated at 2,200 RPM and 156 horsepower, a rebuilt model NW324X24 angle pump rated for 18,000 GPM at 15 feet of total dynamic head, and a right angle gear drive. Additional requirements include installation of new fuel lines and tanks, exhaust piping, a sound attenuated enclosure, and fencing. The response deadline is February 28, 2022 and the period of performance is 120 days from award. The soliciting agency is the U.S. Fish and Wildlife Service.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140F0122R0037_Amd_0001.pdf | ||
| Attach-5-Past_Performance_and_Clauses.pdf | ||
| Sol_140F0122R0037.pdf | ||
| Attach-4-DBA_Min__Wage_Rates.pdf | ||
| Attach-3-_Price_Sheet.xlsx | XLSX spreadsheet | |
| Attach-2-Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STEWART COUNTY GEORGIA
40161800
ENGINEERING GRAPHIC SCALES
ARCHITECTURAL GRAPHIC SCALES
FEET 1/4"=1'-0"
METERS 1:48
0 21 3
2 3
CENTIMETERS 1:24
FEET 1/2"=1'-0"
0 50 100
0 1 2 3 4
FEET 1"=20'
METERS 1:240
0 5 10
20 30 40 50
7 22.966 2.134 7
MILES
9.656 6
14.484
11.265
12.875
KILOMETERS
1.609
6.437
8.047
3.219
4.828
2.743
2.438
KILOMETERS
3.728
5.592
4.350
4.971
0.621
2.485
3.107
1.243
1.864
MILES
29.528
26.247
METRIC CONVERSION TABLES
INCHES
FEET
20.32 8
METERS
0.610
1.829
1.524
1.219
0.914
0.305
22.86
METERS
CENTIMETERS
2.54
7.62
15.24
17.78
10.16
12.70
5.08
CENTIMETERS
3.150
6.562
19.685
16.404
13.123
9.843
3.281
FEET
3.543
1.181
2.362
2.756
1.574
1.969
0.934
0.787
INCHES
EUFAULA
NATIONAL WILDLIFE REFUGE
REHABILITATION OF THE
BRADLEY UNIT PUMP STATION
REHABILITATION OF THE
BRADLEY UNIT PUMP STATION
SITE
ENVIRONMENT & INFRASTRUCTURE SOLUTIONS, INC.
1075 BIG SHANTY ROAD, NW., SUITE 100
KENNESAW, GEORGIA 30144
PREPARED BY:
O
I
T
R
E
R
I
H
E
F
O T
N
E
R
D
P
T
T
A
N
E
M
THIS SITE LIES IN A FLOOD ZONE, PER F.I.R.M. PANEL 13259C0210B, DATED SEPTEMBER 3, 2010.
SITE
COVER SHEET
G-001
(770) 421-3400
COA# PEF000213
EXPIRES: 06/30/2022
SITE
EUFAULA BRADLEY
PUMP STATION SIGN
DRAWING INDEX
DRAWING TITLE
G-001 COVER SHEET
C-100 EXISTING SITE CONDITIONS
C-101 OVERALL SITE & EROSION CONTROL PLAN
C-102 EROSION AND SEDIMENTATION CONTROL NOTES
C-501 DETAILS
A-101 ROOF JOIST REPAIR PLAN
M-101 MECHANICAL DEMOLITION AND NEW WORK PLAN
M-102 MECHANICAL NEW WORK PLAN
M-501 MECHANICAL DETAILS AND SCHEDULES
E-001
ELECTRICAL GENERAL NOTES, LEGEND AND ABBREVIATIONS
E-101 GROUNDING AND LIGHTNING PROTECTION PLAN
E-102 ELECTRICAL POWER AND LIGHTING PLAN
E-103 LIGHTNING PROTECTION ROOF PLAN
E-501 ELECTRICAL DETAILS
ISSUED FOR CONSTRUCTION
ZONE A
STEWART COUNTY
UNINCORPORATED AREAS
130393
FLOOD HAZARD INFORMATION
IS NOT SHOWN ON THIS MAP
IN AREAS OUTSIDE OF
STEWART COUNTY
12/15/21
ISSUED FOR CONSTRUCTION
EXISTING SITE CONDITIONS
CB
SK
C-100
FEET 1"=20'
METERS 1:240
0 5 10
20 30 40 50
N
EXISTING PUMP SHAFT LOCATION
BRADLEY PUMP STATION SITE
EXISTING ACCESS
GATE TO PUMP HOUSE
W
RaA
W
SOILS LEGEND
MAP UNIT
SYMBOL
MAP UNIT NAME
RaA
RAINS SANDY LOAM, 0 TO 2 PERCENT
SLOPES, OCCASIONALLY FLOODED
W WATER
BRADLEY DIKE TRAIL
*SOIL DATA PROVIDED FROM USDA WEB SOIL SURVEY
DISCHARGE PIPE
PUMP SUPPORT STRUCTURE
ISSUED FOR CONSTRUCTION
OVERALL SITE & EROSION
CONTROL PLAN
C.B.
X.X.
C-101
FEET 1"=20'
METERS 1:240
0 5 10
20 30 40 50
N
Tc
EXISTING PUMP SHAFT LOCATION
BRADLEY PUMP STATION SITE
EXISTING ACCESS
GATE TO PUMP HOUSE
TURBIDITY CURTAIN
CONTRACTOR LAYDOWN AREA
BRADLEY DIKE TRAIL
DISCHARGE PIPE - SEE NOTE 1
NOTES:
1. DISCHARGE PIPE TO BE COATED WITH RUST INHIBITED
COATING ON EXPOSED PART OF PIPE (SUCH AS
MACROPOXY 646). CONTRACTOR TO IMPLEMENT
MEASURES TO ENSURE NO COATING ENTERS INTO
BODY OF WATER.
2. CONTRACTOR TO INSTALL BEST MANAGEMENT
PRACTICES SUCH AS TURBIDITY CURTAIN AS SHOWN
ON DRAWING TO PREVENT EROSION RUNOFF INTO
BODY OF WATER DURING CONSTRUCTION.
3. CONTRACTOR TO OPERATE DURING NON-BLACKOUT
DATES. BLACKOUT DATES LISTED UNDER
SPECIFICATION SECTION 01 11 00 - 1.9 WORK HOURS.
4. CONTACT THE REFUGE MANAGER 48 HOURS PRIOR TO
PUMP REMOVAL OR REPLACEMENT. THE PUMP SHALL
NOT BE REMOVED OR INSTALLED WITHOUT THE
REFUGE MANAGER BEING ON SITE. CONTRACTOR TO
ENSURE NOT TO DAMAGE THE PUMP SUPPORT
STRUCTURE DURING PUMP REPLACEMENT. REPAIR OR
REPLACEMENT OF THE PUMP SUPPORT STRUCTURE
DUE TO CONTRACTOR DAMAGE SHALL BE DONE AT NO
ADDITIONAL COST TO THE OWNER. PUMP SUPPORT
STRUCTURE MAY BE CUT UP TO 36 INCHES, OR AS
DIRECTED BY REFUGE MANAGER, TO FACILITATE EASE
OF PUMP REMOVAL AND INSTALLATION. THE TOP
CHAIN HOIST BRACKET SHOULD BE REMOVED AND
REINSTALLED. WHEN REFUGE HAS BEEN DRAINED FOR
THE PUMP REPLACEMENT, THE SUPPORT STRUCTURE
SHALL BE COASTED WITH A RUST INHIBITED COATING
ON ALL EXPOSED PARTS. COATING TO BE MACROPOXY
646 OR APPROVED EQUIVALENT. CONTRACTOR TO
REPLACE THE CHAIN, CHAIN HOIST, AND CONNECTORS
WITH NEW STAINLESS STEEL PARTS OF SIMILAR SIZE
AND RATINGS.
PUMP SUPPORT STRUCTURE - SEE NOTE 4
ISSUED FOR CONSTRUCTION
EROSION AND SEDIMENTATION
CONTROL NOTES
C.B.
X.X.
C-102
SITE DESCRIPTION
THIS PROJECT IS LESS THAN 1 ACRE AND EXEMPT FROM THE
NPDES PERMIT. THIS EXEMPTION DOES NOT ALLEVIATE THE
CONTRACTOR FROM PREVENTING SEDIMENT FROM LEAVING THE
SITE, OR FROM THE REQUIREMENTS OF THE CLEAN WATER ACT.
THIS PROJECT WILL BE FOR EQUIPMENT REPLACEMENT ONLY.
