1224H820R0003__07242020_FINAL.pdf
PDF 743 KB Posted
- Solicitation number
- 1224H820R0003
About this file
This solicitation is for a construction project to improve Forest Road 262 Longhouse Scenic Drive on the Allegheny National Forest. Key work includes culvert replacement, streambed simulation, asphalt paving, aggregate installation, and erosion control. The project involves three sites with separate schedules of items and will be awarded to a single contractor. The Cornplanter site involves box culvert replacement, the Mudlick site includes arch culvert installation and stream realignment, while the third site covers resurfacing 11,000 feet of roadway and replacing culverts. The performance period for all sites is from September 2020 to April 2021. The solicitation incorporates standard construction clauses and specifies compliance with state and federal regulations regarding prevailing wage, safety, and environmental protection. Responses are due by August 2020 and the contract will be awarded for a 180-day performance period.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMEND 03_08272020.pdf | ||
| AMEND 2_08242020.pdf | ||
| AMEND 01_08192020.pdf | ||
| Attach 1.0 CORN_FSSS_20200529.docx | DOCX document | |
| Attach 2.0 MUD_FSSS_20200529.docx | DOCX document | |
| Attach xx GovtProvidedTechnicalProposalForms.rtf | RTF text file | |
| Attach 3.1 FR262-MUD-CORN_Final_20200629_signed.pdf | ||
| Attach 2.1 Mudlick_FINAL_20200629_signed.pdf | ||
| Attach 1.1 CORNPLANTER_FINAL_20200629.pdf | ||
| WAGE DET_07242020.pdf | ||
| Attach 3.0 FR262-MUD-CORN_FSSS_20200629.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
1008755
USDA FOREST SERVICE
ALLEGHENY NATIONAL FOREST
4 FARM COLONY DRIVE
WARREN PA 16365
24H8
ASHLEY WITMER 814-728-6258
1x 07/24/2020
1224H820R0003
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Allegheny National Forest FR-262 Longhouse Road Project-2020.
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 240 calendar days and complete it within ________________ ________________ calendar days after receiving
52.211-10
08/24/2020
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
USDA FOREST SERVICE
ALLEGHENY NATIONAL FOREST
4 FARM COLONY DRIVE
WARREN PA 16365
24H8
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
1224H820R0003
Allegheny National Forest FR-262 Longhouse Road
Project-2020
Delivery Location Code: 24H8
USDA FOREST SERVICE
ALLEGHENY NATIONAL FOREST
4 FARM COLONY DRIVE
WARREN PA 16365 US
Period of Performance: 09/01/2020 to 04/30/2021
0001 Allegheny National Forest FR-262 Longhouse Road
Project-2020
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Construction RFP Solicitation Number 1224H820R0003 Project Description ALNF FR-262 Longhouse Road Project-2020
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
B-1: SCHEDULE OF ITEMS CORNPLANTER AOP
ITEM No. ITEM DESCRIPTION UNIT QTY UNIT COST SUBTOTAL
15101 MOBILIZATION LUMP SUM 1 $ $
15201 CONSTRUCTION, SURVEY AND
STAKING, METHOD 1, TOLERANCE A
LUMP SUM 1 $ $
15713 SOIL EROSION & POLLUTION
CONTROL
LUMP SUM 1 $ $
20101 CLEARING AND GRUBBING LUMP SUM 1 $ $
20301 REMOVAL OF STRUCTURE AND
OBSTRUCTIONS, REMOVE FROM
PROJECT
LUMP SUM 1 $ $
20415 EMBANKMENT CONSTRUCTION,
METHOD 1, TOLERANCE A
CUBIC YARD* 471 $ $
20802 FOUNDATION FILL, INCLUDES
GEOCELL AND AGGREGATE GRADING
PA-2A
TON* 34 $ $
20803 STRUCTURE EXCAVATION CUBIC YARD* 644 $ $
20803 STRUCTURAL BACKFILL CUBIC YARD* 78 $ $
25102 PLACED RIPRAP, CLASS R-4 TON* 111 $ $
25105 KEYED RIPRAP, CLASS R-6 BANK
PROTECTION
TON* 7 $ $
30115 AGGREGATE SURFACE COURSE,
COMPACTION METHOD D, INCLUDES
SURFACE AGGREATE FOR SHOULDERS
AND DRIVEABLE DIP
TON* 58 $ $
30201 AGGREGATE BASE, GRADING C,
COMPACTION D
TON* 248 $ $
30204 SUBBASE, GRADING A, COMPACTION
D
TON* 495 $ $
30210 BEDDING AGGREGATE AROUND
CROSS DRAIN CULVERT
TON* 2 $ $
40301-1 ASPHALT CONCRETE PAVEMENT,
PENNDOT PLANT MIX, BINDER
COURSE
TON* 127 $ $
40301-2 ASPHALT CONCRETE PAVEMENT,
PENNDOT PLANT MIX, WEARING
COURSE
TON* 55 $ $
ITEM No. ITEM DESCRIPTION UNIT QTY UNIT COST SUBTOTAL
55201 STRUCTURAL CONCRETE FOR
FOUNDATIONS INCLUDES
REINFORCING STEEL
CUBIC YARD* 31 $ $
60201 30 INCH PIPE CULVERT, CMP LINEAR FOOT* 70 $ $
60304 21'-7" SPAN, 4'-11" RISE,
ALLUMINUM STRUCTURAL PLATE
BOX CULVERT, INCLUDES
DEWATERING
LINEAR FOOT* 42 $ $
60305 ALLUMINUM STRUCTURAL PLATE
HEADWALL
EACH 2 $ $
61701 GUARDRAIL SYSTEM REMOVE AND
INSTALL NEW
LINEAR FOOT* 206 $ $
61904 FENCE POST, 4" ROUND EACH 16 $ $
62504 SEEDING, DRY OR HYDRAULIC
METHOD
LUMP SUM 1 $ $
62901 EROSION CONTROL MAT, TYPE 3.B
BIODEGRADABLE
LUMP SUM 1 $ $
63301 SIGN SYSTEM LUMP SUM 1 $ $
63401 PAVEMENT MARKINGS TYPE,
CENTERLINE DOUBLE SOLID, YELLOW
REFLECTORIZED
LINEAR FOOT* 250 $ $
63501 TEMPORARY TRAFFIC CONTROL LUMP SUM 1 $ $
64703-4 MITIGATION, LOG BARRIER LUMP SUM 1 $ $
64801 PLACED STREAMBED SIMULATION
ROCK, BED CLASS 8, PLACEMENT
METHOD A
TONS* 128 $ $
64803 PLACED CHANNEL ROCK, CLASS 2,
PLACEMENT METHOD A
TONS* 45 $ $
TOTAL $
OPTIONAL ITEMS
20421 ROCK EXCAVATION CUBIC YARD 90 $ $
60501 STANDARD UNDERDRAIN SYSTEM, 6"
PERFORATED PIPE
LINEAR FOOT* 100 $ $
TOTAL $
B-2: SCHEDULE OF ITEMS MUDLICK AOP
ITEM
No.
