PNSY CAT 3 PNSYCAT3
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 14 00.00 22 WORK RESTRICTIONS (PWD ME) [PNSY PROJECTS]
01 35 26.00 22 GOVERNMENTAL SAFETY REQUIREMENTS (PWD ME)
01 57 19.00 22 TEMPORARY ENVIRONMENTAL CONTROLS - PORTSMOUTH NAVAL
SHIPYARD (PWD ME)
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SECTION 01 14 00.00 22
WORK RESTRICTIONS (PWD ME) [PNSY PROJECTS]
6/2019
PART 1 GENERAL
[This specification applies to all Design-Bid-Build and Design-Build projects located on the Portsmouth Naval Shipyard.]
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 241 (2009) Standard for Safeguarding Construction, Alteration, and Demolition Operations
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
List of Contact Personnel; G
1.3 SPECIAL SCHEDULING REQUIREMENTS (PNSY)
a. The facility will remain in operation during the entire construction period. The Contractor shall conduct his/her operations so as to cause the least possible interference with normal operations of the Portsmouth Naval Shipyard.
b. Permission to interrupt any Portsmouth Naval Shipyard roads, crane rail, railroads, and/or utility services shall be submitted to the Contracting Officer in writing a minimum of 15 calendar days prior to the desired date of interruption.
1.4 CONTRACTOR ACCESS AND USE OF PREMISES (PNSY)
Notify the Contracting Officer 30 days in advance for any wide loads. The Contractor shall contact the Contracting Officer to determine if there are other access limitations at the Portsmouth Naval Shipyard.
Ensure that Contractor personnel employed on the Portsmouth Naval Shipyard become familiar with and obey Portsmouth Naval Shipyard regulations. Keep
SECTION 01 14 00.00 22 Page 1 within the limits of the work and avenues of ingress and egress. Do not enter restricted areas unless required to do so and until cleared for such entry.
All Contractors' equipment shall be conspicuously marked with company signage for identification.
1.4.1 Subcontractors and Personnel Contacts
Furnish a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.4.2 Identification Badges and Installation Access
a. Application for and use of badges will be as directed.
The Contractor shall contact the Facility's Installation Visitor Control Center to obtain the appropriate credentials for access to the Facility.
Additional information may be found in Attachment A and at the Commander, Navy Installations Command website at https://www.cnic.navy.mil/om/dbids.html.
All Contractor personnel without appropriate credentials, will need two forms of approved identification for access to the Installation.
See Attachment B for the list of acceptable identification documents.
b. One-Day Passes: The Contractor's personnel will have to obtain daily passes, be subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government will not be responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred.
1.5 STATION REGULATIONS
1.5.1 Radiological Indoctrination (PNSY)
All Contractors working at the Portsmouth Naval Shipyard are required to view a 15 minute video briefing on radiological postings and controls in use at the Portsmouth Naval Shipyard. The briefing will be given at the Pass Office prior to issue of security badges and vehicle passes.
Any Contractor employee who disregards, alters, moves, or otherwise tampers with a radiological posting, or who disobeys a radiological instruction, may be removed from the Portsmouth Naval Shipyard and denied future access.
1.5.2 Yellow Materials (PNSY)
Contractors working at the Portsmouth Naval Shipyard shall not use yellow or orange-yellow colored materials for the following purposes: Protective clothing, hoods, sheeting, tarpaulins, polyethylene bottles or other containers, tapes, bags, banding, identification marks on tools, boundary markers, ribbons, vent ducts, temporary erosion control devices, survey ribbon, etc. The Contractor shall contact the Contracting Officer for a list of yellow items that have been approved for use on the Shipyard.
Contractor generated yellow colored waste shall be disposed of by the Contractor off-yard. Shipyard refuse containers shall not be used for
SECTION 01 14 00.00 22 Page 2 disposal of yellow colored waste materials. Yellow colored items such as described above are of special significance within the Shipyard and are subject to strict controls. Yellow colored contract generated debris shall be bagged in non-translucent containers, and promptly removed from Portsmouth Naval Shipyard.
1.5.3 Smoke Detectors (PNSY)
Ionization type smoke detectors and duct smoke detectors contain radioactive material and are prohibited from use on the Portsmouth Naval Shipyard. Photoelectric smoke detectors are the only type authorized for use on the Shipyard.
1.5.4 Radioactive Sources (PNSY)
All contracts involving radiation generating devices shall conform to the requirements listed in Section 01 35 26.00 22 GOVERNMENTAL SAFETY REQUIREMENTS (PWD ME) and U.S. Army Corps of Engineers Safety Manual EM 385-1-1. All requirements are to be submitted to the Contracting Officer at least 14 days prior to commencement of operations involving radiation generating devices. A requirements checklist will be provided by NAVFAC (COTs) Contractor Oversight Technician.
1.5.5 Laser Control
Contractor shall comply with laser safety requirements under 21 CFR 1040 and ANSI 2136.1-1986 for any work under this contract utilizing lasers.
1.5.6 Energy Conservation
In cooperation with Government representatives, the Contractor shall participate in an active program directed toward the efficient use of energy.
1.5.7 Fire Prevention (PNSY)
Contractor shall familiarize and require all their employees to become familiar with fire prevention regulations within the Portsmouth Naval Shipyard to include the proper method of turning in a fire alarm, storage of flammable and combustible materials and control of combustible waste and trash. Any HOT WORK (welding, burning, grinding, cutting, etc.) requires a HOT WORK PERMIT prior to commencing such work. This permit is obtained from the Portsmouth Naval Shipyard's Fire Department via the Contracting Officer.
