Attach 1.1 CORNPLANTER_FINAL_20200629.pdf
PDF 11 MB Posted
- Solicitation number
- 1224H820R0003
About this file
This solicitation seeks proposals for the Allegheny National Forest FR 262 Longhouse Scenic Drive Project 2020. The U.S. Department of Agriculture Forest Service R9-Eastern Region is requesting bids to complete road and trail maintenance work along Longhouse Scenic Drive in the Allegheny National Forest. Bids are due by July 29, 2020. The selected contractor will be responsible for repairing and resurfacing approximately three miles of the gravel roadway, clearing drainage ditches and culverts, and performing brush cutting and tree trimming along the road corridor and trail system. The anticipated period of performance is Fall 2020.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMEND 03_08272020.pdf | ||
| AMEND 2_08242020.pdf | ||
| AMEND 01_08192020.pdf | ||
| Attach 1.0 CORN_FSSS_20200529.docx | DOCX document | |
| Attach 2.0 MUD_FSSS_20200529.docx | DOCX document | |
| Attach xx GovtProvidedTechnicalProposalForms.rtf | RTF text file | |
| 1224H820R0003__07242020_FINAL.pdf | ||
| Attach 3.1 FR262-MUD-CORN_Final_20200629_signed.pdf | ||
| Attach 2.1 Mudlick_FINAL_20200629_signed.pdf | ||
| WAGE DET_07242020.pdf | ||
| Attach 3.0 FR262-MUD-CORN_FSSS_20200629.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LOCATION
VICINITY MAP
SHEET OF
United States Department of Agriculture
Forest Service
01 13
RECOMMENDED BY:
APPROVED:
FOREST ENGINEER
DISTRICT RANGER DATE
DATE
DIRECTOR OF ENGINEERING
DATE
FOREST SUPERVISOR
DATE
RO BRIDGE PROGRAM MANAGER
DATE
5/2 8/2
0 1 3:
C
GO
ME
ZD
AV
IL
A
C:
\U
SE
RS
\C
GO
ME
ZD
AV
IL
A\
DO
CU
ME
NT
S\
PR
OJ
EC
TS
\F
OR
ES
TS
\A
LL
EG
HE
NY
NF
\20
1-
_F R2
\F
R2
_N
EW
SC
OP
E\
CU
LV
ER
TS
\C
OR
NP
LA
NT
ER
\C
AD
\C
OR
NP
LA
NT
ER
_A
OP
_D
ET
AI
LS
_2
6.D
W G;
PENNSYLVANIA
MCKEAN COUNTY
(R09) EASTERN REGION
ALLEGHENY NATIONAL FOREST
BRADFORD RANGER DISTRICT
INDEX OF SHEETS
SHEET SHEET TITLE DATE
G-01 COVERSHEET
G-02 GENERAL NOTES
C-00 EXISTING CONDITIONS
C-01 SITE PLAN
C-02 STRUCTURE LAYOUT
C-03 STREAM SIMULATION AND STRUCTURE PROFILES
C-04 EXCAVATION AND STREAM SIMULATION DETAILS
C-05 STREAM CROSS SECTIONS
C-06 ROAD, CULVERT TRENCH, INLET AND OUTLET PROTECTION DETAILS
C-07 FOUNDATION DETAILS
C-08 FENCE, LOG JAM AND STRUCTURE HEADWALL DETAILS
C-09 DEWATERING PLAN
C-10 DETOUR TRAFFIC CONTROL PLAN
UNNAMED TRIBUTARY TO MUDLICK RUN
41.784451, -78.908873
TRAVEL DIRECTIONS:
FROM WARREN, PA POST OFFICE ( ): AT CORNER OF 3RD AVENUE AND LIBERTY STREET, HEAD WEST
ON W 3RD AVENUE AND CONTINUE FOR 0.1 MI. TURN LEFT AT HICKORY STREET AND CONTINUE FOR
0.14 MILES. TURN LEFT ONTO CRESCENT PARK/PA-337 AND CONTINUE FOR 0.43 MILES. TURN LEFT
ONTO US-6 E AND CONTINUE FOR 2.0. TURN LEFT ONTO KINZUA ROAD/PA-59 E AND CONTINUE FOR 9.82
MILES. TURN RIGHT ONTO LONGHOUSE SCENIC DRIVE/FR262 AND CONTINUE FOR 8.9 MILES TO SITE
LOCATION, UNNAMED TRIBUTARY TO MUDLICK RUN. LONGITUDE AND LATITUDE : 41.784451, -78.908873
FROM KANE, PA POST OFFICE (131 N FRALEY ST, KANE, PA): HEAD NORTH ON N FRALEY ST FOR 215
FEET. TURN RIGHT ONTO HAINES AND CONTINUE FOR 0.4 MILES. TURN LEFT ONTO HACKER ST/PA-321
N/KINZUA AVE AND CONTINUE FOR 8.4 MILES. TURN LEFT ONTO LONG HOUSE SCENIC DR/FR262 AND
CONTINUE FOR 2.4 MILES TO SITE LOCATION, UNNAMED TRIBUTARY TO MUDLICK RUN. LONGITUDE
AND LATITUDE : 41.784451, -78.908873
PA One Call System Inc.
1-800-242-1776 or 811
CALL 3-BUSINESS DAYS IN ADVANCE
BEFORE YOU DIG, GRADE, OR EXCAVATE
FOR THE MARKING OF UNDERGROUND
MEMBER UTILITIES.
UNNAMED TRIBUTARY TO MUDLICK RUN CULVERT
REPLACEMENT PROJECT
(AOP-02 FR 262 STA 130+00)
Maps data ©2019 Google
Structure Number: 091903000035411
MP: 2.5
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
E
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
CONTROL POINT TABLE
POINT # NORTHING EASTING ELEVATION DESCRIPTION
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
5/2 6/2
0 1 3:
C
GO
ME
ZD
AV
IL
A
C:
\U
SE
RS
\C
GO
ME
ZD
AV
IL
A\
DO
CU
ME
NT
S\
PR
OJ
EC
TS
\F
OR
ES
TS
\A
LL
EG
HE
NY
NF
\20
1-
_F R2
\F
R2
_N
EW
SC
OP
E\
CU
LV
ER
TS
\C
OR
NP
LA
NT
ER
\C
AD
\C
OR
NP
LA
NT
ER
_2
5.D
W G;
R9
EASTERN REGION
UNNAMED
TRIBUTARY TO
MUDLICK RUN
CULVERT
REPLACEMENT
PROJECT
ALLEGHENY NATIONAL
FOREST
BRADFORD DISTRICT
EXISTING PLAN
8/26/2019
C.GOMEZ
C.GOMEZ
P.LANE
AOP-02 STA 130+00
FS090523_R102013_L1-002.dwg
C-00 03 13
Feet
0 20 40
AutoCAD SHX Text
UNNAMED TRIBUTARY TO MUDLICK RUN
AutoCAD SHX Text
WETLAND AREA DO NOT EXCAVATE PROTECT WITH EARTH BERMS DURING CONSTRUCTION
AutoCAD SHX Text
INSTALL LOG BARRIER ON RIVER RIGHT (PAY ITEM 64703-4)
AutoCAD SHX Text
EXISTING GRADE CONTROL
AutoCAD SHX Text
EXISTING GRADE CONTROL
AutoCAD SHX Text
INSTALL TEMPORARY EARTH DIVERSION (PAY ITEM 15703)
AutoCAD SHX Text
ROAD EDGE
AutoCAD SHX Text
CONSTRUCT ROLLING DIP (PAY ITEM 20407) SEE C-04
AutoCAD SHX Text
EXISTING GRADE CONTROL
AutoCAD SHX Text
GUARDRAIL
AutoCAD SHX Text
WORK LIMITS
AutoCAD SHX Text
WORK LIMITS
AutoCAD SHX Text
EXISTING STRUCTURE REMOVE AND DISPOSE (PAY ITEM 20305)
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
NORTH
AutoCAD SHX Text NOTES: 1. IN THE EVENT THAT PREVIOUSLY UNDISCOVERED CULTURAL IN THE EVENT THAT PREVIOUSLY UNDISCOVERED CULTURAL RESOURCES ARE ENCOUNTERED DURING THE COURSE OF THE PROJECT, ALL GROUND-DISTRUBING ACTIVITIES WILL BE HALTED UNTIL EVALUATED BY A GOVERNMENT ARCHAEOLOGIST. IF NECESSARY, THE THE FOREST MAY MODIFY THE PROJECT IN ORDER TO PROTECT RESOURCES BEFORE WORK CONTINUES. 2. ROAD ALIGNMENT AND STREAM RE-ALIGNMENT GEOMETRY, ROAD ALIGNMENT AND STREAM RE-ALIGNMENT GEOMETRY, COORDINATES AND ELEVATION ARE PROVIDED IN THE PLANSET. 3. NOTIFY THE CONTRACTING OFFICER OF ANY MISSING CONTROL NOTIFY THE CONTRACTING OFFICER OF ANY MISSING CONTROL POINTS PRIOR TO STAKING FOR THE AFFECTED WORK. THE CONTRACTOR SHALL PROVIDE ANY ADDITIONAL CONTROL POINTS NEEDED TO COMPLETE THE REQUIRED WORK. 4. CONTRACTOR MAY USE UP TO 500 FEET ALONG THE ROAD ON CONTRACTOR MAY USE UP TO 500 FEET ALONG THE ROAD ON EACH SIDE OF STRUCTURE FOR STORAGE OF MATERIALS.