ITEM DESCRIPTION UNIT QTY UNIT COST SUBTOTAL
15101 MOBILIZATION LUMP SUM 1 $ $
15201 CONSTRUCTION, SURVEY AND
STAKING, METHOD 1, TOLERANCE A
LUMP SUM 1 $ $
15713 SOIL EROSION & POLLUTION
CONTROL
LUMP SUM 1 $ $
20101 CLEARING AND GRUBBING LUMP SUM 1 $ $
20301 REMOVAL OF STRUCTURE AND
OBSTRUCTIONS, REMOVE FROM
PROJECT
LUMP SUM 1 $ $
20415 EMBANKMENT CONSTRUCTION,
METHOD 1, TOLERANCE A
CUBIC YARD* 691 $ $
20801 STRUCTURE EXCAVATION CUBIC YARD* 1309 $ $
20802 FOUNDATION FILL, INCLUDES
GEOCELL AND AGGREGATE GRADING
PA-2A
TON* 63 $ $
20803 STRUCTURAL BACKFILL CUBIC YARD* 155 $ $
30115 AGGREGATE SURFACE COURSE,
COMPACTION METHOD D FOR
SHOULDER
TON* 9 $ $
30201 AGGREGATE BASE, GRADING C,
COMPACTION D
TON* 122 $ $
30204 SUBBASE, GRADING A, COMPACTION
D
TON* 244 $ $
30210 BEDDING AGGREGATE CROSS DRAIN
CULVERT
TON* 5 $ $
40301-1 ASPHALT CONCRETE PAVEMENT,
PENNDOT PLANT MIX, BINDER
COURSE
TON* 63 $ $
40301-2 ASPHALT CONCRETE PAVEMENT,
PENNDOT PLANT MIX, WEARING
COURSE
TON* 27 $ $
55201 STRUCTURAL CONCRETE FOR
FOUNDATIONS INCLUDES
REINFORCING STEEL
CUBIC YARD* 59 $ $
60304 26'-0" SPAN, 8'-7" RISE, ALLUMINUM
STRUCTURAL PLATE ARCH CULVERT,
INCLUDES DEWATERING
LINEAR
FOOT*
73 $ $
60705 REMOVING, CLEANING, RESETING
CULVERT
LUMP SUM 1 $ $
61701 GUARDRAIL SYSTEM REMOVE AND
INSTALL NEW
LINEAR
FOOT*
350 $ $
ITEM
No.
ITEM DESCRIPTION UNIT QTY UNIT COST SUBTOTAL
62504 SEEDING, DRY OR HYDRAULIC
METHOD
LUMP SUM 1 $ $
62901 EROSION CONTROL MAT, TYPE 3.B
BIODEGRADABLE
LUMP SUM 1 $ $
63301 SIGN SYSTEM LUMP SUM 1 $ $
63401 PAVEMENT MARKINGS TYPE,
CENTERLINE DOUBLE SOLID, YELLOW
REFLECTORIZED
LINEAR
FOOT*
123 $ $
63501 TEMPORARY TRAFFIC CONTROL LUMP SUM 1 $ $
64703 MITIGATION, LOG BARRIER LUMP SUM 1 $ $
64704 MITIGATION, STREAMBED MATERIAL TON* 68 $ $
64705 MITIGATION, STREAMBED CHANNEL
REALIGNMENT
CUBIC YARD* 5 $ $
64801 PLACED STREAMBED SIMULATION
ROCK, BED CLASS 10, PLACEMENT
METHOD A
TONS* 404 $ $
64803.2 PLACED CHANNEL ROCK, CLASS 2,
PLACEMENT METHOD A
TONS* 117 $ $
64803.3 PLACED CHANNEL ROCK, R-7,
PLACEMENT METHOD A
LUMP SUM 1 $ $
*DESIGNATES CONTRACT
QUANTITIES
OPTIONAL ITEMS
20421 ROCK EXCAVATION CUBIC YARD 90 $ $
60501 STANDARD UNDERDRAIN SYSTEM, 6"
PERFORATED PIPE
LINEAR
FOOT*
100 $ $
B-3: SCHEDULE OF ITEMS FOREST ROAD 262 STA 117+00 TO STA 128+00
PAY
ITEM
DESCRIPTION UNIT QTY UNIT
COST
TOTAL
15101 MOBILIZATION LS 1 $ $
15201 CONSTRUCTION SURVEY AND
STAKING, METHOD 1, TOLERANCE A
LS 1 $ $
15713 EROSION & POLLUTION CONTROL LS 1 $ $
20101 CLEARING AND GRUBBING LS 1 $ $
20302 REMOVAL OF EXISTING CULVERTS,
INCLUDES INCIDENTAL TREE
REMOVAL AND SPILLWAYS
EA 4 $ $
20424 DRAINAGE EXCAVATION, TYPE
RECONSTRUCTION/CONSTRUCTION
LEADOFF DITCHES, OUTLET DITCHES,
LINE DITCHES, DITCHBLOCKS
LF* 915 $ $
30113 AGGREGATE SURFACE COURSE FOR
SHOULDER, GRADING F
TON
125 $ $
30205 CRUSHED AGGREGATE BASE,
COMPACTION D
TON
941 $ $
30204 CRUSHED AGGREGATE SUBBASE,
COMPACTION D
TON
1,881 $ $
40304.1 HOT-MIX ASPHALT CONCRETE
PAVEMENT, PENNDOT PLANT MIX
BITUMINOUS, 3-1/2” THICK BINDER
COURSE, FB-1
TON
482 $ $
40304.2 HOT-MIX ASPHALT CONCRETE
PAVEMENT, PENNDOT PLANT MIX
BITUMINOUS, 1-1/2” THICK WEARING
COURSE, FB-1
TON
207 $ $
41301 ASPHALT PAVEMENT MILLING, 5 INCH
DEPTH, DISPOSAL BY CONTRACTOR
SY* 30,000 $ $
60201 18 INCH ALUMINIZED STEEL, TYPE 2,
CORRUGATED STEEL PIPE, 0.064 INCH
THICKNESS, COMPACTION METHOD 6
LF* 254 $ $
60501 STANDARD UNDERDRAIN SYTEM,
INCLUDES TRENCH EXCAVATION,
GEOTEXTILE, AGGREGATE AND
OUTLET SYSTEM
LS 1 $ $
61705 REPLACE GUARDRAIL SYSTEM,
INCLUDES TERMINAL SECTIONS
LF* 39 $ $
61707 REMOVE AND RESET GUARDRAIL
SYSTEM
LF 223 $ $
62550 TURF ESTABLISHMENT, HYDRAULIC OR
DRY METHOD
LS 1 $ $
62901 ROLLED EROSION CONTROL PRODUCT,
TYPE EROSION CONTROL MATS, TYPE
3B, BIODEGRADABLE
SY* 2,586 $ $
63301 PERMANENT SIGN SYSTEM LS 1 $ $
63401 PAVEMENT MARKINGS, DOUBLE SOLID,
