Attach 05 CASEVAC CDRLs Exhibit A_ID04200024 Nov 23 2020 .pdf
PDF 415 KB Posted
- Solicitation number
- 47QFSA-20-R-0011
About this file
This document contains a Contract Data Requirements List (CDRL) for a federal contract opportunity to provide a Casualty Evacuation (CASEVAC) Tactical Combat Care (TCCC) Set. The CDRL outlines eleven required data items to be delivered by the contractor, including safety studies reports, training materials, drawings, provisioning parts lists, engineering change proposals, status reports, and other configuration management documents. Delivery dates and distribution statements are provided for each data item. The related federal contract opportunity is a request for proposal to award an Indefinite-Delivery/Indefinite-Quantity contract for the CASEVAC TCCC Set. Interested vendors must register in the GSA Assisted Acquisition Services Supply System portal and notify the points of contact by January 1, 2021 to access the solicitation. Pricing is to be provided in Attachment 06 and the SF1449 must be completed for proposal submission. Past performance questionnaires are due by December 23, 2020.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER Safety .
D. SYSTEM/ITEM
SOF COMBAT CASUALTY CARE
E. CONTRACT/PR. NO.
F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Safety Studies Report
3. SUBTITLE
Material Safety Data Sheets (MSDS)
4. AUTHORITY (Data Acquisition Document No.)
DI-SAFT-81065
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
USSOCOM
7. DD 250 REQ
DD
9. DIST STATEMENT
REQUIRED
C
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
See block 16
14. DISTRIBUTION
8. APP CODE
A
11. AS OF DATE
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repr
16. REMARKS
In lieu of format required by the DID, the Contractor shall provide a summary listing of all items containing hazardous materials or requiring special handling instructions. This summary shall have all related Material Safety Data Sheets included as an appendix and will be provided in digital format. In addition, the MSDS shall be delivered with each item containing hazardous material or requiring special handling instructions. The MSDS will provide workers and emergency personnel with procedures for handling or working with that substance in a safe manner, and includes information such as physical data (melting point, boiling point, flash point, etc.), toxicity, health effects, first aid, reactivity, storage, disposal, protective equipment, and spill handling procedures.
Block 9: DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government Agencies and direst supporting contractors. Other requests for this document shall be referred to Program Manager – Special Operations Forces Survival, Support & Equipment Systems (PM‐SOF
SSES).
Block 12/13: First submission within 30 days of contract award, subsequent deliveries with each procurement order
Block 14.a: Electronic submissions may be addressed to jeffrey.w.luciano.civ@mail.mil.
15. TOTAL
See
BLK
16b
See
BLK
16b
See
BLK
16b
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED.
Page 1 of 1 Pages
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed
TDP TM OTHER Configuration Management .
SOF COMBAT CASUATLY CARE
A002
Training Materials
TCCC Training Guide - Student Guide
DI-ILSS-80872
DD
AS REQ
11. AS OF DATE
13. DATE OF SUBSEQUENT
16. REMARKS
The Contractor shall provide a Student Training Guide to include safety, operation, and maintenance procedures for the CASEVAC Set. The content shall be suitable for application in a self-paced, self-directed format. The material shall contain sufficient instructions to guide students through all specified hands-on training without a need for instruction lectures and instructor interface. Existing manufacturer’s training and service manuals may be incorporated into the material insofar as they meet specified requirements. The Training Guide will be developed and approved by the Program office prior to delivery of the first New Equipment Training (NET) Course.
and direst supporting contractors. Other requests for this document shall be referred to Program Manager – Special Operations Forces Survival, Support & Equipment Systems (PM‐SOF SSES).
Block 12/13: First submission (draft) in digital format within 30 days of contract award.
Student guides in hard copy will then be provided during each NET Training course.
Block 14.a: Electronic submissions may be addressed to jeffrey.w.luciano.civ@mail.mil
Total qty. not to exceed 10, 000
Government review and approval shall be within 30 days of contractor submission. Contractor revisions shall be within 2 weeks of Government review and approval. Final Government approval shall be within 20 days of delivery of final Training Materials.