INSTALL SEDIMENT FENCE AND SILT CURTAINS AS NECESSARY TO
PROTECT WATERS OF THE STATE.
GENERAL NOTES
1. NON-EXEMPT ACTIVITIES SHALL NOT BE CONDUCTED WITHIN
THE 25 OR 50-FOOT UNDISTURBED STREAM BUFFERS AS
MEASURED FROM THE POINT OF WRESTED VEGETATION OR
WITHIN 25-FEET OF THE COASTAL MARSHLAND BUFFER AS
MEASURED FROM THE JURISDICTIONAL DETERMINATION LINE
WITHOUT FIRST ACQUIRING THE NECESSARY VARIANCES AND
PERMITS..
2. AFTER CONSTRUCTION, EROSION AND SEDIMENTATION SHALL
BE MANAGED BY GRAVEL.
3. PRIOR TO THE LAND DISTURBING CONSTRUCTION, THE
CONTRACTOR SHALL SCHEDULE A PRE-CONSTRUCTION
MEETING WITH THE AREA SITE DEVELOPMENT INSPECTOR.
4. THE CONTRACTOR SHALL OBSERVE THE PROJECT SEQUENCE
SHOWN ON THE PLAN. THE CONTRACTOR SHALL MAINTAIN
CAREFUL SCHEDULING AND PERFORMANCE TO INSURE THAT
LAND STRIPPED OF ITS NATURAL COVER IS EXPOSED ONLY IN
SMALL QUANTITIES.
5. NO STAGING AREAS, MATERIAL STORAGE, OR DEBRIS BURN
AND BURIAL HOLES SHALL BE LOCATED WITHIN 500 FEET OF
DESIGNATED TREE PROTECTION AREAS.
6. A COPY OF THE APPROVED LAND DISTURBANCE PLAN SHALL
BE PRESENT ON THE SITE AT ALL TIMES.
7. WASTE MATERIALS SHALL NOT BE DISCHARGED TO WATERS
OF THE STATE, EXCEPT AS AUTHORIZED BY A SECTION 404
PERMIT.
8. THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE
PREVENTED BY THE INSTALLATION OF EROSION AND
SEDIMENT CONTROL MEASURES AND PRACTICES PRIOR TO
LAND-DISTURBING ACTIVITIES.
9. EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL
TIMES. IF FULL IMPLEMENTATION OF THE APPROVED PLAN
DOES NOT PROVIDE FOR EFFECTIVE EROSION CONTROL,
ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES
SHALL BE IMPLEMENTED TO CONTROL OR TREAT THE
SEDIMENT SOURCE.
10. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD GREATER
THAN 14 DAYS SHALL BE STABILIZED WITH MULCH OR
TEMPORARY SEEDING.
11. FOR BUILDING MATERIALS, BUILDING PRODUCTS,
CONSTRUCTION WASTES, TRASH, LANDSCAPE MATERIALS,
FERTILIZERS, PESTICIDES, HERBICIDES, DETERGENTS,
SANITARY WASTE AND OTHER MATERIALS PRESENT ON THE
SITE, PROVIDE COVER (E.G. PLASTIC SHEETING, TEMPORARY
ROOFS) TO MINIMIZE THE EXPOSURE OF THESE PRODUCTS TO
PRECIPITATION AND TO STORMWATER, OR A SIMILARLY
EFFECTIVE MEANS DESIGNED TO MINIMIZE THE DISCHARGE OF
POLLUTANTS FROM THESE AREAS. MINIMIZATION OF
EXPOSURE IS NOT REQUIRED IN CASES WHER EXPOSURE TO
PRECIPITATION AND TO STORMWATER WILL NOT RESULT IN A
DISCHARGE OF POLLUTANTS, OR WHER EXPOSURE OF A
SPECIFIC MATERIAL OR PRODUCT POSES LITTLE RISK TO
STORMWATER CONTAMINATION (SUCH AS FINAL PRODUCTS
AND MATERIALS INTENDED FOR OUTDOOR USE).
12. NO BURN OR BURY PIT SHALL BE PERMITTED ON THE
CONSTRUCTION SITE WITHOUT WRITTEN PERMISSION BY THE
OWNER AND/OR THE DESIGN PROFESSIONAL.
13. ALL SILT FENCE SHALL MEET THE REQUIREMENTS OF SECTION
171 OF THE "DEPARTMENT OF TRANSPORTATION, STATE OF
GEORGIA STANDARD SPECIFICATIONS, CONSTRUCTION OF
TRANSPORTATION SYSTEMS" (GDOT STANDARD
SPECIFICATIONS), LATEST EDITION.
14. ALL ITEMS IN THESE NOTES SHALL MEET THE REQUIREMENTS
AS SET FORTH IN SECTIONS 161, 162, 163, AND 164 OF THE
GDOT STANDARD SPECIFICATIONS UNLESS OTHERWISE
SPECIFIED IN THE PROJECT DOCUMENTS.
15. TEMPORARY SEEDING AND/OR MULCH SHALL BE APPLIED TO
ALL EXPOSED AREAS WITHIN 14 DAYS OF LAND DISTURBANCE.
16. ALL DISTURBED AREAS LEFT MULCHED AFTER 30 DAYS SHALL
BE STABILIZED WITH TEMPORARY VEGETATION.
17. SEDIMENT AND EROSION CONTROL MEASURES SHALL BE
CHECKED AFTER EACH RAIN EVENT. EACH DEVICE SHALL BE
MAINTAINED OR REPLACED IF SEDIMENT ACCUMULATION HAS
REACHED 1/2 THE CAPACITY OF THE DEVICE. ADDITIONAL
DEVICES SHALL BE INSTALLED IF NEW CHANNELS HAVE
DEVELOPED.
18. THE CONSTRUCTION EXIT SHALL BE MAINTAINED IN A
CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF
MUD ONTO PUBLIC RIGHTS-OF-WAY. THIS MAY REQUIRE
PERIODIC TOP DRESSING WITH A 1" TO 3" LAYER OF STONE, AS
CONDITIONS DEMAND. ALL MATERIALS SPILLED, DROPPED,
WASHED OR TRACKED FROM VEHICLES ONTO PUBLIC
ROADWAYS OR INTO STORM DRAINS SHALL BE REMOVED
IMMEDIATELY.
19. CONTRACTOR SHALL INSPECT CONTROL MEASURES AT THE
END OF EACH WORKING DAY TO ENSURE MEASURES ARE
FUNCTIONING PROPERLY.
20. FAILURE TO INSTALL, OPERATE OR MAINTAIN ALL EROSION
CONTROL MEASURES WILL RESULT IN ALL CONSTRUCTION
BEING STOPPED ON THE JOB UNTIL SUCH MEASURES ARE
CORRECTED BACK TO THE APPROVED EROSION CONTROL
PLAN.
21. THE SITE CONTRACTOR SHALL BE RESPONSIBLE FOR
MAINTENANCE OF ALL EROSION CONTROL MEASURES
INCLUDING REPLACING OR REPAIRING ANY DAMAGED DEVICES
DUE TO ANY CONSTRUCTION ACTIVITY BY OTHERS.
22. SEDIMENT SHALL NOT BE WASHED INTO INLETS. IT SHALL BE
REMOVED FROM THE SEDIMENT TRAPS, DISPOSED OF AND
STABILIZED SO THAT IT WILL NOT ENTER THE INLET AGAIN.
23. THE CONTRACTOR SHALL FURNISH AND MAINTAIN ALL
NECESSARY BARRICADES WHILE IMPROVEMENTS ARE BEING
MADE.
24. CRITERIA FOR SILT FENCE PLACEMENT. THE SILT FENCE SHALL
BE MAINTAINED UNTIL PERMANENT GROUND COVER IS
ESTABLISHED ON THE SLOPE. SILT SHALL BE REMOVED WHEN
ACCUMULATION REACHES 1/2 HEIGHT OF THE BARRIER.
ADDITIONALLY, DIVERSION DIKES SHALL BE CONSTRUCTED
ALONG THE TOP OF ALL SAID FILL SLOPES WITH THE USE OF
TEMPORARY DOWN DRAINS TO CONTROL STORMWATER RUN
OFF AS SHOWN ON THE PLAN. SEE SEPARATE DETAILS FOR
ADDITIONAL INFORMATION.
25. STOCKPILED TOPSOIL SHALL BE APPLIED AT A MINIMUM
THICKNESS OF 3-INCHES TO ALL FINAL GRADE SOIL SURFACES.
