This document is a set of construction design drawings for a federal military construction project at Tinker Air Force Base, Oklahoma. The project, identified as WWYK230053, involves replacing an existing underground fuel storage vault and fuel tank system at Building 3202. The concept design, dated 25 June 2025, was prepared by the Air Force Materiel Command, 72nd Air Base Wing Civil Engineer Directorate.
The project scope encompasses complete demolition of the existing underground fuel storage tank with its associated containment sump, piping, and related infrastructure, followed by removal of the underground vault structure. Hazardous material assessment and soil testing are required to confirm no contamination remains. New work includes installation of a 200-gallon double-wall fuel storage tank with 150% containment capacity inside Building 3202, construction of a 37-foot by 12-foot reinforced concrete driveway for fuel truck access, installation of new stainless steel fuel piping compliant with ASME B31.3 standards, and provision of associated systems including tank fill lines, vents, gauges, sensors, and monitoring connections. Additional work includes roof replacement with EPDM roofing system, new roof drainage systems, replacement of roof vents and exhaust fans compliant with NFPA 37, electrical upgrades with new conduits and lighting fixtures, security fence repairs, and site restoration with sod grass. The construction must comply with UFC 3-460-01 (Petroleum Fuel Facilities), Oklahoma Administrative Code regulations for storage tanks, and NFPA standards for fuel systems. Project phasing requires completion of new equipment pads and tank installation before demolition of the underground systems.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REVIEWED BY:
REVIEWED BY:
USING AGENCY:
ASBESTOS EVALUATION:
SAFETY:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
INDUSTRIAL HYGIENE:
DATE:
PROJECT DRAWING INDEX SIGNATURES
CORROSION ENGINEER: (CECE)
CE OPERATIONS: (CECO)
COMMUNICATIONS: (COMM)
CHIEF ENGINEER DIR: (CECE)
CHIEF DESIGN BRANCH: (CECE)
DESIGN MANAGER: (CECE)
ZONE MANAGER:
CONSTRUCTION MANAGEMENT: (CECE)
ENVIRONMENTAL:
BASE CIVIL ENGINEER: (CE)
FIRE DEPARTMENT: (CEFT)
GENERAL1. BRAND NAMES: REFERENCE TO SPECIFIC BRAND NAMES
OR COMPANIES IS FOR THE PURPOSE OF ESTABLISHING
MINIMUM QUALITY STANDARDS, IDENTIFICATION AND
GUIDANCE AND IS NOT INTENDED TO LIMIT SELECTION OF
OTHER MANUFACTURERS THAT ARE EQUAL OR EXCEED
THE SPECIFIED ITEMS IN TERMS OF PHYSICAL
PROPERTIES, INCLUDING, COLOR RANGE, FINISH,
DURABILITY, APPEARANCE, PERFORMANCE
CHARACTERISTICS, AND OTHER FACTORS. OTHER
PRODUCTS, MATERIALS, COLORS AND SYSTEMS, MAY BE
SUBMITTED FOR EVALUATION AND
APPROVAL/DISAPPROVAL BY THE CONTRACTING OFFICER.
2. THIS SET OF CONSTRUCTION DOCUMENTS SHALL BE
CONSIDERED AS A WHOLE IN THAT THE GENERAL
CONTRACTOR AND ALL THE SUB-CONTRACTORS ARE
RESPONSIBLE FOR THE INFORMATION PRESENTED ON ALL
SHEETS ON THE SET OF DRAWINGS AND ALL SECTIONS OF
THE SPECIFICATIONS.
3. THE CONTRACTOR IS RESPONSIBLE FOR ERECTING ALL
CONSTRUCTION FENCING AND BARRICADES AS REQUIRED
TO PROTECT CONSTRUCTION MATERIAL AND TO PREVENT
ANY UNAUTHORIZED PERSONNEL FROM ENTERING THE
CONSTRUCTION SITE.
4. ANY DAMAGE TO THE EXISTING GROUNDS OR FACILITIES
CAUSED BY CONSTRUCTION TRAFFIC OR ANY
CONSTRUCTION OPERATION SHALL BE REPAIRED OR
REPLACED BY THE CONTRACTOR TO MATCH OR EXCEED
EXISTING CONDITIONS AT NO ADDITIONAL COST TO THE
GOVERNMENT.
