This Statement of Work (SOW) details the U.S. Department of State's requirements for developing a non-proprietary blast, forced entry, and ballistic resistant roof hatch system for diplomatic facilities. The Department of State's Bureaus of Overseas Building Operations (OBO) and Diplomatic Security (DS) are seeking proposals from engineering design firms to create a modern roof hatch system that addresses current security and architectural performance standards. The project aims to develop a comprehensive solution that enables Department designers, planners, and contractors to fabricate and install compliant roof hatch systems.

The SOW outlines three primary objectives: 1) specification development, which involves compiling relevant standards and requirements for roof hatch systems, 2) design development, focusing on creating a roof hatch based on existing specifications with potential optimizations, and 3) fabrication and validation testing to ensure the system meets stringent performance criteria. The project requires a comprehensive deliverable package including system drawings, installation and operator manuals, maintenance instructions, testing reports, and an exhibition sample. The performance period is not to exceed 15 months, and responses must include detailed references, a work plan, cost estimate, and be led by a licensed Professional Engineer with at least 15 years of experience. The project classification is Sensitive But Unclassified (SBU) and will comply with federal export control regulations.

View the file

Other files

File Type Posted
19AQMM25R0297 Amendment 0001.pdf PDF
19AQMM25R0297 QA.pdf PDF
19AQMM25R0297.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCLASSIFIED

Bureau of Diplomatic Security Physical Security Division

Research and Development

Keith Nelson, Sr. Construction Engineer, Project Lead NelsonKM@state.gov

Craig Ackerman, Blast Program Manager AckermanCR@state.gov

Alec Williamson, FE/BR Program Manager WilliamsonAA@state.gov

Statement of Work (dated 20250606) Development of Non-proprietary Blast, Forced Entry, and Ballistic Resistant Roof Hatch System

INTRODUCTION

The U.S. Department of State's Bureau of Diplomatic Security is seeking proposals from qualified engineering design firms for an emergency egress roof hatch system. This Request for Proposal (RFP) outlines the requirements and deliverables associated with this request.

Roof hatch systems provide an emergency egress option for personnel and serve as a mandated security feature in diplomatic facilities. The need to develop a modern roof hatch system stems from advancements in various architectural and physical security performance requirements that make legacy roof hatch systems non-compliant. Given the specialized nature of these roof hatch systems and the limited market demand, the Department is now seeking a non-proprietary option to meet project requirements.

BACKGROUND

The U.S. Department of State's Bureaus of Overseas Building Operations (OBO) and Diplomatic Security (DS) have implemented newly revised standards to enhance functionality and security at diplomatic facilities. Specifically, updates to OBO Specification 077234 and SD-STD-01.01 Revision H have directly impacted roof hatch systems. Many roof hatch systems were designed and developed over twenty years ago, and as Department specifications and requirements have evolved over time, the roof hatch systems have not.

Now, in FY25, the Department sees the absence of a Department-compliant roof hatch system in the marketplace as a risk to both DS and OBO. To mitigate this risk, DS and OBO are developing a non-proprietary roof hatch design that will enable Department designers, planners, UNCLASSIFIED mailto:NelsonKM@state.gov mailto:AckermanCR@state.gov mailto:WilliamsonAA@state.gov

Statement of Work: Non-proprietary Forced Entry & Ballistic Resistant Roof Hatch System

UNCLASSIFIED

and contractors to fabricate and install the required roof hatch systems themselves, thereby fulfilling Department requirements.

OBJECTIVES

1. Objective 1: Specification Development - The performer shall review, identify, and compile relevant specifications for the Department's roof hatch systems. This information will serve as the foundation for developing the roof hatch design.

a. The performer shall compile and document a comprehensive list of relevant standards and requirements applicable to the Department’s use of roof hatch systems. This shall include, but not be limited to, architectural, operational, relevant International Building Code (IBC), and security requirements.

b. OBO and DS will collaborate with the performer to provide Department specifications and standards for roof hatch systems. The performer will also search for existing non-Department standards related to emergency egress hatch systems (i.e., DoD or Storm Shelter) that may inform and enhance the development of the roof hatch system for this effort. The documents listed below will be provided to the performer after the award for this work:

i. OBO SPECIFICATION SECTION 077234 - FORCED-ENTRY (FE) /

BALLISTIC RESISTANT (BR) ROOF HATCHES

1. The roof hatch shall be designed to resist.

a. 60-Minute Forced Entry Attack

b. Rifle Level Ballistic Resistance

ii. OBO SPECIFICATION SECTION 099602 – HIGH-PERFORMANCE

FE/BR COATINGS

iii. OBO SPECIFICATION SECTION 080001 – BLAST REQUIREMENTS

1. The intent is that the roof hatch should be openable after a blast event.

2. The roof hatch design shall be based on a blast load of 15 psi and a

125 psi-msec, and analyzed at the specified maximum allowable size as determined by the performer.

iv. SD-STD-01.01, Revision H, CERTIFICATION STANDARD FOR

FORCED ENTRY AND BALLISTIC RESISTANCE OF BUILDING

SYSTEMS

2. Objective 2: Design Development - The performer shall create a roof hatch based on existing requirements and specifications (identified in Objective 1) and then modernize and optimize the roof hatch system if improvements can be made. The overarching goal of this effort is to develop an enhanced roof hatch system that meets the Department’s operational needs and reduces life-cycle and maintenance costs compared to current roof hatch systems. This will likely be an iterative process between DS, OBO, and the performer.

UNCLASSIFIED

Below are the design requirements and preferences that will help potential responders better understand the scope and critical requirements that the Department has for this effort.

a. The roof hatch design shall be corrosion-resistant with an estimated serviceable life expectancy of no less than 50 years.

i. The assumed environmental corrosivity of the atmosphere shall be “C5” as defined in ISO 9223.

b. The roof hatch system must be adaptable in size and include egress and ladder options as identified in OBO Standard Specification 077234. The performer shall determine the maximum and minimum allowable size for the design. Optionally, if the roof hatch design is not easily adaptable or scalable, the performer shall develop at least two specific size options as part of the scope of this work.

i. If the performer identifies occupant egress or ladder alternatives during the design process, they shall present these options to the Department for consideration. This effort aims to modernize the roof hatch system, enhancing legacy designs where possible. Improving the safety and accessibility of the roof hatch system is a top priority for this initiative.

