This solicitation requests proposals for a lead paint abatement project on Lighthouse Island in Huron National Wildlife Refuge. The selected contractor will remove lead-based paint from and paint exterior surfaces of four historic buildings constructed between 1891 and 1934. Add alternates include interior lead removal and painting in two structures, removing lead paint from tram rails, and replacing damaged siding. Proposals are due no later than February 25, 2022. The anticipated award date is March 11, 2022. The estimated value of the contract is between $100,000 and $250,000. The work will be performed on a firm fixed price lump sum basis under NAICS code 562910 at the project site in Marquette County, Michigan. A virtual site visit is scheduled for January 25, 2022. All inquiries must be submitted in writing by February 11, 2022 to the contact provided. The soliciting agency is the U.S. Fish and Wildlife Service Region 2.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 02 – Pricing Schedule
Lighthouse Island – Huron NWR Lead Abatement Project
This project involves removing and proper disposal of exterior lead-based paint, repairing/replacing damaged boards, and painting components of buildings located on Lighthouse Island in the Huron Island NWR System to preserve them in accordance with the National Historic Preservation Act. This project also involves removing a 55-gallon waste oil drum from underneath the Boathouse. Add alternates will be to remove interior lead and repaint the interior of the Privy and Oil House structures and lead base paint removal and disposal on the tram rail system and empty Oil Tank.
Year Building Constructed material
SQFT Approximate Square Footage of Lead Paint to be Removed
Exterior Lead Building Remediation 1934 Asst. Keeper’s Residence wood 800 2400 1891 Fog Signal Building Brick masonry 874 425 1896 Oil House Brick masonry 100 65 1898 Privy Brick masonry 200 190 Add Alternate Interior Building 1896 Oil House Brick masonry 100 340 1898 Privy Brick masonry 46 330 Add Alternate Tramway Rails Boat House and Fog Signal Building Tramway Rails Steel 600
Huron NWR is made up of eight islands and has a wilderness designation. Lighthouse Island is the site location for this project. The refuge island lies in Lake Superior off the Michigan Shoreline in Marquette County. Travel to the islands from the nearest boat launch is typically 40-45 minutes. Huron NWR is managed by staff at Seney National Wildlife Refuge, approximately three hours east of Huron NWR.
Lead Base Paint Removal, painting, and removal of used oil barrel.
The work includes but is not limited to the following work on the Assistant Keeper’s Quarters:
1. The removal and proper disposal of lead base paint on exterior of building.
2. Painting using approved paint for the exterior of Assistant Keeper’s Quarters, and
3. Removal and disposal of 55 Gallon drum of oil barrel under Boat House
Base: $_____________
Add Alternate 1:
Painting of wood and metal using purified linseed oil primer and purified linseed oil paint instead of approved Latex or Low VOC based paint:
Alt 1: $_____________
Attachment 02 – Pricing Schedule
Add Alternate 2: The work includes but is not limited to:
1. The removal and proper disposal of lead base paint from the exterior of Assistant Keeper’s Quarters, Oil House, Privy, and Fog Signal Building.
2. The painting of exterior of buildings using approved paint of Assistant Keeper’s Quarters, Oil House, Privy, and Fog Signal Building.
Alt 2: $_____________
Add Alternate 3:
Painting of wood and metal using purified linseed oil primer and purified linseed oil paint instead of approved Latex or Low VOC based paint:
Alt 3: $_____________
Add Alternate 4: The removal of lead base paint from tram rail system in Boat House and the tramway near Fog Signal Building.
Alt 4: $_____________
Add Alternate 5: The removal of lead base paint from interior of Oil House and Privy and paint interior metal with latex paint.
Alt 5: $_____________
Additional Work as Required
Replacement of installation of damaged siding and facia base on linear foot:
The contractor will provide pricing for replacing damaged or missing siding and facia from buildings on an 8 foot board price for equivalent material:
Per 8 foot board cedar 1 x 4 Price: $_____________
Building Dimensions:
The Assistant Keepers Quarters 48 LN FT long X 20 LN FT wide; 1 story.
Boat House 40 LN FT X 15 LN FT, 1 story
Fog Signal Building 19 LN FT X 46 LN FT, 1 story
Privy 6 LN FT X 8 LN FT, 1 story
Oil House 100 square Feet, 1 story