5. ALL WORK NOTED & LOCATED IN THESE DOCS SHALL BE
UNDERSTOOD BY THE CONTRACTOR TO REQUIRE ALL NEW
LABOR & MATERIALS UNLESS SPECIFICALLY NOTED TO BE
"EXISTING" OR "BY OTHERS".
WWYK230053
REPLACE VAULT AND
FUEL TANK, B3202
KEY PLAN:
GENERAL NOTES:
DISCIPLINE
PROJECT
LOCATION
1 G-101 GENERAL NOTES & VICINITY MAP
SHT.SEQ. SHEET TITLE
OF
TI
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
CONCEPT
DESIGN
W W
YK
RE
PL
AC
E
VA
UL
T
AN
D
FU
EL
T
AN
K, B
Ju n
TE
PA
-S R
M
G-101
S
ST
AR
R
B W
YM
ER
En gr
\D es ig n2
0\
\2
3\ 0_
Su pp or t\0
_3 _D ra w in gs
GE
NE
RA
L N
OT
ES
AN
D
VI
CI
NI
TY
M
AP
01 08
AERIAL IMAGE WITH UTILITIESC-100
DEMOLITION PLAN VAULT AND FUEL TANKCD-101
MECHANICAL DEMOLITION PLAN
M-101
MECHANICAL NEW WORK PLAN
MD-101
ELECTRICAL DEMOLITION PLANED-101
ELECTRICAL NEW WORK PLANE-101
4 DEMOLITION AND NEW WORK ROOF PLANR-101
Turbine Dr.
R U
N W
AY
8/
RUNWAY 13/31
TA
XI
W
AY
G
TAXIW
AY H
TAXIWAY B
TAXIWAY C
TAXIWAY M
TA
XI
W
AY
K
TAXIWAY E
TAXIWAY A
TA
XIW
AY E
E
TAXIWAY F
TAXIWAY D
TAXIWAY E
TAXIWAY J
TA
XI
W
AY
G
TAXIWAY A
TAXIW
AY H
TAXIWAY C
TAXIWAY D
TAXIWAY EE
TAXIWAY F
Elm C reek
Cr ut ch o
Cr ee k
Kuhlman Creek
Soldier Creek
Kuhlman Creek
Elm C reek
East Crutcho Creek
Elm Creek
El m
C re ek
Elm Creek
Elm C reek
Elm CreekElm C reek
Ku hlm an C re ek
Ea st
C ru tc ho
C re ek
Elm C ree k
West Crutcho Creek
W es t C ru tc ho
C re ek
Elm Creek
Soldier Creek
Elm C reek
Soldier CreekSoldier Creek
Ea st
C ru tc ho
C re ek
Elm Creek
Ea st
C ru tc ho
C re ek
East C rutcho C reek
Soldier Creek
So ld ie r C re ek
East C rutch o Creek
Soldier C reek
Soldier C reek
So ld ie r C re ek
East Crutcho Creek
416506
21222121
59475946
11401128
62540
61089
838837
62509
62528
62523
62501X
43774
62512
62516
62525
3592135916
99999
62543
32101
71086
53902
50414
55300
56601
930G
948-E
911-E
948-W
61019
911-W
33001
35913
62501
65672
930S
45134
43609
42116
62517
62515
62526
62527
62503
62513
61289
62542
62501OK
11289
62501
15930
15908
15904
15904
15908
15908
15904
15904
15908
62502
41046
62501
62514
62501
61018
71089
45134
96022
43120
41157
44045
45815
40592
43610
62522
41163
15930
15930
11824
Arnold St.
Ea st
D r.
SE 74th St
SE 59th St.
Ai r D ep ot
Patrol Rd.
St af f D r.
Reserve Rd.
5th Ave
"A " A ve
M un iti on s R d.
W ar eh ou se R d.
"B " A ve
7th St.
"H " A ve
M cN ar ne y Av e.
Mitchell Ave
Al er t R d.
Co ok
A ve
W es t D r.
"E "A ve
Extender Dr.
Sentry Rd.
34th St.
Twining Dr.
5th Ave.
Jo ne s
Globemaster Dr.
To w er R d.
Vanaman Rd.
In du st ria l B lv d.
So ut h St
1st St.
Do ol itt le
A ve
Pi cn ic R d.
Ja m es D r.
W ol fe D r.
Ai r D ep ot
Ai r D ep ot
"D " A ve
Perimeter Rd.
Rapcon Rd.
