Dugway CLIN Schedule

Area 2 of SWMU 11, Dugway Proving Ground, Tooele County UTSolicitation No: W9123823R0019
Waste Excavation, Transportation, and Disposal - Dugway Proving Ground

POP: Contract Award through 36 Months

CLIN No.Base TasksPWS ReferenceTask DescriptionQuantityUnitPrice (Base)
15.1Task 1 – Mobilization and Preparatory$0.00
TBD1.15.1.1Mobilization of Construction Equipment and Facilities1Job
TBD1.25.1.2Submittals/Implementation Plans1Job
TBD1.35.1.3Setup/Construction of Temporary Facilities1Job
TBD1.45.1.4OPTIONAL TASK - Additional Mobilization/Demobilization1Job
25.2Task 2 – Monitoring, Sampling, Testing and Analysis$0.00
TBD2.15.2.1Meteorolgical Monitoring1Job
TBD2.1.15.2.2Radiation Monitoring1Job
TBD2.1.25.2.3Air Monitoring and Sampling1Job
TBD2.1.35.2.4Sampling Surface Water/Groundwater/Liquid Waste1Job
TBD2.1.45.2.5Soil Sampling1Job
TBD2.1.55.2.6Laboratory Chemical Analysis1Job
TBD2.1.65.2.7Radioactive Waste Analysis1Job
35.3Task 3 – Site Work$0.00
TBD3.15.3.1Clearing and Grubbing1Job
TBD3.25.3.2Earthwork1Job
TBD3.35.3.3Fencing1Job
TBD3.45.3.4BMP Installation1Job
45.4Task 4 – Contaminated Soil Removal$0.00
TBD45.4Contaminated Soil Removal1Job
TBD4.15.4.1OPTIONAL - Additional Contaminated Soil Removal (Beyond Base Quantity)1Job
55.5Task 5 – Transport and Disposal$0.00
TBD55.5OPTIONAL - Transport and Disposal1Job
TBD5.15.5.1OPTIONAL - Transport and Disposal Mixed Waste1Job
TBD5.25.5.2OPTIONAL - Additional Transport and Disposal (Beyond Base Quantity)1Job
65.6Task 6 – Site Restoration$0.00
TBD65.6Site Restoration1Job
TBD6.15.6.1OPTIONAL - Site Restoration (Above Base Quantity)1Job
TBD6.15.6.2OPTIONAL - Off-Site Backfill (Base Quantity)1Job
TBD6.15.6.3OPTIONAL - Off-Site Backfill (Above Base Quantity)1Job
75.7Task 7 – Demobilization$0.00
TBD7.15.7.1Removal of Temporary Facilities1Job
TBD7.25.7.2Final Decontamination1Job
TBD7.35.7.3Demobilization of Construction Equipment and Facilities1Job
TBD7.45.7.4Submittals/Final Reports1Job
85.8Task 8 – General Requirements$0.00
TBD8.15.8.1Meetings/Conferences1Job
Sub-Total Base Tasks:$0.00cross checkERROR:#REF!
Sub-Total Optional Tasks:ERROR:#REF!cross check
Total Project Cost:ERROR:#REF!cross check$0.00