1.5.8 Identification and Control of Seamed (Welded) Pipe and Tubing (PNSY)
Submarine Safety regulations prohibit the use of seamed (welded) pipe or tubing within the Portsmouth Naval Shipyard, unless such pipe or tubing is identified and controlled so as to prevent its inadvertent substitution for seamless pipe or tubing. The following requirements apply and will be strictly enforced:
Any seamed (welded) copper-nickel, carbon steel, carbon-moly steel, stainless steel, nickel-chromium-iron alloy, or nickel-copper pipe or tubing the Contractor intends to use on the Shipyard shall be identified in the following manner PRIOR TO DELIVERY TO THE SHIPYARD:
Use a lead-free white paint, to mark a 24-inch long stripe and the word
SECTION 01 14 00.00 22 Page 3
"welded" alternately along the entire length of the pipe or tubing. Apply a one-half inch wide stripe unless the size of the pipe or tubing requires use of a narrower stripe.
Contractor shall maintain positive control over seamed pipe or tubing until worked into place or removed from the Shipyard.
Seamless pipe or tubing may be substituted for any seamed (welded) pipe or tubing specified in the technical specifications.
The above requirements do not apply to square or rectangular tubing, copper or brass pipe or tubing, they also do not apply to piping or tubing which has been incorporated into equipment or fixtures prior to delivery to the Shipyard.
1.5.9 Pesticide and Herbicide Control
Contractor shall not apply pesticides nor herbicides unless specifically required by this contract. Where application of pesticides or herbicides is required, provide the submittals required by the specification and obtain written approval prior to any application. Contracting Officer will require review and approval of pesticides or herbicides submittals.
1.5.10 Smoking Policy
In accordance with NAVFAC policy, smoking is prohibited inside all buildings and other facilities except those areas specifically identified as smoking areas (e.g., smoking shelters). Smoking is not permitted within 20 feet of air intakes, doorways or windows.
1.5.11 Portal Crane Clearance Zone (PNSY)
The Contractor shall ensure there is no construction debris or materials within the Crane Clearance Zone (i.e., between the painted yellow lines on each side of the rail) unless a rail outage has been approved.
1.6 WORKING HOURS (PNSY)
Regular working hours shall consist of a period established by the Contracting Officer between 7 AM and 3:30 PM, Monday through Friday, excluding Government holidays. The regular working hours shall be confirmed with the Contracting Officer.
Work outside regular working hours requires Contracting Officer approval.
Provide written requests fifteen (15) Calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress and to allow scheduling of full time escorts in the building(s) if required. During periods of darkness, the different parts of the work shall be lighted in a manner approved by the Contracting Officer.
1.7 WORK IN OCCUPIED BUILDING(S)
Work under this contract may be located in an occupied building. Move unfixed furniture away from Contractor's working area as required to perform the work; protect; and replace in original locations upon completion of the work. Leave fixed equipment in place and protect against damage or temporarily disconnect, relocate, protect, and reinstall at completion of work. If determined necessary by the Contracting Officer, the Government will remove and relocate other Government property in the
SECTION 01 14 00.00 22 Page 4 areas of the buildings scheduled to receive work. Allow 15 calendar days after written notification from the Contractor for the Government to relocate Government property.
1.8 UTILITY CUTOVERS AND INTERRUPTIONS
Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays as approved by the Contracting Officer. Conform to procedures required in the paragraph "Work Outside Regular Hours." Anticipated costs shall be included in the bid.
Ensure that new utility lines are complete, except for the connection, before interrupting existing service.
Interruption to Water, Sanitary Sewer, Storm Sewer, Telephone Service, Electric Service, Air Conditioning, Heating, Fire Alarm, Compressed Air, and other utilities shall be considered utility cutovers pursuant to the paragraph entitled "Work Outside Regular Hours." This time limit includes time for deactivation and reactivation.
Operation of Station Utilities: The Contractor shall not operate nor disturb the setting of control devices in the Station's utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor shall notify the Contracting Officer in writing within 15 calendar days when such operation is required.The Contracting Officer will provide the Outage Request Form to the Contractor.
1.9 CRANE AND RAILROAD TRACKAGE INTERRUPTIONS (PNSY)
Crane and railroad trackage are considered utilities, and as such are subject to strict scheduling approvals. Where the following contract work is planned, submit written requests for Outages & Securements a minimum of 15 calendar days prior to the desired date of interruption to the Contracting Officer:
A. Track Outage:
Any excavation, that is within 10 feet of a rail that will extend below the grade of the cross ties.
Any work performed that will penetrate a track foundation.
Any work involving trackage replacement or repair.
Any work affecting the load bearing capacity of the trackage.
No work shall be conducted in affected areas until the Contractor receives written approval to the request for outage.
B. Track Securement:
Track Securement differs from Track Outage in that it does not affect track certification. Track Securement requests shall be prepared by the Contractor and submitted to the Contracting Officer to obtain scheduling approval from Code 740.2 before work that would curtail the use of tracks (e.g., placing equipment or hoses within the crane envelope or within the defined Crane Clearance Zones).
SECTION 01 14 00.00 22 Page 5
No work shall be conducted in affected areas until the Contractor receives written approval to the request for securement.
1.10 WORK ADJACENT TO CIA SECURITY FENCING (PNSY)
Work adjacent to Portsmouth Naval Shipyard Controlled Industrial Area (CIA) fencing is strictly controlled to ensure security is maintained at all times.