CROSS SECTIONS SEE C-04
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
FR262 POINT TABLE
POINT # NORTHING EASTING ELEVATION DESCRIPTION
FR262 LINE TABLE
NUMBER STATION NORTHING EASTING RADIUS DELTA
TANGENT
LENGTH
BEARING
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
5/2 6/2
0 1 3:
C
GO
ME
ZD
AV
IL
A
C:
\U
SE
RS
\C
GO
ME
ZD
AV
IL
A\
DO
CU
ME
NT
S\
PR
OJ
EC
TS
\F
OR
ES
TS
\A
LL
EG
HE
NY
NF
\20
1-
_F R2
\F
R2
_N
EW
SC
OP
E\
CU
LV
ER
TS
\C
OR
NP
LA
NT
ER
\C
AD
\C
OR
NP
LA
NT
ER
_2
5.D
W G;
R9
EASTERN REGION
UNNAMED
TRIBUTARY TO
MUDLICK RUN
CULVERT
REPLACEMENT
PROJECT
ALLEGHENY NATIONAL
FOREST
BRADFORD DISTRICT
SITE PLAN
8/26/2019
C.GOMEZ
C.GOMEZ
P.LANE
AOP-02 STA 130+00
FS090523_R102013_L1-002.dwg
C-01 04 13
Feet
0 20 40
AutoCAD SHX Text
UNNAMED TRIBUTARY TO MUDLICK RUN
AutoCAD SHX Text
WETLAND AREA DO NOT EXCAVATE PROTECT WITH EARTH BERMS DURING CONSTRUCTION
AutoCAD SHX Text
INSTALL 7 - 4" X 8'-0" TREATED WOOD FENCE POST ABOUT 5' APART (PAY ITEM 61904)
AutoCAD SHX Text
INSTALL HEADWALL SEE C-07 (PAY ITEM 60305)
AutoCAD SHX Text
INSTALL HEADWALL SEE C-07 (PAY ITEM 60305)
AutoCAD SHX Text
INSTALL LOG BARRIER ON RIVER RIGHT (PAY ITEM 64703-4)
AutoCAD SHX Text INSTALL 30" X 70' CMP INLET ELEVATION: 1362.68' SEE C-05 (PAY ITEM 60201) INSTALL 1 TON R-4 INLET STONE PROTECTION (PAY ITEM 25102)
AutoCAD SHX Text
OUTLET ELEVATION: 1358.45'
AutoCAD SHX Text
INSTALL GRADE CONTROL SEE C-2 (PAY ITEM 64803)
AutoCAD SHX Text INSTALL BANK PROTECTION CREST ELEVATION: 1 FT ABOVE EXISTING BOTTOM OF BANK SEE C-04 (PAY ITEM 25105-00)
AutoCAD SHX Text
INSTALL 4 TON R-4 OUTLET STONE PROTECTION SEE C-05 (PAY ITEM 25102)
AutoCAD SHX Text
EXISTING GRADE CONTROL
AutoCAD SHX Text
EXISTING GRADE CONTROL
AutoCAD SHX Text
INSTALL TEMPORARY EARTH DIVERSION (PAY ITEM 15703)
AutoCAD SHX Text
ROAD EDGE
AutoCAD SHX Text
CONSTRUCT ROLLING DIP (PAY ITEM 20407) SEE C-04
AutoCAD SHX Text INSTALL 9 - 4" X 8'-0" TREATED WOOD FENCING POSTS ABOUT 5' APART (PAY ITEM 61904) SEE C-07
AutoCAD SHX Text
INSTALL GRADE CONTROL SEE C-03 (PAY ITEM 64803)
AutoCAD SHX Text
EXISTING GRADE CONTROL
AutoCAD SHX Text
GUARDRAIL
AutoCAD SHX Text
WORK LIMITS
AutoCAD SHX Text
WORK LIMITS
AutoCAD SHX Text INSTALL ALUMINUM BOX CULVERT WITH WINGWALLS 21'-7" X 4'-11" X 42'-0" SKEW:58°(PAY ITEM 60304)
AutoCAD SHX Text
STA 180+82
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
NORTH
AutoCAD SHX Text CULVERT AT STATION 130+82 INLET AT OUTLET ELEVATIONS CAN BE MODIFIED IN THE FIELD TO PROVIDE FOR BETTER DRAINAGE. CONTACT THE CO PRIOR ANY MODIFICATIONS TO THESE PLANS.
GUARDRAILS RIGHT AND LEFT: REMOVE, RESET AND MATCH TO EXISTING (REPLACE WITH NEW IF ANY SIGNS OF DAMAGE OR CORROSION EXIST. ) FROM STA128+75 TO ) FROM STA128+75 TO STA 129+41 AND FROM STA 130+57 TO 130+94 (PAY ITEM 61707-00)
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
STRUCTURE POINT TABLE
POINT # NORTHING EASTING ELEVATION DESCRIPTION
BANK PROTECTION POINT TABLE
POINT # NORTHING EASTING CREST ELEVATION DESCRIPTION
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
5/1 6/2
0 1 0:
C
GO
ME
ZD
AV
IL
A
C:
\U
SE
RS
\C
GO
ME
ZD
AV
IL
A\
DO
CU
ME
NT
S\
PR
OJ
EC
TS
\F
OR
ES
TS
\A
LL
EG
HE
NY
NF
\20
1-
_F R2
\F
R2
_N
EW
SC
OP
E\
CU
LV
ER
TS
\C
OR
NP
LA
NT
ER
\C
AD
\C
OR
NP
LA
NT
ER
_2
5.D
W G;
R9
EASTERN REGION
UNNAMED
TRIBUTARY TO
MUDLICK RUN
CULVERT
REPLACEMENT
PROJECT
ALLEGHENY NATIONAL
FOREST
BRADFORD DISTRICT
STRUCTURE LAYOUT
XX/XX/XXXX
C.GOMEZ
C.GOMEZ
P.LANE
AOP-02 STA 130+00
FS090523_R102013_L1-002.dwg
C-02 05 13
Feet
0 5 10
AutoCAD SHX Text
INSTALL 7 - 4" X 8'-0" TREATED WOOD FENCE POST ABOUT 5' APART (PAY ITEM 61904)
AutoCAD SHX Text
INSTALL HEADWALL SEE C-07 (PAY ITEM 60305)
AutoCAD SHX Text
INSTALL HEADWALL SEE C-07 (PAY ITEM 60305)
AutoCAD SHX Text
INSTALL GRADE CONTROL SEE C-2 (PAY ITEM 64803)
AutoCAD SHX Text INSTALL BANK PROTECTION CREST ELEVATION: 1 FT ABOVE EXISTING BOTTOM OF BANK SEE C-04 (PAY ITEM 25105-00)
AutoCAD SHX Text
EXISTING GRADE CONTROL
AutoCAD SHX Text
INSTALL GRADE CONTROL SEE C-03 (PAY ITEM 64803)
AutoCAD SHX Text INSTALL ALUMINUM BOX CULVERT WITH WINGWALLS 21'-7" X 4'-11" X 42'-0" SKEW:58°(PAY ITEM 60304)
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
FEATURE POINT NUMBER
UNTRIB MUDLICK RUN STREAM SIMULATION PROFILE
UNTRIB MUDLICK RUN STRUCTURE PROFILE
FR262 PROFILE
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
5/1 6/2
0 1 0:
C
GO
ME
ZD
AV
IL
A
C:
\U
SE
RS
\C
GO
ME
ZD
AV
IL
A\
DO
CU
ME
NT
S\
PR
OJ
EC
TS
\F
OR
ES
TS
\A
LL
EG
HE
NY
NF
\20
1-
_F R2
\F
