This amendment modifies a solicitation for scheduled preventative maintenance services. The contractor will provide labor, equipment, and materials to perform preventative maintenance of listed mechanical equipment at the National Institute of Standards and Technology campus in Boulder, Colorado, according to the statement of work and job plans. Key equipment includes CRAC units, make-up air handling units, and packaged AC units. The amendment incorporates price sheets for the equipment, revised job plans and PM schedules, and answers to questions from prospective offerors. It also includes a new clause requiring COVID-19 safety protocols for on-site work. Offers are due by May 26, 2022 under solicitation number 1333ND22QNB190171.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Contractor Price Sheet Amd 0001 .xlsx | XLSX spreadsheet | |
| Amend 0001 OISM PMs and Job Plans 060822.xlsx | XLSX spreadsheet | |
| Revised Job Plans Amend 0001.pdf | ||
| 1333ND22QNB190171.pdf | ||
| Attach 1 - OISM PMs and Job Plans.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Attachment Page
PAGE 2 OF 18 1333ND22QNB1901710001
The purpose of this amendment is to incorporate the following changes:
A. OISM PMs Price Sheet is attached. Please provide a price for each piece of equipment for the base year and all option years.
B. The revised OISM PMs and Job Plans spreadsheet is attached.
C. Questions and Answers (#1-8) are hereby incorporated.
D. The following revised job plans have been incorporated: JP-C-CRAC, JP-C-MAU-A, JP-C-MAU-Q, JP-C-PAC-C.
E. Clause 1352.223-99 is incorporated.
F. No other changes occur as a result of this amendment.
Table of Contents
1352.223-99ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (OCT 2021) (DEVIATION). 4
Questions and Answers
JP-C-CRAC - revised Amend 0001
JP-C-MAU-A revised Amend 0001
JP-C-MAU-Q Revised Amend 0001
JP-C-PAC-C Revised Amend 0001
PAGE 3 OF 18 1333ND22QNB1901710001
CLAUSES
1352.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (OCT 2021) (DEVIATION)
(a) Definition. As used in this clause - United States or its outlying areas means -
(1) The fifty States;
(2) The District of Columbia;
(3) The commonwealths of Puerto Rico and the Northern Mariana Islands;
(4) The territories of American Samoa, Guam, and the United States Virgin Islands; and
(5) The minor outlying islands of Baker Island, Howland Island, Jarvis Island, Johnston Atoll, Kingman Reef, Midway Islands, Navassa Island, Palmyra Atoll, and Wake Atoll.
(b) Authority. This clause implements Executive Order 14042, Ensuring Adequate COVID Safety Protocols for Federal Contractors, dated September 9, 2021 (published in the Federal Register on September 14, 2021, 86 FR 50985).
(c) Compliance. The Contractor shall comply with all guidance, including guidance conveyed through Frequently Asked Questions, as amended during the performance of this contract, for contractor or subcontractor workplace locations published by the Safer Federal Workforce Task Force (Task Force Guidance) at https:/www.saferfederalworkforce.gov/contractors/.
(d) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (d), in subcontracts at any tier that exceed the micro purchase threshold, as defined in Federal Acquisition Regulation 2.101 on the date of subcontract award, and are for services, including construction, performed in whole or in part within the United States or its outlying areas.
(End Of Clause)
PAGE 4 OF 18 1333ND22QNB1901710001
Questions and Answers
PAGE 5 OF 18 1333ND22QNB1901710001
Questions and Answers
Q1. Job task vs equipment sheet: Am I safe putting in the frequency of the PM by the dates that are on the equipment sheet.
A1. See revised equipment sheet that includes corrections.
Q2. M/N# and S/N#, we talked today about getting them, is it ok if we were awarded the job to spend a day gathering that info for our system to help with asset management.
A2. Yes
Q3. Do we need to add the tasks from your job sheets to our system or can we use the matrix system that we have? Reason I ask is it comes up in the tech work orders to complete.
A3. There is no issue with you using your program as long as it covers all of the items that we need checked.
Q4. I don’t see building #5 Crac unit on the equipment sheet. Is it named something else?
A4. It is listed as 05-AHU-001.
Q5. Building #92 booster pump, it was mentioned today that its not there, but it is on the equipment list. Should it get deleted or accounted for?
A5. The pump doesn’t exist.