Work which will breach CIA fencing is prohibited unless approval has been obtained from Head of Security Operations (Code 1122) and a Shipyard Police representative is at the worksite during the period that the fence has been breached.
A minimum of 30 calendar days prior to performing work which requires breaching the CIA security fence, arrange through the Contracting Officer to obtain Head of Security Operations approval and scheduling of the Shipyard Police representative. "Breaching the fence" is any repair, alteration, or other work which would allow access into the CIA either over, under, or through an opening in a CIA fence.
Conditions which breach the fence shall be eliminated during all non-work periods to the satisfaction of the Shipyard Police representative.
Contractor shall not leave the worksite until such conditions are eliminated. All materials used to close openings in fencing and method of installation shall be the same type and construction as adjacent, undisturbed CIA fencing.
Except for temporary off-loading of materials, the 10-foot zone adjacent to CIA fencing shall remain clear of vehicles, materials, and equipment.
Contractor personnel shall be at the site throughout the entire time of any off-loading.
1.11 WORK ADJACENT TO AN OVERHEAD CRANE
Provide a minimum vertical clearance of three (3) inches between the highest point of the crane and the lowest overhead obstruction. For buildings where truss sag becomes a factor, increase the clearance as necessary to maintain the minimum required clearance.
The horizontal clearance between the end of the crane and the building columns, knee braces or any other obstructions shall not be less than two
(2) inches with the crane centered on the runway rails. Pipes, conduits, etc. shall not reduce this clearance.
The vertical clearance beneath a bridge crane is to be at least three (3) inches. This clearance is not applicable to the hook block unless it is in its up most position.
For work involving installation, adjustment, or replacement of rail fasteners (e.g. clips/bolts), the Contractor shall verify the existing crane envelope and clearance measurements around the rail head prior to beginning work. The Contractor shall notify the Government if the work will reduce the clearance between the bridge crane and rail fasteners and ensure newly installed items will not obstruct bridge crane travel.
The Contractor shall notify the Government to verify that crane clearance has been maintained when the work performed may have changed any physical dimensions of objects or structures adjacent to the crane (e.g., changing
SECTION 01 14 00.00 22 Page 6 or servicing lighting fixtures/pendant assemblies, removal and reinstallation of pipes, conduits, junction boxes, etc.). If the crane is not available (e.g., undergoing maintenance, inspection, etc.), the Contractor shall verify crane clearance by taking measurements using reference points (e.g., vertical and horizontal distance from the top of crane rail with respect to the crane envelope, vertical distance from the floor with respect to the crane envelope, etc.).
1.12 FIRE PROTECTION
1.12.1 Compliance (PNSY)
The Contractor shall comply with COE EM 385-1-1, NFPA 241 and Portsmouth Naval Shipyard fire regulations. Obtain approval from the Portsmouth Naval Shipyard Fire Chief via the Contracting Officer prior to commencement of hot work operations.
1.12.2 Fired Kettles
Melt kettles for tar, asphalt, and similar materials shall not be closer than 25 feet to buildings or combustible materials. Final location of the materials shall be approved by the Facility Fire Department. Provide a minimum of two 20 pound ABC all-purpose type extinguishers at the melting kettle and the area of hot material application. Equip kettles with proper heat controls and means of agitation to assure controlled uniform temperatures throughout contents to prevent spot heating. Do not heat contents above flash point.
1.13 SECURITY REQUIREMENTS
1.13.1 General
Contractor employees and representatives performing work under this contract are required to be United States citizens. If naturalized, the individual shall present his naturalization papers to the Security Officer for inspection. Foreign born personnel shall present evidence of citizenship regardless of citizenship of parents, as required by immigration laws.
1.13.2 Access to the Portsmouth Naval Shipyard (PNSY)
Contract Clause "FAR 52.204-2, Security Requirements and Alternate II" and the following apply:
Access to areas designated as "Red Badge" will require the Contractor to be escorted by a "Red Badged" Government Representative. The Contractor shall notify the Contracting Officer at least 14 Calendar Days in advance of the date access is required.
Obtain security badges and vehicle passes to enter the Portsmouth Naval Shipyard at the Portsmouth Naval Shipyard's Pass/Security Office.
Contractor must furnish proof that employees are U.S. citizens to obtain badges to enter the Portsmouth Naval Shipyard.
Contractor must have a completed Department of Homeland Security Form I-9;
Employment Eligibility Verification for each employee and furnish proof that employees are U.S. citizens to obtain badges to enter Portsmouth Naval Shipyard.
SECTION 01 14 00.00 22 Page 7
1.13.3 Application and Issue of Security Badges
"Temporary" Security Badges will be issued to Contractor personnel requiring access for less than two (2) work days upon satisfactory proof of U.S. citizenship, in the form of an original or certified birth certificate, passport, or naturalization papers. A picture ID is required in addition to satisfactory proof of citizenship. See Attachment B.
"Permanent" (photo) Standard Access Control Badges will be issued to Contractor personnel requiring access for two (2) or more work days.
Contractor personnel will be required to complete an authorization application form for local record check, and a personal information sheet.
The forms will be furnished to the Contractor following award of any contract resulting from this solicitation, at time of pre-performance or pre-construction conference.
In the event the Contractor requires access to contract work areas not permitted by the level of security badge issued, such need shall be demonstrated and an escort obtained. The escort shall remain visible to the Contractor at all times within areas requiring escort.
