Attach 1 - PWS.docx
DOCX document 52 KB Posted
- Solicitation number
- SP330024Q0001
- Issued by
-
Defense Logistics Agency Distribution
About this file
This document is a Performance Work Statement (PWS) for a federal contract opportunity to provide Preventive Maintenance (PM) and Corrective Maintenance (CM) services on industrial woodworking equipment at the DLA Distribution Albany, Georgia facility.
The PWS outlines the scope of work, including details on the equipment that requires maintenance, the types of maintenance services required (PM and CM), maintenance performance schedules, replacement parts, documentation requirements, quality control and assurance, contractor personnel requirements, environmental compliance, and security and safety specifications. The maintenance services are required for a base year with four option years and a six-month contract extension. The contractor will be responsible for providing all labor, equipment, tools, materials, and supervision necessary to perform the required maintenance services. This is a non-personal services contract where the government will not exercise supervision or control over the contractor's personnel.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attach 4 - QASP (CAP) DDAG Woodworking Equip.pdf | ||
| Attach 3 - Wage Determination dtd 26Dec2023.pdf | ||
| Attach 2 - Schedule of Services 24Q0001.xlsx | XLSX spreadsheet | |
| Attach 4 - QASP-DDAG Woodworking Equip.docx | DOCX document | |
| Combined Syn Sol 24Q0001.pdf | ||
| Attach 5 - TE 1.1 Contractor Personnel Security.docx | DOCX document | |
| Attach 6 - TE 1.2 CAC Procedures.docx | DOCX document | |
| Attach 4 - QASP (POCs Listing) DDAG Woodworking.docx | DOCX document | |
| Attach 4 - QASP (COSR) DDAG Woodworking Equip.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
PERFORMANCE WORK STATEMENT (PWS)
FOR PREVENTIVE AND CORRECTIVE MAINTENANCE
ON INDUSTRIAL WOODWORKING EQUIPMENT
AT DLA DISTRIBUTION ALBANY, GEORGIA
SCOPE OF WORK.
A. Background: The Defense Logistics Agency (DLA) is a United States (U.S.) Department of Defense (DoD) agency that provides worldwide logistics support for the missions of the Military Departments and the Unified Combatant Commands under conditions of peace and war. The primary mission of DLA Distribution is to provide supplies and services to the United States military forces worldwide.
B. The DLA Distribution Albany, GA is in possession of various industrial woodworking equipment for which maintenance services are required to ensure operational availability. The maintenance services shall include two types of service: Preventive Maintenance (PM) scheduled and on call Corrective Maintenance (CM) unscheduled.
The following table identifies the six (6) units of DLA Distribution Albany, GA equipment that requires maintenance services for the Base Year, four (4) Option Years, and one (1) Six (6)-Month Contract Extension:
| EQUIPMENT |
| MODEL # |
| QUANTITY |
| LOCATION |
| SERIAL NUMBER |
Diehl 750 Ripsaw
| 950 |
| 1 Each |
| Building 1221 Bay 2 |
| 7/85-4844-4255 |
| Tiger saw |
| M24 |
| 1 Each |
| Building 1221 Bay 2 |
| Tiger saw |
| M24 |
| 1 Each |
| Building 1221 Bay 2 |
| Automated Box Machine |
| HBM 72 |
| 1 Each |
| Building 1221 Bay 2 |
413042518
| Hendrick Saw |
| HC4-2600W |
| 1 Each |
| Building 1221 Bay 2 |
| Hendrick Saw PRO |
| PROH102 |
| 1 Each |
| Building 1221 Bay 2 |
0Y1887R004
C. The DLA Distribution Albany, GA equipment maintenance requirements are subject to change by the Government when equipment addition(s) and/or deletion(s) are required due to equipment disposal or replacement.
GENERAL.
A. The Contractor shall provide all labor, equipment, tools, materials, replacement parts, travel, and supervision necessary to perform maintenance services on the Government owned equipment located at DLA Distribution Albany, GA which resides on the Marine Corps Logistics Base, Albany GA, complete and in accordance with (IAW) the terms and conditions specified herein. All references in this PWS to “Contractor personnel” include both Contractor employees and subcontractors. The Contracting Officer (KO) will designate a Contracting Officer’s Representative (COR) who will be perform the COR duties under this contract.
B. This is a non-personal services contract to provide Preventive and Corrective Maintenance Support Services on Woodworking Equipment at DLA Distribution Albany, GA. The Government will not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. The Government and the Contractor understand that the services to be provided under this contract by the Contractor are non-personal services and that no employer-employee relationship exists between the Government and the Contractor. The Government may provide technical direction which will assist the Contractor in accomplishing the PWS; however, the Government will not control the methods used by the Contractor to perform the service requirements set forth in the PWS.