Reserve Rd
"L " A ve
Mercury Rd.
1st St.
Br ow n Dr
Po nd
R d.
O ld
A ir
De po t
Airey Dr.
General Motors Dr
Bradley Dr.
Entrance Road "C"
Entrance Road "A"
"C " A ve
"C " A ve
Vandenberg Dr.
Hi llt op R d.
Do rm ito ry
R d.
Dormitory Rd.
"M " A ve
Chennault Dr.
M itc he ll A ve
Spaatz Dr.
Co m m od ity D r.
Doolittle Ave
W hi te D r.
3rd Ave.
"D " D riv e
Ba ll
Pa rk
R d.
Joint STARS Dr.
Ai r D ep ot
B lv d
Turbine Dr.
Turbine Dr.
Central Plant Dr.
6th St.6th St.
Falco n Dr.
Blackb ird
Dr.
W ey la nd
L oo p
Pegasus Dr.
Thunderbolt D r.
Munitions Rd. Ext.
Codding Rd.
Starlifter Dr.
Chidlaw Ct.
Co rs ai r D r.
Ra pt or Ct
N ig ht H aw k
Ct
Ph an to m
D r.
Fr an kl in
Po w er ho us e
Dr
Sk ym as te r D r.
Spaatz Ct.
La w re nc e
M un de ll
Nabors Dr.
In tr ud er
D r.
M cN ic kl e
M ill er D r.
Ta il
Fe at he r D r.
Holden Dr.
Ai re y C ir.
Smith Ct.
Ra ve n Ct
Air Dep ot Ai r D ep ot
Vanaman Rd.
1st St.
1st St.
TAXIWAY F
Ra w li ng s A ve
Mitc he ll A ve
Mercury Rd.
Ra ily ar d
Rd
He rc ul es
R d.
"F " A ve
Pr op ul sio n Dr
Stratofortress Dr.
96021
Arnold St.
TINKER AFB, OK
VICINITY MAP
BASE
OPERATIONS
B240
CONTRACTING
B3
GOTT
GATE
TINKER GATE
PASS & ID B6611
HRUSKOCY
GATE
EAKER GATE
FIRE DEPARTMENT
B117
VANCE
GATE
LIBERATOR GATE
HOPE
GATE
LEGEND
CONTRACTOR
HAUL ROUTE
LANCER
GATE
TRUCK GATE
PIAZZA GATE
BASE CIVIL
ENGINEER
B400
PROJECT
LOCATION
OF
TI
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
CONCEPT
DESIGN
W W
YK
RE
PL
AC
E
V
AU
LT
A
ND
FU
EL
T
AN
K, B
Ju n
TE
PA
-S
RM
J
AL
LE
N
C-100
S
ST
AR
R
B W
YM
ER
En gr
\D es ign \20
\20
\20
\0_
Su pp or t\0
_3 _D ra wi ng s\
AE
RI
AL
IM
AG
E
W
IT
H
UT
ILI
TI
ES
02 08
GENERAL NOTES
1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS
FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING
CONDITIONS FOR ACCURACY.
2. CONTRACTOR SHALL VERIFY AND PROTECT ALL UTILITIES FROM DAMAGE DURING
DEMOLITION AND CONSTRUCTION.
C-100
AERIAL IMAGE WITH UTILITIES
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
CONCEPT
DESIGN
W W
YK
RE
PL
AC
E
V
AU
LT
A
ND
FU
EL
T
AN
K, B
Ju n
TE
PA
-S R
M
J
AL
LE
N
CD-101
S
ST
AR
R
B W
YM
ER
En gr
\D es ig n\
\2
3\
\0
_S up po rt\
0_ 3_
D ra w in gs
DE
MO
LIT
IO
N
AN
D
NE
W W
OR
K
PL
AN
VA
UL
T
AN
D
FU
EL
T
AN
K
03 08
GENERAL NOTES
1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS FOR FIELD
OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS FOR ACCURACY.
CD-101
DEMOLITION AND NEW WORK PLAN VAULT AND FUEL TANK
DEMOLITION GENERAL NOTES
1. REMOVE EXISTING CONCRETE PAVEMENT ABOVE EXISTING UNDERGROUND FUEL STORAGE TANK
AND VAULT ROOM WALLS AND FLOORS.