R2
_N
EW
SC
OP
E\
CU
LV
ER
TS
\C
OR
NP
LA
NT
ER
\C
AD
\C
OR
NP
LA
NT
ER
_2
5.D
W G;
R9
EASTERN REGION
UNNAMED
TRIBUTARY TO
MUDLICK RUN
CULVERT
REPLACEMENT
PROJECT
ALLEGHENY NATIONAL
FOREST
BRADFORD DISTRICT
STREAM SIMULATION
AND STRUCTURE
PROFILES
8/26/2019
C.GOMEZ
C.GOMEZ
P.LANE
AOP-02 STA 130+00
FS090523_R102013_L1-002.dwg
C-03 06 13
AutoCAD SHX Text
CHANNEL RIBS SEE C-03
AutoCAD SHX Text
EXISTING GRADE CONTROL
AutoCAD SHX Text
EXISTING GRADE CONTROL
AutoCAD SHX Text
PLACED STREAMBED SIMULATION ROCK (TYP.) 2.9% GRADIENT SEE C-03
AutoCAD SHX Text
VERTICAL SCALE: 2V:1H
AutoCAD SHX Text
EXISTING GROUND
AutoCAD SHX Text
EXISTING STRUCTURE REMOVE AND DISPOSE
AutoCAD SHX Text
21'-7" X 4'-11" X 42'-0" ALUMINUM BOX CULVERT SEE C-03
AutoCAD SHX Text
FINISHED PAVED SURFACE
AutoCAD SHX Text
MATCH TO EXISTING GRADE SEE C-04
AutoCAD SHX Text
21'-7" X 4'-11" X 42'-0" STRUCTURAL PLATE ALUMINUM BOX CULVERT SEE C-03
AutoCAD SHX Text
CONCRETE FOUNDATIONS SEE C-05
AutoCAD SHX Text
CULVERT FOUNDATION STARTS
AutoCAD SHX Text
MAX POOL DEPTH
AutoCAD SHX Text
RIB
AutoCAD SHX Text
CULVERT FOUNDATION ENDS
AutoCAD SHX Text
STREAM WORK LAYOUT NTS
AutoCAD SHX Text
RIB
AutoCAD SHX Text
RIB
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
1+00
1+75
2+00
2+33
2+75
3+22
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
5/1 6/2
0 1 0:
C
GO
ME
ZD
AV
IL
A
C:
\U
SE
RS
\C
GO
ME
ZD
AV
IL
A\
DO
CU
ME
NT
S\
PR
OJ
EC
TS
\F
OR
ES
TS
\A
LL
EG
HE
NY
NF
\20
1-
_F R2
\F
R2
_N
EW
SC
OP
E\
CU
LV
ER
TS
\C
OR
NP
LA
NT
ER
\C
AD
\C
OR
NP
LA
NT
ER
_2
5.D
W G;
R9
EASTERN REGION
UNNAMED
TRIBUTARY TO
MUDLICK RUN
CULVERT
REPLACEMENT
PROJECT
ALLEGHENY NATIONAL
FOREST
BRADFORD DISTRICT
STREAM CROSS
SECTIONS
8/26/2019
C.GOMEZ
C.GOMEZ
P.LANE
AOP-02 STA 130+00
FS090523_R102013_L1-002.dwg
C-04 07 13
AutoCAD SHX Text
EXISTING GROUND FINISHED GROUND
AutoCAD SHX Text
EXISTING GROUND FINISHED GROUND
AutoCAD SHX Text
EXISTING GROUND FINISHED GROUND
AutoCAD SHX Text
EXISTING GROUND FINISHED GROUND
AutoCAD SHX Text
EXISTING GROUND FINISHED GROUND
AutoCAD SHX Text
EXISTING GROUND FINISHED GROUND
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
STREAM SIMULATION NOTES:
1. STREAMBED FINISHED GRADE SHALL BE PLACED IN AN IRREGULAR MATTER TO PROVIDE
FOR LOW FLOW PASSAGE.
2. CHANNEL ROCK CLUSTERS SHALL PROTRUDE RANDOMLY ABOVE THE STREAM BED, AT 1
TO 6 INCHES.
3. STREAM SIMULATION PLACEMENT SHALL BE APPROVED BY CO. PRIOR TO INSTALLATION
OF METAL STRUCTURE.
4. ROCK SPANNING RIBS LOCATIONS SHALL BE STAKED IN THE FIELD AND APPROVED BY
THE CONTRACTING OFFICER PRIOR TO INSTALLATION.
5. CHANNEL ROUGHNESS BOULDERS SHALL BE PLACED AT THE DIRECTION OF THE
CONTRACTING OFFICER.
6. SUITABLE EXCAVATED MATERIAL USED FOR THE STREAM BOTTOM SHALL MEET THE
GRADATION REQUIREMENTS, AS SHOWN ON THE DRAWINGS, AND SHALL BE APPROVED
BY THE CONTRACTING OFFICER.
7. THE CONTRACTOR SHALL SOURCE MATERIAL MEETING THE SPECIFICATIONS FOR THE
GRADATION OF THE STREAMBED SIMULATION ROCK TABLE SHOWN IN THE FOREST
SERVICE SUPPLEMENT SPECIFICATIONS SECTION 705.08.
STREAM SIMULATION INSTALLATION:
1. COMPACT ANY BACKFILL MATERIAL TO DESIGNED SUB BASE ELEVATION IN CHANNEL.
2. PLACE BANK RIP RAP ALONG BOTH FOOTERS FOR ENTIRE LENGTH OF STRUCTURE,
MAKING SURE TO KEY INTO INLET AND OUTLET BANKS AND INTO SUB BASE AT LEAST ONE
THIRD OF WIDEST PART OF ROCK. AS RIP RAP IS PLACED, FILL IN VOIDS WITH
STREAMBED MATERIAL. PLACE THE BED, COMPACTED IN LAYERS, AT THE SAME TIME
THAT THE BACKFILL OUTSIDE OF THE FOOTING IS BEING COMPACTED. THIS SHOULD
PREVENT THE FOOTING FROM MOVING, AND AVOIDS EXCESSIVE HORIZONTAL LOADING
ON THE STEM WALLS.
3. CONSTRUCT ROCK RIP RAP RIBS AT DESIGNED LOCATIONS, KEYING INTO THE SUBGRADE.
AS RIP RAP IS PLACED, FILL IN VOIDS WITH STREAMBED MATERIAL.
4. PLACE LARGE RIP RAP “KEY PIECES” THROUGHOUT STRUCTURE, KEYING INTO
SUBGRADE.
5. PLACE DESIGNED STREAMBED MATERIAL IN CHANNEL AS SHOWN IN THE PLANS AND
CONSTRUCT A LOW FLOW CHANNEL NEAR THE MIDDLE OF THE CHANNEL.
6. PLACE STREAMBED MATERIAL IN LAYERS OF THE DIFFERENT SIZED MATERIAL ENSURING
A CONSISTENT MIX OF PARTICLE SIZES THROUGHOUT STRUCTURE.
7. WASH STREAMBED MATERIAL INTO RIBS AND STREAMBANK ENSURING ALL VOIDS ARE
CHOCKED WITH FINES.
4. STREAM SIMULATION PLACEMENT SHALL BE APPROVED BY CO. PRIOR TO INSTALLATION
OF METAL STRUCTURE.
CA B
SECTION A-A
N.T.S.
NOTE: SORT AND PLACE CHANNEL ROCK ALONG BANK LINES AND FILL ALL VOIDS WITH
STREAM SIMULATION ROCK
SECTION B-B
N.T.S.
SECTION C-C
N.T.S.
STREAM SIMULATION LAYOUT
N.T.S.
FLOODPLAIN
2'-0"
(TYP.)