Therefore, the performer shall seek to incorporate innovations in egress systems, techniques, or the design of the roof hatch system.

c. The performer shall consider Value Engineering (VE) as part of the design development. The VE should focus on maximizing value for both functionality and cost for the roof hatch system and its life cycle costs.

i. For example, the Current OBO Specification 077234 requires the use of stainless steel to mitigate corrosion. The performer shall determine whether other techniques (i.e., coatings) or materials (i.e., aluminum) can be utilized to achieve the overall objective of this effort.

ii. For example, legacy-style roof hatch systems often depended on gas-assisted struts to facilitate roof hatch operation. These components were prone to failure and needed routine replacement to ensure the functionality of the roof hatch. The performer may seek to simplify the roof hatch design to reduce the number of components and/or lower maintenance and life cycle costs (i.e., counter-balanced door, sliding door, or mechanical gear-driven operation).

d. The performer shall be responsible for scheduling no fewer than three (3) design review meetings with DS during the development of the roof hatch design.

However, it should be noted that the performer can request additional meetings or submit an unlimited number of RFIs to finalize the design. Meetings may be conducted in person or virtually at the performer’s discretion. The design review meetings are intended to ensure that the roof hatch design meets the Department’s needs and to understand and approve any enhancements proposed by the performer. Notional milestone design review meetings are:

i. Conceptual Design Review

ii. Primary Design Review

iii. Final Design Review

UNCLASSIFIED

1. DS shall confirm in writing that the acceptance of the final design is substantially complete before conducting any activities associated with Objective 3.

e. The performer shall document and track all deviations from existing specifications and requirements, identified in Objective 1, during the development of the roof hatch system. It is understood that VE and updated design considerations may necessitate variance from the existing specifications and requirements. As part of the roof hatch development, the performer shall edit, update, and revise a draft version of OBO Specification 077234 to reflect the final configuration of the roof hatch system. The goal is to ensure that the roof hatch system complies with OBO Specification 077234.

f. The performer shall define the standard sub-frame and mounting conditions required to install the roof hatch system. OBO’s construction contractor typically provides the mounting and sub-frame as part of the building design. Therefore, it is essential that construction detailing be supplied to ensure the successful integration of the roof hatch system into Department facilities. This shall include all flashing and waterproofing to prevent water intrusion around the roof hatch system.

i. Caulks, sealants, and membranes shall not serve as the primary means of waterproofing the roof hatch system to the structure. Any caulks, sealants or membranes that are part of the roof hatch design shall not be relied upon for waterproofing.

ii. The primary method of waterproofing must consist of a metal-based, properly layered flashing system that relies on gravity to prevent water intrusion. Alternatively, the design of the roof hatch system itself must incorporate waterproofing as part of its design.

iii. The performer shall include accommodations for the roof hatch system to be mounted into a raised curb assembly, as is the current design guidance for Department facilities.

iv. The performer must provide adequate construction tolerances for both the mounting condition and the system itself.

v. The performer shall also define required clearances to integrate the roof hatch system into a structure.

3. Objective 3: Fabrication and Validation Testing – The performer shall be responsible for coordinating and planning all analyses and testing described below for the finalized roof hatch design. This includes fabricating all required test samples, coordinating with accredited testing laboratories, reviewing, developing, and approving all test plans, and scheduling with DS as needed. If the roof hatch system fails any necessary tests, the performer shall modify the roof hatch design to address any identified deficiencies, and the tests will be repeated until the required performance is achieved.

a. Security Testing

i. SD-STD-01.01 Revision H testing, a list of DS-approved testing laboratories is provided in Attachment D

1. Rifle BR

2. 60-Minute Forced Entry

UNCLASSIFIED

ii. Sound Transmission Testing

1. Class rating of STC-50

a. (ASTM E90 and ASTM E413)

iii. Blast Resistance Testing

1. Tested to the design load and duration previously specified, following ASTM F2927-21 and SD-SUP-ASTM F2927

a. Performance condition II (2) or I (1).

b. The final roof hatch design shall reflect the configuration that satisfies all of the specifications and requirements outlined in this document.

DELIVERABLES

The required deliverables for this effort shall include the following:

1. An in-person kickoff meeting shall be scheduled with DS, OBO, and the performer no more than 30 calendar days from the date of the award. The kickoff meeting shall be held at State Annex 14 (SA-14) (1400 Wilson Blvd., Arlington, VA 22209)

2. Complete roof hatch system drawings

a. Drawings shall be professional in appearance and conform to either the American

Society of Mechanical Engineers (ASME) or the American National Standards Institute (ANSI) format requirements.

b. Drawings shall be delivered in both .pdf and .dwg formats

i. PDF format shall contain a hyperlinked Table of Contents and/or

Bookmarks for easy page navigation.

c. Drawings shall include all required specifications, assembly, parts and fabrication details. The overarching intent is to have a complete drawing package that can be sent to a fabricator for procurement.

i. Assembly drawings shall include exploded views showing each part/component

ii. Assembly drawings shall convey the configuration of the roof hatch system.

iii. Part drawings shall contain all relevant information for the procurement of any “off-the-shelf” components.

iv. Fabrication drawings shall contain all material specifications, material handling procedures, welding procedures, and or any

v. All specifications shall be included in the drawing package to serve as a stand-alone fabrication package, including any coating requirements or paint specifications.

3. Complete installation manual

a. A detailed installation manual shall be included for the roof hatch system. The manual, at a minimum, shall consist of the following:

i. Rough opening and mounting requirements: Specific details on the raised curb and construction considerations.

ii. All flashing and waterproofing details

iii. Installation instructions for the roof hatch itself.

