Scheduled Preventative Maintenance for Listed Mechanical Equipment
Solicitation number
1333ND22QNB190171
Issued by

About this file

This spreadsheet and solicitation outline a preventative maintenance program for mechanical equipment at the National Institute of Standards and Technology Boulder campus. Key assets include rooftop air conditioners, CRAC units for server farms, air cooled condensing units, fan coil units, make-up air units, electric unit heaters, backflow preventers, emergency generators, and associated job plans. Maintenance frequencies range from monthly to annual, with services to be performed in accordance with the statement of work. Solicitation 1333ND22QNB190171 seeks a contractor to provide all labor, equipment, and materials for the scheduled preventative maintenance in accordance with the listed job plans. The requirement is set aside for small businesses with response due by the specified date and period of performance expected to be one base year with four option years.

View the file

Other files

File Type Posted
Contractor Price Sheet Amd 0001 .xlsx XLSX spreadsheet
Amend 0001 OISM PMs and Job Plans 060822.xlsx XLSX spreadsheet
Revised Job Plans Amend 0001.pdf PDF
Amendment 0001.pdf PDF
1333ND22QNB190171.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

AssetDescriptionLocationFrequencyFrequency UnitsJanFebMarAprilMayJuneJulyAugSeptOctNovDec
01-PAC-2001-01 (Replaced PAC-002)PACKAGED AIR CONDITIONER, ROOFTOP,01-ROOF-L6MONTHSJP-C-PAC-CJP-C-PAC-MJP-C-PAC-H
01-PAC-2001-02 (Replaced PAC-075)PACKAGED AIR CONDITIONER, ROOFTOP, TRANE01-ROOF-L6MONTHSJP-C-PAC-CJP-C-PAC-MJP-C-PAC-H
92-CRAC-001CRAC UNIT FOR B92 SERVER FARM92-1A1023MonthsJP-C-CRACJP-C-CRACJP-C-CRACJP-C-CRAC
92-CRAC-002CRAC UNIT FOR B92 SERVER FARM92-1A1023MonthsJP-C-CRACJP-C-CRACJP-C-CRACJP-C-CRAC
92-CRAC-003CRAC UNIT FOR B92 SERVER FARM92-1A1023MonthsJP-C-CRACJP-C-CRACJP-C-CRACJP-C-CRAC
92-CRAC-004CRAC UNIT FOR B92 SERVER FARM92-1A1023MonthsJP-C-CRACJP-C-CRACJP-C-CRACJP-C-CRAC
92-CRAC-005CRAC UNIT FOR B92 SERVER FARM92-1A1023MonthsJP-C-CRACJP-C-CRACJP-C-CRACJP-C-CRAC
92-CRAC-006CRAC UNIT FOR B92 SERVER FARM92-1A1023MonthsJP-C-CRACJP-C-CRACJP-C-CRACJP-C-CRAC
92-CRAC-007CRAC UNIT FOR B92 SERVER FARM92-1A1033MonthsJP-C-CRACJP-C-CRACJP-C-CRACJP-C-CRAC
92-CRAC-008CRAC UNIT FOR B92 SERVER FARM92-1A1033MonthsJP-C-CRACJP-C-CRACJP-C-CRACJP-C-CRAC
92-ACCU-001Air Cooled Condensing Unit92-X Building 92 Exterior6MonthsJP-C-ACCUJP-C-ACCU
92-ACCU-002Air Cooled Condensing Unit92-X Building 92 Exterior6MonthsJP-C-ACCUJP-C-ACCU
92-ACCU-003Air Cooled Condensing Unit92-X Building 92 Exterior6MonthsJP-C-ACCUJP-C-ACCU
92-ACCU-004Air Cooled Condensing Unit92-X Building 92 Exterior6MonthsJP-C-ACCUJP-C-ACCU