YELLOW, CENTERLINE,
REFLECTORIZED
LF* 1,200 $ $
PAY
ITEM
DESCRIPTION UNIT QTY UNIT
COST
TOTAL
63501 TEMPORARY TRAFFIC CONTROL LS 1 $ $
TOTAL BID $
*INDICATES CONTRACT QUANTITIES
Contractor Acceptance Statement: By signing the offer, the Contractor agrees to all terms, conditions, and provisions included in the solicitation and agrees to furnish any awarded items at the price set in the schedule unless otherwise excepted as follows:
Contractor Notes:
1. Contractor must be registered in www.sam.gov in order to submit an offer on this project.
THIS IS A FREE REGISTRATION.
2. There is no pre-proposal meeting for this project. The Directions to site are included in the attached plans and the site is accessible without notice to the Government. Contractors are urged and expected to inspect the site where the work will be performed (Reference 52.236-27 Site Visit (Construction)). Directions to site are included in this solicitation package. Contact the Contracting Officer for additional information if required.
3. This is a construction project which has the following bonding requirements:
- 20% bid bond for offers over $150,000 required with offer submission.
- 100% performance and payment bonds for offers over $150,000 upon award. See
Section I for details.
- Proper bonding forms must be utilized. Forms can be accessed at https://www.gsa.gov/reference/forms
4. Award will be made to one contractor. You must submit pricing for all items, including any option items and/or option years to be considered
5. Due to mail/delivery limitations as a result of the COVID-19 pandemic, quote guarantees must be submitted electronically via email with quotes. NO FAXES OR HARDCOPIES WILL BE
ACCEPTED.
6. All questions must be sent to the Contracting Officer in writing via email.
7. This acquisition is being conducted as a Request for Proposal (RFP).
http://www.sam.gov/ https://www.gsa.gov/reference/forms
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
The Magnitude of Construction for this project is between $1,000,000 and $5,000,000.
CORNPLANTER AOP STATEMENT OF WORK
C.1 DESCRIPTION OF WORK
Work includes, but is not limited to: mobilization, clearing, brushing, excavation, removal, disposal and replacement of culverts, one (1) aluminum structural plate box culvert on reinforced concrete footings, one (1) corrugated metal culvert at a separate tributary, placing streambed simulation materials, structural excavation and backfill.
Drainage ditch excavation, removal, disposal and placement of new asphalt pavement, aggregate base and sub-base aggregate course, and turf establishment. Guard rails shall be removed, reset and replaced where indicated by the Contracting Officer (CO). Install underdrain system along the road and installing pavement markings. Material shall be stockpiled at a site as designated by the CO.
The Contractor shall refer to the Schedule of Items, Project Area Map, and referenced Specifications when making estimates for quantities of work.
C.2 PROJECT LOCATION
State of Pennsylvania, County of McKean, Allegheny National Forest, Bradford Ranger District; Latitude: 41.784451, Longitude -78.908873 The FR 262 Station 130+00 culvert replacement project is located on FR 262 approximately 2.9 miles from SR 321 near Red Bridge.
Directions from Warren, PA Post Office (210 W 3rd Ave Ste 100, Warren, PA 16365):
At Corner of 3rd Avenue and Liberty Street, Head West on W 3rd Avenue and continue for 0.1 mi. Turn left at Hickory Street and continue for 0.14 miles. Turn left onto Crescent Park/PA-337 and continue for 0.43 miles. Turn left onto US-6 E and continue for 2.0. Turn left onto Kinzua Road/PA-59 E and continue for 9.82 miles. Turn right onto Longhouse Scenic Drive/FR262 and continue for 8.9 miles to Site Location, Unnamed Tributary to Mudlick Run.