22'-0" 19'-0" (TYP.)
(BANKFULL WIDTH)
2'-0" (TYP.)
EMBEDMENT
2' (TYP.)
2' (TYP.)
1'-0" (TYP.)
FLOW
FACE OF FOOTING STEMWALL
CONTINUOUS STREAMBANK MADE
OF CHANNEL ROCK CLASS CR-1.
(TYP. BOTH SIDES)
(PAY ITEM 64803-00) CLUSTERS OF 2-3 PIECES OF
CHANNEL ROCK CR-1 AT
APPROXIMATELY 8 FEET SPACING.
B A C
CHANNEL SPANNING RIBS COMPOSED OF SINGLE LAYER
CHANNEL ROCK CR-1, TWO PARTICLES WIDE (IN FLOW
DIRECTION), WITH SLIGHT UPSTREAM ARCH SHAPE. USE
SMALLER PARTICLES IN CHANNEL ROCK SIZE RANGE.
STREAM SIMULATION
BEDDING
EXISTING GROUND /
CHANNEL
PLACE MIXTURE OF ROCK CR-1 AS
BANK LINES, IN-FILL ANNULAR
VOIDS WITH FINES
CONSTRUCT BANKS WITH CHANNEL
ROCK CR-1
STREAMBED PROFILE
ELEVATION
STREAM SIMULATION
ROCK BED CLASS 8
FOOTINGS
RIB COMPOSED OF SINGLE LAYER OF
CHANNEL ROCK CR-1 AT STREAMBED
ELEVATION
FOOTINGS
BACKFILL EXISTING CHANNEL
WITH 2% (MIN.) SLOPE
TOWARD NEW CHANNEL
BANK CONSTRUCTION
SEE C-01 FOR LIMITS
BANK HEIGHT
12" (TYP.)
CONSTRUCT BANKS WITH
CHANNEL ROCK CR-1
STREAM SIMULATION
ROCK BED CLASS 8
BANK HEIGHT
12" (TYP.)
TYPICAL CULVERT CROSS SECTION
N.T.S.
1'-6"
MIN.
1'-0" (TYP.)
BANKFULL WIDTH = 19'-0"
TYPICAL FOUNDATION DETAIL
SEE C-06
LIMITS OF BACKFILL
(TYP.)
(PAY ITEM 20415)
LIMITS OF BACKFILL
(TYP.)
(PAY ITEM 20815)
PLACED STREAMBED
CHANNEL ROCK, PLACEMENT
METHOD A
SEE STREAM SIMULATION
ROCK ON TYPICAL SECTIONS
BELOW
PLACED STREAMBED SIMULATION ROCK
SEE STREAM SIMULATION ROCK ON TYPICAL
SECTIONS BELOW
CONCRETE FOUNDATIONS
PROPOSED STRUCTURAL PLATE ALUMINUM BOX CULVERT
(STRUCTURAL DESIGN TO BE DETERMINED BY THE MANUFACTURER)PAVED SURFACE COURSE
SEE ROADWAY CROSS SECTION
TYPICAL ON SHEET C-05
MATCH TO EXISTING PAVED SURFACE
2'-0"
(TYP.)
TYPICAL STRUCTURE EXCAVATION LIMITS
ROADWAY SURFACE
LEGEND:
STRUCTURE EXCAVATION
(IPAY ITEM 20803)
STRUCTURAL BACKFILL
(PAY ITEM 20803)
GEOCELL FOUNDATION
(PAY ITEM 20802)
TYPICAL EARTHWORK CROSS SECTION
N.T.S.
STRUCTURAL EXCAVATION NOTES STRUCTURAL BACKFILL NOTES
REMOVAL OF EXISTING CULVERT
(PAY ITEM 20301)
21'-7" X 4-11"
STRUCTURAL PLATE ALUMINUM BOX CULVERT
4'-0" MIN.
AS DESIGNED BY BOX
CULVERT MANUFACTURER
6" (TYP.)
1'-6"
(MIN.)
1'-6"
(MIN.)
EXISTING STRUCTURE
REMOVE AND DISPOSE
LIMITS OF EXCAVATION (TYP.)
(PAY ITEM 20803)
SEE NOTE NO.1 -
STRUCTURAL EXCAVATION
NOTES
STRUCTURAL BACKFILL
STRUCTURAL EXCAVATION NOTES
1. COMPLETE STRUCTURE EXCAVATION IN ACCORDANCE WITH FP-14 SECTION 209.
2. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EXCAVATION SUPPORT AND COMPLIANCE
WITH ALL APPLICABLE OSHA REGULATIONS.
3. CLEAR AREA OF VEGETATION AND OBSTRUCTIONS PRIOR TO EXCAVATION.
4. CONSERVE ALL SUITABLE MATERIAL FOR STRUCTURAL BACKFILL AND OTHER BACKFILL
PURPOSES.
5. DO NOT STOCKPILE EXCAVATED MATERIAL OR ALLOW CONSTRUCTION EQUIPMENT CLOSER
THAN 2 FEET FROM THE EDGE OF ANY EXCAVATIONS.
4. SUBMIT AN EXCAVATION PLAN FOR APPROVAL PRIOR TO BEGINNING WORK ONSITE. AT A
MINIMUM, THE EXCAVATION PLAN MUST INCLUDE: DRAWINGS AND A WRITTEN OUTLINE
DESCRIBING THE PROPOSED EXCAVATION LIMITS, METHODS, EQUIPMENT TO BE USED,
LOCATION OF STOCKPILES, AND ESTIMATED QUANTITIES. THE EXCAVATION PLAN SHALL
COMPLY WITH ALL APPLICABLE OSHA REGULATIONS AND LIST THE SOIL TYPE ASSUMED.
CHANGES TO THE EXCAVATION LIMITS SHOWN ON THE CONTRACT DRAWINGS, OR FOR THE
CONTRACTOR'S DEWATERING PLAN, OR FOR THE CONTRACTOR'S CONVEINENCE MUST BE
SHOWN ON THE EXCAVATION PLAN, AND ARE THE RESPONSIBILITY OF THE CONTRACTOR.
THE EXCAVATION PLAN IS INCIDENTAL TO WORK ITEMS IN THE SCHEDULE OF ITEMS.
STRUCTURAL BACKFILL NOTES
1. BACKFILL USING SUITABLE MATERIAL (INCIDENTAL TO EMBANKMENT CONSTRUCTION) AS
APPROVED BY THE CO. FOLLOW MANUFACTURER'S GUIDELINES ON CRITICAL BACKFILL
ZONES
2. PLACE STRUCTURAL BACKFILL IN ACCORDANCE WITH FP-14 SECTION 209.09, WITH MATERIAL
MEETING THE REQUIREMENTS OF SECTION 704.
3. PLACE STRUCTURAL BACKFILL IN HORIZONTAL LAYERS THAT DO NOT EXCEED 6 INCHES IN
COMPACTED THICKNESS.
4. PLACE STRUCTURAL BACKFILL LAYERS EVENLY ON ALL SIDES OF THE STRUCTURE AS
APPROPRIATE. EXTEND EACH LAYER TO THE LIMITS OF THE EXCAVATION OR TO NATURAL
GROUND.
5. STRUCTURAL BACKFILL SHALL BE SCREENED TO REMOVE ALL ORGANIC MATERIAL.
6. BACKFILL LIMITS SHOWN ON THIS SHEET ARE THE MINIMUM REQUIREMENTS.
7. ANY BACKFILL OUTSIDE THE LIMITS SHOWN IS CONSIDERED EMBANKMENT AND SHALL MEET
THE REQUIREMENTS FOR EMBANKMENT CONSTRUCTION.
8. COMPACT BACKFILL IN ACCORDANCE WITH FP-14 SECTION 209.10 (AASHTO T99, METHOD C
AND AASHTO T310) AND SUBMIT TEST RESULTS TO THE CONTRACTING OFFICER.