2. EXCAVATE ALL MATERIAL IN AND AROUND THE VAULT TO THE EXTENT NEEDED TO REMOVE ALL
HAZARDOUS MATERIAL TO THE SATIFICATION OF THE COR.
3. CONDUCT TESTS OF THE SOIL BY AN APPROVED LABORATORY TO CONFIRM NO HAZMAT MATERIAL
EXISTS IN THE IMMEDIATE VACINITY OF THE EXCAVATED VAULT ROOM.
4. DISPOSE OF ANY HAZARDOUS MATERIALS OFF BASE TO AN APPROVED DISPOSAL SITE. DISPOSE
TICKETS TO THE APPROVED SITE MUST BE FURNISHED TO THE COR FOR ALL LOADS.
5. REMOVE THE EXISTING SIDEWALK IN FRONT IF BUILDING 3202 TO PREPARE FOR THE FUTURE
INSTALLATION OF THE FUEL TRUCK PAD.
6. REMOVE THE EXISTING GUARDRAIL EAST OF BUILDING 3202.
NEW WORK KEYED NOTES
BACKFILL THE ENTIRE EXCAVATION WITH APPROVED SELECT FILL COMPACTED TO 95% MODIFIED
PROCTOR DENSITY IN 6" LIFTS TO12" BELOW TOP OF THE EXISTING GRADE.
EXCAVATE THE AREA TO FACILITATE PROPER DRAINAGE. INSTALL SOD GRASS OVER THE AREA TO
RESTORE IT'S SURFACE AND ENSURE STABILIZATION.
CONSTRUCT AN 37 'x 12 'x 8" REINFORCED CONCRETE DRIVEWAY FOR FUEL TRUCK ACCESS WEST OF
BUILDING 3202.
REPAIR THE SECURITY FENCE ON THE SOUTH SIDE OF BUILDING 3202.
CONTRCTORS STAGING AREA.
REMOVE GATE.
FUEL
TANK
FUEL TRUCK LOCATION
4 1
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
CONCEPT
DESIGN
W W
YK
RE
PL
AC
E
V
AU
LT
A
ND
FU
EL
T
AN
K, B
Ju n
TE
PA
-S R
M
A
AL
AW
AD
I
R-101
S
ST
AR
R
B W
YM
ER
En gr
\D es ig n\
\2
3\
\0
_S up po rt\
0_ 3_
D ra w in gs
DE
MO
LIT
IO
N
AN
D
NE
W W
OR
K
RO
OF
P
LA
N
04 08
GENERAL NOTES
1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS FOR FIELD
OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS FOR ACCURACY.
2. THERE ARE ASBESTOS ON THE ROOF NEED TO BE REMOVED.
R-101
DEMOLITION AND NEW WORK ROOF PLAN
DEMOLITION AND NEW WORK KEYED NOTES
REMOVE EXISTING BUR ROOFING AND INSTALL NEW EPDM SYSTEM.
REMOVE EXISTING ROOF DRAINS, INSTALL NEW PRIMARY AND SECONDARY DRAINING
SYSTEM.
REMOVE AND REPLACE THE VENTS, EXHAUST FAN AND MUFFLER.
ELECTRIC FIRE PUMP DIESEL FIRE PUMP
ELECTRIC JOCKEY PUMP
SUMP PUMP
SURGE
TANK
ROOF EXHAUST
FAN
UNDERGROUND
3202-TNK-1
FOS
FOS
OF
TI
NK
ER
A
IR
F
OR
CE
B
AS
E, O
KL
AH
OM
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
MD-101
MECHANICAL DEMOLITION PLAN
SCALE: 1/4" = 1'-0"
CONCEPT
DESIGN
W W
YK
RE
PL
AC
E
V
AU
LT
A
ND
FU
EL
T
AN
K, B
Ju n
TE
PA
-S R
M
T
AR
M
ST
R O
N G
MD-101
S
ST
AR
R
B W
YM
ER
En gr
\D es ig n\
\2
3\
\0
_S up po rt\
0_ 3_
D ra w in gs
ME
CH
AN
IC
AL
D
EM
OL
IT
IO
N
PL
AN
05 08
DEMOLITION GENERAL NOTES
A. ALL INFORMATION AND GENERAL ARRANGEMENTS SHOWN ON DRAWINGS ARE DIAGRAMATIC
AND SHOW DESIGN INTENT FOR INFORMATION ONLY. CONTRACTOR SHALL VERIFY ALL
DIMENSIONS AND EXISTING CONDITIONS PRIOR TO DEMOLITION AND CONSTRUCTION.