PERIOD OF PERFORMANCE.
Maintenance services shall be performed during the base year period and option year periods (if exercised) as shown in the contract.
PLACE OF PERFORMANCE.
The Contractor shall perform Preventive and Corrective Maintenance Services on Woodworking Equipment at DLA Distribution Albany, GA.
1.0 PREVENTIVE MAINTENANCE (PM) (Scheduled)
1.1 This maintenance service includes the care and servicing by Contractor personnel for the purpose of maintaining equipment in satisfactory operating condition in accordance with manufacturer’s recommended preventive maintenance tasks. PM services shall include, but are not limited to overall inspection, testing, sustainment, restoration, and modernization (SRM) to include all components, lubrication of fittings and/or carriages, optical assessments, lightness check on chain drive, overall cleaning of photocells, check brakes of different systems, and system adjustments. The Contractor shall perform preventive maintenance services as recommended in the manufacturer’s maintenance manual. The Government will provide available maintenance manuals; however, if the Government does not have the maintenance manual, the Contractor shall be responsible for obtaining the manual. All replacement parts, materials, environmental compliance, and Contractor personnel travel used for preventive maintenance services shall be included in the contract unit price for preventive maintenance service.
1.2 Based on the PM schedule requirements identified in the Schedule of Supplies/Services, the Contractor shall establish a PM schedule. Within 7 calendar days after the date of contract award, the Contractor shall submit the PM schedule to the Contracting Officer Representative (COR). The Government will accept or propose an alternate PM schedule within 5 calendar days.
1.3 All repairs required as a result of preventive maintenance inspection, except as noted below, shall be accomplished under Corrective Maintenance, with the approval of the COR.
2.0 CORRECTIVE MAINTENANCE (CM) (Unscheduled)
2.1 This maintenance service includes all actions to diagnose equipment malfunctions and restore the equipment to normal operating condition. All CM maintenance shall be performed to the standards set by, and in accordance with the Original Equipment Manufacturer (OEM) specifications. The COR will advise the Contractor POC of the suspected problem and request an evaluation. The Contractor will inspect the equipment, inform the COR of the problem discovered, and provide a cost estimate as soon as possible when major repairs exceed $1,500.00. The Contractor shall begin repairs only after approval by the Government COR. If repairs are more extensive, or cost more than originally estimated, or are determined to exceed 70 percent of the value of a new and identical item of equipment, the Contractor will obtain the approval of the COR before continuing work.
2.2 The Contractor shall provide the COR a point of contact and cell phone number to receive and respond to CM service requests. The Contractor shall ensure that this cell phone number is monitored to guarantee prompt response to CM service requests.
2.3 For repair actions estimated to cost $1,500.00 or less, the Contractor is authorized to make any repairs when the total to be invoiced to the Government for all repairs of a piece of equipment is $1,500.00 or less.
2.4 The COR (or other Government designee) will accompany the Contractor to the work area and remain present while the Contractor performs corrective maintenance services.
3.0 MAINTENANCE PERFORMANCE SCHEDULE
3.1 Preventive maintenance services shall be completed within 5 calendar days of scheduled service, unless otherwise approved by the COR.
3.2 Corrective maintenance services shall be responded to on site by Contractor personnel within 24 to 48 hours after verbal notification by COR. Upon arrival on site, Contractor personnel shall report to the COR. The Contractor shall continue corrective maintenance services until such time as the equipment is returned to full operational capability or as otherwise instructed by the Government COR.
4.0 REPLACEMENT PARTS/PRODUCTS
4.1 The Contractor shall use only new parts, or parts which have been refurbished to “like new” condition which enable the part to function or operate at a level equal to the specification of the original equipment. The invoice and work order shall indicate if a “like new” part has been installed or used in the repair of the equipment.
4.2 Parts used for PM shall not be invoiced separately but shall be included as part of the PM pricing.
4.3 Replacement parts required in the performance of CM shall be invoiced to the Government in accordance with the terms and conditions of this contract (FAR 52.212-4 Alternate I).
4.4 Equipment lubricants and oils used in the performance of this contract shall be the same or equal to those recommended by the manufacturer’s technical manuals or specifications.
4.5 The Contractor is responsible for obtaining equipment maintenance service manuals that are not available from the Government.
5.0 MAINTENANCE SERVICE DOCUMENTATION.
The Contractor shall provide the COR a maintenance service document for all PM and CM services provided. Each maintenance service document shall contain the information listed below, as applicable to PM or CM services, and shall be submitted within 5 working days after completion of the maintenance services.