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
5/1 6/2
0 1 5:
C
GO
ME
ZD
AV
IL
A
C:
\U
SE
RS
\C
GO
ME
ZD
AV
IL
A\
DO
CU
ME
NT
S\
PR
OJ
EC
TS
\F
OR
ES
TS
\A
LL
EG
HE
NY
NF
\20
1-
_F R2
\F
R2
_N
EW
SC
OP
E\
CU
LV
ER
TS
\C
OR
NP
LA
NT
ER
\C
AD
\C
OR
NP
LA
NT
ER
_A
OP
_D
ET
AI
LS
_2
6.D
W G;
R9
EASTERN REGION
UNNAMED
TRIBUTARY TO
MUDLICK RUN
CULVERT
REPLACEMENT
PROJECT
ALLEGHENY NATIONAL
FOREST
BRADFORD RANGER DISTRICT
EXCAVATION AND
STREAM SIMULATION
DETAILS
8/26/2019
C.GOMEZ
C.GOMEZ
P.LANE
AOP-02 STA 130+00
FS090523_R102013_L1-002.dwg
C-05 07 13
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
REFER TO PENNDOT STANDARD SPEC
408 SECTION 620 FOR GUIDERAIL AND
ASPHALT REQUIREMENTS GUIDERAIL DETAIL (TYP.)
N.T.S
ROADWAY CROSS SECTION (TYP.)
N.T.S.
5'-3"
(TYP.)
2'-4"
(TYP.)
1'-3"
(TYP.)
2'-0"
(TYP.)
10'-6"
(TYP.)
21'-0"
(TYP.)
10'-6"
(TYP.)
2'-0"
(TYP.)
2'-0"
(TYP.)
28"
(TYP.)
STEEL POST; W6X8.5,
SET AT 12'-6" O.C.
W-BEAM
OFFSET BLOCK
EDGE OF ASPHALT
6" THICK AGGREGATE
BASE GRADING C
FROM FP-14 TABLE
703-2 RECONSTRUCT EMBANKMENT TO 2.5:1 SLOPE (TYP.)
TO MATCH EXISTING; WORK SHALL BE CONSIDERED
INCIDENTAL CONSTRUCTION
(SEE SITE PLAN SHEET FOR FINISHED GRADE
CONTOURS)
RECONSTRUCT GUIDERAIL
(TYP.)
3.5" THICK ASPHALT
BINDER COURSE
RECONSTRUCT
SHOULDER TO
EXISTING WIDTH
(TYP.) AS PER FP-14
SECTION 703.05(C)
1.5" THICK ASPHALT
WEARING COURSE
COMPACTED SUBGRADE
DIRECTION OF WATER FLOW
2% CROWN OR CROSS SLOPE 2%
AS REQUIRED
12" THICK SUB-BASE PLACED IN TWO 6" COMPACTED LAYERS
SUBBASE GRADIND A FROM FP-14 TABLE 703-2
ALL THE WAY TO SHOULDER
BACKFILLING PIPE (TYP.)
N.T.S.
CMP
4" MIN.
D OR
12" MIN. D D OR
12" MIN.
10D
12" MIN.
COVER
MATCH TO EXISTING
PAVED SURFACE
BEDDING MATERIAL
AS PER FP-14 SECTION 704.02
(PAY ITEM 30210)
BACKFILL WITH CLEAN SUITABLE
MATERIAL AS PER FP-14 SECTION
704.03(A) APPLIED IN 6" LAYERS
CULVERT OUTLET TO STREAM
STA 131+00
12" MIN. 12" MIN.
PLAN VIEW (TYP.)
N.T.S
CROSS SECTION (TYP.)
N.T.S
STREAM CHANNEL
ROAD SHOULDER
FL
OW
TOE OF FILL
ROAD SHOULDER
TOE OF FILL
RIPRAP R-4
RIPRAP R-4
15'-0"
10:1 10:1
2% 2% 2.5:1
6%
10'-6" 2'-0"
(TYP.)37'-6"
EXISTING GROUND
FINISHED GRADE
SEE ROADWAY CROSS SECTION (TYP)
DETAILS
INSTALL 6" OF R-3 STONE
(PAY ITEM 30115-00)
DRIVABLE DIP DETAIL
NTS
ELEVATION:
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
5/1 6/2
0 1 5:
C
GO
ME
ZD
AV
IL
A
C:
\U
SE
RS
\C
GO
ME
ZD
AV
IL
A\
DO
CU
ME
NT
S\
PR
OJ
EC
TS
\F
OR
ES
TS
\A
LL
EG
HE
NY
NF
\20
1-
_F R2
\F
R2
_N
EW
SC
OP
E\
CU
LV
ER
TS
\C
OR
NP
LA
NT
ER
\C
AD
\C
OR
NP
LA
NT
ER
_A
OP
_D
ET
AI
LS
_2
6.D
W G;
R9
EASTER REGION
UNNAMED
TRIBUTARY TO
MUDLICK RUN
CULVERT
REPLACEMENT
PROJECT
ALLEGHENY NATIONAL
FOREST
BRADFORD RANGER DISTRICT
ROAD, CULVERT TRENCH,
INLET AND OUTLET
PROTECTION DETAILS
8/26/2019
C.GOMEZ
C.GOMEZ
P.LANE
AOP-02 STA 130+00
FS090523_R102013_L1-002.dwg
C-06 08 13
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
4'- 9"
1'-6" 1'-4" 1'-6" 4'-4"
3'- 9"
#4 U-BAR
24" O.C.
12"
6"
#5 VERT
12" O.C.
4'--8"
10"
(4
4 x C
ON
T
EA
CH
F
AC
E
(4) #4 x CONT. TOP AND BOTTOM
#5 x 4' @ 12"
3" CLR
SEE DETAIL A
FOOTING DETAIL
NTS
6"
1'-5"
LEGEND:
STRUCTURAL BACKFILL
(INCIDENTAL TO PAY ITEM 60302-0000)
BEDDING MATERIAL
(PAY ITEM 30210-0000)
GEOCELL FOUNDATION
(PAY ITEM 20802-0000)1.00'
BEDDING MATERIAL
GEOCELL FOUNDATION
FOLLOW MANUFACTURER'S
INSTALLATION
INSTRUCTIONS
SPLICE LOCATION AT
1/2 HEIGHT OF STEM
WALL
ALTERNATE LOCATIONS (ON EACH
SIDE OF STEM WALL) FOR
POST-INSTALLED ANCHORS
ALTERNATIVE
MECHANICAL SPLICES, TYP.
BOTH SIDES OF FOOTING AND STEM WALL
10' MAX.
TYP PRECAST SEGMENT
NTS
2" 2"
2" TYP
⅊ 5 16" x 8" x 1'-3"
W/(4) 13
16"Ø HOLES
(4) 34"Ø x 6" HILTI HAS-E RODS (OR APPROVED
EQUAL) W/ NUT AND WASHER. 3 1
2"
EMBEDMENT, DRILL AND EPOXY W/ HILTI HIT
HY 150 (OR APPROVED EQUAL)
1" 1"
2" T
YP
(2) 34"Ø A325 BOLTS W/ 7
8"Ø
HOLES IN FLANGE
11 2"
WT8x20x10"
(2) 12"Øx6" HEADED CONCRETE
ANCHOR @ 6" OC (TYP EACH
EMBED)
L 3x3x516x10" (TYP)1"
1" 1"
BAR 3"x516"x8"
1/4
NOTE: FOOTING
SPLICE SHOWN,
WALL SPLICE
SIMILAR
NOTES:
1. AT THE CONTRACTOR'S OPTION, THE CAST-IN-PLACE FOOTING MAY BE PRECAST OFF-SITE. IF PRECAST, CONNECT
SECTIONS AS SHOWN ON THIS SHEET.
2. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ANY ROCK EXCAVATION REQUIRED TO SET THE PRECAST FOUNDATION
AT THE ELEVATIONS SHOWN ON SHEET C-03.
3. PRIOR TO FABRICATING PRECAST FOOTINGS, SUBMIT FOR APPROVAL SHOP DRAWINGS DETAILING SEGMENT LENGTHS, SPLICE CONNECTIONS, CONCRETE MIX DESIGN, AND PICK LOCATIONS
4. THE PRECAST FOOTINGS REQUIRE THE GEOCELL LAYER SHOWN ON SHEET C-05 ON BOTH BEDROCK AND NATIVE SOIL
BOLTED ALTERNATIVE - PLAN
NTS
BOLTED ALTERNATIVE - ELEVATION
NTS
WELDED ALTERNATIVE - PLAN
NTS
WELDED ALTERNATIVE - ELEVATION
NTS
POST INSTALLED ANCHORS ALTERNATIVE -
ELEVATION
NTS
DESIGN ELEVATION
SEE STRUCTURE PROFILE SHEET C-03
BEDROCK (ASSUMED)
ADJUST FOOTING ELEVATION
AND CAST DIRECTLY ON
APPROVED COMPETENT
BEDROCK
1'-4" MIN
MIN (2) EACH FACE
12" O.C.