Statement or Work: Non-proprietary Forced Entry & Ballistic Resistant Roof Hatch System

UNCLASSIFIED

iv. Any on-site assembly instructions for the roof hatch design

v. A detailed list of tools or other materials that may be needed to complete the installation.

4. Operator instruction manual

a. A detailed operation manual describing the features, operation, and use of the roof hatch system shall be provided. This should include any operational hazards and troubleshooting instructions in the event of a malfunction.

5. Maintenance Manual

a. A detailed maintenance schedule shall be provided to ensure the roof hatch system remains in operable condition for the life of the system.

b. A parts list and diagrams shall be included in this document to aid Department facility maintenance personnel in the replacement of components should the need arise.

6. Reporting

a. Copies of all testing reports, whether pass or fail, must be included. The primary intent is to ensure complete documentation showing that the roof hatch meets the required specifications.

b. The performer shall provide a supplemental report that includes a narrative of the design development and documents the basis for all design choices.

7. OBO Specification 077234

a. Provide an updated and revised OBO Specification 077234. (See Objective 2, Paragraph “e”.)

8. Exhibition Sample

a. One complete and fully functional roof hatch system shall be delivered to DS/RD (address to be determined). This whole assembly will be used to train Department staff, contractors, and facility personnel on the roof hatch system.

9. Monthly Status Reports (MSR)

a. The performer shall submit monthly status reports no later than the 5th of each month

b. A sample MSR format is included in Attachment A. Note that this format should be substantially followed, but can be modified at the performer's discretion to accommodate additional milestones and events specific to this effort.

Period of Performance

The performance period shall not exceed 15 months, including all required testing and evaluation.

Responses to this RFP

Responses to this proposal shall meet the following requirements.

• Shall not exceed 15 pages

• Shall provide no less than three references demonstrating previous experience working on U.S. Department of State facilities, emphasizing a solid understanding of building envelope and security design.

UNCLASSIFIED

• Shall provide a work plan and schedule (Gantt chart format with milestones identified) that meets the performance period for this effort.

• Shall provide a cost estimate to complete the work as outlined in this document. The cost to complete each Objective shall be given, with the total cost being the sum of each Objective’s cost.

• The Principal Investigator assigned to this effort shall be a licensed Professional Engineer or Registered Architect with no less than 15 years of experience.

o Responses shall include the current license status and the state where the PI is currently registered or licensed.

• Shall identify key personnel and experience for the project team members assisting with this effort.

Classification

The classification for this work will be Sensitive But Unclassified (SBU) in accordance with the Department’s classification criteria. This work shall also comply with all Federal Export Control regulations. Deliverables associated with this work will remain the property of the USG.

ATTACHMENT A

Appendix A:

Example Monthly Status Report

DS/C/PSP/PSD/RD – Project Name Task Manager: TBD

Developer PI: (Fill in name, phone number once contract is awarded) Contract Number: (fill in)

MONTHLY STATUS REPORT

1) TASK TITLE: ((fill in)

2) DESCRIPTION/REQUIREMENT: (fill in)

3) DEVELOPER(S): (add any significant subcontractors)

4) TECHNICAL APPROACH: (Summarize the project’s technical approach in five or six sentences.)

5) MILESTONES: (fill in relevant milestones)

Milestone Planned Rescheduled Actual Project Plan Kickoff Meeting Preliminary Design Review Operations and Maintenance Manual Critical Design Review Test Plan Test Report Etc.

6) FUNDING & COSTS:

Project Funding History Funding Action Date Amount Comment Contract Award 7/15/2016 $68,000.00 Contract award, funds through Nov 2016 Mod 1 10/15/2016 $58,000.00 Incremental funding, funds through Dec 2016.

Mod 2 1/15/2017 $65,000.00 Fully funds effort

Funding Provided to Date

Expenditures (Current Month)

Accrued Expenditures (Cumulative)

Remaining Obligated Funds

Funding $100,000.00 $25,000.00 $100,000.00 $0.00 Total Funding Provided $200,000.00 Contract Value $300,000.00

Insert graph showing planned expenditures, current funding level, and actual expenditures here. The graph must cover from the contract start date to the end date. If a revised spending plan becomes necessary, include the original plan. (See sample below):

ATTACHMENT A

7) TASK STATUS / MONTHLY ACTIVITIES:

a. Report month –

b. Upcoming Month –

8) ISSUES: (Identify any issue that affects the progress of the project, funds requirements, payment of invoices, and potential schedule problems. Include requirements for resolution of the issue.)

9) PHOTOS/VIDEO: (Include at least two current digital images of 300 pixel/inch quality or better in “.jpg,” “.tif,” or “.bmp” format that show a conceptual application, design, physical prototype or other meaningful representation of the project progress If applicable, provide video compatible with Windows Media Player.)

ATTACHMENT B

OBO Specifications

(Starts Next Page)

OBO SPECIFICATION SECTION 077234 - FORCED-ENTRY (FE) / BALLISTIC

RESISTANT (BR) ROOF HATCHES

OBO SPECIFICATION SECTION 099602 – HIGH-PERFORMANCE FE/BR COATINGS

OBO SPECIFICATION SECTION 080001 – BLAST REQUIREMENTS

UNITED STATES DEPARTMENT OF STATE UNCLASSIFIED OCTOBER 1, 2023

OVERSEAS BUILDINGS OPERATIONS

GUIDE SPECIFICATIONS

FORCED-ENTRY (FE) / BALLISTIC SECTION 077234 - 1

RESISTANT (BR) ROOF HATCHES UNCLASSIFIED

SECTION 077234 - FORCED-ENTRY (FE) / BALLISTIC RESISTANT (BR) ROOF HATCHES

PART 1 - GENERAL

1.1 SUMMARY

A. The extent and location(s) of high-security roof hatches is indicated on Contract Drawings.

B. Related Sections include the following:

1. Section 055005 “Metal Fabrications” for stairs, ladders, and platforms to provide access to roof hatches.

2. Division 07 Sections for interfacing of roof hatches with roofing, insulation, flashing, and other components of the work.