Directions from Kane, PA Post Office (131 N Fraley St, Kane, Pa): Head North on N Fraley St for 215 feet. Turn right onto Haines and continue for 0.4 miles. Turn left onto Hacker St/PA-321 N/Kinzua Ave and continue for 8.4 miles. Turn left onto Long House Scenic Dr/FR262 and continue for 2.4 miles to Site.
C.3 CONTRACT TIME
Construction season to be August 15-May 15, with no instream work in October. The contract duration shall be 180 calendar days. Contract duration includes delays for weather, locating and transporting supplies and materials, and final site cleanup.
C.4 PROJECT SITE CLEAN UP
Project site cleanup includes the removal and proper disposal of all project trash, demolition debris, and residue off National Forest Land. Proper waste disposal sites shall be any local commercial landfill.
All spills of petroleum products including leak spots from parked vehicles shall be removed and properly disposed according to all Local, State, and Federal rules, regulations, and laws governing such disposal. Any Fuel Trucks staged on-site must be equipped with spill containment kits and portable berms that meet all state and federal regulations. A Spill Containment Plan must be submitted and approved prior to the start of work. If any fuel or oil are to be stored onsite (regardless of the amount), the Contractor shall prepare, and submit for review and approval, then later for implementation a Spill Prevention and Countermeasures Plan. The (SPCC) Plan shall meet applicable EPA requirements (40 CFR 112), including required certification by a Registered Professional Engineer. Contractor is responsible for all clean-up costs of petroleum product spills within the project vicinity area caused directly or indirectly by their employees or from their contract operations.
C.5 RESERVED
C.6 SPECIAL CONDITIONS AFFECTING THE WORK
a. Physical Conditions. The indications of physical conditions on the drawings and in the specifications are the result of site investigations and surveys performed by the Government.
b. Existing Structures. The existing culverts are corrugated metal pipes.
c. Excavation Plan. Due to the proximity and/or limitations of existing structures, and the limited work space, the Contractor shall submit a comprehensive excavation plan that outlines the proposed methodology for excavating down to the required depth, and any proposed shoring to protect workers. The Contractor is solely responsible for the development and execution of their Bridge Excavation Plan.
d. Dewatering Plan. Due to the proximity of water, the Contractor shall submit for approval a Dewatering Plan, for the purpose of protecting the abutment foundations.
The Contractor is solely responsible for the development and execution of their dewatering plan.
e. Weather. Low temperatures at the project site range from less than 20 ºF from December to February to lows of 50 ºF in June and August. High temperatures range from 30 ºF from December to February, to around 80 ºF in July and August. The annual precipitation at the project site is less than 50 inches per year, including snowfall.
Winter snow storms and freezing temperatures will occur during the winter months and will cause the project to be shutdown. Icy conditions on local roads and highways can occur during the fall, winter and spring. Highway curves in shaded areas will remain covered with ice or frost for weeks.
f. Typical Work Hours, Weekends and Holiday Hours. Holiday restrictions from September 1st to September 5th, 2020.
g. Safety, Emergency Communications and Evacuation. Contractor is responsible for the safety of the Contractor’s employees including Subcontractors employees, Government employees associated with the project, and any visitors to the site both Government and private. The Contractor shall submit a Project Safety Plan to the Contracting Officer for review prior to commencement of Work. The project safety plan shall comply with the appropriate Pennsylvania OSHA and Federal OSHA rules and regulations and must include a medical evacuation and emergency communications plan.
h. Staging Areas. The contractor shall provide the necessary site investigation of the project area and any adjacent areas, and propose staging areas for approval by the Contracting Officer.
i. Highway Permits. Contractor is responsible for securing any overload or over width limit permits required for the transport of materials or equipment to the project site.
The Contractor is responsible for conducting a thorough reconnaissance of all routes leading to the site.
j. Fuel Storage. The contractor shall propose fuel storage areas for approval by the Contracting Officer. The fuel storage tank shall be set inside a fuel containment basin.
The containment basin shall be large enough to hold 110% of the tanks capacity.
Provide spill plan in accordance to the specifications for review and approval by the Contracting Officer.
k. Toilets. No toilet or shower facilities are available on site. Contractor shall provide portable toilet facilities for its employees.
l. Camping. Contractor may request a permit from Bradford Ranger District.
m. Water. Non-potable water for the project construction can be drafted directly out of the unnamed tributaries of the Kinzua Creek (at the project site). Use appropriate procedures to prevent sediment and other debris from entering the creek.
n. Security. Contractor is responsible for the Contractor’s equipment and materials owned or supplied to the site. Lost, damaged, or stolen equipment or materials shall be replaced at the contractor’s expense. All equipment not equipped with a key lock system shall be secured in such a manner as to make it inoperable to the average person at the end of each working day. All hand tools and other equipment shall be secured at the end of each working day. The contractor shall be responsible for signing, limiting public access, and safety of the public and/or government employees at the site. All refuse shall be properly stored or removed from the site at the end of each day.
o. Traffic Control. Contractor shall submit a Traffic Control and Signage Plan for review and approval, 10 days prior to the start of operations. Construction signing for traffic control shall conform to the Manual of Uniform Traffic Control Devices (MUTCD). Traffic control signs shall be placed in areas with adequate turnaround space for a public truck pulling a fifth wheel trailer. Contractor shall not be paid directly for this item, rather it will be considered incidental to other items of work listed in the Schedule of Items. The existing bridge shall be closed to all public traffic throughout the full duration of work onsite.
p. Burning Permits. Contractor is subject to all rules and regulations governing the on-site burning of slash and other debris. Contractor shall obtain a burning permit from the jurisdiction having control over burning. The Contractor shall comply with Fire Plan for Construction and Service Contracts included in the Contract.
q. Protection of Resources. Contractor shall thoroughly clean all equipment prior to delivery to the project site, to remove weeds, seeds, mud, grease and oil buildup from all equipment surfaces. Contractor shall schedule an equipment inspection with the COR 36 hours prior to mobilization. Spills of petroleum products and other hazardous substances shall be reported, contained, and removed in accordance with all applicable rules, regulations and laws. Contractor shall submit a project spill response plan at the pre-work meeting for review by the Contracting Officer.