NSRDEC
BLK
16b
See
BLK
16b
See
BLK
BLK
16b
See
BLK
16b
See
BLK
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed
TDP X TM OTHER .
A003
Commercial Drawings/Models and Associated Lists
Product Baseline Drawings and Inventory Diagrams
DI-SESS-81003F
DD
ASREQ
REQRE
Q
See BLK 16
AS REQD
16. REMARKS
This deliverable shall be reflective of the CASEVAC Set configuration delivered to the Government.
The data rights associated with this CDRL are owned by the Government in their entirety and without restriction. Contractor drawing format shall apply in lieu of TDP Option Selection Worksheet. First submission of this CDRL shall reflect configuration of the First Article Test Set.
The drawings or ‘tabletop’ will be used for inventory management to ensure kits are complete and available for reuse. Any changes made to the kit configuration after First Article Test Set delivery shall be submitted as updates to this CDRL. Any changes made after Production Sets are delivered shall follow the ECP Configuration Process and will require resubmission of this CDRL reflecting the approved changes and affected data.
Documentation shall be made available in digital format. The drawings will be provided during each delivery in hard copy and on CD-ROM with each respective Set, Kit, or Module. All computer media will be compatible with current Government software. All digital copies provided to the Government program office will be available for future editing.
and direst supporting contractors. Other requests for this document shall be referred to Program Manager – Special Operations Forces Survival, Support & Equipment Systems (PM‐SOF
Block 12/13: The base file will be provided by the government. Initial submission of final award configuration will be delivered in digital format within 30 days of award.
Subsequent deliveries will occur with every Set, Kit, or Module delivery. Updates will be made and submitted in digital format for review within 10 days of ECP changes to configuration.
Block 14.a Electronic submissions may be addressed to jeffrey.w.luciano.civ@mail.mil
Government review and approval shall be within 30 days of contractor submission. Contractor shall be within 20 days of delivery of final drawings/models and associated Lists.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed
TDP TM OTHER Training .
SOF Combat Casualty Care
A004
Training Material
Safety, Operation, and Maintenance Training for the CASEVAC SET
DI-ILSS-80872
DD
ASREQ
16. REMARKS
The Contractor shall provide a Training Video on CD or DVD ROM, in lieu of hardcopy text specified in the DID, to include safety, operation, and maintenance procedures for the CASEVAC Set. The content shall be suitable for application in a self-paced, self-directed format. The material shall contain sufficient instructions to guide students through all specified hands-on training without a need for instruction lectures and instructor interface. Existing manufacturer’s training and service manuals may be incorporated into the material insofar as they meet specified requirements.
Block 12/13: First submission within 30 days of award, subsequent deliveries with each procurement order in each Set, Kit or Module. Videos will also be distributed to the components thru SOFSA.
Total qty not to exceed 10, 000
Updates to equipment configurations via ECP or changes in training requirements and/or techniques will require revisions to the training video.
Government review and approval shall be within 30 days of contractor submission. Contractor shall be within 20 days of delivery of final Training Material.
BLK
16b
See
BLK
16b
See
BLK
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed
A005
Provisioning Parts List (PPLs)
3. SUBTITLE
Spare equipment, parts and maintenance material
DI-SSES-81715
DD
ASREQ
See Block 16
A
11. AS OF DATE
Initial offer
13. DATE OF SUBSEQUENT
See Block 16
16. REMARKS
The Contractor shall submit a complete list of all individually replaceable sub-components with the entire TCCC Set.
The list shall include, as a minimum, Contractor quantities for every type of spare part for the Set to include all consumable and expendable items, part number, OEM part number, NSN if assigned, nomenclature, quantity and price.
The list must be kept updated with pricing and ECP driven part changes.
The deliverable shall be submitted in electronic format in Government compatible software.