92-ACCU-005Air Cooled Condensing Unit92-X Building 92 Exterior6MonthsJP-C-ACCUJP-C-ACCU
92-ACCU-006Air Cooled Condensing Unit92-X Building 92 Exterior6MonthsJP-C-ACCUJP-C-ACCU
92-ACCU-007Air Cooled Condensing Unit92-X Building 92 Exterior6MonthsJP-C-ACCUJP-C-ACCU
92-ACCU-008Air Cooled Condensing Unit92-X Building 92 Exterior6MonthsJP-C-ACCU
01-W6-FCU-357PM FAN COIL UNIT01-46103MONTHSJP-C-FCUJP-C-FCUJP-C-FCUJP-C-FCU
01-W6-FCU-370PM FAN COIL UNIT01-46613MONTHSJP-C-FCUJP-C-FCUJP-C-FCUJP-C-FCU
01-W6-FCU-377PM FAN COIL UNIT01-46103MONTHSJP-C-FCUJP-C-FCUJP-C-FCUJP-C-FCU
01-W6-FCU-378PM FAN COIL UNIT01-46103MONTHSJP-C-FCUJP-C-FCUJP-C-FCUJP-C-FCU
FCU-073PM FAN COIL UNIT01-4042D6MONTHSJP-C-FCUJP-C-FCU
FCU-581PM FAN COIL UNIT30366MONTHSJP-C-FCUJP-C-FCU
01-W3-FCU-392PM FAN COIL UNIT33346MONTHSJP-C-FCUJP-C-FCU
01-W3-FCU-393PM FAN COIL UNIT33346MONTHSJP-C-FCUJP-C-FCU
FCU-039PM FAN COIL UNIT20186MONTHSJP-C-FCUJP-C-FCU
FCU-094PM FAN COIL UNIT21256MONTHSJP-C-FCUJP-C-FCU
81-FCU-01-2B108PM FAN COIL UNIT81-1A1056MONTHSJP-C-FCUJP-C-FCU
81-FCU-02-2K100PM FAN COIL UNIT81-1C1016MONTHSJP-C-FCUJP-C-FCU
81-FCU-06-2K100PM FAN COIL UNIT81-1D1016MONTHSJP-C-FCUJP-C-FCU
81-FCU-07-2K100PM FAN COIL UNIT81-1E1016MONTHSJP-C-FCUJP-C-FCU
81-FCU-08-2K100PM FAN COIL UNIT81-1F1016MONTHSJP-C-FCUJP-C-FCU
81-FCU-09-2K100PM FAN COIL UNIT81-1G1016MONTHSJP-C-FCUJP-C-FCU
92-PMP-001WATER BOOSTER PUMP921YEARJP-C-PMP
03-EAC-002ELECTRIC AIR CONDITIONERS03-1A1036MONTHSJP-C-CRACJP-C-CRAC
03-EAC-007ELECTRIC AIR CONDITIONERS3-2A1096MONTHSJP-C-CRACJP-C-CRAC
03-EAC-013ELECTRIC AIR CONDITIONERS3-3A1106MONTHSJP-C-CRACJP-C-CRAC
WAC-002WALL AIR CONDITIONER04-M1402A6MONTHSJP-C-WACJP-C-WAC
FCU-929PM FAN COIL UNIT24-10126MONTHSJP-C-FCUJP-C-FCU
05-AHU-001PM PACKAGED A/C05-Roof6MONTHSJP-C-PAC-CJP-C-PAC-H
92-MAU-001MAKE-UP AIR UNIT923MONTHSJP-C-MAU-QJP-C-MAU-AJP-C-MAU-QJP-C-MAU-Q
92-UH-001ELECTRIC UNIT HEATERS921YEARJP-C-UH
92-UH-002ELECTRIC UNIT HEATERS921YEARJP-C-UH
92-UH-003ELECTRIC UNIT HEATERS921YEARJP-C-UH
92-UH-004ELECTRIC UNIT HEATERS921YEARJP-C-UH
92-UH-005ELECTRIC UNIT HEATERS921YEARJP-C-UH
92-UH-006ELECTRIC UNIT HEATERS921YEARJP-C-UH
92-BFP-001BACKFLOW PREVENTER921YEARJP-C-BFP-A
92-EMG-001
EMERGENCY GENERATORS
921MONTHSJP-C-B92-EMG-MJP-C-B92-FUEL-Q
JP-C-B92-EMG-MJP-C-B92-EMG-MJP-C-B92-EMG-MJP-C-B92-FUEL-Q
JP-C-B92-EMG-MJP-C-B92-EMG-MJP-C-B92-EMG-MJP-C-B92-EMG-A

JP-C-B92-LOAD-A

JP-C-B92-FUEL-Q

JP-C-B92-EMG-M

August 2025

JP-C-B92-5YRJP-C-B92-EMG-MJP-C-B92-EMG-MJP-C-B92-FUEL-Q
JP-C-B92-EMG-MJP-C-B92-EMG-M
EMG-008EMERGENCY GENERATORS01-20011MONTHSJP-C-2001-EMG-MJP-C-2001-EMG-MJP-C-2001-EMG-MJP-C-2001-EMG-MJP-C-2001-EMG-MJP-C-2001-EMG-MJP-C-2001-EMG-MJP-C-2001-EMG-M

JP-C-2001-EMG-A

AUGUST 2025

JP-C-2001-EMG-5YR JP-C-2001-EMG-M JP-C-2001-EMG-M JP-C-2001-EMG-M JP-C-2001-EMG-M