STANDARD ACCESS CONTROL BADGES SHALL BE ATTACHED TO THE OUTER GARMENT AND
DISPLAYED AT ALL TIMES WHILE ON THE STATION.
CONTRACTOR PERSONNEL SHALL NOT ENTER AREAS FOR WHICH THEY HAVE NOT BEEN
CLEARED. WHERE A NEED HAS BEEN DEMONSTRATED TO ENTER SUCH AREAS,
CONTRACTOR SHALL BE UNDER CONSTANT ESCORT BY PERSONNEL WHO HAVE BEEN
CLEARED. FAILURE TO ADHERE TO POSTED SECURITY REQUIREMENTS MAY RESULT IN
REMOVAL OF THE EMPLOYEE FROM THE STATION WITH FUTURE ACCESS DENIED.
1.13.4 Application and Issue of Vehicle Passes (PNSY)
Vehicle passes will be issued upon satisfactory proof of a valid Operator's License, Vehicle Insurance, and State Vehicle Registration. Temporary passes will be issued for short term or single trip requirements on a case by case basis. All vehicles permitted to enter or park on the Portsmouth Naval Shipyard shall comply with the Portsmouth Naval Shipyard's traffic and parking regulations and shall only park in assigned areas, which may or may not be in the vicinity of the site of the contract work. No vehicle shall be parked in such a manner that crane tracks, railroad tracks, and vehicle access routes are blocked. Vehicles left unattended which are blocking such access routes are subject to towing and loss of vehicle passes. Parking on the Portsmouth Naval Shipyard may be in excess of one-half mile from the worksite.
1.13.5 Application and Issue of Vehicle Passes for Entry into Portsmouth Naval Shipyard's Controlled Industrial Areas (CIA)
Contractor vehicular access to the CIA will be minimized and all vehicles shall comply with the following requirements:
Vehicles must visibly display a CIA vehicle entry pass and inspection pass from the Commercial Vehicle Inspection Station (CVIS), Building 386. CIA passes will only be issued to company owned or leased vehicles, rental vehicles rented in the company name, or privately owned vehicles the company has certified in writing, to be necessary in the performance of contracted work. A current license, registration, security badge, and decal number or temporary vehicle pass is required for a CIA vehicle entry pass. Contractor's company name must appear on the registration and on the
SECTION 01 14 00.00 22 Page 8 vehicle. CIA passes will be issued on weekends and holidays at Building 29, from the Watch Supervisor. Contractors not possessing the level security badge required for CIA access must be accompanied by a properly badged escort to obtain the CIA vehicle pass.
Vehicles must clearly display an authorized company sign or logo, in the form of an exterior mounted magnetic signs or painted identifications on both sides of the vehicle. Paper or cardboard signs are not authorized.
Vehicles will only be allowed in the CIA for the transportation of Contractor's tools, parts, and materials to and from the worksite. An exception to this policy, Contractors may transport employees to and from the worksite if a specific security plan has been developed and approved by the Shipyard Security Officer.
Parking of privately owned or contractor owned not utilized in the execution of construction activities (e.g. not a working truck or specialty vehicle) within the CIA or in any project laydown space is is prohibited.
1.13.6 Application and Issue of Crane Passes (PNSY)
Comply with EM 385-1-1. For Cranes Passes at the Portsmouth Naval Shipyard to be valid, the Certificate of Compliance (FORM 16-1).
1.13.7 Return of Badges and Vehicle Passes
Contractor shall ensure all vehicle access permits and personnel badges are returned to the Security Officer when the need has ended. Contractor shall account in writing for each missing pass or badge prior to final payment being made on the contract.
1.13.8 Contractor Security Responsibilities (PNSY)
Contractor employees shall not transport, drink, or have in their possession any alcoholic beverages. Possession of any controlled substances without a physician's prescription is also prohibited. Any Contractor employee appearing to be under the influence of intoxicating liquor or narcotics will be apprehended by Shipyard Police, escorted off of the Portsmouth Naval Shipyard, and turned over to the local Police Department.
Any vehicle found to contain controlled substances, including usable residue, may be seized and impounded. Within 24 hours of the work day following any vehicle seizure, the Portsmouth Naval Shipyard Police will have determined whether forfeiture of the vehicle is required. If not, the vehicle will be returned to the owner or authorized agent. If the vehicle is determined to be appropriate for forfeiture, the Portsmouth Naval Shipyard's Legal Officer will notify the Drug Enforcement Administration of such seizure and impoundment, for initiation of forfeiture proceedings pursuant to Title 2l, U.S. Code, Section 88l. Such actions may be taken regardless of whether the owner/operator of the vehicle had knowledge of the presence of drugs in the vehicle. The Government may pursue criminal or other disciplinary actions pursuant to Title l8, U.S. Code, Section l382.
Possession of firearms, ammunition and/or explosives is prohibited. In the event explosives are required for construction work, specific handling requirements and approvals shall be obtained from the Security Officer via the Contracting Officer.
SECTION 01 14 00.00 22 Page 9
Cameras, video equipment, or similar photographic equipment shall not be introduced into nor removed from the Portsmouth Naval Shipyard. In the event such equipment is required for performance of contract work, approvals shall be obtained from the Security Officer via the Contracting Officer.
Weapons (firearms, personal knives with blades 2-1/2 inch long or greater, Mace, Pepper Spray etc.) are not permitted aboard the Shipyard.