C.7 RESERVED
C.8 EQUIPMENT CLEANING & NOXIOUS WEED-FREE CERTIFICATION
Unless the entire project area is already infected with noxious weeds, the contractor shall ensure that prior to moving from one on forest location to another part of the project area all off-road equipment, which last operated in areas known by Forest Service to be infected with noxious weeds, is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. Contractor shall certify in writing to the CO that off-road equipment is free of noxious weeds prior to each start-up of operations and for subsequent moves of equipment to other project areas. Measures taken to ensure that off-road equipment is free of noxious weeds will be identified. “Off-road equipment” includes all equipment operating off of paved roadways. A Current list of noxious weeds of concern to Forest Service is available at the Forest Supervisor’s office, and can be obtained by the contractor upon request. Contractor shall clean off-road equipment prior to moving between project areas with known infestations with noxious weeds and other project areas, if any, which are free of such weeds. Contractor shall employ whatever cleaning methods are necessary to ensure that off-road equipment is free of noxious weeds. Equipment shall be considered free of soil, seeds, and other such debris when a visual inspection does not disclose such material. Disassembly of equipment components or specialized inspection tools is not required.
The Contractor shall notify Forest Service at least 24 hours prior to beginning of work in area designated as a noxious weed area, unless otherwise approved by CO. Notification shall include the location of the equipment’s most recent operations. If the prior location of the off-road equipment cannot be identified, Forest Service may assume that it was infested with noxious weed seeds. Upon request of Forest Service, Contractor must arrange with CO for Forest Service to inspect each piece of off-road equipment prior to it being placed into service. If Contractor desires to clean off-road equipment on National forest land, such as at the end of a project or prior to moving to a new unit that is free from noxious weeds, Contractor and Forest Service CO shall agree on methods of cleaning, locations for the cleaning, and control of off-site impacts, if any. New infestations of noxious weeds, of concern to Forest Service and identified by either Contractor or Forest Service, within the project area or on the haul route, shall be promptly reported to the other party.
C.9 BARRICADES, WARNING SIGNS, AND OTHER DEVICES
The Contractor shall provide, erect, and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Roads closed to traffic shall be protected by effective barricades, and obstructions shall be illuminated during the hours of darkness. Suitable warning signs shall be provided to properly control and direct traffic.
The Contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of the road or trail by traffic and at all intermediate points where the new work crosses or coincides with an existing road or trail. All road barricades, warning signs, lights, temporary signals, flagmen and pilot car operators and equipment, and other protective devices, except for special devices, shall conform to Part VI of the Manual on Uniform Traffic Control Devices for Streets and Highways, published by the Federal Highway Administration and applicable safety codes.
The Contractor shall furnish, erect, maintain, and remove when notified, four project information signs. Sign details and installation shall conform to the (MUTCD) standards for temporary signs on a rural highway. A sign plan shall be submitted to the CO for approval prior to fabrication or installation of the signs. Specific locations shall be designated by the COR prior to installation. All signs shall be installed prior to commencing on-site work.
Trenches and other hazards shall be signed and flagged in such a way that the public will be aware of the hazard.
C.10 STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND
BRIDGES ON FEDERAL HIGHWAY PROJECTS
The Standard Specifications for this project are contained within the “Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects” FP- 14 U.S. Customary Units. Copies of this document are available on-line only at the Federal Highway Administration web site at https://flh.fhwa.dot.gov/resources/specs/ in either Microsoft Word .doc or Adobe Acrobat .pdf format.
Special Project Specifications and Supplemental Project Specifications are included in full text as an attachment in Section J of the contract and amend, supplement, or replace the FP-14 Standard Specifications. All specifications not included in the specification listing, but referenced by listed specifications are applicable.
101 - Terms¸ Format¸ and Definitions 102 - Bid¸ Award¸ and Execution of Contract 103 - Scope of Work 104 - Control of Work 106 - Acceptance of Work 107 - Legal Relations and Responsibility to the Public 108 - Prosecution and Progress 109 - Measurement and Payment
109.01 Measurement of Work
152 - Construction Survey and Staking 155 - Schedules for Construction Contracts 157 - Soil Erosion and Sediment Control 201 - Clearing and Grubbing 204 - Excavation and Embankment 208 - Structure Excavation and Backfill for Selected Major Structures 209 - Structure Excavation and Backfill 301 - Untreated Aggregate Courses 302 - Minor Crushed Aggregate 603 - Structural Plate Structures 625 - Turf Establishment 633 - Permanent Traffic Control 648 - Stream Simulation 705 - Rock
NOTE: Offerors are cautioned to carefully review these Standard and Supplemental https://flh.fhwa.dot.gov/resources/specs/
Project Specifications prior to submission of proposals. All specifications in the “Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects” FP-14 U.S. Customary Units are binding on the parties signing the contract.
C.11 PENNDOT STANDARD SPECIFICATIONS
Certain products reference the State of Pennsylvania Department of Transportation (PennDOT) standard specifications. Copies of this document are available online at the PennDOT website at http://www.dot.state.pa.us/public/PubsForms/Publications/Pub_408/408_2016/408_2016 _2/408_2016_2.pdf. Refer to the Schedule of Items for a list of products required to comply with PennDOT specifications.