IF SUFFICIENT TOPSOIL IS NOT AVAILABLE TO COVER ALL
FINAL GRADE SURFACES, PREFERENCE SHALL BE GIVEN TO
CUT AND FILL SLOPE AREAS.
26. UPON COMPLETION OF THE CONSTRUCTION ACTIVITIES (AND
RECEIPT OF CERTIFICATE OF OCCUPANCY), THE CONTRACTOR
SHALL REMOVE ALL TEMPORARY EROSION CONTROL
MEASURES AND DISPOSE OF THEM UNLESS NOTED ON PLAN.
MAINTENANCE
SEDIMENT SHALL BE REMOVED FROM SILT FENCES ONCE IT HAS
ACCUMULATED TO 1/2 THE ORIGINAL HEIGHT OF THE BARRIER.
FILTER FABRIC SHALL BE REPLACED WHENEVER IT HAS
DETERIORATED TO SUCH AN EXTENT THAT THE EFFECTIVENESS OF
THE FABRIC IS REDUCED (APPROXIMATELY 6 MONTHS).
SEDIMENT SHALL NOT BE WASHED INTO THE INLET. IT SHALL BE
REMOVED FROM THE SEDIMENT TRAP, DISPOSED OF AND
STABILIZED SO THAT IT WILL NOT RE-ENTER THE INLET.
FLOOD INSURANCE RATE MAP, 13259C0210B, DATED SEPTEMBER 3,
2010, SHOWS THE SITE AND THE SURROUNDING AREA TO BE IN
"ZONE A" DETERMINED TO BE WITHIN THE FLOODPLAIN.
SOIL TYPES
THE NCRS SOIL TYPES ARE: RaA AND W
SOIL DISTURBING ACTIVITIES INCLUDE:
· INSTALLING PERIMETER EROSION AND SEDIMENT
CONTROLS
· EXCAVATION FOR UTILITIES
· PREPARATION FOR FINAL PAVING
· COMPLETION OF ON-SITE STABILIZATION
24-HOUR CONTACT: SITE REPRESENTATIVE
NAME OF RECEIVING WATERS
WALTER F. GEORGE RESERVOIR AND THE CHATTAHOOCHEE RIVER
EROSION AND SEDIMENT CONTROLS
ALL PERIMETER SILT FENCES AND CONSTRUCTION EXITS SHALL BE
IN PLACE PRIOR TO ANY LAND DISTURBING ACTIVITIES.
EXISTING VEGETATION SHALL BE LEFT IN PLACE UNTIL SUCH TIME
THAT LAND DISTURBING ACTIVITIES ARE TO TAKE PLACE UPON THAT
PORTION OF THE SITE. WHEN CONSTRUCTION ACTIVITIES HAVE
CEASED IN AN AREA, THAT AREA SHALL BE STABILIZED WITHIN 14
DAYS. IF THE AREA IS NOT YET TO FINAL GRADE, IT SHALL BE
MULCHED. IF THE AREA IS TO FINAL GRADE AND WILL EVENTUALLY
CONTAIN SITE IMPROVEMENTS SUCH AS THE STRUCTURES OR
SIDEWALKS, IT SHALL BE TEMPORARY SEEDED. AREAS BROUGHT TO
FINAL GRADE THAT WILL REMAIN PERVIOUS ARE TO BE
PERMANENTLY SEEDED
OTHER CONTROLS
NO WASTE SHALL BE DISPOSED OF INTO STORMWATER INLETS OR
WATERS OF THE STATE
WASTE MATERIALS
ALL WASTE MATERIALS SHALL BE COLLECTED AND STORED IN A
SECURELY LIDDED METAL DUMPSTER. THE DUMPSTER SHALL MEET
ALL SOLID WASTE MANAGEMENT REGULATIONS. ALL TRASH AND
CONSTRUCTION DEBRIS FROM THE SITE SHALL BE DEPOSITED IN
THE DUMPSTER. THE DUMPSTER SHALL BE EMPTIED A MINIMUM OF
ONCE PER WEEK, OR MORE OFTEN IF NECESSARY, AND TRASH
SHALL BE HAULED AS REQUIRED BY LOCAL REGULATIONS. NO
CONSTRUCTION WASTE SHALL BE BURIED ON-SITE.
ALL PERSONNEL SHALL BE INSTRUCTED ON PROPER PROCEDURES
FOR WASTE DISPOSAL. A NOTICE STATING THESE PRACTICES SHALL
BE POSTED AT THE JOB SITE AND THE CONTRACTOR IS
RESPONSIBLE FOR SEEING THAT THESE PROCEDURES ARE
FOLLOWED.
HAZARDOUS WASTES
ALL HAZARDOUS WASTE MATERIALS SHALL BE DISPOSED OF IN THE
MANNER SPECIFIED BY LOCAL, STATE AND/OR FEDERAL
REGULATIONS AND BY THE MANUFACTURER OF SUCH PRODUCTS.
THE JOB SITE SUPERINTENDENT, WHO WILL ALSO BE RESPONSIBLE
FOR SEEING THAT THESE PRACTICES ARE FOLLOWED, SHALL
INSTRUCT SITE PERSONNEL IN THESE PRACTICES. MATERIAL
SAFETY DATA SHEETS (MSDS) FOR EACH SUBSTANCE WITH
HAZARDOUS PROPERTIES THAT IS USED ON THE JOB SITE SHALL BE
OBTAINED AND USED FOR THE PROPER MANAGEMENT OF
POTENTIAL WASTES THAT MAY RESULT FROM THESE PRODUCTS. AN
MSDS SHALL BE POSTED IN THE IMMEDIATE AREA WHERE SUCH
PRODUCT IS STORED AND/OR USED AND ANOTHER COPY OF EACH
MSDS SHALL BE MAINTAINED IN THE ESPC PLAN FILE AT THE JOB
SITE CONSTRUCTION TRAILER OFFICE. EACH EMPLOYEE WHO MUST
HANDLE A SUBSTANCE WITH HAZARDOUS PROPERTIES SHALL BE
INSTRUCTED ON THE USE OF MSDS SHEETS AND THE SPECIFIC
INFORMATION IN THE APPLICABLE MSDS FOR THE PRODUCT HE/SHE
IS USING, PARTICULARLY REGARDING SPILL CONTROL TECHNIQUES.
THE CONTRACTOR SHALL IMPLEMENT THE SPILL PREVENTION
CONTROL AND COUNTERMEASURES (SPCC) PLAN FOUND WITHIN
THIS ESPC PLAN AND SHALL TRAIN ALL PERSONNEL IN THE PROPER
CLEANUP AND HANDLING OF SPILLED MATERIALS. NO SPILLED
HAZARDOUS MATERIALS OR HAZARDOUS WASTES SHALL BE
ALLOWED TO COME IN CONTACT WITH STORMWATER DISCHARGES.
IF SUCH CONTACT OCCURS, THE STORMWATER DISCHARGE SHALL
BE CONTAINED ON-SITE UNTIL APPROPRIATE MEASURES IN
COMPLIANCE WITH STATE AND FEDERAL REGULATIONS ARE TAKEN
TO DISPOSE OF SUCH CONTAMINATED STORMWATER. IT SHALL BE
THE RESPONSIBILITY OF THE JOB SITE SUPERINTENDENT TO
PROPERLY TRAIN ALL PERSONNEL IN THE USE OF THE SPCC PLAN.
SANITARY WASTES
A MINIMUM OF ONE PORTABLE SANITARY UNIT SHALL BE PROVIDED
FOR EVERY TEN (10) WORKERS ON THE SITE. ALL SANITARY WASTE
SHALL BE COLLECTED FROM THE PORTABLE UNITS A MINIMUM OF
ONE TIME PER WEEK BY A LICENSED PORTABLE FACILITY PROVIDER
IN COMPLETE COMPLIANCE WITH LOCAL AND STATE REGULATIONS.
ALL SANITARY WASTE UNITS SHALL BE LOCATED IN AN AREA WHERE
THE LIKELIHOOD OF THE UNIT CONTRIBUTING TO STORMWATER
DISCHARGE IS NEGLIGIBLE. ADDITIONAL CONTAINMENT BMP'S MUST
BE IMPLEMENTED, SUCH AS GRAVEL BAGS OR SPECIALLY DESIGNED
PLASTIC SKID CONTAINERS AROUND THE BASE, TO PREVENT
WASTES FROM CONTRIBUTING TO STORMWATER DISCHARGES.
