Attach 2 Material Submittals.pdf
PDF 177 KB Posted
- Attached to
- Water Softener Replacement Federal contract opportunity
- Solicitation number
- 12305B21R0033
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 12305B21R0033.pdf | ||
| Image 2.pdf | ||
| WaterQuality2021.pdf | ||
| RFI USDA - NCCCWA Water Softener Replacement 08-19-2021.docx | DOCX document | |
| Amendment 0002.pdf | ||
| Image 1.pdf | ||
| 12305B21R0033.pdf | ||
| SOWr.1 14MAY21 Water Softeners NCCCWA Leetown Kearneysville WV (1).pdf | ||
| Attach 4 Original Drawings.pdf | ||
| Attach 1 - Pre-Bid Site Visit Requirements.pdf | ||
| Attach 5 Photographs.pdf | ||
| 12305B21R0033.pdf | ||
| Attach 3 Master Specifications.pdf | ||
| WV20210037 06042021.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MATERIAL APPROVAL SUBMITTAL
TO: USDA/ARS CO
CC: A&E, COR
FROM: (Contractor) PROJECT TITLE: CONTRACT NUMBER:
(To be completed by the Contractor) Government Use Only
SUBMITTAL
NUMBER:
PREVIOUS SUBMITTAL NUMBER
(only if items listed were submitted previously):
A&E Recommendation
COR/EPM
Recommendation
Contracting Officer Approval/Disapproval
Line No.
Specification Sect.
Para No., Draw No.
Description of Material
(Include type, model, mfg)
APP
DISAP
See
Comments on Reverse
Comments on Reverse
Comments on Reverse
If an item is disapproved, a resubmittal is due within ________ calendar days of the Contracting Officer’s signature below.
Contractor (Ktr) A&E COR/EPM Contracting Officer TYPE or PRINT NAME & TITLE TYPE or PRINT NAME & TITLE TYPE or PRINT NAME & TITLE TYPE or PRINT NAME & TITLE
SIGNATURE: SIGNATURE: SIGNATURE: SIGNATURE:
DATE: DATE: DATE: DATE:
By completing this form, the above signed contractor certifies that the material complies with all specifications of the subject contract.
DATE RECEIVED FROM KTR: DATE RECEIVED FROM A&E: DATE RECEIVED FROM COR:
Material Approval Submittal Cover Sheet (11/2016)
CONTRACT #: SUBMITTAL #:
COMMENTS
Instructions: Enter the initials of the individual making the comment, the Line Number of the item for which the comment is being made, and the comment.
Material Approval Submittal Cover Sheet (11/2016) (Reverse)
Address City State WV Zip
P I C R N E O W O S S R & A D T S T T M R U D R C A I R C R U H T R F S R M A T A C E E E I A E A N
W T D M P C M C N T D I I U E O A P O U Y A N O L N R T L R A T G N E T T E E D L A S S S S S S S S S X X X X X X X X
X X X X X X X X X X X X X X X X X
PH Meter Turbidity Data Logger
Water Tower Isolation/Check Valve
Project Name NCCCWA WATER SOFTENER REPLACEMENT
11861 LEETOWN ROAD
Award Date
KEARNEYSVILLE
Type Of Submittal
Item Description
Water Softener PVC Pipe, Fittings and Valves
Submittal Number
Submittal Date
Specification Number Dwg
Number Specification Name Status
Contract Number Project Number
Insulation Liquid Chlorine Meter
| Material Submittal Log.pdf |
| Sheet1 |