Q6. We talked today about the backflow getting removed from the task. Just want to make sure that is correct.
A6. Backflow has been removed.
Q7. I think I found the unit for building #5. It says packaged on roof or is that something different?
A7. The unit at building 5 is the unit inside the server room and the condensing units outside the door, there are no units on the roof.
Q8. Also, one other question. Plan shows: 03-EAC-002, but then say it is a Crac unit for 2 PM’s a year. Is it just a window shaker with no fitters or is it a Crac unit with filters. There are 3 of them, so I just want to make sure I get it right.
A8. These are small crac units they are not window shakers so they will have a filter.
JP-C-CRAC - revised Amend 0001
PAGE 6 OF 18 1333ND22QNB1901710001
10/11/18 6:35 AM 1 / 6
Job Plan List
Job Plan : JP-C-CRAC Description : Contractor Job plan for CRAC Units Task Sequence
Task Task Description Task Long Description
0 2 SAFETY REQUIRMENTS - READ SAFETY SHOULD ALWAYS BE PARAMOUNT IN OPERATION AND
MAINTENANCE. BEFORE ATTEMPTING ANY MAINTENANCE, BE
CERTAIN THE EQUIPMENT CANNOT BE STARTED
ACCIDENTALLY. IF SYSTEM IS PUMPED DOWN AND/OR VALVES
ARE CLOSED, TAG OR LABEL TO INDICATE STATUS OF UNIT. BE
CERTAIN THERE IS NO PRESSURE IN THE MACHINE BEFORE
OPENING. ON A RECIPROCATING UNIT, LOOSEN (DO NOT
REMOVE) ALL NUTS ON A VALVE COVER. PRY IT LOOSE SO THAT
ANY TRAPPED GAS MAY ESCAPE. THE REMOVE ALL NUTS AND
THE COVER.
NOTICE: ALWAYS RECOVER REFRIGERANT AND USE ADEQUATE
VENTILATION. "FREON" TYPE REFRIGERANTS CAN BE
DANGEROUS; WHEN HEATED TO DECOMPOSITION, THEY EMIT
HIGHLY TOXIC FUMES OF PHOSGENE AND FLUORIDES.
0 3 SCHEDULE THE PM Schedule the PM with the COR. NO equipment will be shut down without scheduling with the COR.
0 5 REVIEW Review all steps in PM.
Review safety requirements for this equipment and space.
Review manufacturer's instructions and equipment history record, if available.
0 7 EQUIPMENT SHUTDOWN SAFETY De-energize, tag, and lock out electrical circuits to motors, pumps, control circuits, etc and release pressure in lines before working on equipment when necessary.
Ensure that the people affected have been notified (COR to notify) and associated equipment's operation will not be affected.
0 9 CHECK WITH OPERATING OR AREA PERSONNEL Check with operating or area personnel for any deficiencies.
PAGE 7 OF 18 1333ND22QNB1901710001
10/11/18 6:35 AM 2 / 6
Job Plan List
Job Plan : JP-C-CRAC Description : Contractor Job plan for CRAC Units
Task Sequence
Task Task Description
0 10 AIR FILTER
Task Long Description
___1. Check/replace filters / Change air filters with % filter recommended by manufacturer. ( Filter pleat direction should run parallel to the direction of the short side of the filter/ Do not use long pleat filter construction because it can cause filter collapse.)
___2. Grille area unrestricted ___3. Wipe section clean ___4. Coil clean
0 20 Blower Section ___1. Blower wheels free of debris ___2. Check belt tension and condition (replace if needed or every 30 months)Belt's should be replace with factory installed parts.
