Att5_Lim_on_SubK_Breakout.xlsx

XLSX spreadsheet 94 KB Posted

Attached to
GAOA TETON DAM RECONSTRUCTION Federal contract opportunity
Solicitation number
140L0625R0013
Issued by
Department of the Interior Bureau of Land Management National Office

About this file

This file is an Excel spreadsheet tracking Limitations on Subcontracting for a small business federal contract opportunity. The document is specifically related to the GAOA Teton Dam Reconstruction solicitation (Number 140L0625R0013) issued by the Department of the Interior Bureau of Land Management National Office. The spreadsheet provides a detailed breakdown of subcontracting requirements, including provisions for tracking total proposed amounts, material costs, labor costs, and subcontractor payments, with specific emphasis on distinguishing between small business (SSS) and large business (LBS) subcontractor labor contributions. The template includes calculation fields to ensure compliance with federal subcontracting limitations, requiring self-performance percentages and tracking of first-tier subcontractors within the specified NAICS code.

View the file

Other files for this federal contract opportunity

Other files attached to GAOA TETON DAM RECONSTRUCTION, newest first.
File Type Posted
Sol_140L0625R0013_Amd_0004.pdf PDF
Att11_TetonDam_InspRpt_0004.pdf PDF
Att10_QuesAnswersAM04_0004.pdf PDF
Sol_140L0625R0013_Amd_0003.pdf PDF
Sol_140L0625R0013_Amd_0002.pdf PDF
Sol_140L0625R0013_Amd_0001.pdf PDF
Att9_TetonDam_SiteVisit_Roster_0001.pdf PDF
Att1_Drawings_10022024.pdf PDF
Att2_Specifications_102024.pdf PDF
Att4_Price_Breakout.pdf PDF
Sol_140L0625R0013.pdf PDF
Att8_25R0013_RFI_Form.xlsx XLSX spreadsheet
Att7_Past_Perf_Questionnaire.docx DOCX document
Att3_WY20250037_20250103.pdf PDF
Att6_Experience_ProjectDataSheet.docx DOCX document
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Lim on Sub Breakout Limitations on Subcontracting Breakout FAR 52.219-14(e)(3) or (4)

Solicitation Number
Type of Set-AsideSmall Business
Performance Period
Required Self-Performance15%

(A) Total Amount Proposed¹

(B) Total Material Cost2

(C) Self Performed Labor

(D) Small Business Subcontractor (SSS) Labor3
Total Amount Paid to [Insert First SSS Name]
Total Amount Paid to [Insert Second SSS Name]
Total Amount Paid to [Insert Third SSS Name]
Total Amount Paid to [Insert Fourth SSS Name]
Total Amount Paid to [Insert Fifth SSS Name]
Total Amount Paid to [Insert Sixth SSS Name]
Total Amount Paid to SSS Companies$0.00
(E) Large Business Subcontractor (LBS) Labor
Total Amount Paid to [Insert First LBS Name]
Total Amount Paid to [Insert Second LBS Name]
Total Amount Paid to [Insert Third LBS Name]
Total Amount Paid to [Insert Fourth LBS Name]
Total Amount Paid to [Insert Fifth LBS Name]
Total Amount Paid to [Insert Sixth LBS Name]
Total Amount Paid to LBS Companies$0.00

(F) Total Labor Cost4 $0.00

(G) Limitation on Subcontracting Percentage5
(Total Labor Cost - Total Amount Paid to LBS Companies) / Total Labor CostERROR:#DIV/0!
*Note 1: (A) Total Amount Proposed = (B) Total Material Cost + (F) Total Labor Cost
*Note 2: Total Material Cost includes special tooling, special testing equipment, and construction equipment. Additional definition of material cost can be found at 13 CFR 125.1.
*Note 3: Subcontractors must be first tier and qualify as a small business under the solicitation NAICS. All second tier subcontractors are counted as LBS labor.
*Note 4: Total labor costs consist of all contractual costs other than material.
*Note 5: To be compliant, limitation percentage must be greater than the required self-performance percentage.

Sheet2

Services (except construction)
General construction
Construction by special trade contractors

File details come from the government source that posted it. Updated .