1. Date and time of service call notification and arrival at Government location.
2. Manufacturer, model, serial number, and location of the equipment involved.
3. For PM, the labor hours spent, and tasks performed.
4. For CM, labor hours and associated labor rates worked.
5. For PM and CM, all replacement parts used by part number, part name, quantity, and cost per unit which shall supported by actual supplier invoices, published price lists and/or proof of payment.
6. Description of malfunction and work/service performed, and corrective action taken if action is a repair.
7. Legibly printed name of Contractor personnel who accomplished work
6.0 WARRANTY
The Contractor shall take advantage of every manufacturer warranty provision on equipment to include labor and parts. The automated equipment management control system generated work order indicates the warranty expiration date. Warranty items shall be furnished by the manufacturer and labor for warranty work performed by the Contractor shall be reimbursed by the manufacturer. Warranty disputes shall be directed to the COR. The Contractor shall indicate the date the manufacturer was called on the work order with a follow-up call if the manufacturer does not respond in a timely manner. The Contractor shall inspect each piece of equipment after warranty work is performed to ensure that equipment has been repaired and is safe to operate.
7.0 CONTRACTOR PERSONNEL
7.1 Contractor personnel shall wear required Government furnished badge and be easily recognizable. This may be accomplished by Contractor personnel wearing distinctive clothing bearing the name of the company and/or by wearing appropriate badges which contain the company name and employee’s name.
7.2 Contractor personnel shall comply with directives pertaining to operation of privately owned vehicles on the DLA Distribution Albany GA grounds.
7.3 The Contractor shall assure that Contractor personnel completely understand the requirements of this Performance Work Statement. All Contractor service technicians must have sound mechanical aptitude and ability; must have basic understanding of machinery, both mechanical and electrical; must have the ability to understand and comprehend technical manuals, drawings, diagrams, and any other technical data supplied by various manufacturers. All Contractor service technicians must have working knowledge of diagnosis and repair for the types of equipment included in this PWS and be capable of diagnosis and repair.
8.0 QUALITY CONTROL PLAN
8.1 The Contractor shall establish and maintain a complete Commercial Quality Control Plan to ensure the requirements of the contract are provided as specified.
8.2 The plan shall include an inspection system covering both preventative and corrective maintenance repairs required by this contract. The plan must ensure that quality service levels are maintained throughout contract performance.
8. 3 The Contractor shall maintain records of all inspections conducted by the Contractor and any necessary corrective action taken. This documentation and all records and schedules, as described in the PWS, that are the responsibility of the Contractor, are the property of the Government and shall be made available to the Government during the term of the contract.
9.0 QUALITY ASSURANCE
9.1 The COR is responsible for performing Government quality assurance functions for all services and supplies furnished under this contract. Contractor performance is subject to review by the COR and Contracting Officer (KO). Upon contract award, the identity of the COR will be promptly furnished to the Contractor.
9.2 The COR will provide general instructions on limitations and deadlines. Additional instructions will be provided for any unusual assignments or those that vary from established procedures. The Contractor’s employees will independently carry out the assignments. Completed work will be spot-checked by the Government for adherence to procedures, accuracy, and completeness.
9.3 The Quality Assurance Surveillance Plan (QASP) is the Government’s plan to ensure the contractor provides the required services and adheres to the quality standards as specified in this PWS. Both the Contractor and the Government have agreed to the terms of this contract. During the life of the contract, administrative procedures such as inspections, documentation, and retention of records, which reflect the Contractor’s performance, will be retained.
9.4 This QASP will be used to monitor compliance with contract terms and conditions, identify nonconforming services to determine appropriate action. This plan sets forth the method and manner by which the Government intends to conduct surveillance of work under the contract and is subject to the unilateral change by the Government without modification of the contract. All work required by the contract is subject to surveillance, whether or not specifically included in the plan. When the Contractor performance fails to achieve the acceptable performance level and is clearly the fault of the Contractor, the COR will prepare a Contractor Deficiency Report (CDR) annotating the discrepancy, the date and time the deficiency was noted and will forward it to the Contractor and request corrective action. In response to the CDR, the Contractor will explain within seven working days, in writing, why performance was unacceptable, how performance will be returned to acceptable levels and how recurrence of the problem will be prevented in the future. The COR will evaluate the Contractor’s explanation and determine the appropriate actions.
9.5 When the Contractor re-performs services, because of the discrepancies, and the contractor does not meet the standards identified in this PWS, the Government may desire that the work to be re-performed prior to the completion of the delivery order. If this is the case, the Contractor will perform the service at no additional cost to the Government.