___3. Check/lube bearings ___4. Check sheave/ pulley (replace if worn) ___5. Check motor mount ___6. Motor amp draw L1_________________L2___________________L________________ ____Compare to nameplate amps
0 30 Reheat ___1. Inspect elements ___2. Check wire connections (inside reheat box) ___3. Reheat amp draw ___a. #1 ___a. #2 ___a. #3
0 50 Infrared Humidifier ___1. Check drain lines and trap for clogs ___2. Check /clean pan for mineral deposits ___3. Clean reflector ___4. Check water make-up valve for leaks ___5. Check humidifier lamps (replace if burnt out) ___6. Check wire connections (inside humidifier box) ___7. Humidifier amp draw L1_____L2_____L3_____
PAGE 8 OF 18 1333ND22QNB1901710001
10/11/18 6:35 AM 3 / 6
Job Plan List
Job Plan : JP-C-CRAC Description : Contractor Job plan for CRAC Units
Task Sequence
Task Task Description Task Long Description
0 60 Condensate Pump ___1. Check for debris in sump ___2. Check operation of float(s) (free movement)
0 70 Refrigeration Piping ___1. Check refrigerant lines (clamps secure/ no rubbing /no leaks ___2. Check for moisture (sight glass)
0 90 Drain Piping ___1. Check for free running drain system ___2. Clear out obstructions and material buildup on tubing walls ___3. Check for leaks ___4. Check for tubing kinks or damage
0 100 Compressor Section ___1. Check oil level ___2. Check for oil leaks ___3. Check compressor mounts ( springs/bushings) ___4. Cap tubes (not rubbing) ___5. Check wire connections (inside compressor box) ___6. Compressor operation (vibration/noise) ___7. Suction pressure Circuit #1______Circuit #2______ ___8. Discharge pressure Circuit #1______Circuit #2______ ___9. Superheat Circuit #1______Circuit #2______ ___10. Low pressure switch cut out Circuit #1______Circuit #2______ ___11. Low pressure cut in Circuit #1______Circuit #2______ ___12. High pressure cut out Circuit #1______Circuit #2______ ___13. Amp draw ___1. Circuit # 1 ____a. L1____L2____L3____ ___2. Circuit # 2 ____a. L1____L2____L3____
0 110 Electrical Panel ___1. Check fuses ___2. Check contactors for pitting ___3. Check wire connections
PAGE 9 OF 18 1333ND22QNB1901710001
10/11/18 6:35 AM 4 / 6
Job Plan List
Job Plan : JP-C-CRAC Description : Contractor Job plan for CRAC Units
Task Sequence
Task Task Description Task Long Description
0 120 Controls ___1. Check/verify control operation (sequence) ___2. Check humidifier high water alarm operation ___3. Check operation of the air safety switch ___4. Check setting/ operation of the filter clog switch ___5. Check/test water detection device(s)
PAGE 10 OF 18 1333ND22QNB1901710001
10/11/18 6:35 AM 5 / 6
Job Plan List
Job Plan : JP-C-CRAC Description : Contractor Job plan for CRAC Units
Task Sequence
Task Task Description
0 130 Air-Cooled Condenser/ Dry cooler
Task Long Description
___1. Coil surfaces and fans free of debris(clean, wash and straighten fins as needed)(Power wash condenser coils, if coils are doubled, seperate and power wash between coils.
Clean evaporator drain pan, blowers, fans, motors, and drain piping as required. (No coil cleaners allowed, only domestic water)
___2. Fan motors securely mounted ___3. Motor bearings in good condition ___4. Check all piping and capillaries for vibration isolation ;
support and secure as necessary ___5. Check fuses ___6. Check contactors for pitting ___7. Check wire connections ___8. Fan speed control operation ___9. Check operational sequence/thermostat setpoints ___10. Check refrigerant/glycol lines for signs of leaks/repair leaks as found ___11. Check refrigerant level in each Liebert Lee �Temp receiver ___12. Glycol level ___13. Glycol solution_______________% ___14. Motor amp draw #1 L1______L2______L3______ (L1 and L2 on fan speed control motor) #2 L1______L2______L3______ #3 L1______L2______L3______ #4 L1______L2______L3______ #5 L1______L2______L3______ #6 L1______L2______L3______ #7 L1______L2______L3______ #8 L1______L2______L3______
PAGE 11 OF 18 1333ND22QNB1901710001
10/11/18 6:35 AM 6 / 6
Job Plan List
Job Plan : JP-C-CRAC Description : Contractor Job plan for CRAC Units
Task Sequence
Task Task Description
0 999 COMPLETE PM
Task Long Description
Complete the PM; noting condition, suspect problems, parts used, gauge/meter readings, etc.
NOTIFY COR IF ANY EQUIPMENT OR PARTS REQUIRE
REPLACEMENT AND NOTE ON PM.