FIELD CUT VERTICAL
ALT. FOOTING ON BEDROCK
NTS
NOTES:
1. STRUCTURAL CONCRETE AND REINFORCEMENT STEEL IS INCIDENTAL TO
PAY ITEM 60302.
2. FOUNDATION FILL SHALL COMPLY WITH FP-14 SECTION 704.01.
3. PRIOR TO CONSTRUCTING THE FOOTINGS, THE CONTRACTOR SHALL
VERIFY THAT THE DIMENSIONS OF THE STRUCTURE (AS SHOWN ON THESE
PLANS) MATCH THOSE BEING PRODUCED BY ITS FABRICATOR. IF THEY DO
NOT MATCH, AN ADJUSTMENT TO THE FOOTING LOCATIONS MAY BE
REQUIRED. ANY SUCH ADJUSTMENTS SHALL BE SUBMITTED TO THE CO FOR
APPROVAL.
4. FOR INFORMATION ON CHANNEL DIVERSION DURING CONSTRUCTION, SEE
SPECIAL CONTRACT REQUIREMENT 209.
5. OVER-EXCAVATION AND REPLACEMENT WITH FOUNDATION FILL MAY BE
REQUIRED PER STANDARD AND SPECIAL CONTRACT REQUIREMENT
SECTION 208.08(d).
6. THE CONTRACTOR MAY ELECT TO PRECAST THE FOOTINGS. SEE NOTES
ON SHEET G-01 FOR CONDITIONS. DO NOT PLACE PRECAST FOOTINGS
DIRECTLY ON ROCK, USE 6" GEOCELL LAYER PER DETAIL.
7. GEOCELL MAT TO EXTEND 6" BEYOND LENGTH OF FOOTING.
8. OVEREXCAVATE ALL CLAY ENCOUNTERED AT FOUNDATION LEVEL AND
REPLACE WITH BACKFILL MATERIAL. INCIDENTAL TO PAY ITEM 20802.
9. DO NOT PLACE FOOTINGS DIRECTLY ON LARGE BOULDERS OR
OUTCROPPINGS OF BEDROCK. IF BEDROCK IS ENCOUNTERED, ADJUST
THE FOOTING DEPTH AND FOOTING STEM WALL HEIGHT AS SHOWN ON
THIS SHEET. REINFORCING TO REMAIN THE SAME EXCEPT WHERE SHOWN.
10. ROCK EXCAVATION REQUIRED TO ACHIEVE DIMENSIONS SHOWN IS
OPTIONAL TO ITEM 20401.
NTS
GROUT KEY PER
MANUFACTURER'S
SPECIFICATIONS.
VERIFY WITH
MANUFACTURER
KEYWAY
DIMENSIONS.
4" 8" 4"
4"
DETAIL A
NTS
SUBGRADE
GEOTEXTILE
GEOWEB
GRANULAR INFILL
GEOTEXTILE
GEOCELL FOUNDATION SYSTEM (TYP) DETAIL
NTS
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
5/1 6/2
0 1 5:
C
GO
ME
ZD
AV
IL
A
C:
\U
SE
RS
\C
GO
ME
ZD
AV
IL
A\
DO
CU
ME
NT
S\
PR
OJ
EC
TS
\F
OR
ES
TS
\A
LL
EG
HE
NY
NF
\20
1-
_F R2
\F
R2
_N
EW
SC
OP
E\
CU
LV
ER
TS
\C
OR
NP
LA
NT
ER
\C
AD
\C
OR
NP
LA
NT
ER
_A
OP
_D
ET
AI
LS
_2
6.D
W G;
R9
EASTER REGION
UNNAMED
TRIBUTARY TO
MUDLICK RUN
CULVERT
REPLACEMENT
PROJECT
ALLEGHENY NATIONAL
FOREST
BRADFORD RANGER DISTRICT
FOUNDATION DETAILS
8/26/2019
C.GOMEZ
C.GOMEZ
P.LANE
AOP-02 STA 130+00
FS090523_R102013_L1-002.dwg
C-07 09 13
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
LOG JAM NOTES:
1. LOG JAMS WILL BE LOCATED AND STAKED IN THE FIELD BY
FOREST STAFF PRIOR TO CONSTRUCTION.
2. LOGS FOR THE LOG JAM SHALL BE CEDAR, SPRUCE, PINE OR
FIR. LIMBS AND BRANCHES SHALL BE IN TACT TO THE
FULLEST EXTENT POSSIBLE. OTHER TYPES OF LOGS MAY BE
USED IF APPROVED PRIOR TO CONSTRUCTION WITH THE CO.
3. STRUCTURE MEMBERS ARE TO BE A MINIMUM OF 2 FEET BOLE
DIAMETER WITH 6 FEET EFFECTIVE DIAMETER ROOTWAD.
4. EXCAVATE A CRADLE AREA ON THE STREAMBED TO PLACE
BASE MEMBERS OF LOG JAM. BURY ROOTWAD 3 FEET INTO
STREAMBED. USE EXCAVATED GRAVELS TO BACKFILL
AROUND BASE MEMBERS.
5. BALLAST STRUCTURE WITH AT LEAST 11 BOULDERS (3) 6 FOOT
AND (8) 4 FOOT DIAMETER, RESTING ON TOP OF THE LOG IN A
STABLE POSITION. EACH LOG SHALL BE BALLASTED WITH AT
LEAST 2 BOULDERS.
6. ANCHOR ALL MEMBERS TOGETHER AS SHOWN IN ANCHOR
DETAIL. PRE-DRILL 1 INCH HOLE AND USE AN A307
HOT-DIPPED GALVANIZED, 1 INCH DIAMETER, THREADED
STAINLESS STEEL ROD WITH HEAVY PLATE WASHERS AND
NUTS.
SECTION
LOG JAM & ROCK PLACEMENT DIAGRAM
NTS
PLAN VIEW
30'
35'
25'
40'
ANCHOR DETAIL
(not to scale)
EXISTING BANK
BASE MEMBERS
BOULDERS
TOP MEMBERS
BASE MEMBERS
TOP MEMBERS
BOULDERS
BASE MEMBERS
CRADLE AREA
SEE NOTE 3
ORDINARY HIGH WATER
TOP MEMBERS
TYPICAL ANCHOR PLACEMENT
BASE MEMBERS1"Ø STAINLESS STEEL
ROD
ORDINARY HIGH WATER
5'-0" (TYP.)
4'-0" (TYP.)
3'-0" MIN.