OFF-SITE VEHICLE TRACKING
CONSTRUCTION WILL OCCUR ON GRAVEL SURFACES, SO NO
CONSTRUCTION EXIT IS PLANNED. ANY VEHICLE LEAVING THE
CONSTRUCTION SITE SHALL ENSURE TIRES ARE CLEAN OF MUD AND
SEDIMENT BEFORE ENTERING A PAVED PUBLIC ROAD.
SPILL PREVENTION
PRACTICES SUCH AS GOOD HOUSEKEEPING, PROPER HANDLING OF
HAZARDOUS PRODUCTS AND PROPER SPILL CONTROL PRACTICES
SHALL BE FOLLOWED TO REDUCE THE RISK OF SPILLS AND THE RISK
OF SPILLS FROM DISCHARGING INTO STORMWATER RUNOFF.
GOOD HOUSEKEEPING
QUANTITIES OF PRODUCTS STORED ON-SITE SHALL BE LIMITED TO
THE AMOUNT NEEDED FOR THE JOB.
1. PRODUCTS AND MATERIALS SHALL BE STORED IN A NEAT,
ORDERLY MANNER IN APPROPRIATE CONTAINERS PROTECTED
FROM RAINFALL WHERE POSSIBLE.
2. PRODUCTS SHALL BE KEPT IN THEIR ORIGINAL CONTAINERS
WITH MANUFACTURER LABELS LEGIBLE AND VISIBLE.
3. PRODUCT MIXING, DISPOSAL AND DISPOSAL OF PRODUCT
CONTAINERS SHALL BE ACCORDING TO THE MANUFACTURER'S
RECOMMENDATIONS.
4. THE CONTRACTOR SHALL INSPECT SUCH MATERIALS TO
ENSURE PROPER USE, STORAGE AND DISPOSAL.
PRODUCT SPECIFIC PRACTICES
CONCRETE TRUCK WASHING - BERMED CONTAINMENT AREAS SHALL
BE ESTABLISHED FOR CONCRETE TRUCKS TO WASH DOWN TOOLS,
CONCRETE MIXER CHUTES, HOPPERS AND THE REAR OF THE
VEHICLES. WASHOUT OF THE DRUM AT THE CONSTRUCTION SITE IS
PROHIBITED.
FERTILIZER/HERBICIDES - THESE PRODUCTS SHALL BE APPLIED AT
RATES THAT DO NOT EXCEED THE MANUFACTURER'S
SPECIFICATIONS OR ABOVE THE GUIDELINES SET FORTH IN THE
CROP ESTABLISHMENT OR IN THE GSWCC MANUAL FOR EROSION
AND SEDIMENT CONTROL IN GEORGIA. ANY STORAGE OF THESE
MATERIALS SHALL BE UNDER ROOF IN SEALED CONTAINERS.
PAINTS/FINISHES/SOLVENTS - ALL PRODUCTS SHALL BE STORED IN
TIGHTLY SEALED ORIGINAL CONTAINERS WHEN NOT IN USE. EXCESS
PRODUCT SHALL NOT BE DISCHARGED TO THE STORMWATER
COLLECTION SYSTEM. EXCESS PRODUCT, MATERIALS USED WITH
THESE PRODUCTS AND PRODUCT CONTAINERS SHALL BE DISPOSED
OF ACCORDING TO MANUFACTURER'S SPECIFICATIONS AND
RECOMMENDATIONS.
BUILDING MATERIALS - NO BUILDING OR CONSTRUCTION MATERIALS
SHALL BE BURIED OR DISPOSED OF ON-SITE. ALL SUCH MATERIAL
SHALL BE DISPOSED OF USING PROPER WASTE DISPOSAL
PROCEDURES.
SPILL PREVENTION, CONTROL AND COUNTER MEASURES PLAN
THE CONTRACTOR SHALL NOTIFY THE LICENSED PROFESSIONAL
WHO PREPARED THIS PLAN IF MORE THAN 1320 GALLONS OF
PETROLEUM PRODUCTS ARE STORED ON-SITE (THIS INCLUDES
FLUIDS WITHIN EQUIPMENT) IN VOLUMES OF 55 GALLONS OR
GREATER. IF THIS CONDITION EXISTS, THE CONTRACTOR WILL NEED
A SPILL PREVENTION, CONTROL AND COUNTERMEASURE (SPCC)
PLAN PREPARED BY A LICENSED PROFESSIONAL ENGINEER (PE) OF
THE STATE.
· PETROLEUM BASED PRODUCTS - CONTAINERS FOR
PRODUCTS SUCH AS FUELS, LUBRICANTS AND TARS
SHALL BE INSPECTED DAILY FOR LEAKS AND SPILLS. THIS
INCLUDES ON-SITE VEHICLE AND MACHINERY DAILY
INSPECTIONS AND REGULAR PREVENTATIVE
MAINTENANCE OF SUCH EQUIPMENT. EQUIPMENT
MAINTENANCE AREAS SHALL BE LOCATED AWAY FROM
STATE WATER, NATURAL DRAINS AND STORMWATER
DRAINAGE INLETS. IN ADDITION, TEMPORARY FUELING
TANKS SHALL HAVE A SECONDARY CONTAINMENT LINER
TO PREVENT/MINIMIZE SITE CONTAMINATION.
· DISCHARGE OF OILS, FUELS AND DISPOSAL AS REQUIRED
BY LOCAL AND STATE REGULATIONS.
· LOCAL, STATE, AND MANUFACTURER'S RECOMMENDED
METHODS FOR SPILL CLEANUP SHALL BE CLEARLY
POSTED AND PROCEDURES SHALL BE MADE AVAILABLE TO
SITE PERSONNEL.
· MATERIAL AND EQUIPMENT NECESSARY FOR SPILL
CLEANUP SHALL BE KEPT IN THE MATERIAL STORAGE
AREAS. TYPICAL MATERIALS AND EQUIPMENT INCLUDES,
BUT IS NOT LIMITED TO, BROOMS, DUSTPANS, MOPS,
RAGS, GLOVES, GOGGLES, CAT LITTER, SAND, SAWDUST,
AND PROPERLY LABELED PLASTIC AND METAL WASTE
CONTAINERS.
· SPILL PREVENTION PRACTICES AND PROCEDURES SHALL
BE REVIEWED AFTER A SPILL AND ADJUSTED AS
NECESSARY TO PREVENT FUTURE SPILLS.
· ALL SPILLS SHALL BE CLEANED UP IMMEDIATELY UPON
DISCOVERY. ALL SPILLS SHALL BE REPORTED AS
REQUIRED BY LOCAL, STATE AND FEDERAL REGULATIONS.
· FOR SPILLS THAT IMPACT SURFACE WATER (LEAVE A
SHEEN ON SURFACE), THE NATIONAL RESPONSE CENTER
(NRC) SHALL BE CONTACTED WITHIN 24-HOURS AT
1-800-424-8802.
· FOR SPILLS OF AN UNKNOWN AMOUNT, THE NATIONAL
RESPONSE CENTER (NRC) SHALL BE CONTACTED WITHIN
24-HOURS AT 1-800-424-8802.
· FOR SPILLS GREATER THAN 25 GALLONS AND NO
SURFACE WATER IMPACTS, THE GEORGIA EPD SHALL BE
CONTACTED WITHIN 24-HOURS.
· FOR SPILLS LESS THAN 25 GALLONS AND NO SURFACE
WATER IMPACTS, THE SPILL SHALL BE CLEANED UP AND
LOCAL AGENCIES SHALL BE CONTACTED AS REQUIRED.
LIMIT OF DISTURBANCE 0.0 AC
ISSUED FOR CONSTRUCTION
DETAILS
C.B.
X.X.
CRUSHED STONE CONSTRUCTION EXIT
EXIT DIAGRAM
NOTES:
1. AVOID LOCATING ON STEEP SLOPES OR AT CURVES ON PUBLIC ROADS.
2. REMOVE ALL VEGETATION AND OTHER UNSUITABLE MATERIAL FROM THE
FOUNDATION AREA, GRADE, AND CROWN FOR POSITIVE DRAINAGE.
3. AGGREGATE SIZE SHALL BE IN ACCORDANCE WITH NATIONAL STONE
ASSOCIATION R-2 (1-1/2" TO 3-1/2" STONE).
4. GRAVEL PAD SHALL HAVE A MINIMUM THICKNESS OF 6".
5. PAD WIDTH SHALL BE EQUAL FULL WIDTH AT ALL POINTS OF VEHICULAR
EGRESS, BUT NO LESS THAN 20'-0".