The data rights associated with this CDRL are owned by the Government in their entirety and without restriction.
and direct supporting contractors. Other requests for this document shall be referred to Program
BLK 12: The Contractor shall submit a PPL concurrent with the awarded equipment configuration.
BLK 13: Subsequent submissions shall be delivered in electronic format within 10 days of ECP-driven configuration updates.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed
A006
Engineering Change Proposal (ECP)
ECP
DI-SESS-80639E
DD
AS REQ
A
11. AS OF DATE 13. DATE OF SUBSEQUENT
16. REMARKS
The Contractor shall submit a Class II ECP for each proposed change that will NOT affect form, fit, function, or safety. Class II ECPs shall be provided in Contractor format. They shall be provided for Government concurrence in classification only and will not require Government approval, but will be used for configuration tracking.
The Contractor shall provide Type I ECPs for Government review and approval. The Government will review the ECP for technical merit and impact. Final approval/disapproval of the Type I ECPs will be granted by the Government Contracting Officer in writing.
Block 12/13: BLK 12: Class I ECPs shall be submitted in time to allow 30 days for Government approval process.
16b
See
BLK
16b
See
BLK
16b
See
BLK
16b
See
BLK
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed
ALL
TDP TM OTHER Program Management .
A007
Status Report
Monthly contract status report
DI-MGMT-80368A
DD
MONTHLY
12. DATE OF FIRST SUBMISSION
See Block 16
14. DISTRIBUTION
8. APP CODE
See Block 16
Blocks 10, 12, 13: Initial submission in digital format shall be made within 15 days of the end of the first full month of performance under this order. Subsequent submissions shall be made by the 15 th day of each month thereafter.
The Report shall contain the following:
1.0 Summary: The summary shall include a brief statement of the overall project status, covering accomplished technical activities and development, objectives of efforts, summary results of efforts, identification of major problems/deficiencies with impact and recommended solutions.
2.0 Body of Report: The body shall contain the following:
a. A statement as to whether the program is on task/schedule. If not, provide details of why and the planned effort to get on task/schedule.
b. Effort expended on each task to date, a brief description of work performed during the reporting period.
c. Key dates in any testing or development work with significant results.
d. A narrative of outstanding problems existing as of the previous status report and their resolution status.
e. New problem areas encountered or anticipated, their effect on the overall work effort/project and steps being taken to remedy problem situations.
f. Significant results of conferences, trips or directives for the Contracting Officers Representative.
g. Any other information which may cause significant changes in the program schedule.
3.0 Itemized man-hours and costs. Itemized man-hour and cost expenditure incurred for the reporting period by category and task, total contractual expenditures and funds remaining as of the reporting date.
4.0 Contract deliveries status. The status of each deliverable end items, including data deliverables, as required by the contract. Provide item and contract identification, shipping/transmittal data, acceptance status, and schedule due date information.
5.0 ECP Status. Include a summary of ECP’s, including identification of proposed ECP’s, Approved
ECP’s and implemented ECP’s.
Block 9: DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government Agencies and direst supporting contractors. Other requests for this document shall be referred to Program Manager – Special Operations Forces Survival, Support & Equipment Systems (PM‐SOF
Electronic submissions may be addressed to stephanie.t.elder.civ@mail.mil mailto:stephanie.t.elder.civ@mail.mil
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed
TDP X TM OTHER .
A008
Identification Marking of U.S. Military Property
IUID Marking
MIL-STD-130/DFARS 252.211-7003
LT
ASREQ
12. DATE OF FIRST SUBMISSION
See Block 16
See Block 16
Item Unique Identification marking requirements: End items for which the Government’s unit acquisition cost is $5,000 or more are to be marked and registered with the IUID registry in compliance with Defense Acquisition Regulation Supplement (DFARS) clause 252.211-7003 and IAW MIL-STD-130.
BLK 8: Approval (written) is not required. However, the data will be rejected and submitted for rework if it does not conform to the requirements herein. The Government will review and provide comment within 30 days of receipt, as required.
