This is a DD Form 1423, Contract Data Requirements List (CDRL), dated February 2024, establishing data deliverable requirements for a Charter Vessel Contract under contract number N3220526R6077.

The contractor is required to submit periodic reports and assessments to the Military Sealift Command (MSC) PM4 Program Office. Monthly deliverables include a Fuel Oil Inventory and Consumption Report and a Navy Energy Usage Report (NEURS), along with a Combined Force Protection/Chemical Biological Radiological Nuclear (FP/CBRN) Report. Insurance documentation must be submitted within 10 days of contract award to the Contracting Officer and Charterer. A Vessel Self-Assessment Report is due 14 days prior to commencement of Operations, Control, and Intelligence (OCI), while vessel photographs showing overhead, bow, stern, port, and starboard views are due 60 days following contract award. Additional annual requirements include a Small Arms Inventory Report and an Inventory Report of all Government Furnished Materials and Property. Voyage Passage and Position Reports are submitted situationally as directed by OPCON. All deliverables are distributed to four MSC personnel: the Contracting Officer (Stephanie Ricker), Contract Specialist (Yvonne Escoto), PM4 Contract Contracting Officer's Representative (Samuel Fuller II), and PM4 Contract Project Officer (Jon Schauwecker). The form was prepared by Samuel Fuller II and approved by Jon Schauwecker, with a contract award date of 28 December 2026 and initial submission date of 2 March 2027.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PREVIOUS EDITION MAY BE USED.

DD FORM 1423, FEB 2024 Page 1 of 2

(Updated 20260512)UNCLASSIFIED

UNCLASSIFIED

CONTRACT DATA REQUIREMENTS LIST

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

16. REMARKS

15.TOTAL 0 4 0

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. SIGNATURE I. APPROVED BY J. SIGNATURE

N3220526R6077 N/A

Contract Deliverable and Schedule TBD TBD

0001 Periodic and required Contract Deliverables Charter Vessel Contract Deliverables

N/A N3220526R6077 MSC, PM4 Program Office

N/A

N/A

N/A

28-DEC-2026

Various 02-MAR-2027

Contracting Officer

Contract Specialist

PM4 COR

PM4 Project Officer

Contractor shall be responsible and submit the following Reports, Assessments, Attachments and Documents:

Monthly:

* Fuel Oil Inventory and Consumption Report, NEURS, (Navy Energy Usage Report), (Per Attachment E-1.21.3).

* Combined FP/CBRN, Force Protection, (Chemical Biological Radiological Nuclear Report), (Per COMSC Inst.

5530.3H, Para(2) Monthly Combined FP/CBRN Report.

10 Days Following Contract Award:

* Submit Insurance Documentation, to Charterer and KO, (Per Attachment E-1.30.6).

Situational, as Directed by OPCON, Conditional:

* Voyage Passage & Position Report, (Per Attachment E-1.21.4).

14 Days Prior to Commencement of OCI:

* Submit Vessel Self-Assessment Report to COR, (Per Attachment E-1.27).

60 Days Following Contract Award Date:

* Submit Vessel Photographs, complete Portfolio of ship, Overhead, Bow, Stern, Port and Stbd side view, (Per Attachment E-1.30.4).

Annually:

* Small Arms Inventory Report, (Per Attachment E-1.15.23).

* Inventory Report of all GFM, Government Furnished Property, Material, (Per Attachment G-1.18.6).

Block 14(a) Addressee:

MSC Contracting Officer: stephanie.ricker.civ@us.navy.mil MSC Contract Specialist: yvonne.escoto.civ@us.navy.mil MSC PM4 Contract COR: samuel.e.fuller2.civ@us.navy.mil MSC PM4 Contract Project Officer: jon.t.schauwecker.civ@us.navy.mil

(See Block 16 for email)

X

Samuel Fuller II Jon Schauwecker

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoDM 5010.12 for detailed instructions.)

DD FORM 1423, FEB 2024 Page 2 of 2

(Updated 20260512)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning," "Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support (e.g., Mission Design Series (MDS) designator).

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Name of preparer of CDRL.

Item H. Date CDRL was prepared and signature of preparer of CDRL.

Item I. Name of CDRL approval authority.

Item J. Date CDRL was approved and signature of CDRL approval authority.

Item 1. See DFARS Subpart 204.71 for proper numbering. To add or delete additional data items, point and click the plus or minus sign to the right of Block J.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Identify only one Data Acquisition Document No. If a single work task generates more than one deliverable data product, prepare a separate data item for each deliverable data product.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work/Performance Work Statement paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data and computer software, specify the contractor's requirement to mark the appropriate distribution statement on the technical data or computer software (ref. DoDI 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14; Desired medium for delivery of the data item.

Identify for which data item additional remarks are provided. When tailoring the Data Acquisition Document invoked in Item 4, identify which portions of that Document are being tailored.

Identify any referenced attachments to the form. Attachments can be added using the button at the bottom of page 1.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government’s rights to use the data shall be governed by the pertinent provisions of the contract.