Att4_Price_Breakout.pdf

PDF 22 KB Posted

Attached to
GAOA TETON DAM RECONSTRUCTION Federal contract opportunity
Solicitation number
140L0625R0013
Issued by
Department of the Interior Bureau of Land Management National Office

About this file

This is a Price Schedule document for the GAOA Teton Dam Reconstruction federal contract (Solicitation Number 140L0625R0013). The detailed pricing breakdown includes 21 line items for dam reconstruction work, with quantities specified in various units such as Cubic Yards (CY), Tons (TON), Lump Sum (LS), and Square Yards (SY). Major work categories include site preparation, excavation, embankment, spillway construction, outlet works, riprap protection, and drainage systems. The document notes that quantities are not guaranteed, and total prices for each item are fully burdened, including overhead, profit, and bonding costs. Specific quantities include 53,270 CY of common excavation, 64,369 CY of compacted embankment, 10,230 TON of new riprap slope protection, and multiple lump sum items for mobilization, demolition, and infrastructure construction.

View the file

Other files for this federal contract opportunity

Other files attached to GAOA TETON DAM RECONSTRUCTION, newest first.
File Type Posted
Sol_140L0625R0013_Amd_0004.pdf PDF
Att11_TetonDam_InspRpt_0004.pdf PDF
Att10_QuesAnswersAM04_0004.pdf PDF
Sol_140L0625R0013_Amd_0003.pdf PDF
Sol_140L0625R0013_Amd_0002.pdf PDF
Sol_140L0625R0013_Amd_0001.pdf PDF
Att9_TetonDam_SiteVisit_Roster_0001.pdf PDF
Att5_Lim_on_SubK_Breakout.xlsx XLSX spreadsheet
Att1_Drawings_10022024.pdf PDF
Att2_Specifications_102024.pdf PDF
Sol_140L0625R0013.pdf PDF
Att8_25R0013_RFI_Form.xlsx XLSX spreadsheet
Att7_Past_Perf_Questionnaire.docx DOCX document
Att3_WY20250037_20250103.pdf PDF
Att6_Experience_ProjectDataSheet.docx DOCX document
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item

No. Description Unit Price Total Price**

1 Mobilization and Preparatory Work 1 LS

2 Site Clearing, Topsoil Stripping, & Restoration 1 LS

3 Existing Outlet Works Demolition 1 LS

4 Common Excavation 53,270 CY

5 Muck Excavation 3,540 CY

6 Compacted Embankment 64,369 CY

7 Lime Amended Embankment 4,120 CY

8 Spillway Excavation 4,534 CY

9 Spillway and Training Dike Fill 3,422 CY

10 Filter Sand 7,806 CY

11 Drain Gravel 616 CY

12 Road Gravel 1,470 TON

13 Outlet Works Tower and Inlet Structure 1 LS

14 Outlet Works Conduit 1 LS

15 Stilling Basin 1 LS

16 New Riprap Slope Protection 10,230 TON

17 Salvage and Replace Existing Rock 1,400 CY

18 Riprap Bedding 7,210 TON

19 Water Control/Dewatering 1 LS

20 Toe Drain System 1 LS

21 Stabilization Fabric 500 SY

Rate***

** Total Price for each Item is fully burdened and includes Overhead, Profit, and Bond.

*** Overhead, Profit, and Bond rates used in the total price to be provided.

*Quantities are not guaranteed. Measurement and payment for each Item is defined in Section 01150, Measurement and

Payment.

Overhead

Profit

Bonds

140L0625R0013 GAOA TETON DAM RECONSTRUCTION

Price Schedule

Quantity*

TOTAL CONTRACT PRICE