3. Division 07 Sections for standard roof hatches.

4. Section 087155 “Security Door Hardware”; see requirements to Adjust and Clean.

5. [Section 099602 “High Performance FEBR Coatings.”]

1.2 PRE-INSTALLATION MEETINGS

A. Before beginning installation of FE/BR assemblies, the Contractor shall conduct a pre-installation confer-ence at the Project site with installation sub-contractor, roofing sub-contractor, the Project Director/COR, and other interested parties to review installation procedures and manuals, schedules, and coordination of FE/BR-assembly installation with other elements of the Work.

1.3 ACTION SUBMITTALS

A. General:

1. Action submittals should be accepted by the PD/COR prior to procurement of associated items by Contractor; premature procurement is at the risk of Contractor.

2. Refer to Division 01 Section on Submittals for general administrative requirements.

3. All Action submittals shall be submitted together in one submission.

B. Product Data:

1. Product data for each element of work, whether purchased from other manufacturers or provided as hatch Fabricator's standard production to include hardware, weather-stripping, fasteners, gas-kets, seals and accessary items. Include data substantiating that products comply with the require-ments of this Section.

C. Shop Drawings: Shop drawings for each hatch unit. Provide plans, elevations, and sections at 1:20 scale.

Provide details of fabrication, hatch seals, applied accessories, anchorages, and interfaces with adjoining and supporting construction at 1:5 scale. Include the following:

1. Cover sheet: Include manufacturer's name, address, telephone, and facsimile numbers; customer and address; project location; contract or purchase order number; and submittal release record.

GUIDE SPECIFICATIONS

FORCED-ENTRY (FE) / BALLISTIC SECTION 077234 - 2

RESISTANT (BR) ROOF HATCHES UNCLASSIFIED

2. Unit information:

a. Manufacturers model number.

b. Government DOS certification model number.

c. DOS 4-digit code.

d. Mark (hatch no.).

e. Hatch/frame finish.

f. Hatch type.

3. Elevation Drawings (in plan):

a. Rough opening dimensions.

b. Hatch opening dimensions.

c. Frame opening dimensions.

d. Substrate/rough opening material.

e. Manufacturer's name and reference number for primer and finish paint, including number of coats applied.

f. Separate steel sub-frames/embeds (number and list), where applicable.

g. Detail symbols.

h. Hardware and hardware symbols.

i. Ladder or ships ladder integration

4. Section Drawings:

a. Relate to sections and details on drawing.

b. Identify "Attack" and "Protected" sides.

5. Details: Show section at 1:5 scale of members indicating construction, size, and thickness of com-ponents, frame profile, anchorage, steel sub-frames/embeds (where applicable), continuous shim plates (where applicable), location of conduit entry into both sub-frame and hatch frame, fasten-ings, shims, sealant, backer rods, and means of separating dissimilar metals and ladder/ship ladder details shall be on separate sheets from plan and elevation drawing.

a. Sections through the curb (long and short direction) that shows dimensions of the curb, edge condition and all items protruding into the opening to include lifting devices, springs, and ladders.

b. Details shall include contract drawing information of “products by others” such as flashing, ladders, and finishes surrounding the product.

1) Details for flashing and weather proofing associated with Division 07, shall be coor-dinated with the weather proofing submittal/design and shall be shown for frame/roof curb condition.

2) Details for the hatch shall be coordinated with safety rails, ladders, or ship ladders and shown in the drawings.

6. General Product Information: Include notes sheet, miscellaneous materials specifications, abbre-viations, finish/paint system, and legend.

a. Breakdown of Product Line Items: If Manufacturer produces one contract line item as sev-eral parts, they shall break out items on drawings. Each item shall be a subdivision of that product line-item number.

GUIDE SPECIFICATIONS

FORCED-ENTRY (FE) / BALLISTIC SECTION 077234 - 3

RESISTANT (BR) ROOF HATCHES UNCLASSIFIED

7. Coordination Drawings: provide coordination drawings with roof curb, roof weatherproof system, ladder, and Fall protection (as required).

8. Design Data including supporting calculations of each of the required performances.

9. Testing Laboratory Qualifications in accordance with the Part 1 Article on QUALITY

ASSURANCE.

10. Shop finish samples for each required metal and finish showing required colors, textures and sheen; apply on 150mm lengths or squares of typical member shapes or plates used in the work.

11. Certificates: Letter from manufacturer indicating the products have been certified by Bureau of

Diplomatic Security (DS) in accordance with the Part 2 Article on PERFORMANCE

REQUIREMENTS.

12. Installation instructions customized for each type of application.

1.4 INFORMATIONAL SUBMITTALS

A. General:

1. Informational submittals shall be submitted at least four weeks prior to installation.

2. Refer to Division 01 Section on Submittals for general administrative requirements.

B. Installer Qualification Data:

1. Submit resumes of all team lead installers (present and responsible for each install) documenting the installers conformance with experience requirements in accordance with the Part 1 Article on QUALITY ASSURANCE. Each resume shall include at least three references (including contract information) that can provide verification that the installer has the expertise required to perform a successful installation.

2. Submit manufacturers’ certification to Project Director/COR for of the team lead installer indi-cated the he/she is capable of properly installing the FE/BR products, in accordance with the Part 1 Article on QUALITY ASSURANCE. The installer's qualifications require approval by OBO/CFSM/SM/SCD/SEB and OBO/CFSM/FAC.

C. Qualification Data: For Manufacturer and Installer in accordance with the Part 1 Article on QUALITY

ASSURANCE.

