Att4_Price_Breakout.pdf
PDF 22 KB Posted
- Attached to
- GAOA TETON DAM RECONSTRUCTION Federal contract opportunity
- Solicitation number
- 140L0625R0013
About this file
This is a Price Schedule document for the GAOA Teton Dam Reconstruction federal contract (Solicitation Number 140L0625R0013). The detailed pricing breakdown includes 21 line items for dam reconstruction work, with quantities specified in various units such as Cubic Yards (CY), Tons (TON), Lump Sum (LS), and Square Yards (SY). Major work categories include site preparation, excavation, embankment, spillway construction, outlet works, riprap protection, and drainage systems. The document notes that quantities are not guaranteed, and total prices for each item are fully burdened, including overhead, profit, and bonding costs. Specific quantities include 53,270 CY of common excavation, 64,369 CY of compacted embankment, 10,230 TON of new riprap slope protection, and multiple lump sum items for mobilization, demolition, and infrastructure construction.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L0625R0013_Amd_0004.pdf | ||
| Att11_TetonDam_InspRpt_0004.pdf | ||
| Att10_QuesAnswersAM04_0004.pdf | ||
| Sol_140L0625R0013_Amd_0003.pdf | ||
| Sol_140L0625R0013_Amd_0002.pdf | ||
| Sol_140L0625R0013_Amd_0001.pdf | ||
| Att9_TetonDam_SiteVisit_Roster_0001.pdf | ||
| Att5_Lim_on_SubK_Breakout.xlsx | XLSX spreadsheet | |
| Att1_Drawings_10022024.pdf | ||
| Att2_Specifications_102024.pdf | ||
| Sol_140L0625R0013.pdf | ||
| Att8_25R0013_RFI_Form.xlsx | XLSX spreadsheet | |
| Att7_Past_Perf_Questionnaire.docx | DOCX document | |
| Att3_WY20250037_20250103.pdf | ||
| Att6_Experience_ProjectDataSheet.docx | DOCX document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item
No. Description Unit Price Total Price**
1 Mobilization and Preparatory Work 1 LS
2 Site Clearing, Topsoil Stripping, & Restoration 1 LS
3 Existing Outlet Works Demolition 1 LS
4 Common Excavation 53,270 CY
5 Muck Excavation 3,540 CY
6 Compacted Embankment 64,369 CY
7 Lime Amended Embankment 4,120 CY
8 Spillway Excavation 4,534 CY
9 Spillway and Training Dike Fill 3,422 CY
10 Filter Sand 7,806 CY
11 Drain Gravel 616 CY
12 Road Gravel 1,470 TON
13 Outlet Works Tower and Inlet Structure 1 LS
14 Outlet Works Conduit 1 LS
15 Stilling Basin 1 LS
16 New Riprap Slope Protection 10,230 TON
17 Salvage and Replace Existing Rock 1,400 CY
18 Riprap Bedding 7,210 TON
19 Water Control/Dewatering 1 LS
20 Toe Drain System 1 LS
21 Stabilization Fabric 500 SY
Rate***
** Total Price for each Item is fully burdened and includes Overhead, Profit, and Bond.
*** Overhead, Profit, and Bond rates used in the total price to be provided.
*Quantities are not guaranteed. Measurement and payment for each Item is defined in Section 01150, Measurement and
Payment.
Overhead
Profit
Bonds
140L0625R0013 GAOA TETON DAM RECONSTRUCTION
Price Schedule
Quantity*
TOTAL CONTRACT PRICE