Block 9: DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government Agencies and direst supporting contractors. Other requests for this document shall be referred to Program Manager – Special Operations Forces Survival, Support & Equipment Systems (PM‐
SOF SSES)
BLK 10/11/12: Due concurrent with delivery of applicable items.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed
A009
Supplier’s Configuration Management Plan (SCMP)
SCMP
DI-SESS-80858D
LT
ASREQ
12. DATE OF FIRST SUBMISSION
See Block 16
14. DISTRIBUTION
8. APP CODE
See Block 16
Contactor will develop and maintain a SCMP to control all aspects of the Configuration Management (CM) process. The SCMP will include event-based criteria for assumption of control of the CM process following acceptance by the Government of documents, designs, or requirements. The Contractor will designate a CM representative to serve as primary point of contact (POC) to the Government for all CM matters and be responsible for any sub-contractor CM efforts.
Contractor will notify the Government of any changes which affect the Contractor’s established CM process.
Program Manager – Special Operations Forces Survival, Support & Equipment Systems (PM‐
SOF SSES)
BLK 10/11/12: Initial submission (draft) in digital format within 60 days of award; final submission 14 days after receipt of Government comments. Subsequent submissions will be made if applicable (i.e. changes to approved SCMP).
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed
TDP TM OTHER Management .
A010
Data Accession List (DAL)
DAL
DI-MGMT-81453B
LT
ASREQ
12. DATE OF FIRST SUBMISSION
See Block 16
14. DISTRIBUTION
8. APP CODE
N
See Block 16
Program Manager – Special Operations Forces Survival, Support & Equipment Systems (PM‐
SOF SSES)
BLK 10/11/12: Initial submission (draft) in digital format within 30 days of award.
Subsequent submissions shall be monthly as changes occur. If no changes occur during the month, the contractor shall provide a negative response to addressees via email.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed
TDP TM OTHER Management .
A011
Diminishing Manufacturing Sources and Material Shortages Management Plan
DMSMS
DI-MGMT-81948
LT
ASREQ
12. DATE OF FIRST SUBMISSION
See Block 16
14. DISTRIBUTION
8. APP CODE
See Block 16
Agencies and direct supporting contractors. Other requests for this document shall be referred to Program Manager – Special Operations Forces Survival, Support & Equipment Systems (PM‐
SOF SSES)
BLK 10/11/12/13: Initial submission (draft) in digital format within 60 days of award. Final submission due 14 days after receipt of government comments.
Subsequent submissions of Health Assessment Reports shall be submitted as an attachment to the Monthly Status Report (MSR), as applicable.
Tailoring to Data Item Description DI-MGMT-81948:
Para 3: The Health Assessment Report shall contain, at a minimum:
● Traceability of issues impacting CASEVAC Set, Kit, or Module functionality to determine if a functional re-design will be cost effective.
● Out-year availability information for future supportability and planning purposes
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed
A012
Request for Variance (RFV)
RFD
MIL-HDBK-61
LT
ASREQ
12. DATE OF FIRST SUBMISSION
See Block 16
14. DISTRIBUTION
8. APP CODE
See Block 16
At a minimum, the RFV shall contain the following information: (a) Date prepared; (b) Originator;
(c) RFV Classification (critical, major, or minor); (d) Designation for variance (model/type, CAGE code, system designation, and variance number); (e) Class of variance; (f) Part Number affected;
(g) Cost/Price data; (h) Effectivity; (i) Description of variance; (j) Need for variance; (k) Effect on delivery schedule; (l) Recommended corrective action; and (m) Alternatives evaluated
Program Manager – Special Operations Forces Survival, Support & Equipment Systems (PM‐
SOF SSES)
BLK 10/11/12/13: Initial submission (draft) in digital format within 60 days of award. Final submission due 14 days after receipt of government comments. Subsequent submissions as required.
File details come from the government source that posted it. Updated .