B. CONTRACT DOCUMENTS WERE PREPARED FROM FIELD SURVEYS, THEY ARE NOT INTENDED
TO DEPICT UNFORESEEN CONDITIONS THAT MAY ADVERSELY AFFECT THE MECHANICAL
SYSTEM DEMOLITION OR INSTALLATION. MECHANICAL CONTRACTOR SHALL FIELD VERIFY
EXISTING CONDITIONS PRIOR TO STARTING ANY WORK.
C. CONTRACTOR SHALL PROVIDE AN ADEQUATE CONSTRUCTION BARRIER TO PROTECT ALL
ADJACENT AREAS FROM DAMAGE DURING DEMOLITION AND CONSTRUCTION.
D. CONTRACTOR SHALL PROTECT CONDUIT, WIRING, UNDERGROUND PIPING AND DEVICES THAT
ARE TO BE MODIFIED AND/OR RE-INSTALLED.
E. ALL DEMOLISHED EQUIPMENT SHALL REMAIN PROPERTY OF THE US GOVERNMENT.
CONTRACTOR SHALL CONSULT WITH CONTRACTING OFFICER FOR DIRECTION ON PROPER
DISPOSAL OR STORAGE OF ALL DEMOLISHED EQUIPMENT.
F. COORDINATE ALL SHUTDOWNS AND REQUIRED WORK IN EACH SPACE WITH THE
USER/GOVERNMENT A MINIMUM OF FOUR WEEKS PRIOR TO STARTING ANY WORK.
G. REMOVAL OF THE UNDERGROUND FUEL STORAGE TANK WILL REQUIRE A LICENSED
OKLAHOMA CORPORATION COMMISSION (OCC) OPERATOR ON SITE AND A LICENSED OCC
ENVIRONMENTAL CONSULTANT TO PERFORM THE REQUIRED SOIL SAMPLING AND COMPLY
WITH OCC 165:25-1-56.
H. PRIOR TO ALL DEMOLITION WORK, REMOVE ANY FUEL FROM THE TANK AND UNDERGROUND
PIPING; TEST THE SURROUNDING SOIL TO DETERMINE IF THE TANK IS LEAKING AND IF
REMEDIATION IS REQUIRED; AND INSPECT THE UNDERGROUND PIPE INSULATION FOR
ASBESTOS CONTAINING MATERIAL (ACM).
DEMOLITION KEYED NOTES
DEMOLISH COMPLETELY THE EXISTING UNDERGROUND FUEL TANK WITH ITS ASSOCIATED
TANK TOP CONTAINMENT SUMP, MANHOLES WITH ITS COVER, FUEL SENSOR, FILL PIPE WITH
SPILL BUCKET, RISER , VENT, FUEL CONNECTION PIPES, FITTINGS, SUBMERGED FUEL
TRANSFER PUMP, ETC. DEMOLISH THE UNDERGROUND VAULT.
DEMOLISH THE EXISTING FUEL PIPING, PIPE FITTINGS, AND PIPE INSULATION FROM THE
UNDERGROUND TANK INTO B3202 AND UP TO THE CONNECTIONS ON THE DAY TANKS.
DEMOLISH THE EXISTING DAY TANKS AND THE PIPING CONNECTING IT TO THE GENERATOR.
DEMOLISH THE EXISTING EXHAUST FAN MOUNTED ON THE ROOF OF B3202 AND ALL
ASSOCIATED CONTROLS.
PHASING NOTES
1. CONSTRUCT THE NEW EQUIPMENT PAD AND INSTALL THE NEW TANK INSIDE B3202.
2. DISCONNECT THE EXISTING DAY TANK FROM THE DIESEL GENERATOR. DISCONNECT THE EXISTING
DAY TANK FROM THE MAIN STORAGE TANK'S SUPPLY AND RETURN LINES AND DEMOLISH IT.