Cell phones equipped with cameras are permitted aboard the Portsmouth Naval Shipyard outside NAVSEA controlled spaces such as the CIA, but using them to take pictures is not allowed. Cameras, or cell phones equipped with cameras, are not allowed in the CIA or in any NAVSEA space such as an NWA, CNIA or Security Island. At a minimum, all Superintendents & SHHO (and anyone acting in this capacity) shall have a CIA compliant mobile phone on their persons any time while work is occurring at the contract jobsite(s).
The phone number(s) associated with these phones shall be provided during the pre-con meeting and work will not be allowed to proceed without one.
Laptops and any other computer, regardless of form factor, shall not be introduced nor removed from Portsmouth Naval Shipyard without authorization. Only business use computers are allowed. Contractors are not authorized to bring personally owned computers on-yard. If a computer is required to perform work on-yard, a Visitors Portable Computer Equipment Registration form must be completed and submitted for approval. These forms can be obtained and completed at the pass office upon entrance to the shipyard or your shipyard POC.
Any computing devices that also have or had an installed camera, must follow the same requirements as cell phones. If the computing device is visiting a NAVSEA space, it cannot have a camera. If the device has a camera, the only acceptable remediation is that the camera be professionally removed or drilled out and the resulting void must be filled with an epoxy.
In the event that a camera is required for the performance of the contracted work, approval must be obtained from the C1120 security office.
In the event of any deviation from the requirement to remove and epoxy the camera, authorization must be sought from C1120. All requests for camera use and deviations should come to C1120 through your COR or Shipyard POC.
Authorizations and approved computer registrations must remain with the devices and be presentable upon request. Devices without a documented approval or observed being used in a manner that violates the terms of the Visitor Portable Computer Equipment Registration agreement are subject to search and seizure.
Use of wireless networking and communication on-yard by a contractor requires prior authorization. Communication devices such as cellular hotspots and wireless routers must also be registered using the same Visitors Portable Computer Equipment Registration. This does not include air-cards and straight cellular data. It does include any device that transmits or broadcasts Wi-Fi, including cellular phones with the personal hot-spot feature enabled.
Broadband internet connections must be authorized prior to use on-yard.
All requests for physical cable service from an internet service provider (ISP) must be authorized and coordinated through C109. Contractors must work through their COR to request broadband access.
SECTION 01 14 00.00 22 Page 10
Driver use of a hand-held cellular phone in a moving vehicle on the Portsmouth Naval Shipyard is prohibited. This prohibition does not include hands-free cellular phone devices. Hands-free devices include console/dash-mounted or otherwise secured cellular phones with integrated features such as voice-activation, speed dial, speakerphone or other similar technology for sending and receiving calls.
Driver use of any portable, personal listening device worn inside the aural canal, around or covering the driver's ear while operating a motor vehicle, is prohibited. Listening devices include wired or wireless earphones and headphones (including blue tooth or similar technology), and do not include hearing aids or devices designed and required for hearing protection.
The use of radar or laser detection devices to indicate the presence of speed recording instruments or to transmit simulated erroneous speeds is prohibited in accordance with OPNAVINST 5100.2H.
The Contractor shall indoctrinate personnel on access limitations to ensure security control is maintained as an integral part of their work pattern and habit.
Contractor is advised that any unescorted personnel found in security areas requiring a higher level clearance than the level represented by the badge displayed will be removed from the area with possible confiscation of security badges and vehicle passes.
1.13.9 Access to Unclassified Information
Access to U.S. Navy technical information manuals, documents, drawings, plans, specifications, and other information (e.g., photos, presentations, renderings, papers, etc.) is government propriety and restricted to an official need-to-know basis. Handle, control, and safeguard to prevent oral, visual, and documentary disclosure to the public, to foreign sources, and to personnel not having an official need-to-know.
1.13.10 Disclosure of Information
a. The Contractor shall not release to anyone outside the Contractor's organization any unclassified information, regardless of medium (e.g., hard copies, computer files, film, tape, document), pertaining to any part of this contract or any program related to this contract, unless the Contracting Officer has given prior written approval;
b. Requests for approval under paragraph (a)(1) shall identify the specific information to be released, the medium to be used, and the purpose for the release. The Contractor shall submit its request to the Contracting Officer at least 10 business days before the proposed date for release.
c. The Contractor agrees to include a similar requirement, including this paragraph (c), in each subcontract under this contract. Subcontractors shall submit requests for authorization to release through the prime contractor to the Contracting Officer.
SECTION 01 14 00.00 22 Page 11
1.14 MARINE ACTIVITIES (PNSY)
a. The Contractor shall coordinate all marine vessel movements with the Contracting Officer's Representative and the Shipyard's Port Operations Department. The Contractor shall submit a weekly updated schedule showing proposed docking locations and vessel movements to the Contracting Officer's Representative. The Contractor shall meet with the Contracting Officer Representative and Shipyard Port Operations Representative weekly to review the vessel schedule.
b. Any Contractor waterborne craft or vessel movements which will be adjacent to any naval vessels shall be made under the direction of the Shipyard's Pilot. The Contractor shall notify the Contracting Officer's Representative at least 14 calendar days in advance of any movements that will require the Shipyard Pilot.
c. All contract activities shall maintain a minimum standoff from submarines of 100' for in water work and 50'for landside work. All Contractor waterborne craft shall at all times maintain a minimum of twenty-five(25)feet clearance to any Government Barge in the vicinity of the work. This applies to subcontractors and materials suppliers as well as to the prime Contractor. This minimum clearance shall also take into account any materials or equipment present on the Contractor craft that could reduce this effective clearance distance. This restriction is in effect at all times 24/7 including overnight hours and weekends.
d. All marine activities shall be completed to a manner that ensures the stability of caissons, piers, berths, bulkheads, fender systems, mooring hardware and other structures adjacent to the work site. The Contractor shall repair any damage caused by the Contractors operations or vessels.
e. When not in use, the Contractor vessels shall be tied up at a location approved by the contracting Officer's Representative and the Shipyard's Port Operations Department.
f. Any waterborne craft which is deemed to be unsafe by the Contracting Officer's Representative shall be prohibited from working at the Shipyard. Copies of all inspections and certificates shall be submitted to the Contracting Officer's Representative for approval prior to bringing any vessel to the Shipyard.