6. A DIVERSION RIDGE SHOULD BE CONSTRUCTED WHEN GRADE TOWARD
PAVED AREA IS GREATER THAN 2%.
7. INSTALL PIPE UNDER THE ENTRANCE IF NEEDED TO MAINTAIN DRAINAGE
DITCHES.
8. WHEN WASHING IS REQUIRED, IT SHOULD BE DONE ON AN AREA STABILIZED
WITH CRUSHED STONE THAT DRAINS INTO AN APPROVED SEDIMENT TRAP OR
SEDIMENT BASIN (DIVERT ALL SURFACE RUNOFF AND DRAINAGE FROM THE
ENTRANCE TO A SEDIMENT CONTROL DEVICE).
9. WASHRACKS AND/OR TIRE WASHERS MAY BE REQUIRED DEPENDING ON
SCALE AND CIRCUMSTANCE. IF NECESSARY, WASHRACK DESIGN MAY
CONSIST OF ANY MATERIAL SUITABLE FOR TRUCK TRAFFIC THAT WILL
REMOVE MUD AND DIRT.
10. MAINTAIN AREA IN A WAY THAT PREVENTS TRACKING AND/OR FLOW OF MUD
ONTO PUBLIC RIGHTS-OF-WAYS. THIS MAY REQUIRE TOP DRESSING, REPAIR
AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT.
6" MIN
6" MIN
M
I
N
N
FLOW
FLOW
ENTRANCE ELEVATION
(IF NEEDED)
Co
SIDE VIEW
FLOW
M
I N
M
I N
2"
6'-0" MAX O.C.
FABRIC
TRENCH
M
I N
M
I N
FRONT VIEW
SILT FENCE - TYPE NON-SENSITIVESd1-Ns
NOTES:
1. USE STEEL OR WOOD POSTS OR AS SPECIFIED BY
THE EROSION, SEDIMENTATION, AND POLLUTION
CONTROL PLAN.
2. HEIGHT (*) IS TO BE SHOWN ON THE EROSION,
SEDIMENTATION, AND POLLUTION CONTROL PLAN.
ANCHOR SYSTEM AND LAYOUT DETAILS
W A
T E
R
F
L O
W
BRIDGE
WORK
DANGER BUOY
(BRIDGE WORK
EXAMPLE)
M
A X
NOTES:
1. SILT CURTAINS SHOULD BE ORIENTED PARALLEL TO THE DIRECTION OF
FLOW.
2. FOR SITES NOT SUBJECT TO HEAVY WAVE ACTION, THE CURTAIN HEIGHT
SHALL PROVIDE SUFFICIENT SLACK TO ALLOW THE TOP OF THE CURTAIN TO
RISE TO THE MAXIMUM EXPECTED HIGH-WATER LEVEL (INCLUDING WAVES)
WHILE THE BOTTOM MAINTAINS CONTINUOUS CONTACT WITH THE BOTTOM
OF THE WATER BODY. THE BOTTOM EDGE OF THE CURTAIN SHALL HAVE A
WEIGHT SYSTEM CAPABLE OF HOLDING THE BOTTOM OF THE CURTAIN DOWN
AND CONFORMING TO THE BOTTOM OF THE WATER BODY, SO AS TO
PROHIBIT ESCAPE OF TURBID WATER UNDER THE CURTAIN.
3. THE SILT CURTAIN SHALL BE LOCATED BEYOND THE LATERAL LIMITS OF THE
CONSTRUCTION SITE AND FIRMLY ANCHORED INTO PLACE (THE ALIGNMENT
SHOULD BE SET AS CLOSE TO THE WORK AREA AS POSSIBLE BUT NO SO
CLOSE AS TO BE DISRUPTED BY CONSTRUCTION EQUIPMENT).
4. DANGER BUOYS SHALL BE USED AS DIRECTED BY THE COAST GUARD OR
DNR PERMIT WHEN WORKING IN NAVIGABLE WATERS.
5. THE ENDS OF THE SILT CURTAIN SHALL BE SECURELY ANCHORED AND
KEYED IN ORDER TO ENCLOSE AREA.
6. A GENERAL RULE OF THUMB FOR ATTACHING ANCHORS IS TO DO SO AT 100'
INTERVALS (DEPENDING ON CURRENT AND TIDAL CONDITIONS, IT MAY BE
NECESSARY TO ANCHOR THE BARRIER ON BOTH SIDES-AS SHOWN).
Tc TURBIDITY CURTAIN SYSTEM
C-501
CHAIN LINK FENCE
TIE WIRES OR
HOG RINGS (TYP)
LINE POST
TENSION
WIRE
8'-0" MAX
8'-0" MAX
LINE POSTS TO BE EQUALLY
SPACED
GRADE
F A
B R
C
W
D
T H
BOTTOM OF FABRIC
LINE POST
CHAIN LINK FABRIC
(9-GAUGE, 2" MESH)
BRACE RAIL
TOP RAIL OR
TENSION WIRE
TIE WIRES OR
CLIPS (TYP)
TRUSS ROD
(3/8" MIN DIA)
CORNER, END
OR PULL POST
HOG RINGS (TYP)
CHAINLINK FENCE POST SURFACE MOUNT
BRACKET ANCHORED TO CONCRETE WITH
" DIA. WEDGE ANCHOR EMBED A MAXIMUM
OF 4"
3/4" CHAMFER (TYP)
EXISTING
CONCRETE
6"
DRILL 5/8" DIA HOLE AND INSTALL #4
DEFORMED DOWELS @ 18" O.C. EMBED 4"
INTO EXISTING SLAB WITH HILTI HY 200 OR
APPROVED EQUAL
3,000 PSI CONCRETE
FUEL-RESISTANT SEALANT ON
EACH SIDE
SCALE: NTS
6' REINFORCED CONCRETE CURB DETAIL
SCALE: NTS
BEAM REPLACEMENT DETAIL
SCALE: 3" = 1'-0"
12/15/21
40161800
ISSUED FOR CONSTRUCTION
ROOF JOIST REPAIR PLAN
CB
SK
A-101
TWO (2) NEW 1/2" X10" GALVANIZED
HEX BOLT W/ (2) WASHERS AND (1)
NUT EACH. USE EXISTING DRILLED
HOLES IN POSTS.
REPLACE DAMAGED DOUBLE
(2) 2x10 BEAM, PRESSURE
TREATED NO. 1 SOUTHERN
YELLOW PINE. BOARDS TO
BE SMOOTH TO LAY FLAT
AGAINST EACH OTHER
EXISTING 6X6 POST
NOTES:
1. ALL FASTENERS SHALL BE HOT DIP GALVANIZED.
2. CONTRACTOR TO SUPPORT ROOF DURING BEAM,
JOIST AND PURLIN REPLACEMENT.
3. DO NOT REUSE EXISTING MATERIALS. ALL
REPLACEMENT HARDWARE TO BE NEW.
4. ANY MATERIAL DAMAGED BY CONTRACTOR DURING
INSTALLATION SHALL BE REPLACED IN KIND WITH
NEW MATERIAL.
5. ALL WOOD FRAMING TO BE NAILED IN ACCORDANCE
WITH GEORGIA WOOD FRAMING CODE.
6. IN AREAS WHERE GRADE IS MORE THAN 4 FEET
LOWER THAN THE CONCRETE SURFACE, INSTALL
1-3/8" CHAIN LINK TOP RAIL OR
" COATED WIRE
CABLE AT 42" ABOVE WORKING SURFACE. CONNECT
TOP RAIL WITH WOOD TO STEEL POST ADAPTERS.
FOR CABLE INSTALLATION, DRILL
" HOLE IN POST
AND SECURE WITH CABLE TERMINALS AT END.
SECTION B
AREA OF DAMAGED ROOF
JOIST TO BE REPLACED
ROOF REPAIR PLAN VIEW
SCALE: 3/8" = 1'-0"
AREA OF DAMAGED ROOF
JOIST TO BE REPLACED
SECTION A
SCALE: 3/8" = 1'-0"
EXISTING METAL ROOFING
2X6 JOIST
EXISTING DIESEL TANK
EXISTING ROOF JOISTS
EXTERIOR FACE NORTH ELEVATION
24'-7"
14'-4"
A
SCALE: 3/8" = 1'-0"
1X2 PURLIN
(2) 2X10 BEAM
NEW (2) 2X10
BEAMS
- B
NEW (1) 1X2 PURLIN
NEW (3) 2X6 JOIST
(2) 2X10 BEAMS
6X6 POST
2X6 JOIST
6X6 POST
FALL
PROTECTION
SEE NOTE 6
1. CONTRACTOR TO REMOVE AND PROPERLY DRAIN AND
SALVAGED/SCRAPPED EXISTING DIESEL ENGINE
1. FIELD VERIFY EXACT LOCATIONS OF EXISTING EQUIPMENT.
2. FIELD COORDINATE WITH STRUCTURAL AND ELECTRICAL
DISCIPLINES PRIOR TO START OF WORK.