9.6 The COR is designated as the point of final inspection and acceptance by the Government of all items and services required by the contract.
10.0 MAINTENANCE SUPPORT HOURS
10.1 The Contractor shall provide preventive maintenance (PM) support services Monday through Friday between the hours of 0700 and 1530, excluding federal holidays. The Government observes the following federal holidays:
| New Year’s Day | 1 January | ||
| Martin Luther King Jr. Birthday | Third Monday in January | ||
| Presidents Day | Third Monday in February | ||
| Memorial Day | Last Monday in May | ||
| Juneteenth Day | 19 June | ||
| Independence Day | 4 July | ||
| Labor Day | First Monday in September | ||
| Columbus Day | Second Monday in October | ||
| Veterans Day | 11 November | ||
| Thanksgiving | Fourth Thursday in November | ||
| Christmas | 25 December |
If the holiday falls on a Saturday, it will be observed on the preceding Friday. If the holiday falls on a Sunday, it will be observed on the following Monday. The Contractor shall not be required to perform PM services on these days. In the event an Executive Order issued by the President of the United States declares Agencies of the Federal Government closed on a Contractor-scheduled PM service date, the COR will advise the Contractor on whether PM services should be performed for that day or services should be rescheduled.
10.2 The Contractor shall provide corrective maintenance (CM) support services Monday through Friday between the hours of 0700 and 1530, excluding federal holidays unless the COR determines that maintenance support outside designated hours is required because non-operational equipment will impact immediate mission functions.
11.0 ENVIRONMENTAL COMPLIANCE
11.1 The Contractor shall comply with all Federal, State and Local regulations as well as DLA and Host installation rules and policies regarding the use, storage, transport and disposal of hazardous materials and wastes.
11.2 Hazardous work processes and hazardous materials utilized or generated in the performance of this contract shall be controlled and disposed of by the Contractor in a manner that is safe IAW the appropriate local, state and US Government laws and directives established for the control of those processes and materials.
11.3 The Contractor shall provide for clean-up of all hazardous and non-hazardous spills when they may occur in, around, or as a result of the Contractor’s operation. The Contractor shall also provide for transportation and disposal off the facility of all hazardous and non-hazardous waste products generated in the performance of this contract. The Contractor shall immediately notify the COR of any hazardous waste spills.
12.0 SECURITY REQUIREMENTS
12.1 The Contractor or authorized representative shall submit to the COR a roster identifying all Contractor personnel who will be performing under this contract and require access to the equipment for which maintenance services are required. The roster shall contain the following information for each individual. An updated roster and individual information shall be provided to the COR when any Contractor personnel changes occur.
(1) Name (last, first, middle initial), aliases
(2) Status (type of employment)
(3) Name of company
(4) Office Phone
(5) Home address
(6) Date of birth
(7) Weight, height, color hair and eyes
(8) Length of anticipated employment
12.2 The roster shall be furnished to the COR within 5 calendar days after the date of contract award. When any Contractor personnel changes occur, the Contractor shall provide an updated roster and individual information to the COR within 5 calendar days. The prompt submission of this information will keep to a minimum any delay and inconvenience to the Contractor and Contractor personnel in performance of the contract. The information will be used for accomplishment of the DLA Form 1486, Application for Civilian Identification, and Electronic Access Card, completed by the DLA Distribution Albany, GA Site Security Officer.
12.3 Contractor personnel must bring personal identification and all completed forms to the Site Security Officer for badge photograph and identification when notified by the COR.
12.4 The Contractor and Contractor personnel shall comply with all security requirements, imposed by the installation commander, at all times, while on the installation. Contractor personnel involved in civil crimes and/or other incidents of misconduct may be restricted entry to the base. The Contractor is responsible for ensuring the badges are returned within three calendar days of employee termination or contract completion.
12.5 The Contractor shall prohibit the use of Government issued keys or Electronic Access Cards by any persons other than Contractor personnel. The Contractor shall prohibit the opening of locked areas by Contractor personnel to permit entrance of persons other than Contractor personnel engaged in the performance of assigned work in those areas.
13.0 SAFETY AND OCCUPATIONAL HEALTH (SOH)
13.1 The Contractor shall conform to all applicable safety and occupational health standards published in the Federal Register or any other Occupational Safety and Health Administration (OSHA) Public Laws and ensure employees observe safety, traffic control, and fire prevention requirements in effect at the site.