1.5 CLOSEOUT SUBMITTALS:

A. General:

1. Refer to Division 01 Sections on Submittals and on Closeout for general administrative require-ments.

B. Special Warranty: Provide special warranty in accordance with the Part 1 Article on WARRANTY.

C. Maintenance Data:

1. Data shall include instructions for cleaning and maintenance.

D. Inspection Reports and Certificates of Compliance: See forms at end of this Section.

GUIDE SPECIFICATIONS

FORCED-ENTRY (FE) / BALLISTIC SECTION 077234 - 4

RESISTANT (BR) ROOF HATCHES UNCLASSIFIED

1. Provide Table of contents and/or bookmarks organizing by building and floor for each product using contract identification number.

2. Provide plan showing location of products (one plan may cover multiple products or whole floor if legible).

3. Provide completed Certificates of Compliance documenting that all FE/BR hatch assemblies have been installed in accordance with contract documents. Certificates of Compliance must be signed by the installation team leader and the General Contractors Quality Control.

4. Provide any additional QC documents used by Contractor during the installation.

1.6 QUALITY ASSURANCE

A. Quality Control for Forced-Entry/Ballistic Resistant (FE/BR) Products: Certify compliance of fabricated and assembled FE/BR products specified in this Section with each quality control procedure established by the Government; these procedures are identified in the Compliance Form at end of this Section. Other quality control forms are also found at end of this Section.

B. Testing Laboratory Qualifications: For compliance with non-security performance requirements on secu-rity hatch assemblies of this Section, use only those testing laboratories, which have successfully demon-strated to Project Director/COR that they have experience and capabilities needed to satisfactorily con-duct required tests.

C. Installer Qualifications: Team lead installers (present and responsible for each install) shall have installed FE/BR hatch assemblies for a DOS project within last three years (minimum of five installed FE/BR or non-FE/BR roof hatches).

D. Pre-Installation:

1. Pre-Installation Conference: See Part 1 Article on PRE-INSTALLATION MEETINGS.

E. Installation Team Training: The Team leader (at no cost to the U.S. Government) shall provide the crew which is to actually perform installations of FE/BR assemblies with on-site, hands-on training to include installation of the entire assembly of the first FE/BR hatch. The Team leader shall also instruct the crew on preventive measures which must be taken to protect installers from injury and protect FE/BR assem-blies from damage during construction.

F. Additional Assistance: Manufacturer's technical representative (at no cost to the U.S. Government) shall provide General Contractor any additional advice, instruction, or inspection required to enable General Contractor to complete installation certification in accordance with this Section.

G. Certification by General Contractor: Prior to final completion, the General Contractor shall provide to the Project Director/COR a certification that the FE/BR materials have been installed in accordance with the manufacturer's instructions, these specifications and are operational. Use Certificates of Compliance forms at end of this Section. Deviation from these requirements is only permitted with the written ap-proval of the Project Director/COR with input from the OBO/CFSM/SM Physical Security Engineer, Designer of Record, and OBO/CFSM/FAC. Specifically the General Contractor's certification shall in-clude verification that:

1. The Installer team leader trained the installation crew and supervised the installation of the hatch.

2. Verify roof curb is installed square and rough opening is correct size.

3. Shim each bolt, as required; maintain minimum anchor embedment.

4. Ensure that hatches equipped with deadbolts turn freely without binding as applicable.

GUIDE SPECIFICATIONS

FORCED-ENTRY (FE) / BALLISTIC SECTION 077234 - 5

RESISTANT (BR) ROOF HATCHES UNCLASSIFIED

5. All temporary bolts have been replaced with permanent bolts.

6. All frame bolts have been torqued to meet the manufacturer’s specifications. Shims have been in-serted at all bolt locations.

7. Frame bolts/screws shall comply with approved shop drawings.

8. All FE/BR product bolts, screws and anchors are metric products to the extent feasible.

9. Any cladding or removable covers that conceal the frame bolt/screw access holes has either access holes with cap plugs or is attached with screws for easy removal. Cap plugs, cladding, and remov-able covers for each hatch have been tagged and won't be installed until after the final QA inspec-tion has been conducted by the OBO/SEB representative.

10. At each hatch assembly, there is a consistent gap between the hatch leaf and the hatch frames.

11. All access plates for each hatch have been installed as indicated in the approved shop drawings.

12. Each hatch frame head has been installed level and the non- hinge side jamb has been installed plumb and square.

13. Each lockset fully engages and freely operates.

14. If applicable ballistic trim bars have been installed per the approved shop drawings.

15. The manufacturer has provided two metal ID plates for each product that has machine applied let-ters and numbers. One ID plate should be located on the hatch frame and one ID plate should be located under the hatch leaf.

16. Weather proofing and flashing is installed as shown on the approved shop drawings.

1.7 IDENTIFICATION SYSTEMS

A. Identify each assembly to provide Government with ready reference to original manufacturer to facilitate reorders, replacement parts, service, resolution of complaints, and inventory. Provide a label as an em-bossed/printed metal plate mechanically fastened to the frame and hatch for permanent identification.

Locate ID label plate on the protected side, under the hatch edge at the hinge side of the base unit frame.

The label shall be approximately 40 by 75 mm and shall cite:

1. Manufacturer's name/city/state.

2. Contract number.

3. Month/year of fabrication.

4. Mark number.

5. DOS model number. (Certification Number).

6. DOS Code.

1.8 DELIVERY, STORAGE, AND HANDLING

A. Deliver roof hatch units to the project site prefabricated, prefinished, assembled, and equipped with ac-cessory units to the greatest extent feasible. Ship hatch in export wood crates separate from any sub-frames/embeds (if applicable). Comply with the Government's criteria and manufacturer's recommenda-tions for packaging, handling, storage, and delivery.

B. As applicable, clearly mark subframes with hatch mark number and identify jambs with “attack side”.

Package subframes/embeds separate from the hatch assemblies. Protect each subframe/embed piece to minimize damage to finished surfaces.

C. Package and ship installation hardware (anchors, bolts, screws, shims, ballistic trim, shop drawings, etc.)

for each hatch in the same crate as the hatch assembly.

