This amendment to a federal solicitation provides revised details for the Allegheny National Forest FR 262 Longhouse Scenic Drive Project 2020 opportunity. Key changes include extending the proposal due date from August 24 to August 31, 2020, replacing the original Schedule B-1 with a revised version indicating adjusted line items and quantities, and deleting Project B-1 in its entirety. The solicitation seeks proposals to perform road reconstruction and drainage structure replacement work along Forest Road 262 within the Allegheny National Forest. Revised pay items include mobilization, surveying, erosion control, clearing and grubbing, culvert removal, waste removal, aggregate courses, asphalt paving, milling, pipe installation, underdrain construction, guardrail work, turf establishment, erosion control mats, signage, pavement markings, and traffic control. Proposers must price all line items to be considered for award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMEND 03_08272020.pdf | ||
| AMEND 2_08242020.pdf | ||
| Attach 1.0 CORN_FSSS_20200529.docx | DOCX document | |
| Attach 2.0 MUD_FSSS_20200529.docx | DOCX document | |
| Attach xx GovtProvidedTechnicalProposalForms.rtf | RTF text file | |
| 1224H820R0003__07242020_FINAL.pdf | ||
| Attach 3.1 FR262-MUD-CORN_Final_20200629_signed.pdf | ||
| Attach 2.1 Mudlick_FINAL_20200629_signed.pdf | ||
| Attach 1.1 CORNPLANTER_FINAL_20200629.pdf | ||
| WAGE DET_07242020.pdf | ||
| Attach 3.0 FR262-MUD-CORN_FSSS_20200629.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
AMENDMENT 01: Questions and Answers and Changes.
North East Acquisition Team 4 Farm Colony Drive Warren PA 16365
See block 6.
1224H820R0003
08/19/2020
07/24/2020
Solicitation: 1224H820R0003
Date: 19 August 2020
AMENDMENT 01:
QUESTIONS AND ANSWERS:
1. QUESTION: I have not seen any Q/A posted. Do you have any from other vendors so far?
RESPONSE: Reference the solicitation and any posted amendments.
2. QUESTION: Do you have the culvert footer elevations for both culverts? Please provide.
RESPONSE: Reference sheet C-01 for the Mudlick Run Culvert and C-03 for the Unnamed Tributary for Mudlick Run.
3. QUESTION: Do you know the logistics for the log structures? Is the expectation to have those logs delivered from another location or can we use trees in the construction area?
RESPONSE: It is anticipated that trees/rootwads will be available onsite and placed at direction of Forest Service Representative at time of installation.
4. QUESTION: Do you plan on extending the due date for quotes?
RESPONSE: Monitor the solicitation and any applicable amendments for changes.
5. QUESTION: I am looking at the bid sheet you show 30000 sy of milling 5" deep but you don't have enough blacktop for that amount of area. Also it's not shown where you want milling or dimensions can you clarify ?
RESPONSE: Attached is the amended bid sheet.
6. QUESTION: Another question besides the milling quantities,you call out FB1 asphalt this is an old design that the plants do not make should it be superpave mix design ?
RESPONSE: Superpave is an acceptable asphalt mix design. If appropriate, other asphalt mixes will be considered. Material Specifications listed in PennDot Publication 408, Section 400 may be substituted if requested by the contractor and approved by Contracting Officer.
7. QUESTION: Contract time is to be – 9/1/2020 to 4/30/2021, correct?
RESPONSE: The intent is to award by 9/1/2020. If the project is not awarded then the contract will be extended proportionally out.
8. QUESTION: Are B-1, B-2 and B-3 Projects all going to be completed by the contractor the job is awarded to, or is there a chance that the government may eliminate one or two of them?
RESPONSE: The intent is to award one project. Proposals must include pricing for all line items to be considered for award.
9. QUESTION: On drawing AOP-02 STA 130+00 G-02 / Construction Notes #3 – This indicates the backfill material must be approved by the CO and must contain no particles larger then 3”. Is it considered that the excavated material is suitable for reuse as backfill?
RESPONSE: This is contingent on the condition of the material being excavated. If the material is deemed suitable then it can be used as backfill. Material suitability will be determined by Forest Service.
10. QUESTION: Where is the project waste area located?
RESPONSE: The Government will indicate waste location. Location will be within reasonable proximity to project site.
11. QUESTION: Are the E & S plan and features at the waste area the contractors responsibility?
RESPONSE: Yes.
12. QUESTION: It appears that the required layback excavation and embankment are not included in the pay items. Are the layback excavation / embankment incidental to the structure excavation / backfill?
RESPONSE: It is incidental and shall be considered contract quantity.
13. QUESTION: Are any of the aggregates required to be limestone?
RESPONSE: No.
14. QUESTION: Footings – are cast in place or precast footings both acceptable for use?
RESPONSE: Either method is acceptable. Contractor should state which method that they intend on using.
15. QUESTION: If cast in place footings are used at design elevations and they are still not sitting on bedrock, is the geocell foundation required under them ?
RESPONSE: Yes
16. QUESTION: Geocell – the plans specify 2A material to fill the cells. Typically a #57 or #8 clean stone is used due to compaction problems on top of geocell. Please clarify geocell fill material required.
RESPONSE: Contractor shall follow manufacturers installation recommendations.
17. QUESTION: Where is the proposed access to install the log barrier on AOP-02 SAT 130+00 C-01?
RESPONSE: Access will be determined at time of construction
18. QUESTION: Are Hemlock logs suitable for use on log barriers?
RESPONSE: Hemlock and/or hardwood trees will be a suitable substitution
19. QUESTION: On AOP-01 SAT 116+45, the existing 18” x 74’ pipe is shown as save and reset. Is the bedding material included in item #30210?