13.2 Government safety personnel may observe Contractor operations/processes at any time on Government premises. Imminent danger situations shall be reported to the KO within one (1) hour and corrected on the spot; other safety issues shall be reported to the COR within one (1) business day.
13.3 Upon request, the Contractor shall provide a copy of a written SOH plan which outlines:
a. An on-site SOH point of contact (POC); the Contractor’s POC shall be identified in writing to the KO or COR. The Contractor’s POC shall be available to assist the KO or COR with any safety surveillances conducted by the local safety office.
b. How hazards and deficiencies are identified and corrected, procedures for identifying, tracking, and correcting hazards in the Contractor’s assigned work area. Any hazards created during the work by the Contractor must be abated prior to the final departure from the activity.
c. Responsibilities for protection of Government personnel, property and facilities, and procedures for reporting mishaps and correcting unsafe conditions, hazards, or practices.
13.4 The Contractor shall provide employees SOH training commensurate with the type of work being performed on the contract or activities involving Government facilities, personnel, or equipment.
13.5 The Contractor shall provide a Material Safety Data Sheet (MSDS) to the KO or COR for any chemicals brought on site to perform the requirements in the contract and shall provide the MSDS to the KO or COR prior to bringing the chemicals to the worksite.
13.6 The Contractor shall notify the KO or COR within one (1) hour of the occurrence of any accidents and incidents resulting in either personal injury, loss of life, property damage to a government facility or equipment.
13.7 The Contractor shall require their personnel to wear personal protection equipment (PPE) (e.g., hearing protection, eye protection, gloves, steel-toed shoes or boots, aprons, masks, face shields, reflective vests, safety harnesses) in accordance with OSHA standards.
13.8 The Contractor shall inform personnel DLA is in the process of pursuing recognition under the Occupational Safety and Health Administration’s (OSHA) Voluntary Protection Program (VPP). The Contractor is not required to “certify” to VPP, but employees must be aware of the VPP and DLA’s efforts towards the recognition.
13.9 The Contractor shall contact the KO before bringing any radioactive source or device that produces radiation when operated. The KO will contact the Installation Radiation Safety Office for approval.
14.0 GOVERNMENT FACILITIES AND SUPPORT SERVICES
14.1 Work area
14.1.1 The Government will make available during performance of this contract inside workspace close to equipment location. The Contractor shall be responsible for the orderliness and cleanliness of all areas utilized in the performance of this contract. These areas will be neat and clean, free from fire and safety hazards and unsanitary conditions.
14.1.2 During and at completion of work, debris shall not be permitted to spread unnecessarily into adjacent areas nor accumulate in the work area itself. All such debris, excess material, and parts shall be cleaned up and removed at the completion of the job and/or at the end of each workday if work is in progress.
14.2 Utilities
14.2.1 The Government will make available at no cost to the Contractor water and electricity for Contractor connection at Government provided work areas. The Contractor shall instruct employees in utilities conservation practices. The Contractor shall be responsible for operating under conditions which preclude the waste of utilities and shall include the following:
14.2.2 Lights shall be used only in areas where and when work is being performed.
14.2.3 Mechanical equipment controls for heating, ventilation, and air conditioning systems shall not be adjusted by the Contractor or by Contractor personnel in Government areas unless authorized.
14.2.4 Water faucets or valves shall be turned off after use.
14.2.5 Government telephones shall not be used for personal reasons nor for any toll/long distant calls unless authorized by the COR. Telephone access will be made available for the Contractor’s use for local calls only. Long distant and toll calls require prior authorization by the COR and will be limited to credit cards only. Telephone billing will be monitored by the COR. Unauthorized calls by the Contractor will be reported to the KO for resolution.
14.3 Emergency Medical Services
The Government will provide emergency medical treatment and emergency patient transportation service for Contractor personnel. The Contractor shall reimburse the Government the cost of medical treatment and patient transportation service at the current impatient or outpatient treatment rate as appropriate. Telephone number for Urgent Care is: 911.
15.0 GOVERNMENT OBSERVATIONS.
Government personnel, other than the COR may from time to time, with Contractor/Government coordination, observe or inspect Contractor operations. However, these personnel may not interfere with Contractor performance.
16.0 DOCUMENTATION AND RECORDS. All documentation, records, and schedules, as described in this PWS, which are the responsibility of the Contractor, are the property of the Government and shall remain so upon termination or completion of the contract. The Contractor shall keep these items current. Documentation, records, and schedules shall be turned over to the Government upon termination or completion of the contract. All documentation, records, and schedules are subject to the Freedom of Information Act and Privacy Act.
END OF PERFORMANCE WORK STATEMENT
File details come from the government source that posted it. Updated .