C.12 DRAWINGS
G-01 COVERSHEET
G-02 GENERAL NOTES
C-00 EXISTING CONDITIONS
C-01 SITE PLAN
C-02 STRUCTURE LAYOUT
C-03 STREAM SIMULATION AND STRUCTURE PROFILES
C-04 EXCAVATION AND STREAM SIMULATION DETAILS
C-05 STREAM CROSS SECTIONS
C-06 ROAD, CULVERT TRENCH, INLET AND OUTLET PROTECTION DETAILS
C-07 FOUNDATION DETAILS
C-08 FENCE, LOG JAM AND STRUCTURE HEADWALL DETAILS
C-09 DEWATERING PLAN
C-10 DETOUR TRAFFIC CONTROL PLAN
END OF SECTION C
MAY 2020
MUDLICK AOP STATEMENT OF WORK
C.1 DESCRIPTION OF WORK
Work includes, but is not limited to: mobilization, clearing, brushing, excavation, removal, disposal and replacement of culverts, one (1) aluminum structural plate arch culvert on reinforced concrete footings, clean and reset one (1) corrugated metal culvert at a nearby intersection, placing streambed simulation materials, structural excavation and backfill. Sediment excavation, placement of streambed and log barrier installation for stream realignment. Drainage ditch excavation, removal, disposal and placement of new asphalt pavement, aggregate base and sub-base aggregate course, and turf establishment.
Guard rails shall be removed, reset and replaced where indicated by the Contracting Officer (CO). Install underdrain system along the road and installing pavement markings.
Material shall be stockpiled at a site as designated by the CO.
The Contractor shall refer to the Schedule of Items, Project Area Map, and referenced Specifications when making estimates for quantities of work.
C.2 PROJECT LOCATION
State of Pennsylvania, County of McKean, Allegheny National Forest, Bradford Ranger District; Latitude: 41.784435, Longitude -78.908859.
The FR 262 Station 130+00 culvert replacement project is located on FR 262 http://www.dot.state.pa.us/public/PubsForms/Publications/Pub_408/408_2016/408_2016_2/408_2016_2.pdf approximately 2.7 miles from SR 321 near Red Bridge.
Directions from Warren, PA Post Office (210 W 3rd Ave Ste 100, Warren, PA 16365):
At Corner of 3rd Avenue and Liberty Street, Head West on W 3rd Avenue and continue for 0.1 mi. Turn left at Hickory Street and continue for 0.14 miles. Turn left onto Crescent Park/PA-337 and continue for 0.43 miles. Turn left onto US-6 E and continue for 2.0. Turn left onto Kinzua Road/PA-59 E and continue for 9.82 miles. Turn right onto Longhouse Scenic Drive/FR262 and continue for 8.9 miles to Site Location, Unnamed Tributary to Mudlick Run.
Directions from Kane, PA Post Office (131 N Fraley St, Kane, Pa): Head North on N Fraley St for 215 feet. Turn right onto Haines and continue for 0.4 miles. Turn left onto Hacker St/PA-321 N/Kinzua Ave and continue for 8.4 miles. Turn left onto Long House Scenic Dr/FR262 and continue for 2.4 miles to Site.
C.3 CONTRACT TIME
Construction season to be August 15-May 15, with no instream work in October. The contract duration shall be 180 calendar days. Contract duration includes delays for weather, locating and transporting supplies and materials, and final site cleanup.
C.4 PROJECT SITE CLEAN UP
Project site cleanup includes the removal and proper disposal of all project trash, demolition debris, and residue off National Forest Land. Proper waste disposal sites shall be any local commercial landfill.
All spills of petroleum products including leak spots from parked vehicles shall be removed and properly disposed according to all Local, State, and Federal rules, regulations, and laws governing such disposal. Any Fuel Trucks staged on-site must be equipped with spill containment kits and portable berms that meet all state and federal regulations. A Spill Containment Plan must be submitted and approved prior to the start of work. If any fuel or oil are to be stored onsite (regardless of the amount), the Contractor shall prepare, and submit for review and approval, then later for implementation a Spill Prevention and Countermeasures Plan. The (SPCC) Plan shall meet applicable EPA requirements (40 CFR 112), including required certification by a Registered Professional Engineer. Contractor is responsible for all clean-up costs of petroleum product spills within the project vicinity area caused directly or indirectly by their employees or from their contract operations.
C.5 RESERVED
C.6 SPECIAL CONDITIONS AFFECTING THE WORK
a. Physical Conditions. The indications of physical conditions on the drawings and in the specifications are the result of site investigations and surveys performed by the Government.
b. Existing Structures. The existing culverts are corrugated metal pipes.
c. Excavation Plan. Due to the proximity and/or limitations of existing structures, and the limited work space, the Contractor shall submit a comprehensive excavation plan that outlines the proposed methodology for excavating down to the required depth, and any proposed shoring to protect workers. The Contractor is solely responsible for the development and execution of their Bridge Excavation Plan.
d. Dewatering Plan. Due to the proximity of water, the Contractor shall submit for approval a Dewatering Plan, for the purpose of protecting the abutment foundations.
The Contractor is solely responsible for the development and execution of their dewatering plan.
e. Weather. Low temperatures at the project site range from less than 20 ºF from December to February to lows of 50 ºF in June and August. High temperatures range from 30 ºF from December to February, to around 80 ºF in July and August. The annual precipitation at the project site is less than 50 inches per year, including snowfall.
Winter snow storms and freezing temperatures will occur during the winter months and will cause the project to be shutdown. Icy conditions on local roads and highways can occur during the fall, winter and spring. Highway curves in shaded areas will remain covered with ice or frost for weeks.
f. Typical Work Hours, Weekends and Holiday Hours. Holiday restrictions from September 1st to September 5th, 2020.
g. Safety, Emergency Communications and Evacuation. Contractor is responsible for the safety of the Contractor’s employees including Subcontractors employees, Government employees associated with the project, and any visitors to the site both Government and private. The Contractor shall submit a Project Safety Plan to the Contracting Officer for review prior to commencement of Work. The project safety plan shall comply with the appropriate Pennsylvania OSHA and Federal OSHA rules and regulations and must include a medical evacuation and emergency communications plan.
h. Staging Areas. The contractor shall provide the necessary site investigation of the project area and any adjacent areas, and propose staging areas for approval by the Contracting Officer.
i. Highway Permits. Contractor is responsible for securing any overload or over width limit permits required for the transport of materials or equipment to the project site.