D. Provide protection of pre-finished stainless steel finishes during delivery and on-site storage.

GUIDE SPECIFICATIONS

FORCED-ENTRY (FE) / BALLISTIC SECTION 077234 - 6

RESISTANT (BR) ROOF HATCHES UNCLASSIFIED

1.9 WARRANTY

A. Special Warranty: Manufacturer's standard form in which the manufacturer agrees to repair or replace hatches that fail in materials or workmanship within specified warranty period.

1. Failures include, but are not limited to, the following:

a. Failure to meet performance requirements.

b. Structural failures including excessive deflection, water leakage, air infiltration, or conden-sation.

c. Deterioration of metals, other materials, and metal finishes beyond normal weathering.

d. Failure of hardware components.

2. Warranty Period:

a. Hatches: Manufacturer shall warrant hatches for period of five years from substantial com-pletion.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. General: Fabricate and install FE/BR hatch assemblies to achieve indicated levels of resistance. Extend resistance to include anchorages, interfaces with adjoining substrates, and hardware.

B. Manufacturers must be certified by Bureau of Diplomatic Security (DS) in accordance with DS/PSP/PSD SD-STD-01.01, Rev H.

C. Certified Units: Provide units which are produced by manufacturer who has previously produced forced entry or ballistic hatches or doors or commercial roof hatches, within last 5 years, units of similar secu-rity attack resistances of equivalent size and resistance ratings, and which have been certified FE/BR products by Bureau of Diplomatic Security (DS) in accordance with DS/PSP/PSD SD-STD-01.01, Rev H.

D. DOS Hatch Codes: The following labels in Table 2.1, “Roof Hatch Codes” apply based upon the physi-cal security resistance and fire rating associated with each hatch:

FORCED-ENTRY (FE) / BALLISTIC SECTION 077234 - 7

TABLE 2.1, “ROOF HATCH CODES”

DOS

CODE

1st DIGIT - 2nd DIGIT - 3rd DIGIT - 4th DIGIT -

HATCH

COMPO-

SITION

FIRE

RATING

FORCED-

ENTRY

RATING

BALLISTIC-

RESISTANCE

RATING

1 Transparent None None None

2 Opaque 1.5 hours (class D at exterior)

15 minutes Note Used

3 * 3 hours (class A)

60 minutes Rifle 5.56 & 7.62

NATO

4 * 45 minutes (class C)

5 minutes Armor-Piercing (.30- 06)

Notes for above Table 2.1:

a. Composition - Column 1: Designated whether door has a transparency.

b. Fire Rating - Column 2: Fire-rated assemblies: Where indicated for fire resistance, provide flush steel Hatches-and-frame units; comply with NFPA 80, Standard for Fire Doors and Windows. Provide units that have been tested by recognized testing agency in accordance with NFPA No. 252 and ASTM E 152. Provide rated units where shown or as scheduled.

c. Forced Entry Rating - Column 3: Forced-Entry (FE) resistant assemblies: Where hatch as-sembly is shown, or scheduled as FE, provide door manufacturer's material and fabrication for panels, inserts, hardware, devices, and framing of units for the above ratings by the Physical Security Division of the Bureau of Diplomatic Security (DS/PSP/PSD).

d. Ballistic Resistance Rating - Column 4: Ballistic resistant (BR) assemblies: Where hatch assembly is shown, or scheduled as BR, provide door manufacturer's materials and fabrica-tion for panel, inserts, and framing of units for the above ratings by DS/PSP/PSD ratings.

E. Sound Transmission Class: Provide acoustical sound batt insulation, door gaskets and others to achieve an STC-50 rating. Acoustics shall be integrated into the design and not unduly complicate the operation of the hatch (i.e. no installing an additional hatch above or below the FE/BR hatch).

F. Design roof hatch lid to have a drip edge to direct water away from the hatch frame and onto the hatch flashing and finally to the roofing waterproofing system.

G. Wind Resistance: Force entry / ballistic resistant door assemblies shall withstand the effects of wind loads determined as follows, with no permanent deformation or breakage within door assembly when designed in according to ASCE 7-16, as adopted and amended by the OBO Building Code:

1. Basic Wind Speed: Shall be as indicated in the Structural Drawings.

2.2 MATERIALS, GENERAL

A. Stainless Steel: Sheets, Plates, Bars, Tubes, and shapes; Stainless Steel, Type 316, 2205 or 2101: ASTM A240M; low, moderate, and extreme ACL.

FORCED-ENTRY (FE) / BALLISTIC SECTION 077234 - 8

B. Mineral-Fiber Insulation: ASTM C 665, Type I (blankets without membrane facing); consisting of fibers manufactured from slag or rock wool; with maximum flame-spread and smoke-developed indexes of 25 and 50, respectively; passing ASTM E 136 for combustion characteristics in any voids, not requiring TSS or in conflict with the door fasteners and latches or locks.

C. Hatch Gaskets: Provide primary sound reduction and weatherproof gasketing; provide special-perfor-mance secondary hatch seals where indicated. Hatch sound and weather gaskets shall be continuous around the opening. Refer to the Part 2 Article on PERFORMANCE REQUIREMENTS for sound re-quirements.

D. Shims: Provide 1.5 mm (1/16 inch) thick plastic shims with break-off tabs.

E. Inserts, Anchors, Bolts, Fasteners: Standard units of strengths required to endure performances; Stainless steel, grade shall match tested/certified condition. Provide compatible washer that prevents galvanic ac-tion.

1. Stainless Steel Bolts, Hex Headed Screws, Nuts, and Washers: AISI Type 316 (Alloy Group 2), complying with ASTM F593 and ASTM A594, or ASTM A193 and ASTM A194, or ASTM A320 and ASTM A194; provide compatible AISI Type 316 washers where appropriate.

2. Anchors (Frame to Subframe/Substrate Attachment): Stainless steel, hot-dip, zinc-coated steel, or iron, complying with ASTM B 633 and ASTM F1941 for fasteners; provide sufficient mechanical properties to satisfy the specified performance requirements.