1.15 WORK WITHIN PUMPWELLS AND DRY DOCKS (PNSY)
All work completed within the dry docks and pumpwells shall have a Flooding Mitigation Strategy Plan. The process for development of this plan shall start with a meeting to determine any locations of possible flooding. The plan shall cover all penetrations through structures which may be sources of flooding of the pumpwell, the dry dock, or an associated structure.
Flooding sources considered include the Piscataqua River as well as surface rain water. The plan shall identify the source of flooding, provide a strategy for mitigating flooding from that source and details on when that mitigation will be in place (e.g. pipe that is currently open to the river will have double valve protection when not actively being worked). Provide product data sheets with the plan. The plan shall also include an inspection program to verify proper installation and maintenance of all mitigation strategies. The plan shall be submitted and approved by the government.
SECTION 01 14 00.00 22 Page 12
1.16 CONSTRUCTION VEHICLES
The Contractor shall not utilize any vehicle that will exceed an HS20 wheel load. The use of "off road", "Utility", "ATV" vehicles which cannot be legally operated on State roadways or highways is prohibited.
1.17 CONTRACTOR EMPLOYEE PARKING
Contractor employees shall park privately owned vehicles in the JI Parking Lot only. Contractor parking is not allowed in any other parking lot or area on the Shipyard. Contractor employee parking must not interfere with existing and established parking requirements of the Portsmouth Naval Shipyard. If a privately owned vehicle is found parked outside the JI parking lot, the vehicle will be subject to towing and may reflect poorly on prime contractor's performance and noted in their final performance evaluation.
1.18 SHIPYARD 6010 TRAINING
Personnel working inside of or within 10 feet of the coping of the dry dock and its associated structures shall have Shipyard 6010 training. Associated structures include pumpwells, service tunnels, altar pits, etc. This training will be provided, at the Shipyard, to the contractor at no cost and is approximately 4 hours in duration. Coordinate training schedule with the Contracting Officer.
Personnel that complete 6010 training can serve as an escort for up to 5 additional contractor personnel or subcontractors. The escort must be within 10 feet or audio range, whichever is closer, and is responsible for the safety of the personnel they are escorting in an emergency situation.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 14 00.00 22 Page 13
ARE YOU A CONTRACTOR, VENDOR, OR SUPPLIER WHO NEEDS
BASE ACCESS?
IF YES, please read below:
Effective 14 August 2017, NCACS credentials will no longer be accepted for base access. Please read below:
• If you applied for an NCACS credential PRIOR to 17 April 2017, your NCACS credential will remain in effect for base access through 14 August 2017, when NCACS credentials will no longer be accepted.
• If you applied for an NCACS credential BETWEEN 17 April and 31 May 2017 you will also be required to obtain a DBIDS creden-tial in order to obtain base access.
• AFTER 31 May no new NCACS applications will be accepted. All new contractors, vendors and/or suppliers requesting base access will be required to obtain a DBIDS credential.
• AFTER 14 August 2017 only DBIDS credentials will be ac-cepted for base access.
• There is no cost to obtaining a DBIDS credential.
FOR MORE INFORMATION VISIT:
https://www.cnic.navy.mil/om/dbids.html jeffrey.f.hoyt Typewritten Text
ATTACHMENT A
CNICINST 5530.14A CH-2
6 Jun 16
12-24 installation.
(2) Persons requesting access who are not in possession of an approved, government issued credential listed in paragraph
1204.b. shall provide an unexpired document for identity proofing purposes listed in Table 12-1. Any fraudulent information passed during the process may lead to prosecution under appropriate legal authorities.
(3) Authorized government representatives shall, prior to acceptance, visually and tactilely (by touch or feel) inspect documents for evidence of tampering, alteration, or other indications of falsified/fraudulent documents. Authorized government representatives will not accept documents that appear to be fraudulent, forged, or counterfeit and follow the CO’s directed standards for response actions to include detention of persons attempting to provide fraudulent documents. Indications of tampered documents include:
(a) Strange text, fonts, slightly altered text, incomplete letters, misaligned words, strange spacing and errors in punctuation or spelling.
(b) Texture or physical indication the photograph has been glued over the original.
Table 12-1. List of Identity Proofing Documents
Documents that Establish Identity
1. U.S. Passport or Passport Card
2. Permanent Resident Card or Alien Registration Receipt Card
(Form I-551)
3. Foreign passport that contains a temporary I-551 stamp or temporary I-551 printed notation on a machine-readable immigrant visa (MRIV)
4. Employment Authorization Document (Card) that contains a photograph (Form I-766)
5. In the case of a nonimmigrant alien authorized to work for a specific employer incident to status:
(a) Foreign passport; and
(b) Form I-94 or Form I-94A has the following:
(1) Bearing the same name as the passport; and
(2) An endorsement of the alien’s nonimmigrant status, as long as the period of endorsement has not yet expired and the proposed employment is not in conflict with any restrictions or limitations identified on the form.