4" ROUND TREATED
WOOD FENCE POST
FENCE POST INSTALLATION DETAIL
NTS
FLOW
45°
45°
RIVER LEFT
RIVER RIGHT
AA
B B
HEADWALL AND WINGWALL PLAN
NTS
R-4 RIPRAP PLACE AS DIRECTED BY CO (TYP), WRAP AROUND
EACH WINGWALL END TO CATCH FILL SLOPE. RIPRAP SHOWN
NOT TO SCALE. 10 CY. EACH CORNER OF WINGWALL. (PAY
ITEM 25102)
58°
℄ F R2
30°
150°
5.50'
9.50'
5.50'
5.11'
ELEV: 1364.89'
B-B DOWNSTREAM HEADWALL ELEVATION
NTS
A-A UPSTREAM HEADWALL ELEVATION
NTS
ELEV: 1364.18'
ELEV: 1363.77'
ELEV: 1365.72'
ELEV: 1364.92'
RI
VE
R
LE
FT
RI
VE
R
RI
GH
T
RI
VE
R
RI
GH
T
RI
VE
R
LE
FT
4'-9" 28'-6" 4'-5"
3'-10" 28'-6" 6'-9"
1'- 5"
1'- 8"
ELEV: 1357.67'
ELEV: 1358.80'
ELEV: 1364.35'
ALUMINUM
STRUCTURAL
HEADWALL
ALUMINUM
STRUCTURAL
HEADWALL
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
5/1 6/2
0 1 5:
C
GO
ME
ZD
AV
IL
A
C:
\U
SE
RS
\C
GO
ME
ZD
AV
IL
A\
DO
CU
ME
NT
S\
PR
OJ
EC
TS
\F
OR
ES
TS
\A
LL
EG
HE
NY
NF
\20
1-
_F R2
\F
R2
_N
EW
SC
OP
E\
CU
LV
ER
TS
\C
OR
NP
LA
NT
ER
\C
AD
\C
OR
NP
LA
NT
ER
_A
OP
_D
ET
AI
LS
_2
6.D
W G;
R9
EASTER REGION
UNNAMED
TRIBUTARY TO
MUDLICK RUN
CULVERT
REPLACEMENT
PROJECT
ALLEGHENY NATIONAL
FOREST
BRADFORD RANGER DISTRICT
FENCE, LOG JAM AND
STRUCTURE HEADWALL
DETAILS
8/26/2019
C.GOMEZ
C.GOMEZ
P.LANE
AOP-02 STA 130+00
FS090523_R102013_L1-002.dwg
C-08 10 13
AutoCAD SHX Text
FLOW
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
ROADWAY CENTERLINE
PERMANENT CULVERT
PERMANENT NATURAL CHANNELX X
X
TEMPORARY CULVERT
X
X
B
X
B
C
X
C
X
XX
A A
FLOW
BEDDING
LIMITS OF EARTHWORK
SUBGRADE
ROADWAY CENTERLINE
PERMANENT CULVERT
PERMANENT NATURAL CHANNEL
FLOW
SILT FENCE
X X X
X
X
XX
X X
XX
X
X X
X X
X X
X X
XB
X
B
A
X X
A
FLOW
TEMPORARY FORCE
MAIN
LIMITS OF EARTHWORK
SAND BAG TEMPORARY
BARRIER
TRASH PUMP SIZED TO
DIRECT TOAL FLOW FROM STREAM
THROUGH FORCE MAIN
ROADWAY CENTERLINE
PERMANENT CULVERT
FLOWFLOW
NATURAL GROUND
TEMPORARY CULVERT
BACKFILL
D
SANDBAGSPLASTIC LINER
2 FT
PLASTIC LINER
FLOW
FLOW
SCALE : NTS
PLAN - DIVERSION CHANNELC1 PLAN - TRASH PUMP BYPASSC2 SCALE : NTS
PLAN - TEMPORARY CULVERT DIVERSIONA1 SCALE : NTS
SECTION C-C TEMPORARY CULVERTA2 SCALE : NTS
RIPRAP LINED DIVERSION CHANNELB4 SCALE : NTS
D4
SECTION A-A SECTION B-B
2 FT
2 FT 2 FT
NOTES:
1. USE PLASTIC LINER OR RIPRAP ALONG THE ENTIRE LENGTH AND WIDTH OF THE
TEMPORARY DIVERSION CHANNEL.
2. CONSTRUCT CHANNEL AT A MINIMUM GRADE OF 0.5 PERCENT.
3. DO NOT CONSTRUCT WITH LONGITUDINAL JOINTS IF USING A PLASTIC LINER.
BURY THE UPSTREAM EDGE OF THE LINER A MINIMUM OF 6 IN DEEP AND SECURE
WITH RIPRAP OR SANDBAGS.
4. ALL PUMPS WILL HAVE A SCREENED FOOT VALVE.
TEMPORARY DIVERSION CHANNEL WITH
PLASTIC LINER OR RIPRAP USE SANDBAGS TO PREVENT BACKFLOW INTO
NATURAL CHANNEL
USE SANDBAGS TO CONSTRUCT
TEMPORARY BARRIER
TEMPORARY DIVERSION CHANNEL WITH
PLASTIC LINER OR RIPRAP USE SANDBAGS TO PREVENT BACKFLOW INTO
NATURAL CHANNEL
USE SANDBAGS TO CONSTRUCT
TEMPORARY BARRIER
TEMPORARY RIPRAP
ENERGY DISSAPATOR SILT FENCE (TYP. WHEN
SCHEDULED)
BURY PLASTIC LINER 6 IN DEEP AND SECURE
WITH SANDBAGS (TYP.)SILT FENCE
RIPRAP LINING GEOTEXTILE, TYPE II-AGEOTEXTILE, TYPE II-A
SANDBAGSRIPRAP LINING
SECTION B-B SECTION A-A
FRONT VIEW
SCALE : NTS
PERMANENT NATURAL CHANNEL
LIMITS OF EARTHWORK
ROADWAY
EMBANKMENT
ROADWAY
EMBANKMENT
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
5/1 6/2
0 1 5:
C
GO
ME
ZD
AV
IL
A
C:
\U
SE
RS
\C
GO
ME
ZD
AV
IL
A\
DO
CU
ME
NT
S\
PR
OJ
EC
TS
\F
OR
ES
TS
\A
LL
EG
HE
NY
NF
\20
1-
_F R2
\F
R2
_N
EW
SC
OP
E\
CU
LV
ER
TS
\C
OR
NP
LA
NT
ER
\C
AD
\C
OR
NP
LA
NT
ER
_A
OP
_D
ET
AI
LS
_2
6.D
W G;
R9
EASTER REGION
UNNAMED
TRIBUTARY TO
MUDLICK RUN
CULVERT
REPLACEMENT
PROJECT
ALLEGHENY NATIONAL
FOREST
BRADFORD RANGER DISTRICT
DEWATERING PLAN
8/26/2019
C.GOMEZ
C.GOMEZ
X.XXX
AOP-02 STA 130+00
FS090523_R102013_L1-002.dwg
C-09 11 13
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
NOTES :
A (R11-2 INSTALLED ON A TYPE III BARRICADE.) LOCATE TYPE III
BARRICADES AS SHOWN OR AS DIRECTED BY THE CO.
ROAD
CLOSED
BARRIER DETAILS
AS REQUIRED
MUTCD PANEL
R11-2
1'-8"
1'-8" 5'-0"
MIN.
6'-6" MAX.