GENERAL NOTES
KEY NOTES
DEMOLITION PLAN
M.S.
S.W.
DEMOLITION PLAN
SCALE: 1/4" = 1'-0"
REMOVE EXISTING ENGINE,
ASSOCIATED PARTS
AND FUEL PIPING
REMOVE EXISTING PUMP
12/15/21
40161800
ISSUED FOR CONSTRUCTION
EXISTING BELT DRIVE
SCALE: NTS
EXISTING BELT DRIVE TO BE REMOVED
EXISTING PUMP TO BE REMOVED
DIESEL ENGINE TO BE REMOVED
EXISTING FENCE WILL BE REMOVED BY CLIENT PRIOR TO CONSTRUCTION
REMOVE EXISTING ENGINE
EXHAUST AND MUFFLER
M-101
FEET 1/4"=1'-0"
METERS 1:48
0 21 3
2 3
Ø24" OD
1. EXHAUST TO BE WRAPPED IN HIGH-TEMP DIESEL EXHAUST
WRAP - HD INFERNO WRAP MANUFACTURED BY
HEATSHIELD PRODUCTS. PROVIDE EXHAUST FLEX
CONNECTOR AT ENGINE.
2. SEE DETAIL SHEET M-501
3. ROUTE PIPING FITTED WITH TAPERED FLOOR BUMPERS,
TO APPROPRIATE COORDINATING INLETS AND OUTLET.
1. FIELD VERIFY EXACT LOCATIONS OF EXISTING EQUIPMENT.
2. FIELD COORDINATE WITH STRUCTURAL, CIVIL AND
ELECTRICAL DISCIPLINES PRIOR TO START OF WORK.
3. EXISTING FUEL TANK TO BE RELOCATED TO ALLOW 36" OF
CLEARANCE FROM ALL OTHER EQUIPMENT AND FENCING
ENCLOSING EQUIPMENT.
4. FUEL LINES TO BE FITTED WITH A SIPHON PREVENTION
DEVICE
5. ALL CHAINS AND HARDWARE HOLDING BELL END OF THE
PUMP TO BE STAINLESS STEEL 316
6. ALL BOLTS TO BE PAINTED WITH ANTICORROSION PAINT
7. FUEL LINES TO BE BLACK IRON PIPE
8. COORDINATE WITH MANUFACTURER TO RELOCATE DEF
TANK AS SEEN ON THE PLAN DRAWING.
9. ENGINE TO BE FITTED WITH EMERGENCY STOP SWITCH
10. EXISTING FUEL TANK EXTERIOR TO BE REPAINTED AND
RELABELED
11. 1' FUEL PIPE FLEX CONNECTION TO BE ADDED TO SUPPLY
AND RETURN LINES IN AND OUT OF THE ENGINE. PIPE
CONNECTION TO BE SB2 STAINLESS DOUBLE BRAIDED
METAL HOSE BY HOSECRAFT USA.
12. SEE SPECIFICATION SECTION 32 31 13 FOR CHAIN LINK
FENCE DETAILS
13. SEE SHEET C-501 FOR CURB AND FENCE DETAILS
GENERAL NOTES
KEY NOTES
SIDE VIEW
SCALE: 1/4" = 1'-0"
MECHANICAL NEW WORK PLAN
M.S.
S.W.
M-102
MWI MODEL NW324X24 ANGLE PUMP
RATED 18,000 GPM @15' TDH
PLAN VIEW
SCALE: 1/4" = 1'-0"
12/15/21
40161800
ISSUED FOR CONSTRUCTION
DESIGN BASED ON JOHN DEERE DIESEL ENGINE
EPA RATED TIER FOUR,
MODEL 6068HFC08
RATED AT 2200 RPMS
REBUILT MWI MODEL NW324X24
ANGLE PUMP
RATED 18,000 GPM @15' TDH
DE'RAN M200P RIGHT ANGLE GEAR DRIVE
WITH 9" EXTENSION
ENGINE MUFFLER AND EXHAUST TO BE ROUTED
AWAY FROM WORK AREA AND SUPPORTED BY CEILING.
STRUCTURE AND EXHAUST INSULATED TO PROTECT WOOD FROM EXCESS HEAT
T.O.C 194.5' EXISTING CONCRETE PAD
FEET 1/4"=1'-0"
METERS 1:48
0 21 3
2 3
RELOCATED DEF TANK TO BE MOUNTED TO CONCRETE PAD
6" CONTAINMENT CURB
2'-7
8"
48" DRIVE SHAFT
6' CHAIN LINK FENCE TO
CONTAIN DRIVE SHAFT
RELOCATED FUEL TANK
W16 I-BEAM TO BE BOLTED TO CONCRETE
SKID MOUNTED DIESEL ENGINE TO BE BOLTED TO I-BEAM
3'-3
8"
" BLACK IRON RETURN FUEL LINE TO BE RUN OVERHEAD AS HIGH AS PRACTICAL
" BLACK IRON SUPPLY FUEL LINE SUPPLIED
WITH SEALCOATING SKU-SCRF-PR-1 INSTALLED OVER LINE TO PREVENT TRIPPING
ROTATIONAL DIRECTION.
LEGEND
W16 I-BEAM SUPPORT STRUCTURE
MECHANICAL DETAILS AND
SCHEDULES
M.S.
S.W.
12/15/21
40161800
ISSUED FOR CONSTRUCTION
DIESEL ENGINE SCHEDULE
TAG Model MANUFACTURER HP
FUEL INLET
TEMP(F)
FUEL SPECIFIC GRAVITY @
60F RATED TORQUE
DE-1 JOHN DEERE
6068HFC08 FLINT POWER 156 @ 2200 rpm 104 0.853 373 lb-ft
Notes:
1. Engine to rotate counter clockwise
REBUILT PUMP SCHEDULE
TAG Model MANUFACTURER
DESIGN
CAPACITY
(GPM)
DESIGN TDH (FT)
P-1 NW324X24 MWI PUMPS 18,000 15
Notes:
1. Pump to be rebuilt by manufacturer, MWI Pumps
2. Cordinate pump to engine rotation
PUMP DRIVE SCHEDULE
TAG MODEL MANUFACTURER WT(LBS) PUMP SPEED RATIO HP MIN HP MAX
PD-1 M200P DE'RAN GEAR
INC. 645 5:02 96 145
Notes:
1. Gear head to be customized with an additional 9" extension
2. Gear head to rotate counter clockwise
N.T.S.
FLOOR PIPE SUPPORT
M-501
FEET 1/4"=1'-0"
METERS 1:48
0 21 3
2 3
SCALE: 3/4" = 1'-0"
ENGINE SUPPORT
TOP OF EXISTING CONCRETE PAD
W16 I-BEAM ATTACHED TO CONCRETE PAD
DIESEL ENGINE MOUNTED TO SKID
ANCHOR BOLT (TYP.)
TAPERED FLOOR RAMP/BUMPER
USE SEALCOATING SKU-SCRF-PR-1
CUT TO LENGTH TO PREVENT TRIPPING
N.T.S.
MUFFLER INSULATION
EXHAUST
EXHAUST INSULATION
U-BOLT, SEE DETAIL 3
WOOD HEADER
INSULATION FOR WOOD HEADER
WOOD HEADER
STD. U-BOLT PIPE (TYP.)
N.T.S.
PIPE SUPPORT
N.T.S.
DISCHARGE PIPE OUTFALL
ATTACH TEMPORARY PRESSURE GAGE
NOTE: COMPLETE A PRESSURE
PRE-TEST MEASUREMENT BEFORE
REBUILD IS COMPLETE AND A
POST-TEST FOLLOWING THE PUMP
REBUILD.
WIRING DEVICES
G
G
SYMBOL DESCRIPTION
GROUNDING
SYMBOL DESCRIPTION
FIXTURES & COMPONENTS
SYMBOL DESCRIPTION
ELECTRICAL LEGEND
G
G
J J
JUNCTION BOX, SIZED PER NEC, CAST, WEATHERPROOF RATED.
DPST (DOUBLE POLE SINGLE THROW) LIGHT SWITCH, WEATHER PROOF, 120V, 15AMP.
#2/0 STRANDED BARE (COPPER OR ALUMINUM) WIRE.
ROUTED ABOVE GRADE.
WELDED CONNECTION. GROUND CONDUCTOR TO STEEL BY
EXOTHERMIC WELD. SEE TYPICAL DETAIL.
GROUND ROD; 1/2" X 8' TYPE
18" LIGHTNING PROTECTION AIR TERMINAL
CABLE TO CABLE CONNECTION WITH EXOTHERMIC WELD
EXPOSED CONDUIT
WALL MOUNTED LIGHT FIXTURE
SURFACE MOUNTED LIGHT FIXTURE
12/15/21
40161800
ISSUED FOR CONSTRUCTION
ELECTRICAL GENERAL NOTES, LEGEND
AND ABBREVIATIONS
SES
MAG
WALL MOUNTED SOLAR PANEL
WC
E-001
G
#2/0 STRANDED BARE COPPER GROUND GRID WIRE.
ROUTED 2'-6" BELOW FINISHED GRADE.
TOP OF CONCRETE
UNLESS NOTED OTHERWISE
RIGID GALVANIZED STEEL CONDUIT
FURNISHED BY OTHERS
FURNISHED WITH EQUIPMENT
CKT CIRCUIT
DIAMETER
EMPTY CONDUIT
DRAWING(S)DWG
EC
DIA
CATALOG
CONDUIT
AMPERES
ABOVE FINISHED FLOOR
AMERICAN WIRE GAUGE
BOTTOM OF STEEL
BOTTOM OF FIXTURE
ABOVE FINISHED GRADE
CAT
BOS
BOF
AWG
C
A, AMP
AFF
AFG
FBO
FWE
HP
H
GND
HORSEPOWER
GROUND
HEIGHT
EQUIP
EXIST
EE
EL
EQUIPMENT
EXISTING
ENERGY EFFICIENT
ELEVATION
NOT APPLICABLE
NATIONAL ELECTRIC CODE
RECEPT
REQD
N/A
NTS
RECEPTACLE
NOT TO SCALE
REQUIRED
ABBREVIATIONS
LTG
NEC
MTG
NF
MTD
JB
LIGHTING
MOUNTED
MOUNTING
NON FUSED
JUNCTION BOX
WP
W
WEATHERPROOF
WIDTH
UG
UNO
V
TYP
TOC
RM
RGS
VOLT(S)
TYPICAL
UNDERGROUND
ROOM
GROUND
ROD
STEEL
RETAINING
WALL
WC
3'
3'
GROUND
ROD
WC
GGGGG
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
GROUND
GRID (TYP.)
G
G
FROM
SLAB
FROM
SLAB
SLAB
SLAB
F R
O M
S L A
B
COPPER WIRE
(TYP.)
G
G
5 6
G
1. PROVIDE AND INSTALL #2/0 STRANDED BARE COPPER GROUND
WIRE.
2. PROVIDE AND INSTALL 8' LONG x 1/2" DIAMETER GROUND ROD
-SEE DETAIL ON SHEET E-501. ERICO PART# 611380 OR EQUAL.
3. BOND AND GROUND EXISTING FENCE TO NEW GROUND GRID.
SEE FENCE GROUNDING DETAILS ON SHEET E-501.
4. PROVIDE AND INSTALL GROUND GRID AROUND CONCRETE
FOUNDATION AS SHOWN 2'-6" BELOW GRADE.
5. LIGHTNING PROTECTION DOWNCOMER CONTINUES ON SHEET
E-103.
6. PROVIDE AND INSTALL BI-METALLIC SPLICE TO JOIN ALUMINUM
LIGHTNING PROTECTION DOWNCOMER WITH COPPER GROUND
WIRE. ERICO PART# LPA598 OR EQUAL.
7. EXOTHERMICALLY WELD GROUNDING CONDUCTOR TO STEEL
RETAINING WALL -SEE DETAIL SHEET E-501.
KEY NOTES
12/15/21
40161800
ISSUED FOR CONSTRUCTION
GROUNDING
PLAN
SES
MAG
1. FIELD VERIFY EXACT LOCATIONS OF EXISTING EQUIPMENT.
2. FIELD COORDINATE WITH STRUCTURAL AND MECHANICAL
DISCIPLINES PRIOR TO START OF WORK.
GENERAL NOTES
GROUNDING PLAN
SCALE: 1/2" = 1'-0"
E-101
CENTIMETERS 1:24
FEET 1/2"=1'-0"
0 50
0 1 2 3 4
L2
L2
SOLAR PANEL
MOUNTED ON ROOF
L1
EL. 8'-0"
ENGINE
BATTERY
SOLAR PANEL
MOUNTED ON ROOF
MARINE
BATTERY
1 L2
L21
5'
FROM SLAB
F R
O
S
L A
B
F R
O
S
L A
B
5'
FROM SLAB
LIGHTING FIXTURE SCHEDULE
VOLTAGEMOUNTING
CEILING
& CATALOG NO.
MANUFACTURER
NOTES
12/15/21
40161800
ISSUED FOR CONSTRUCTION
ELECTRICAL POWER AND
LIGHTING PLAN
SES
MAG
12VDC
LITHONIA LIGHTING
CAT# VC150I M12
L2
L1
POWER AND LIGHTING PLAN
SCALE: 1/2" = 1'-0"
FIXTURE
TYPE
1. PROVIDE AND INSTALL 12VDC LIGHT FIXTURE AS NOTED -SEE LIGHTING FIXTURE
SCHEDULE. CONNECT TO SOLAR LIGHTING CIRCUIT WITH 2#12AWG -3/4"C VIA
LIGHTING CONTROL SWITCH SECONDARY -SEE KEY NOTE 6.
2. PROVIDE AND INSTALL 12VDC 100AH MARINE BATTERY AND RACK FOR SOLAR
LIGHTING POWER. RENOGY PART# RBT100GEL12-US; ION STORMPRO METAL STAND
PART# EM020156 -OR EQUALS.
3. NEW 12VDC ENGINE BATTERY PROVIDED BY ENGINE MANUFACTURER.
4. PROVIDE AND INSTALL SURFACE MOUNTED 50W SOLAR PANEL AND CHARGER
CONTROLLER KIT PER MANUFACTURER'S INSTRUCTIONS. PROVIDE ADDITIONAL
WIRING AS REQUIRED TO INSTALL DESIGN SHOWN. ROUTE ALL WIRING IN 3/4"
CONDUIT. RENOGY PART# RKIT50DST-US OR EQUAL.
5. PROVIDE AND INSTALL WIRE MESH AROUND SOLAR PANEL TO PREVENT BIRDS FROM
NESTING BETWEEN ROOF AND SOLAR PANEL. BIRD-B-GONE PART# SLRMESH-100 OR
EQUAL.
6. FOR LIGHTING CONTROL, PROVIDE AND INSTALL 20A DPST (DOUBLE POLE SINGLE
THROW) SWITCH IN A WEATHERPROOF BOX AT +48" ABOVE GRADE ON WOOD POLE AS
SHOWN. CONNECT SWITCH PRIMARY TO +VDC AND -VDC BATTERY POSTS WITH
2#12AWG -3/4"C.
7. FOR SOLAR PANEL DISCONNECT, PROVIDE AND INSTALL 20A DPST (DOUBLE POLE
SINGLE THROW) SWITCH IN A WEATHERPROOF BOX AT +48" ABOVE GRADE ON WOOD
POLE AS SHOWN. CONNECT SWITCH SECONDARY TO +VDC AND -VDC BATTERY
POSTS WITH 2#12AWG -3/4"C. COORDINATE WIRING FROM SWITCH PRIMARY TO
SOLAR PANEL WITH MANUFACTURER WIRING INSTRUCTIONS.
8. LIGHTING CONTROL SWITCH TO BE LOCATED AT THE EXTERIOR OF PUMP SHED.
REWORK FENCE AT POLE AS REQUIRED TO MAKE WEATHERPROOF BOX AND
LIGHTING CONTROL SWITCH ACCESSIBLE FROM SHED ENTRANCE.
9. PROVIDE 15A FUSE INLINE WITH +VDC WIRE BETWEEN BATTERY AND SOLAR
CHARGER. PLACE FUSE HOLDER AS CLOSE TO +VDC BATTERY POST AS POSSIBLE.