6. Driver’s license or ID card issued by a RealID Act compliant state or outlaying possession of the U.S., provided it contains jeffrey.f.hoyt Text Box
ATTACHMENT B
CNICINST 5530.14A CH-2
6 Jun 16
12-25 a photograph and biographic information such as name, date of birth, gender, height, eye color, and address. Licenses or IDs possessing “NOT APPLICABLE FOR FEDERAL PURPOSES” will not be accepted.
7. State-issued Enhanced Driver’s licenses
8. Driver’s license issued by the U.S. Department of State
9. Border Crossing Card (From DSP-150)
10. Identification card issued by Federal, State, or local government agencies, provided it contains a photograph and biographic information such as name, date of birth, gender, height, eye color, and address.
11. Veteran Health Identification Card (VHIC) issued by the
Department of Veterans Affairs
12. Department of Homeland Security “Trusted Traveler” Cards
(Global Entry, NEXUS, SENTRI, FAST)
13. U.S. Certificate of Naturalization or Certificate of
Citizenship (Form N-550)
14. School identification card with a photograph
15. Persons under the age of 18 who are unable to present a document listed above may present one of the below documents.
(a) School record or report card
(b) Day care or nursery school record
(c) Birth certificate (original or certified copy)
16. Native American Tribal Photo ID cards
17. U.S. Coast Guard Merchant Mariner Credential (MMC) or
Merchant Mariner’s Documents (MMD)
18. Other documents that may be provide for identity proofing purposes, but must be accompanied by a second form of ID with photograph and biographical information.
a. Social Security Number card
b. Original or certified copy of a birth certificate issued by a state, county, municipal authority, or outlying possession of the U.S. bearing an official seal.
c. Certification of birth Abroad issued by the U.S.
Department of State (Form FS-545)
d. Certification of Report of Birth issued by the U.S.
Department of State (Form DS-1350
e. Voter’s Registration Card
d. Outside the Continental United States (OCONUS)
(1) NSF will utilize appropriate identity proofing credentials such as a passport or nationally issued identity card, or other COCOM approved ID.
(2) ISO will codify approved non-U.S. identity proofing
SECTION 01 35 26.00 22
GOVERNMENTAL SAFETY REQUIREMENTS (PWD ME)
12/18
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)
ASSE/SAFE A10.34 (2001; R 2012) Protection of the Public on or Adjacent to Construction Sites
ASSE/SAFE A10.44 (2014) Control of Energy Sources (Lockout/Tagout) for Construction and Demolition Operations
ASSE/SAFE Z244.1 (2003; R 2014) Control of Hazardous Energy Lockout/Tagout and Alternative Methods
ASSE/SAFE Z359.0 (2012) Definitions and Nomenclature Used for Fall Protection and Fall Arrest
ASSE/SAFE Z359.1 (2007) Safety Requirements for Personal Fall Arrest Systems, Subsystems and Components
ASSE/SAFE Z359.11 (2014) Safety Requirements for Full Body Harnesses
ASSE/SAFE Z359.12 (2009) Connecting Components for Personal Fall Arrest Systems
ASSE/SAFE Z359.13 (2013) Personal Energy Absorbers and Energy Absorbing Lanyards
ASSE/SAFE Z359.14 (2014) Safety Requirements for Self-Retracting Devices for Personal Fall Arrest and Rescue Systems
ASSE/SAFE Z359.15 (2014) Safety Requirements for Single Anchor Lifelines and Fall Arresters for Personal Fall Arrest Systems
ASSE/SAFE Z359.2 (2007) Minimum Requirements for a Comprehensive Managed Fall Protection Program
ASSE/SAFE Z359.3 (2007) Safety Requirements for Positioning and Travel Restraint Systems
SECTION 01 35 26.00 22 Page 1
ASSE/SAFE Z359.4 (2013) Safety Requirements for Assisted-Rescue and Self-Rescue Systems, Subsystems and Components
ASSE/SAFE Z359.6 (2009) Specifications and Design Requirements for Active Fall Protection Systems
ASSE/SAFE Z359.7 (2011) Qualification and Verification Testing of Fall Protection Products
ASME INTERNATIONAL (ASME)
ASME B30.20 (2013; INT Oct 2010 - May 2012) Below-the-Hook Lifting Devices
ASME B30.22 (2010) Articulating Boom Cranes
ASME B30.26 (2015; INT Jun 2010 - Jun 2014) Rigging Hardware
ASME B30.3 (2012) Tower Cranes
ASME B30.5 (2014) Mobile and Locomotive Cranes
ASME B30.8 (2010) Floating Cranes and Floating Derricks
ASME B30.9 (2014; INT Feb 2011 - Nov 2013) Slings
ASTM INTERNATIONAL (ASTM)
ASTM F855 (2015) Standard Specifications for Temporary Protective Grounds to Be Used on De-energized Electric Power Lines and Equipment
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE 1048 (2003) Guide for Protective Grounding of Power Lines
IEEE C2 (2012; Errata 2012; INT 1-4 2012; INT 5-7 2013; INT 8-10 2014; INT 11 2015) National Electrical Safety Code
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA Z535.2 (2011) Environmental and Facility Safety Signs
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 10 (2013) Standard for Portable Fire Extinguishers
NFPA 241 (2013; Errata 2015) Standard for Safeguarding Construction,Alteration, and Demolition Operations
SECTION 01 35 26.00 22 Page 2
NFPA 306 (2014) Standard for Control of Gas Hazards on Vessels
NFPA 51B (2014) Standard for Fire Prevention During Welding, Cutting, and Other Hot Work
NFPA 70 (2014; AMD 1 2013; Errata 1 2013; AMD 2 2013; Errata 2 2013; AMD 3 2014; Errata 3-4 2014; AMD 4-6 2014) National Electrical Code
NFPA 70E (2015; ERTA 1 2015) Standard for Electrical Safety in the Workplace