Number of Records: 17
JP-C-MAU-A revised Amend 0001
PAGE 12 OF 18 1333ND22QNB1901710001
Job Plan List
Job Plan : JP-C-MAU-A Description : Make-up Air Handling Unit Task Sequence
Task Task Description Task Long Description
0 1 Obtain PM
0 30 Clean coil drain pan(s) (No coil cleaners allowed, only domestic water)
0 90 Check and snug all electrical connections. Inspect for sings of wear
0 60 Inspect and clean condensate drain
0 10 Replace filters
0 70 Check all moving parts for wear
0 40 Check for unusual noise or vibration
0 100 Clean coils
0 20 Grease supply fan motor
0 80 Check bearing collar, sheave, and wheel hub setscrews
0 50 Replace belt Verify RPM of fan matches balance report data
0 999 Complete PM
JP-C-MAU-Q Revised Amend 0001
PAGE 13 OF 18 1333ND22QNB1901710001
Job Plan List
Job Plan : JP-C-MAU-Q Task Sequence
Task Task Description
Description : Make-up Air Handling Unit Quaterly
Task Long Description
0 50 Check tension, condition and alignment of belts. Adjust and replace belt if necessary
0 20 Grease supply fan motor
0 30 Clean coil drain pan(s) (No coil cleaners allowed, only domestic water)
0 1 Obtain PM
0 999 Complete PM
0 40 Check for unusual noise or vibration
0 10 Replace filters
JP-C-PAC-C Revised Amend 0001
PAGE 14 OF 18 1333ND22QNB1901710001
4/5/22 8:31 AM 1 / 7
Job Plan List
Job Plan : JP-C-PAC-C Description : Contractor Jobplan PAC Cooling Task Sequence
Task Task Description
0 1 OBTAIN PM Obtain PM from COR. The PM may be issued in a handheld device or paper.
0 2 SAFETY REQUIRMENTS - READ SAFETY SHOULD ALWAYS BE PARAMOUNT IN OPERATION AND
MAINTENANCE. BEFORE ATTEMPTING ANY MAINTENANCE, BE
CERTAIN THE EQUIPMENT CANNOT BE STARTED ACCIDENTALLY.
IF SYSTEM IS PUMPED DOWN AND/OR VALVES ARE CLOSED, TAG
OR LABEL TO INDICATE STATUS OF UNIT. BE CERTAIN THERE IS
NO PRESSURE IN THE MACHINE BEFORE OPENING. ON A
RECIPROCATING UNIT, LOOSEN (DO NOT REMOVE) ALL NUTS ON
A VALVE COVER. PRY IT LOOSE SO THAT ANY TRAPPED GAS MAY
ESCAPE. THE REMOVE ALL NUTS AND THE COVER. NOTICE:
ALWAYS RECOVER REFRIGERANT AND USE ADEQUATE
VENTILATION. FREON TYPE REFRIGERANTS CAN BE
DANGEROUS; WHEN HEATED TO DECOMPOSITION, THEY EMIT
HIGHLY TOXIC FUMES OF PHOSGENE AND FLUORIDES.
0 3 SCHEDULE THE PM Schedule the PM with the COR. NO equipment will be shut down without scheduling with the COR.
0 5 REVIEW Review all steps in PM.Review safety requirements for this equipment and space. Review manufacturer instructions and equipment history record, if available.
PAGE 15 OF 18 1333ND22QNB1901710001
4/5/22 8:31 AM 2 / 7
Job Plan List
Job Plan : JP-C-PAC-C Description : Contractor Jobplan PAC Cooling Task Sequence
Task Task Description
0 7 EQUIPMENT SHUTDOWN SAFETY De-energize, tag, and lock out electrical circuits to motors, pumps, control circuits, etc and release pressure in lines before working on equipment when necessary. Ensure that the people affected have been notified (COTR to notify) and associated equipment operation will not be affected.
0 9 CHECK WITH OPERATING OR AREA PERSONNEL Check with operating or area personnel for any deficiencies.
0 10 AIR FILTER Change air filters with a pleat 40% type.
0 20 DAMPER AND LINKAGE Check outside return dampers for binding & freedom of movement. Check lubricate all linkage. Check & tighten all set screws. Check dampers for tight close off. Verify correct operation of damper motor or actuator. Check outside air minimum outside air position. Check and record mixed air controller operation setpoint. Check and record lockout/change over control operation setpoint.