RETROREFLECTORIZED FACESANDBAGS FOR
ADDED STABILITY
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
5/1 6/2
0 1 5:
C
GO
ME
ZD
AV
IL
A
C:
\U
SE
RS
\C
GO
ME
ZD
AV
IL
A\
DO
CU
ME
NT
S\
PR
OJ
EC
TS
\F
OR
ES
TS
\A
LL
EG
HE
NY
NF
\20
1-
_F R2
\F
R2
_N
EW
SC
OP
E\
CU
LV
ER
TS
\C
OR
NP
LA
NT
ER
\C
AD
\C
OR
NP
LA
NT
ER
_A
OP
_D
ET
AI
LS
_2
6.D
W G;
R9
EASTER REGION
UNNAMED
TRIBUTARY TO
MUDLICK RUN
CULVERT
REPLACEMENT
PROJECT
ALLEGHENY NATIONAL
FOREST
BRADFORD RANGER DISTRICT
DETOUR TRAFFIC
CONTROL PLAN
8/26/2019
C.GOMEZ
C.GOMEZ
P.LANE
AOP-02 STA 130+00
FS090523_R102013_L1-002.dwg
C-10 12 13
PLACE ON EASTBOUND PA-59, AT INTERSECTION W/
FSR 262
SIGN NO. LOCATION TEXT QUANTITY
PLACE ON WESTBOUND PA-59, ACROSS FROM FSR
PLACE ON NORTHBOUND FSR 492, AT INTERSECTION W/
FSR 262
KIASUTHA
CG
PLACE ON NORTHBOUND FSR 141, AT INTERSECTION W/
FSR 262
PLACE ON NORTHBOUND FSR 110, AT INTERSECTION W/
FSR 262
PLACE ON NORTHBOUND FSR 141, AT INTERSECTION W/
FSR 262
PLACE ON NORTHBOUND FSR 110, AT INTERSECTION W/
FSR 262
PLACE ON SOUTHBOUND PA-321, AT INTERSECTION W/
FSR 262
KIASUTHA
CG
PLACE ON NORTHBOUND PA-321, AT INTERSECTION W/
FSR 262
PLACE ON NORTHBOUND PA-321, AT INTERSECTION W/
FSR 262
PLACE ON EASTBOUND PA-59, AT INTERSECTION W/
PA-321
PLACE ON WESTBOUND PA-59, ACROSS FROM
PA-321
PLACE ON NORTHBOUND FSR 492, AT INTERSECTION W/
FSR 262
3 4A
6 7
4a
DETOUR
KIASUTHA CG
DETOUR
DEWDROP CG
JAKES ROCKS
ELIJAH BOAT RAMP
DETOUR
KIASUTHA CG
VIA SR 59
DETOUR
DEWDROP CG
JAKES ROCKS
ELIJAH BOAT RAMP
DETOUR
DEWDROP CG
ELIJAH BOAT RAMP
DETOUR
DEWDROP CG
ELIJAH BOAT RAMP
DETOUR
KIASUTHA CG
PROJECT LOCATION
AutoCAD SHX Text
1. THIS PLAN SHOWS THE MINIMUM REQUIREMENTS FOR DETOUR THIS PLAN SHOWS THE MINIMUM REQUIREMENTS FOR DETOUR AND TEMPORARY TRAFFIC CONTROL. CONTRACTOR SHALL SUBMIT A PLAN TO THE FOREST 30 DAYS PRIOR INITIAL INSTALLATION. 2. ALL SIGN AND BARRICADE INSTALLATION SHALL MEET THE ALL SIGN AND BARRICADE INSTALLATION SHALL MEET THE STANDARDS ESTABLISHED IN THE FEDERAL HIGHWAY ADMINISTRATION'S "MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MUTCD)", CURRENT EDITION. 3. LETTERS ON SIGNS SHALL HAVE A MINIMUM HEIGHT OF 4" AND LETTERS ON SIGNS SHALL HAVE A MINIMUM HEIGHT OF 4" AND MINIMUM WIDTH OF 2". 4. WHERE TRAFFIC IS MAINTAINED THROUGH OR OVER ANY PART WHERE TRAFFIC IS MAINTAINED THROUGH OR OVER ANY PART OF THE PROJECT, THE CONTRACTOR SHALL BE REQUIRED TO MARK ALL HAZARDS WITHIN THE LIMITS OF THE PROJECT (INCLUDING CONNECTING ROADS) WITH WELL-MAINTAINED SIGNS. 5. THE CONTRACTOR'S EQUIPMENT AND PARKING AREAS SHALL THE CONTRACTOR'S EQUIPMENT AND PARKING AREAS SHALL NOT INHIBIT THE VISIBILITY OF PROJECT SIGNS AND BARRICADES. 6. LOCATION AND INSTALLATION OF ALL TRAFFIC SIGNS, TRAFFIC LOCATION AND INSTALLATION OF ALL TRAFFIC SIGNS, TRAFFIC CONTROL, AND BARRICADES SHALL BE IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS AND APPROVED BY THE CO. 7. ALL SIGNS AND BARRICADES SHALL CONSIST OF A SMOOTH, ALL SIGNS AND BARRICADES SHALL CONSIST OF A SMOOTH, RETROREFLECTIVE SURFACE UNLESS OTHERWISE SPECIFIED ON THE PLANS. SIGNS SHALL HAVE A SCREEN PROCESSED BLACK LEGEND AND BORDER ON ORANGE FLEXIBLE RETROREFLECTIVE SHEETING, NON-EXPOSED LENS BACKGROUND. 8. SIGN PANELS FURNISHED BY THE CONTRACTOR FOR USE ONLY SIGN PANELS FURNISHED BY THE CONTRACTOR FOR USE ONLY DURING CONSTRUCTION SHALL BE FABRICATED FROM PLYWOOD, ALUMINUM, STEEL OR OTHER SUITABLE MATERIAL, BUT SHALL BE STABLE AND DURABLE ENOUGH TO MEET OTHER REQUIREMENTS OF THIS CONTRACT. ALL MATERIAL SHALL BE SOUND AND DURABLE. BARRICADES, SIGNS, SYMBOLS AND LETTERING SHALL BE OF GOOD WORKMANSHIP. UNEVEN LETTERING SHALL NOT BE ACCEPTED. 9. ALTERNATE METHODS OF PROCESSING SIGNS OR THE ALTERNATE METHODS OF PROCESSING SIGNS OR THE SUBSTITUTION OF MATERIALS, SYMBOLS OR OTHER REFLECTING ELEMENTS SHALL BE PERMITTED ONLY AFTER APPROVAL OF SUCH METHODS OR MATERIALS BY THE CO IN WRITING. 10. SIGNS AND BARRICADES USED AS TRAFFIC CONTROLS FOR SIGNS AND BARRICADES USED AS TRAFFIC CONTROLS FOR HIGHWAY CONSTRUCTION SHALL NOT BE PAID FOR SEPARATELY, BUT SHALL BE INCLUDED IN ITEM 63501-00. 11. ALL CONSTRUCTION TRAFFIC CONTROL SIGNING AND BARRICADES ALL CONSTRUCTION TRAFFIC CONTROL SIGNING AND BARRICADES SHALL BE COMPLETED AND APPROVED PRIOR TO THE BEGINNING OF CONSTRUCTION, AND ITEM 15101-00 MOBILIZATION, SHALL NOT BE PAID UNTIL SIGNING IS APPROVED BY THE CO. 12. SIGN PANELS SHALL BE ATTACHED TO POSTS SIGN PANELS SHALL BE ATTACHED TO POSTS WITH 3/8" MACHINE BOLTS THROUGH 1/2" HOLES. FIBER WASHERS SHALL BE PLACED BETWEEN THE BOLT HEAD AND THE FACE OF THE SIGN PANEL. 2" GALVANIZED WASHERS SHALL BE PLACED UNDER THE NUT ON THE BACK OF THE TIMBER POSTS. 13. SEE MAP FOR APPROXIMATE SIGN LOCATIONS. FINAL LOCATIONS SEE MAP FOR APPROXIMATE SIGN LOCATIONS. FINAL LOCATIONS SHALL BE APPROVED BY THE CO. 14. ALL TRAFFIC CONTROL DEVICES SHALL FOLLOW THE GUIDELINES ALL TRAFFIC CONTROL DEVICES SHALL FOLLOW THE GUIDELINES ESTABLISHED IN THE REFERENCE TITLED "QUALITY GUIDELINES FOR WORK ZONE TRAFFIC CONTROL DEVICES" PUBLISHED BY THE ROADWAY SAFETY TRAINING INSTITUTE AND THE AMERICAN TRAFFIC SAFETY SERVICE ASSOCIATION AND BE IN ACCORDANCE WITH MUTCD.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
| cornplanter_AOP_Details_20200516-COVERSHEET |
| Sheets and Views |
| COVERSHEET |
| OLE1 |
| Cornplanter_20200515 |
| Sheets and Views |
| Cornplanter_20200515-34X22-C0-EXISTING |
| OLE1 |
| Cornplanter_20200515-34X22-C1-SITEPLAN |
| OLE1 |
| Cornplanter_20200515-34X22-C2_PROJECT LAYOUT |
| OLE1 |
| Cornplanter_20200515-34X22-C3-PROFILES |
| OLE1 |
| Cornplanter_20200515-34X22-C4-XSEC |
| OLE1 |
| cornplanter_AOP_Details_20200516 |
| Sheets and Views |
| cornplanter_AOP_Details_20200516-34X22 G12GENERAL NOTES |
| OLE1 |
| cornplanter_AOP_Details_20200516-34X22 C5-CULVERT&STREAMSIM |
| OLE1 |
| cornplanter_AOP_Details_20200516-34X22 C6-ROAD DETAILS |
| OLE1 |
| cornplanter_AOP_Details_20200516-34X22 C7-FOUNDATION DETAILS |
| OLE1 |
| cornplanter_AOP_Details_20200516-34X22 C8-LOG JAM |
| OLE1 |
| cornplanter_AOP_Details_20200516-34X22 C8-DEWATERING |
| OLE1 |
| cornplanter_AOP_Details_20200516-34X22 C10-TRAFFIC |
| OLE1 |
| 2020-07-07T15:39:07-0400 | |
| ROBERT PHILLIPS |
| 2020-07-08T07:55:40-0400 | |
| RICHARD HATFIELD |
| 2020-07-08T08:44:17-0400 | |
| CHRISTOPHER COOK |
| Regional Bridge Program Manager | |
| 2020-07-08T13:27:58-0500 | |
| JEFFREY DULKA | |
| I am approving this document |
| 2020-07-08T14:34:48-0500 | |
| JOSIAH KIM |
File details come from the government source that posted it. Updated .