3. All anchors for hatches shall be metric (Class 8.8) equivalent to SAE J429 Grade 5 or other appro-priate high strength bolts and hardened nuts and washers, or as needed to satisfy the performance requirements and comply with standard OBO specifications for FE/BR and Blast resistant prod-ucts. In no case the strength of the bolt shall be less than the as tested condition. Contractor’s de-sign shall provide appropriate corrosion prevention where dissimilar metals are in close proximity and to address the atmospheric corrosion performance requirements identified in this specification

F. Butyl tape: Provide a layer of butyl tape between the concrete curb/roofing and roof hatch unit.

G. Curb: Design hatch to be used on a standard 600 mm (24 inches) concrete curb, measured from top of roof slab. If curb is not 600 mm (24”) (e.g., renovation) the curb must be built up to 600 mm (24”) with Stainless steel.

H. Hatch sleeve: Design hatch with a 500 mm (20 inches) extension sleeve from top of hatch roof curb into the roof opening with predrilled bolt slots.

2.3 HARDWARE AND DEVICES

A. General: Provide operating hardware, devices, and accessories, which will fulfill indicated level of safety and functional response to each form of attack or environmental impact, protect building and its occupancy with indicated level of security and will permit occupants to operate roof hatches in normal manner for access and exiting to roof.

B. Hardware: Provide locking hardware that is operated from the protected side of the hatch. No access hardware shall be provided on the attack side.

C. Lift Assist: Provide a primary and secondary lift assist system. (e.g., gas struts, springs, linear actuator, etc.).

FORCED-ENTRY (FE) / BALLISTIC SECTION 077234 - 9

D. Safety Rails: Provide an OSHA compliant 1067 mm (42 inches tall) safety railing/gate system anchored to the frame, not the roof, without compromising integrity of the hatch.

E. Design shall incorporate provision for either a ladder or ships ladder to be fastened directly to the hatch assembly. During coordination drawings development ensure conformance with all required clearances (e.g., head clearance).

2.4 FABRICATION AND ASSEMBLY

A. General: Fabricate to achieve performance requirements. Conform to Contract Drawings.

B. Stainless Steel: Fabricate units of stainless steel sheet of thicknesses indicated, but not less than 1.50

mm. Reinforce hatch and curb/well panels with welded-in-place ribs and edge channels of stainless steel. Reinforce work at hardware/device/accessory locations with welded stainless steel inserts. Pro-vide stainless steel-sheet formed shapes for gasket housings, flashing reglets, and similar elements.

1. At Fabricator's option, equivalent strength aluminum extrusions may be substituted for formed steel-sheet shapes specified above.

2. Fabricate forced-entry resistant units of not-less-than 3.0 mm stainless steel-sheet exposed faces (on the attack side), and with non-removable, flush fastener heads and tightly covered/protected joints between hatches and curb/well. To the greatest extent practicable, locate hardware, devices, and accessories inside unit (on protected side).

3. Fabricate ballistic resistant units of stainless steel sheets/plates, with exposed faces of thickness, which has been certified to resist ballistics at specified ratings.

C. Provide stainless steel-sheet formed shapes for gasket housings, flashing reglets, and similar elements.

D. To the greatest extent practicable, prefabricate high security roof hatches at factory. Disassemble only to extent necessary for handling, delivery, and installation.

E. Hatch frames shall have pre-drilled horizontally slotted bolt-hole patterns not to exceed 300 mm on cen-ter.

F. Provide insulated, double-walled construction of hatches and well or curb of units.

G. Size: Hatch opening shall comply with model IBC and OSHA requirements for hatch clearances.

1. Hatch with Ladder: Standard size 770 (30-1/2 inches) x 940 (37 inches).

2. Hatch with Ship Ladder: Size must be dictated by design. Minimum dimensions 1000 mm (39-1/2 inches) x 1000 mm (39-1/2 inches).

H. Weld seams and grind smooth. Comply with AWS D1.6/D1.6M Latest year Structural Welding Code for Stainless Steel.

I. Hatch Door should overhang frame with a drip edge to run water away from the frame onto flashing away from hatch.

GUIDE SPECIFICATIONS

FORCED-ENTRY (FE) / BALLISTIC SECTION 077234 - 10

RESISTANT (BR) ROOF HATCHES UNCLASSIFIED

2.5 SHOP FINISHING

A. General: Apply finishes as indicated on approved Drawings. As applicable for risk associated with At-mospheric Corrosivity Level (ACL) for the project location. Refer to the Part 2 Article on CORROSION RESISTANCE PERFORMANCE for acceptable component materials for various ACL

[THE FOLLOWING SELECTIONS ARE AESTHETIC-BASED, AND

TYPICALLY SHOULD BE MADE DURING THE BRIDGING DESIGN.]

B. [Stainless Steel: These components do not require coating, but may be coated for aesthetic pur-poses. See Section 099602 “High-Performance FE/BR Coatings” where coatings are applied.]

C. [Fluoropolymer Coatings: Fluoropolymer coatings may be used over any acceptable base metal.

See Section 099602 “High-Performance FE/BR Coatings.”]

2.6 ACCESSORIES

A. Fall Protection: Design roof hatch to accept fall protection railing above the roof level. It shall be capa-ble of being installed directly to the roof hatch assembly and shall be removable if necessary using bolted fasteners. Comply with all requirements of OSHA 1910.29 and the model IBC for design of such railing to include not limited to height, railing size, rail spacing, load ratings, etc.

[IN DESIGN-BUILD PROJECTS THE FOLLOWING OPTION SHOULD BE

LEFT TO THE DESIGN-BUILD FIRM BASED UPON INPUT FROM THE

DESIGNER-OF-RECORD.]

1. At the Contractor’s option, the FE/BR roof hatch may incorporate a ladder or ships' ladder, de-signed by the Designer-of Record, to be fastened directly to the hatch assembly.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Prior to start of installation, inspect the building and verify all conditions and dimensions as being ac-ceptable to receive the Work of this Section.