0 30 FANS AND BELT Check tension, condition, and alignment of belts; adjust as necessary, replace every year, If equiped..
Check fans for alignment and security.
Check motor & fan wheel alignment, vibration &
cleanliness. Check fan housing for rust, corrosion cracking.
0 40 LUBRICATION Lubricate motor and shaft bearings as required with proper lubricants.
PAGE 16 OF 18 1333ND22QNB1901710001
4/5/22 8:31 AM 3 / 7
Job Plan List
Job Plan : JP-C-PAC-C Description : Contractor Jobplan PAC Cooling Task Sequence
Task Task Description
0 50 GENERAL HOUSING Tighten all loose bolts, nuts & screws of cabinet. Check housing exterior condition and note if deficiencies. Check compressor mounts, nuts & screws
0 60 CONDENSER COILS Power wash condenser coils, if coils are doubled, separate and power wash between coils. Clean evaporator drain pan, blowers, fans, motors, and drain piping as required. (No coil cleaners allowed, only domestic water)
0 70 ELECTRICAL CONTROLS Perform operational check of unit; make adjustments on controls and other componets as required for proper operation. Clean electrical wiring and connections; tighten loose connections.
>Inspect condition & sizing of any fuses, including those that may be on the control boards. Check relays & condactor for wear, pitting & operation. Check operating &safety controls. Check and record motor volts-nameplate vs.
n.p. data. Check and record motor amps-nameplate vs. n.p. data.
Check crankcase heater Check compressor motor windings with megohmmeter. Check hi/low pressure swithes.
0 80 COMPRESSOR/REFRIGERANT Check compressor oil level; add proper oil as required. During operation of unit, check refrigerant pressure; add refrigerant as necessary. Note amount added. Check condition of refrigerant oil using Total test tube system or equal. Check and recordambient temperature >Check and record suction pressure. Check and record suction temperature. Check and record compressor discharge temperature.
Check and record head pressure. Check and record refrigerant leaks Record superheat calculation.
PAGE 17 OF 18 1333ND22QNB1901710001
4/5/22 8:31 AM 4 / 7
Job Plan List
Job Plan : JP-C-PAC-C Description : Contractor Jobplan PAC Cooling Task Sequence
Task Task Description
0 90 CLEAN-UP Clean area in and around unit. Properly dispose of all refuse.
0 999 COMPLETE PM Complete the PM on handheld or paper; noting condition, suspect problems, parts used, gauge/meter readings, etc. NOTIFY
COTR IF ANY EQUIPMENT OR PARTS REQUIRE REPLACEMENT
AND NOTE ON PM.
PAGE 18 OF 18 1333ND22QNB1901710001
1.2
C:\PERFORM\FORMS\S30.FRP
Forms Management
C:PERFORMFORMSS30.FRP
Acrobat PDFWriter 2.01 for Windows D:19971010095222 D:19990614133004 Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQUISITION NUMBER
5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6)
CODE
STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended.
is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY
CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer) Previous edition unusable
| Descript: |
| Descript1: See Attachment Page. |
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT: |
| IDCode: |
| pdfpage1: 1 |
| Pages: 18 |
| DocNo: 1333ND22QNB1901710001 |
| EffDate: JUN 15, 2022 |
| ReqNo: NB194000-22-00686 |
| ProjNo: |
| IssuedByCode: 000014 |
| IssuedBy: NATIONAL INST OF STDS AND TECHNOLOGY |
325 BROADWAY
BOULDER CO 80305-3328
| AdminByCode: |
| AdminBy: See Block 6 |
| ContractorCode: |
| FacCode: |
| SolNo: 1333ND22QNB190171 |
| SolDate: MAY 26, 2022 |
| AwdNo: |
| AwdDate: |
| NoCopies: 1 |
| Amended: Yes |
| OffrExt: Off |
| OffrNoEx: No |
| ApprData: See Schedule |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).: |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| SignName: |
| SignTitl: |
| ContDate: |
| ContrOfficerInfo: |
| CODate: |
| Contractor Info: |
| ContractorPOC: |
| Contractor: |
| ModAmount: |
| 15B. CONTRACTOR/OFFEROR: |
| signature: |
| AwdChg: Off |
| SolChg: Yes |
| Header: |
| Footer1: |
File details come from the government source that posted it. Updated .