ATTACH_3_-_BID_SCHEDULE.pdf

PDF 133 KB Posted

Attached to
Project WA-22-004, Electric and Melmont Mines, Car
Solicitation number
140S0323B0003
Issued by

About this file

This document is a bid schedule for solicitation number 140S0323B0003 from the Department of the Interior Office of Surface Mining Reclamation and Enforcement for project WA-22-004 at the Electric and Melmont Mines in Carbonado, Washington. The bid schedule outlines 190 line items across three mine sites (CARB-05, CARB-06, and MM-01) for mobilization, site preparation, tree removal, fencing, polyurethane foam installation, concrete work, monument and hazard sign placement, demobilization, and site restoration. Bidders are to provide unit costs for each line item as well as extended costs. The total bid price will be evaluated for award of a contract to perform reclamation work at the three mine sites in Carbonado, Washington.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IFB 140S0323B0003 - Project WA-22-004, Electric and Melmont Mines, Carbonado Washington

Bid Schedule – Electric and Melmont Mines

Item Quantity Unit Unit Cost Cost

010) Mobilization, Site Preparation, and Site Access -

CARB-05

1 LS

020) Tree Removal and Scaling - CARB-05 1 LS

030) High Tension Wire Fence - CARB-05 300 LF

040) Polyurethane Foam (PUF) - CARB-05 51 Bag Set

050) Steel Mesh Reinforced Concrete Veneer - CARB-05 30 CF

060) Monument and Hazard Sign Placement - CARB-05 1 LS

070) Demobilization and Site Restoration - CARB-05 1 LS

CARB-05 Total

080) Mobilization, Site Preparation, Site Access - CARB-

1 LS

090) Excavation and Grading - CARB-06 1 LS

100) Polyurethane Foam (PUF) - CARB-06 9 Bag Set

110) Steel Mesh Reinforced Concrete Veneer - CARB-06 35 CF

120) Monument and Hazard Sign Placement - CARB-06 1 LS

130) Demobilization and Site Restoration - CARB-06 1 LS

CARB-06 Total

140) Mobilization, Site Preparation, and Site Access -

MM-01

1 LS

150) Excavation and Grading - MM-01 1 LS

160) Polyurethane Foam - MM-01 6 Bag Set

170) Steel Mesh Reinforced Concrete Veneer - MM-01 5 CF

180) Monument and Hazard Sign Placement - MM-01 1 LS

190) Demobilization and Site Restoration - MM-01 1 LS

MM-01 Total

GRAND TOTAL