B. If any conditions are found that may inhibit proper execution of the Work, immediately notify the Project Director/COR in writing. Installation shall not proceed until remedial action, acceptable to the Project Director/COR, has been executed.

3.2 INSTALLATION

A. General: Install security hatch assemblies in accordance with approved shop drawings, manufacturer's data and instructions, and requirements of these specifications, and the checklists associated with at-tached Certificate of Compliance forms.

GUIDE SPECIFICATIONS

FORCED-ENTRY (FE) / BALLISTIC SECTION 077234 - 11

RESISTANT (BR) ROOF HATCHES UNCLASSIFIED

1. Install any fire rated assemblies in compliance with recommendations and instructions of SDI-100 and SDI-105.

a. At fire-rated openings, comply with NFPA Standard No. 80.

2. Avoid cutting rebar during concrete sub-frame installation.

3. Install minimum one shim per bolt, for rough opening (RO) frame clearance.

4. Match finish of cap plugs used in frame with frame finish to the maximum extent possible. Do not install cap plugs until after the final QA inspection, conducted by an OBO/CFSM/SM/SCD/SEB representative or another representative as designated by Project Director/COR, of the hatches has been completed.

B. Flashing: Install roof hatch and integrated flashing with roofing waterproofing systems in accordance with coordination drawings.

C. Anchorage:

1. The contractor shall verify substrates involved, and supply any special fastening tools (e.g., special drill, bit, tap) required by anchoring system.

2. The hatch manufacturer shall provide anchors appropriate for substrate to which frame and sub-frame is to be fastened. The anchor shall be acceptable for shock/short duration loading and have potential for removal and re-installation during life of building.

3.3 FIELD QUALITY CONTROL

A. Hatch installation team leader shall supervise installation crew during their installation of all FE/BR hatch. Upon completion of installation.

3.4 ADJUST AND CLEAN

A. Repair damaged elements, restore abraded surfaces, touch-up base-coat paint finish with air-drying pri-mer and top finish coats in accordance with Section 099602 “High-Performance FE/BR Coatings,” and remove imperfections from exposed natural metal finishes.

B. Upon request of Project Director/COR, remove protective coverings, and clean exposed surfaces.

C. Check and readjust hardware, devices, and accessories with hatch-to-frame-and-sill/ threshold clearances set for proper operation of locks, hatch seals, and other operational units. Do not remove permanently applied performance labels.

3.5 DEMONSTRATION

A. The installation team leader (refer to the Part 1 Article on QUALITY ASSURANCE) shall fully train the Embassy staff in the proper operation and maintenance of the FE/BR hatch assemblies. This training shall be performed at no cost to the US government.

END OF SECTION 077234

FORCED-ENTRY (FE)/ BALLISTIC- SECTION 077234 - A 1

Certificate of Compliance

FE/BR Roof Hatches

Hatch Number ______ (per Construction Documents)

The Contractor shall complete the Certificates of Compliance in full prior to acceptance of the FE/BR products by DOS. A Certificate of Compliance is required for each individual installed product. Each Certificate of Compliance shall be completed by the Installer Team Lead and the Contractor’s Quality Control Manager. When there is no QC Manager then the Contractor’s Project Manager shall complete the form.

The DOS Approving Official (OBO/CFSM/SM/SEB, OBO/CFSM/SM/SOD/PSO, OBO/CFSM/CM, Post Facility Officer, or DOS representative appointed by the COR) will review each Certificate of Compliance for completeness.

DESCRIPTION – TRAINING/ SUPERVISION

1 The Installer team leader trained the installation crew and supervised the installation of the hatch.

Installer Team Leader’s Name/ Date:

DESCRIPTION - GENERAL

INSTALLER

TEAM LEAD:

INITIALS/ DATE

CONTRACTOR

QC MANAGER:

INITIALS/ DATE

2 Verify roof curb is installed square and rough opening is correct size.

3 Shim each bolt, as required; maintain minimum anchor embedment

4 Ensure that hatches equipped with deadbolts turn freely without binding as applicable.

5 All temporary bolts have been replaced with permanent bolts

6 All frame bolts have been torqued to meet the manufacturer’s specifications. Shims have been inserted at all bolt locations.

FORCED-ENTRY (FE)/ BALLISTIC- SECTION 077234 - A 2

DESCRIPTION - GENERAL

INSTALLER

TEAM LEAD:

INITIALS/ DATE

CONTRACTOR

QC MANAGER:

INITIALS/ DATE

7 Frame bolts/screws shall comply with approved shop drawings.

8 All FE/BR product bolts, screws and anchors are metric products to the extent feasible

9 Any cladding or removable covers that conceal the frame bolt/screw access holes has either access holes with cap plugs or is attached with screws for easy removal. Cap plugs, cladding, and removable covers for each hatch have been tagged and won't be installed until after the final QA inspection has been conducted by the OBO/SEB representative.

10 At each hatch assembly, there is a consistent gap between the hatch leaf and the hatch frames

11 All access plates for each hatch have been installed as indicated in the approved shop drawings.

12 Each hatch frame head has been installed level and the non- hinge side jamb has been installed plumb and square.

13 Each lockset fully engages and freely operates 14 If applicable ballistic trim bars have been installed per the approved shop drawings.

15 The manufacturer has provided two metal ID plates for each product that has machine applied letters and numbers. One ID plate should be located on the hatch frame and one ID plate should be located under the hatch leaf.

16 Weather proofing and flashing is installed as shown on the approved shop drawings.

Installer Team Lead:

Printed Name: ____________________________

Signature: ____________________________

Initials: ______

Contractor’s QC Manager:

Printed Name: ________________________

Signature: _________________________

Initials: ______

FORCED-ENTRY (FE)/ BALLISTIC- SECTION 077234 - A 3

Noted Variances:

DOS Approving official approval/rejection/further action indicated for each variance:

1 2 DOS Approving Official: _____________________________________________ Date: __________

Office: _____________________ Name: _________________________ Position: ________________

1 DOS Official acknowledgment…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .