About this file

This is a key personnel resume supplemental information template for architect-engineer services in support of a Naval Facilities Engineering Systems Command (NAVFAC) market research solicitation. The template requires submission of detailed resumes for up to five key personnel assigned to the contract, with each personnel entry documenting their specific role, relevant project experience, and qualifications.

For each key personnel member, the template mandates documentation of project title and location, client and project owner information, point of contact details, and the individual's specific role in the project. Respondents must indicate whether projects involved new construction or repair work, confirm construction costs of $30 million or less (excluding architect-engineer design fees), and identify applicable design and engineering services including design-bid-build, NAVFAC design-build, RFP engineering studies, design-build, and design-operations-repair services. The template also requires identification of relevant project types from a comprehensive list that includes roadways, water treatment systems, sewage collection and treatment systems, drainage systems, parking, pavements, water and sewage pump stations, erosion control, airfields, water distribution systems, and slope stabilization. Respondents may submit information for up to five relevant projects per key personnel member. The solicitation response deadline is Thursday, August 6, 2026 at 12:00 p.m. Hawaii Standard Time (HST).

View the file

Other files

File Type Posted
Attach (2)_SpecializedExperience.docx DOCX document
N62478CON33FY2601.pdf PDF
Attach (1)_Firm Info.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT (B)

KEY PERSONNEL RESUME SUPPLEMENTAL INFORMATION

NAME
ROLE IN THIS CONTRACT (NOT TITLE IN COMPANY)
RELEVANT PROJECT
1
PROJECT TITLE AND LOCATION (CITY & STATE)
CLIENT AND PROJECT OWNER
POINT OF CONTACT / CONTACT INFORMATION

SPECIFIC ROLE IN PROJECT

NEW CONSTRUCTION (NC)

OR REPAIR (R)

CONSTRUCTION COST $30M OR LESS

(NOT AE DESIGN FEE):

SPECIFIED DESIGN/ENGINEERING SERVICE (CHECK ALL THAT APPLIES)

DESIGN BID BUILD

NAVFAC D-B RFP

ENGINEERING STUDIES

DESIGN-BUILD

DOR

RELEVANT PROJECTS TYPES (CHECK ALL THAT APPLIES):

ROADWAYS

WATER TREATMENT SYSTEMS

SEWAGE COLLECTION SYSTEMSS

DRAINAGE SYSTEMS

PARKING PAVEMENTS

WATER PUMP STATIONS

SEWAGE PUMP STATIONS

EROSION CONTROL

AIRFIELDS

WATER DISTRIBUTIONS SYSTEMS

SEWAGE TREATMENT SYSTEMS

SLOPE STABILIZATION

RELEVANT PROJECT
2
PROJECT TITLE AND LOCATION (CITY & STATE)
CLIENT AND PROJECT OWNER
POINT OF CONTACT / CONTACT INFORMATION

SPECIFIC ROLE IN PROJECT

NEW CONSTRUCTION (NC)

CONSTRUCTION COST $30M OR LESS

SPECIFIED DESIGN/ENGINEERING SERVICE (CHECK ALL THAT APPLIES)

DESIGN BID BUILD

NAVFAC D-B RFP

ENGINEERING STUDIES

DESIGN-BUILD

RELEVANT PROJECTS TYPES (CHECK ALL THAT APPLIES):

ROADWAYS

WATER TREATMENT SYSTEMS

SEWAGE COLLECTION SYSTEMSS

DRAINAGE SYSTEMS

PARKING PAVEMENTS

WATER PUMP STATIONS

SEWAGE PUMP STATIONS

EROSION CONTROL

AIRFIELDS

WATER DISTRIBUTIONS SYSTEMS

SEWAGE TREATMENT SYSTEMS

SLOPE STABILIZATION

RELEVANT PROJECT
3
PROJECT TITLE AND LOCATION (CITY & STATE)
CLIENT AND PROJECT OWNER
POINT OF CONTACT / CONTACT INFORMATION

SPECIFIC ROLE IN PROJECT

NEW CONSTRUCTION (NC)

CONSTRUCTION COST $30M OR LESS

SPECIFIED DESIGN/ENGINEERING SERVICE (CHECK ALL THAT APPLIES)

DESIGN BID BUILD

NAVFAC D-B RFP

ENGINEERING STUDIES

DESIGN-BUILD

RELEVANT PROJECTS TYPES (CHECK ALL THAT APPLIES):

ROADWAYS

WATER TREATMENT SYSTEMS

SEWAGE COLLECTION SYSTEMSS

DRAINAGE SYSTEMS

PARKING PAVEMENTS

WATER PUMP STATIONS

SEWAGE PUMP STATIONS

EROSION CONTROL

AIRFIELDS

WATER DISTRIBUTIONS SYSTEMS

SEWAGE TREATMENT SYSTEMS

SLOPE STABILIZATION

RELEVANT PROJECT
4
PROJECT TITLE AND LOCATION (CITY & STATE)
CLIENT AND PROJECT OWNER
POINT OF CONTACT / CONTACT INFORMATION

SPECIFIC ROLE IN PROJECT

NEW CONSTRUCTION (NC)

CONSTRUCTION COST $30M OR LESS

SPECIFIED DESIGN/ENGINEERING SERVICE (CHECK ALL THAT APPLIES)

DESIGN BID BUILD

NAVFAC D-B RFP

ENGINEERING STUDIES

DESIGN-BUILD

RELEVANT PROJECTS TYPES (CHECK ALL THAT APPLIES):

ROADWAYS

WATER TREATMENT SYSTEMS

SEWAGE COLLECTION SYSTEMSS

DRAINAGE SYSTEMS

PARKING PAVEMENTS

WATER PUMP STATIONS

SEWAGE PUMP STATIONS

EROSION CONTROL

AIRFIELDS

WATER DISTRIBUTIONS SYSTEMS

SEWAGE TREATMENT SYSTEMS

SLOPE STABILIZATION

RELEVANT PROJECT
5
PROJECT TITLE AND LOCATION (CITY & STATE)
CLIENT AND PROJECT OWNER
POINT OF CONTACT / CONTACT INFORMATION

SPECIFIC ROLE IN PROJECT

NEW CONSTRUCTION (NC)

CONSTRUCTION COST $30M OR LESS

SPECIFIED DESIGN/ENGINEERING SERVICE (CHECK ALL THAT APPLIES)

DESIGN BID BUILD

NAVFAC D-B RFP

ENGINEERING STUDIES

DESIGN-BUILD

RELEVANT PROJECTS TYPES (CHECK ALL THAT APPLIES):

ROADWAYS

WATER TREATMENT SYSTEMS

SEWAGE COLLECTION SYSTEMSS

DRAINAGE SYSTEMS

PARKING PAVEMENTS

WATER PUMP STATIONS

SEWAGE PUMP STATIONS

EROSION CONTROL

AIRFIELDS

WATER DISTRIBUTIONS SYSTEMS

SEWAGE TREATMENT SYSTEMS

SLOPE STABILIZATION

File details come from the government source that posted it. Updated .