The Contractor is responsible for conducting a thorough reconnaissance of all routes leading to the site.
j. Fuel Storage. The contractor shall propose fuel storage areas for approval by the Contracting Officer. The fuel storage tank shall be set inside a fuel containment basin.
The containment basin shall be large enough to hold 110% of the tanks capacity.
Provide spill plan in accordance to the specifications for review and approval by the Contracting Officer.
k. Toilets. No toilet or shower facilities are available on site. Contractor shall provide portable toilet facilities for its employees.
l. Camping. Contractor may request a permit from Bradford Ranger District.
m. Water. Non-potable water for the project construction can be drafted directly out of the unnamed tributaries of the Kinzua Creek (at the project site). Use appropriate procedures to prevent sediment and other debris from entering the creek.
n. Security. Contractor is responsible for the Contractor’s equipment and materials owned or supplied to the site. Lost, damaged, or stolen equipment or materials shall be replaced at the contractor’s expense. All equipment not equipped with a key lock system shall be secured in such a manner as to make it inoperable to the average person at the end of each working day. All hand tools and other equipment shall be secured at the end of each working day. The contractor shall be responsible for signing, limiting public access, and safety of the public and/or government employees at the site. All refuse shall be properly stored or removed from the site at the end of each day.
o. Traffic Control. Contractor shall submit a Traffic Control and Signage Plan for review and approval, 10 days prior to the start of operations. Construction signing for traffic control shall conform to the Manual of Uniform Traffic Control Devices (MUTCD). Traffic control signs shall be placed in areas with adequate turnaround space for a public truck pulling a fifth wheel trailer. Contractor shall not be paid directly for this item, rather it will be considered incidental to other items of work listed in the Schedule of Items. The existing bridge shall be closed to all public traffic throughout the full duration of work onsite.
p. Burning Permits. Contractor is subject to all rules and regulations governing the on-site burning of slash and other debris. Contractor shall obtain a burning permit from the jurisdiction having control over burning. The Contractor shall comply with Fire Plan for Construction and Service Contracts included in the Contract.
q. Protection of Resources. Contractor shall thoroughly clean all equipment prior to delivery to the project site, to remove weeds, seeds, mud, grease and oil buildup from all equipment surfaces. Contractor shall schedule an equipment inspection with the COR 36 hours prior to mobilization. Spills of petroleum products and other hazardous substances shall be reported, contained, and removed in accordance with all applicable rules, regulations and laws. Contractor shall submit a project spill response plan at the pre-work meeting for review by the Contracting Officer.
C.7 RESERVED
C.8 EQUIPMENT CLEANING & NOXIOUS WEED-FREE CERTIFICATION
Unless the entire project area is already infected with noxious weeds, the contractor shall ensure that prior to moving from one on forest location to another part of the project area all off-road equipment, which last operated in areas known by Forest Service to be infected with noxious weeds, is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. Contractor shall certify in writing to the CO that off-road equipment is free of noxious weeds prior to each start-up of operations and for subsequent moves of equipment to other project areas. Measures taken to ensure that off-road equipment is free of noxious weeds shall be identified. “Off-road equipment” includes all equipment operating off of paved roadways. A Current list of noxious weeds of concern to Forest Service is available at the Forest Supervisor’s office, and can be obtained by the contractor upon request. Contractor shall clean off-road equipment prior to moving between project areas with known infestations with noxious weeds and other project areas, if any, which are free of such weeds. Contractor shall employ whatever cleaning methods are necessary to ensure that off-road equipment is free of noxious weeds. Equipment shall be considered free of soil, seeds, and other such debris when a visual inspection does not disclose such material. Disassembly of equipment components or specialized inspection tools is not required.
The Contractor shall notify Forest Service at least 24 hours prior to beginning of work in area designated as a noxious weed area, unless otherwise approved by CO. Notification shall include the location of the equipment’s most recent operations. If the prior location of the off-road equipment cannot be identified, Forest Service may assume that it was infested with noxious weed seeds. Upon request of Forest Service, Contractor must arrange with CO for Forest Service to inspect each piece of off-road equipment prior to it being placed into service. If Contractor desires to clean off-road equipment on National forest land, such as at the end of a project or prior to moving to a new unit that is free from noxious weeds, Contractor and Forest Service CO shall agree on methods of cleaning, locations for the cleaning, and control of off-site impacts, if any. New infestations of noxious weeds, of concern to Forest Service and identified by either Contractor or Forest Service, within the project area or on the haul route, shall be promptly reported to the other party.
C.9 BARRICADES, WARNING SIGNS, AND OTHER DEVICES
The Contractor shall provide, erect, and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Roads closed to traffic shall be protected by effective barricades, and obstructions shall be illuminated during the hours of darkness. Suitable warning signs shall be provided to properly control and direct traffic.
The Contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of the road or trail by traffic and at all intermediate points where the new work crosses or coincides with an existing road or trail. All road barricades, warning signs, lights, temporary signals, flagmen and pilot car operators and equipment, and other protective devices, except for special devices, shall conform to Part VI of the Manual on Uniform Traffic Control Devices for Streets and Highways, published by the Federal Highway Administration and applicable safety codes.
The Contractor shall furnish, erect, maintain, and remove when notified, four project information signs. Sign details and installation shall conform to the (MUTCD) standards for temporary signs on a rural highway. A sign plan shall be submitted to the CO for approval prior to fabrication or installation of the signs. Specific locations shall be designated by the COR prior to installation. All signs shall be installed prior to commencing on-site work.
Trenches and other hazards shall be signed and flagged in such a way that the public will be aware of the hazard.
C.10 STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND
BRIDGES ON FEDERAL HIGHWAY PROJECTS
The Standard Specifications for this project are contained within the “Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects” FP- 14 U.S. Customary Units. Copies of this document are available on-line only at the Federal Highway Administration web site at https://flh.fhwa.dot.gov/resources/specs/ in either Microsoft Word .doc or Adobe Acrobat .pdf format.
Special Project Specifications and Supplemental Project Specifications are included in full text as an attachment in Section J of the contract and amend, supplement, or replace the FP-14 Standard Specifications. All specifications not included in the specification listing, but referenced by listed specifications are applicable.
101 - Terms¸ Format¸ and Definitions 102 - Bid¸ Award¸ and Execution of Contract 103 - Scope of Work 104 - Control of Work https://flh.fhwa.dot.gov/resources/specs/
106 - Acceptance of Work 107 - Legal Relations and Responsibility to the Public 108 - Prosecution and Progress 109 - Measurement and Payment 152 - Construction Survey and Staking 155 - Schedules for Construction Contracts 157 - Soil Erosion and Sediment Control 201 - Clearing and Grubbing 204 - Excavation and Embankment 208 - Structure Excavation and Backfill for Selected Major Structures 209 - Structure Excavation and Backfill 301 - Untreated Aggregate Courses 302 - Minor Crushed Aggregate 603 - Structural Plate Structures 625 - Turf Establishment 633 - Permanent Traffic Control 648 - Stream Simulation 705 - Rock
NOTE: Offerors are cautioned to carefully review these Standard and Supplemental Project Specifications prior to submission of proposals. All specifications in the “Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects” FP-14 U.S. Customary Units are binding on the parties signing the contract.
C.11 PENNDOT STANDARD SPECIFICATIONS
Certain products reference the State of Pennsylvania Department of Transportation (PennDOT) standard specifications. Copies of this document are available online at the PennDOT website at http://www.dot.state.pa.us/public/PubsForms/Publications/Pub_408/408_2016/408_2016 _2/408_2016_2.pdf. Refer to the Schedule of Items for a list of products required to comply with PennDOT specifications.
C.12 DRAWINGS
G-01 COVERSHEET
G-02 GENERAL NOTES
C-00 EXISTING CONDITIONS
C-01 SITE PLAN
C-02 STRUCTURE LAYOUT
C-03 STREAM SIMULATION AND STRUCTURE PROFILES
C-04 EXCAVATION AND STREAM SIMULATION DETAILS
C-05 STREAM CROSS SECTIONS
C-06 ROAD, CULVERT TRENCH, INLET AND OUTLET PROTECTION DETAILS
C-07 FOUNDATION DETAILS
C-08 FENCE, LOG JAM AND STRUCTURE HEADWALL DETAILS
C-09 DEWATERING PLAN
C-10 DETOUR TRAFFIC CONTROL PLAN
FOREST ROAD 262 STA 117+00 TO STA 128+00 STATEMENT OF WORK
C.1 DESCRIPTION OF WORK
Work includes, but is not limited to: mobilization, clearing, brushing, excavation, removal, disposal and replacement of culverts. Drainage ditch excavation, removal, disposal and placement of new asphalt pavement, aggregate base and sub-base aggregate course, and turf establishment. Guard rails shall be removed, reset and replaced where indicated by the Contracting Officer (CO). Install underdrain system along the road and installing pavement markings. Material shall be stockpiled at a site as designated by the co.
The Contractor shall refer to the Schedule of Items, Project Area Map, and referenced Specifications when making estimates for quantities of work.
C.2 PROJECT LOCATION
State of Pennsylvania, County of Warren, Allegheny National Forest, Bradford Ranger District; Latitude: 41°47'00.4"N, Longitude 78°54'32.5"W The FR 262 Forest Road 262 STA 117+00 TO STA 128+00 culvert replacement and road repaving project is located on FR 262 approximately 2.2 miles from SR 321 near Red Bridge.
Directions from Kane, PA Post Office (131 N Fraley St, Kane, PA): head north on N Fraley St for 215 Feet. Turn right onto Haines and continue for 0.4 miles. Turn left onto Hacker St/PA-321 N/Kinzua Ave and continue for 8.4 miles. Turn left onto Long House Scenic Dr/FR262 and continue for 2.2 miles to site location, Unnamed Tributary to Mudlick Run.
C.3 CONTRACT TIME
Construction season to be August 15-May 15, with no instream work in October. The contract duration shall be 180 calendar days. Contract duration includes delays for weather, locating and transporting supplies and materials, and final site cleanup.
C.4 PROJECT SITE CLEAN UP
Project site cleanup includes the removal and proper disposal of all project trash, demolition debris, and residue off National Forest Land. Proper waste disposal sites shall be any local commercial landfill.
All spills of petroleum products including leak spots from parked vehicles shall be removed and properly disposed according to all Local, State, and Federal rules, regulations, and laws governing such disposal. Any Fuel Trucks staged on-site must be equipped with spill containment kits and portable berms that meet all state and federal regulations. A Spill Containment Plan must be submitted and approved prior to the start of work. If any fuel or oil are to be stored onsite (regardless of the amount), the Contractor shall prepare, and submit for review and approval, then later for implementation a Spill Prevention and Countermeasures Plan. The (SPCC) Plan shall meet applicable EPA requirements (40 CFR 112), including required certification by a Registered Professional Engineer. Contractor is responsible for all clean-up costs of petroleum product spills within the project vicinity area caused directly or indirectly by their employees or from their contract operations.
C.5 RESERVED
C.6 SPECIAL CONDITIONS AFFECTING THE WORK
a. Physical Conditions. The indications of physical conditions on the drawings and in the specifications are the result of site investigations and surveys performed by the Government.
b. Existing Structures. The existing culverts are corrugated metal pipes.
c. Excavation Plan. Due to the proximity and/or limitations of existing structures, and the limited work space, the Contractor shall submit a comprehensive excavation plan that outlines the proposed methodology for excavating down to the required depth, and any proposed shoring to protect workers. The Contractor is solely responsible for the development and execution of their Bridge Excavation Plan.
d. Dewatering Plan. Due to the proximity of water, the Contractor shall…