RENOGY PART RNG-CNCT-FUSE15-US. PROVIDE WITH 2 SPARE 15A FUSES PER
BATTERY.
KEY NOTES
1. FIELD VERIFY EXACT LOCATIONS OF EXISTING EQUIPMENT.
2. FIELD COORDINATE WITH STRUCTURAL AND MECHANICAL
DISCIPLINES PRIOR TO START OF WORK.
GENERAL NOTES
E-102
12VDC
WALL
MOUNTED
DESCRIPTION
PROVIDE WITH 12VDC "LARSON ELECTRIC"
ROUGH SERVICE LED BULB, 10 WATT, 3000K, E26 BASE
CAT# LED-A19-10-E26-1224-30K-12VDC
PROVIDE WITH 12VDC "LARSON ELECTRIC"
ROUGH SERVICE LED BULB, 10 WATT, 3000K, E26 BASE
CAT# LED-A19-10-E26-1224-30K-12VDC
LITHONIA LIGHTING
CAT# VW150I M12
UTILITY VAPOR TIGHT
ALUMINUM FIXTURE WITH GRAY
FINISH AND PRISMATIC GLOBE.
WET LOCATION
UTILITY VAPOR TIGHT
ALUMINUM FIXTURE WITH GRAY
FINISH AND PRISMATIC GLOBE.
WET LOCATION
CENTIMETERS 1:24
FEET 1/2"=1'-0"
0 50
0 1 2 3 4
G
G
1'
1'
GG G
G GG G
G
G
G
G
G
G
G
G
PURLIN
(TYP.)
ROOF LINE
FROM
ROOF
FROM
ROOF
G
G
ALUMINUM WIRE
(TYP.)
G
G
G
G
TYP.
TYP.
12/15/21
40161800
ISSUED FOR CONSTRUCTION
LIGHTNING PROTECTION
ROOF PLAN
SES
MAG
1. FIELD VERIFY EXACT LOCATIONS OF EXISTING EQUIPMENT.
2. FIELD COORDINATE WITH STRUCTURAL AND MECHANICAL
DISCIPLINES PRIOR TO START OF WORK.
3. ALL LIGHTNING PROTECTION PRODUCTS, INCLUDING
GROUND WIRE SHOWN ON ROOF, SHALL BE ALUMINUM TO
PREVENT CORROSION WITH EXISTING GALVANIZED STEEL
ROOF SHINGLES.
4. USE 1/4" X 3" GASKETED STAINLESS STEEL HEX BOLTS AND
SILICON SEALANT AT ALL ROOF PENETRATIONS.
GENERAL NOTES
LIGHTNING PROTECTION PLAN (ROOF)
SCALE: 1/2" = 1'-0"
1. PROVIDE AND INSTALL #2/0, 19-STRAND, BARE ALUMINUM WIRE.
2. PROVIDE AND INSTALL 18" HEIGHT x 1/2" DIAMETER BLUNT
TYPE ALUMINUM LIGHTNING PROTECTION AIR TERMINAL WITH
ALUMINUM BASE ON ROOF. MOUNT BASE WITH SS HEX BOLT
AND SEALANT. ERICO PART# LPA224ST & LPA30212 OR
EQUALS.
3. LIGHTNING PROTECTION DOWNCOMER CONTINUES DOWN TO
GROUND GRID AS SHOWN ON SHEET E-101.
4. INSTALL ALUMINUM WIRE AND AIR TERMINALS CENTERED ON
PURLIN AT OUTER PERIMETER OF ROOF. ANCHOR WIRE WITH
ALUMINUM WIRE CLIPS ALONG PURLIN AT 3' MAX SPACING.
MOUNT CLIPS WITH SS HEX BOLT AND SEALANT.
5. PROVIDE AND INSTALL ALUMINUM WIRE CLIPS AT EACH PURLIN
INTERSECTION. MOUNT CLIPS WITH SS HEX BOLT AND
SEALANT.
KEY NOTES
E-103
CENTIMETERS 1:24
FEET 1/2"=1'-0"
0 50
0 1 2 3 4
SCALE: N.T.S.
FENCE GROUNDING
12/15/21
40161800
ISSUED FOR CONSTRUCTION
ELECTRICAL DETAILS
SES
MAG
ELEVATION AT
INTERMEDIATE
POST
ELEVATION AT
GATE POST
TO GROUND GRID
2'-6" MIN. BELOW GRADE
CONCRETE
ENCASEMENT
#2/0 BARE STRANDED
COPPER
BURNDY CONNECTOR
TYPE GK
BURNDY TYPE
B4D12 FLEXIBLE
COPPER BRAID
BURNDY CONNECTOR
TYPE GD
#2/0 BARE STRANDED
COPPER
BURNDY CONNECTOR
TYPE GAR U-BOLTS
SHALL PASS AROUND
POST AND GRIP ONE
OR MORE FENCE
STRANDS
BURNDY
CONNECTOR TYPE
GAR
BURNDY CONNECTOR
TYPE KS
GROUNDING NOTES
1. THE GROUNDING GRID SHALL CONSIST OF SOFT OR MEDIUM
DRAWN BARE #2/0 STRANDED COPPER CABLE.
2. DIRECT BURIED GROUNDING CABLE SHALL BE A MINIMUM OF
2'-6" BELOW FINISHED GRADE. BURIED CONDUCTORS SHALL BE
"LAID SLACK" IN THE TRENCH TO REDUCE BREAKAGE BY
FUTURE DIG-INS.
3. CABLE TO CABLE AND CABLE TO GROUND ROD CONNECTIONS
SHALL BE BY EXOTHERMIC WELD.
4. EQUIPMENT GROUNDING CONNECTIONS SHALL BE MADE WITH
SOLDERLESS MECHANICAL OR COMPRESSION LUGS AND
SHALL BE ACCESSIBLE.
6. THE PART NUMBERS SHOWN ON THIS DRAWING ARE FOR THE
PURPOSE OF SHOWING DESIGN INTENT ONLY. THE USE OF
COMPONENTS OF EQUAL QUALITY IS ACCEPTABLE.
5. BOND ALL EXISTING FENCE MESH, POSTS, AND GATES USING
BARE #2/0 STRANDED COPPER WIRE AROUND WOODEN POLES,
CORNERS, AND ALL SEPARATIONS.
M I N
GROUND GRADE
SEE PLAN
DWG. FOR
GROUND
CABLE SIZE
AND
LOCATION
CABLE TO
GROUND ROD
THERMAL
WELD
CADWELD
TYPE GT
STEEL PLATE 1/4" X 2"
LENGTH REQ'D WELDED
TO METAL RETAINING
WALL AT (2) CONNECTION
POINTS.
#2/0 CU. GROUND WIRE TO
LIGHTNING PROTECTION
DOWNCOMER.
COMPRESSION LUG GROUNDING
CONNECTION (2-STAINLESS
STEEL BOLTS)
SCALE: N.T.S.
GROUND ROD
SCALE: N.T.S.
RETAINING WALL GROUNDING
RETAINING
WALL
SCALE: N.T.S.
FENCE GROUNDING AT WOOD POLE
ELEVATION AT
WOOD POST
TO GROUND GRID
2'-6" MIN. BELOW GRADE
#2/0 BARE STRANDED
COPPER
BURNDY
CONNECTOR TYPE
GAR
BURNDY CONNECTOR
TYPE KS
1/2" X 8'-0"
COPPERCLAD
STEEL
GROUND ROD
#2/0 BARE STRANDED
COPPER
BURNDY CONNECTOR
TYPE KS
E-501
| Sheets and Views |
| G-001 COVER SHEET |
| C-100 EXISTING SITE CONDITIONS |
| C-101 OVERALL SITE & EROSION CONTROL PLAN |
| C-102 EROSION AND SEDIMENTATION CONTROL NOTES |
| C-501 DETAILS |
| A-101 ROOF JOIST REPAIR PLAN |
| M-101 MECHANICAL DEMOLITION AND NEW WORK PLAN |
| M-102 MECHANICAL NEW WORK PLAN |
| M-501 MECHANICAL DETAILS AND SCHEDULES |
| E-001 ELECTRICAL GENERAL NOTES, LEGEND AND ABBREVIATIONS |
| E-101 GROUNDING AND LIGHTNING PROTECTION PLAN |
| E-102 ELECTRICAL POWER AND LIGHTING PLAN |
| E-103 LIGHTNING PROTECTION ROOF PLAN |
| E-501 ELECTRICAL DETAILS |