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
10 CFR 20 Standards for Protection Against Radiation
29 CFR 1910 Occupational Safety and Health Standards
29 CFR 1910.146 Permit-required Confined Spaces
29 CFR 1910.147 Control of Hazardous Energy (Lock Out/Tag Out)
29 CFR 1910.333 Selection and Use of Work Practices
29 CFR 1915 Confined and Enclosed Spaces and Other Dangerous Atmospheres in Shipyard Employment
29 CFR 1915.89 Control of Hazardous Energy (Lockout/Tags-Plus)
29 CFR 1926 Safety and Health Regulations for Construction
29 CFR 1926.1400 Cranes and Derricks in Construction
29 CFR 1926.16 Rules of Construction
29 CFR 1926.500 Fall Protection
49 CFR 173 Shippers - General Requirements for Shipments and Packagings
CPL 2.100 (1995) Application of the Permit-Required Confined Spaces (PRCS) Standards, 29 CFR 1910.146
ATTACHMENT "A" "CONTRACTOR CRANE, LHE, CONSTRUCTION
EQUIPMENT, AND RIGGING GEAR REQUIREMENTS"
SECTION 01 35 26.00 22 Page 3
ATTACHMENT "B" "PORTSMOUTH NAVAL SHIPYARD UTILITY LOCATING
PROCEDURES"
The attachments are included following the end of this specification section. If attachments are missing from this copy of specification notify the Contracting Officer.
1.2 DEFINITIONS
1.2.1 Competent Person (CP)
The CP is a person designated in writing, who, through training, knowledge and experience, is capable of identifying, evaluating, and addressing existing and predictable hazards in the working environment or working conditions that are dangerous to personnel, and who has authorization to take prompt corrective measures with regards to such hazards.
1.2.2 Competent Person, Confined Space
The CP, Confined Space, is a person meeting the competent person requirements as defined EM 385-1-1 Appendix Q, with thorough knowledge of OSHA’s Confined Space Standard, 29 CFR 1910.146, and designated in writing to be responsible for the immediate supervision, implementation and monitoring of the confined space program, who through training, knowledge and experience in confined space entry is capable of identifying, evaluating and addressing existing and potential confined space hazards and, who has the authority to take prompt corrective measures with regard to such hazards.
1.2.3 Competent Person, Cranes and Rigging
The CP, Cranes and Rigging, as defined in EM 385-1-1 Appendix Q, is a person meeting the competent person, who has been designated in writing to be responsible for the immediate supervision, implementation and monitoring of the Crane and Rigging Program, who through training, knowledge and experience in crane and rigging is capable of identifying, evaluating and addressing existing and potential hazards and, who has the authority to take prompt corrective measures with regard to such hazards.
1.2.4 Competent Person, Excavation/Trenching
A CP, Excavation/Trenching, is a person meeting the competent person requirements as defined in EM 385-1-1 Appendix Q and 29 CFR 1926, who has been designated in writing to be responsible for the immediate supervision, implementation and monitoring of the excavation/trenching program, who through training, knowledge and experience in excavation/trenching is capable of identifying, evaluating and addressing existing and potential hazards and, who has the authority to take prompt corrective measures with regard to such hazards.
1.2.5 Competent Person, Fall Protection
The CP, Fall Protection, is a person meeting the competent person requirements as defined in EM 385-1-1 Appendix Q and in accordance with ASSE/SAFE Z359.0, who has been designated in writing by the employer to be responsible for immediate supervising, implementing and monitoring of the fall protection program, who through training, knowledge and experience in fall protection and rescue systems and equipment, is capable of identifying, evaluating and addressing existing and potential fall hazards
SECTION 01 35 26.00 22 Page 4 and, who has the authority to take prompt corrective measures with regard to such hazards.
1.2.6 Competent Person, Scaffolding
The CP, Scaffolding is a person meeting the competent person requirements in EM 385-1-1 Appendix Q, and designated in writing by the employer to be responsible for immediate supervising, implementing and monitoring of the scaffolding program. The CP for Scaffolding has enough training, knowledge and experience in scaffolding to correctly identify, evaluate and address existing and potential hazards and also has the authority to take prompt corrective measures with regard to these hazards. CP qualifications must be documented and include experience on the specific scaffolding systems/types being used, assessment of the base material that the scaffold will be erected upon, load calculations for materials and personnel, and erection and dismantling. The CP for scaffolding must have a documented, minimum of 8-hours of scaffold training to include training on the specific type of scaffold being used (e.g. mast-climbing, adjustable, tubular frame), in accordance with EM 385-1-1 Section 22.B.02.
1.2.7 Competent Person (CP) Trainer
A competent person trainer as defined in EM 385-1-1 Appendix Q, who is qualified in the material presented, and who possesses a working knowledge of applicable technical regulations, standards, equipment and systems related to the subject matter on which they are…