RESPONSE: Yes.
20. QUESTION: Could you please clarify the material requirements for items 30201 and 30204, should both items be PA2A?
RESPONSE: PA2A is an appropriate substitution. If contractor chooses they may request a variance.
21. QUESTION: It appears that the US Forest Service would like the road reconstructed as they have items for subbase and base aggregates. If this is so, then it would require to add an excavation item for the removal of the existing material.
RESPONSE: Line item 30316, roadway reconditioning added. Quantities updated to reflect roadway reconditioning. See attached amendment.
22. QUESTION: The milling item is shown to be 30,000 sy but based on the limits shown that should be 2,690 sy. Please advise.
RESPONSE: See Response to Question #5 above.
23. QUESTION: Is there a pre bid meeting for the FR 262 project? I didn’t see anywhere in there where it said there was one?
RESPONSE: Reference Contractor Note #2 under the schedule of items and solicitation provision, 52.236-27 Site Visit (Construction) (FEB 1995).
24. QUESTION: I see this project is a small business only project but we’d like to quote materials, etc to contractors that are eligible to bid. Could you provide me with a planholders list?
RESPONSE: The plans are posted with the solicitation so there is not such a list.
(End of Q&A)
CHANGES:
1. Proposal due date: The due date for proposals is hereby changed as follows:
FROM: 1:00 PM (EST) on 24 August 2020
TO: 1:00 PM (EST) on 31 August 2020
2. Schedule B-1: Schedule B-1 of the solicitation is hereby deleted in its entirety and replaced with Schedule B-1 Revised dated 8/19/2020. Revised line items are indicated in red text and noted.
3. Questions about the solicitation: Questions must be submitted to the Contracting Officer prior to close of business on 25 August 2020 to allow time to respond to questions. The Government will endeavor to address questions submitted after 25 August 2020, but may not be able to provide responses prior to solicitation close.
(End of Changes)
Section B: Services and Prices (REV. 8/19/2020) Revised Pay Items: 15101, 15201, 15713, 20101, 20429 30205, 30204, 40304.1, 40304.2, 60501
B-1: SCHEDULE OF ITEMS
PAY ITEM DESCRIPTION UNIT QTY REV QTY UNIT COST TOTAL
15101 MOBILIZATION LS 1
15201 CONSTRUCTION SURVEY AND STAKING,
METHOD 1, TOLERANCE A
LS 1
15713 EROSION & POLLUTION CONTROL LS 1
20101 CLEARING AND GRUBBING LS 1
20302 REMOVAL OF EXISTING CULVERTS,
INCLUDES INCIDENTAL TREE REMOVAL
AND SPILLWAYS
EA 4
20424 DRAINAGE EXCAVATION, TYPE
RECONSTRUCTION/CONSTRUCTION
LEADOFF DITCHES, OUTLET DITCHES,
LINE DITCHES, DITCHBLOCKS
LF* 915
20429 WASTE CY 1,467
30113 AGGREGATE SURFACE COURSE FOR
SHOULDER, GRADING F
TON* 125
30205 CRUSHED AGGREGATE BASE,
COMPACTION D
TON* 941 1,089
30204 CRUSHED AGGREGATE SUBBASE,
COMPACTION D
TON* 1,881 2,178
40304.1 HOT-MIX ASPHALT CONCRETE
PAVEMENT, PENNDOT PLANT MIX
BITUMINOUS, 3-1/2” THICK BINDER
COURSE, FB-1
TON* 482 558
40304.2 HOT-MIX ASPHALT CONCRETE
PAVEMENT, PENNDOT PLANT MIX
BITUMINOUS, 1-1/2” THICK WEARING
COURSE, FB-1
TON* 207 239
41301 ASPHALT PAVEMENT MILLING, 5 INCH
DEPTH, DISPOSAL BY CONTRACTOR
SY* 30,000
60201 18 INCH ALUMINIZED STEEL, TYPE 2,
CORRUGATED STEEL PIPE, 0.064 INCH
THICKNESS, COMPACTION METHOD 6
LF* 254
60501 STANDARD UNDERDRAIN SYTEM,
INCLUDES TRENCH EXCAVATION,
LS 1
PAY ITEM DESCRIPTION UNIT QTY REV QTY UNIT COST TOTAL
GEOTEXTILE, AGGREGATE AND OUTLET
SYSTEM
61705 REPLACE GUARDRAIL SYSTEM,
INCLUDES TERMINAL SECTIONS
LF* 39
61707 REMOVE AND RESET GUARDRAIL
SYSTEM
LF 223
62550 TURF ESTABLISHMENT, HYDRAULIC OR
DRY METHOD
LS 1
62901 ROLLED EROSION CONTROL PRODUCT,
TYPE EROSION CONTROL MATS, TYPE
3B, BIODEGRADABLE
SY* 2,586
63301 PERMANENT SIGN SYSTEM LS 1
63401 PAVEMENT MARKINGS, DOUBLE SOLID,
YELLOW, CENTERLINE, REFLECTORIZED
LF* 1,200
63501 TEMPORARY TRAFFIC CONTROL LS 1
TOTAL BID
*INDICATES CONTRACT QUANTITIES
| FR262-MUD-CORN_SectionB_REV20200819_blank.pdf |
| B-1: SCHEDULE OF ITEMS |
| FR262-MUD-CORN_SectionB_REV20200819_blank.pdf |
| B-1: SCHEDULE OF ITEMS |
| FR262-MUD-CORN_SectionB_REV20200819_blank.pdf |
| B-1: SCHEDULE OF ITEMS |