3. MAKE ALL NECESSARY CONNECTIONS BETWEEN THE NEW TANK AND GENERATOR .
4. DEMOLISH THE UNDERGROUND MAIN TANK, VAULT, AND ALL PIPING INTO B3202.
NK
ER
A
IR
F
OR
CE
B
AS
E, O
KL
AH
OM
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
M-101
MECHANICAL NEW WORK PLAN
SCALE: 1/4" = 1'-0"
CONCEPT
DESIGN
W W
YK
RE
PL
AC
E
V
AU
LT
A
ND
FU
EL
T
AN
K, B
Ju n
TE
PA
-S R
M
T
AR
M
ST
R O
N G
M-101
S
ST
AR
R
B W
YM
ER
En gr
\D es ig n\
\2
3\
\0
_S up po rt\
0_ 3_
D ra w in gs
ME
CH
AN
IC
AL
NE
W W
OR
K
PL
AN
06 08
CONSTRUCTION GENERAL NOTES
A. BASIS OF DESIGN FOR EACH OF THE NEW FUEL TANKS IS A 200 GALLON TRAMONT TRS
WITH 150% CONTAINMENT.
B. INSTALLATION OF THE NEW FUEL STORAGE TANK WILL REQUIRE A LICENSED OKLAHOMA
CORPORATION COMMISSION (OCC) OPERATOR.
C. TANK SHALL HAVE A NORMAL VENT AND EMERGENCY VENTS FOR BOTH THE PRIMARY
TANK AND THE SECONDARY CONTAINMENT SPACE.
D. TANK WILL BE ELECTRICALLY GROUNDED.
E. A LOCKABLE FILL CAP SHALL BE PROVIDED.
F. TANK SHALL BEAR THE WORDS " FLAMMABLE KEEP FIRE AWAY" ON EACH SIDE OF THE
TANK. THE LETTERS MUST BE A MINIMUM OF FOUR INCHES (4") HIGH.
G. TANKS SHALL BE SUPPORTED TO PREVENT THE CONCENTRATION OF EXCESSIVE LOADS
ON THE TANK AT THE POINTS OF SUPPORT. ALL FOUNDATIONS AND FASTENINGS SHALL BE
DESIGNED TO PROVIDE REASONABLE SAFETY UNDER ALL IMPOSED LOADS INCLUDING
WIND, EARTHQUAKE, VIBRATIONS, ETC. THE TANK SHALL BE INSTALLED ON FOUNDATIONS
IN SUCH A MANNER AS TO PERMIT EXPANSION AND CONTRACTION.
CONSTRUCTION KEYED NOTES
CODES
THE FUEL STORAGE SYSTEM (TANK, PIPING AND ACCESSORIES) SHALL COMPLY WITH THE
FOLLOWING CODES AND STANDARDS:
A. UFC 3-460-01, PETROLEUM FUEL FACILITIES
B. ASME B31.3, PROCESS PIPING
C. OKLAHOMA ADMINISTRATIVE CODE, TITLE 165, CHAPTER 25, UNDERGROUND STORAGE
TANKS
D. OKLAHOMA ADMINISTRATIVE CODE, TITLE 165, CHAPTER 26, ABOVEGROUND STORAGE
TANKS
INSTALL NEW DOUBLE WALL, FUEL STORAGE TANKS WITH REQUIRED VENTS, GAUGES,
SENSORS, AND DECALS. INSTALL THE TANKS ON NEW EQUIPMENT PADS AND PROVIDE
LIQUID SENSORS FOR INTERSTITIAL SPACES OF THE NEW FUEL TANK. CONNECT THE
EXISTING MONITORING SYSTEM TO THE NEW PIPING. INSTALL NEW, STAINLESS STEEL
FUEL PIPING FROM THE TANK TO THE GENERATOR. FUEL LINES SHALL COMPLY WITH
ASME B31.3. INSTALLATION AND IDENTIFICATION SHALL COMPLY WITH UFC 3-460-01
SECTION 9-3 AND NFPA 20, NFPA 30, AND NFPA 31.
INSTALL A NEW, STAINLESS STEEL TANK FILL LINE TO THE EXTERIOR WALL WITH A FILLER
NECK AND SCREW ON CAP THAT WILL ACCEPT A 1" AUTO SHUTOFF DIESEL PUMP NOZZLE.
ADD SIGNAGE WITH THE TANK IDENTIFICATION ABOVE THE HOSE CONNECTION.
DESIGN, PROVIDE, AND INSTALL A NEW ROOFTOP EXHAUST FAN AND ALL NECESSARY
CONTROLS NEEDED TO MEET THE REQUIREMENTS OF NFPA 37.
DESIGN, PROVIDE, AND INSTALL A DIESEL FUEL RETURN PUMP IF NECESSARY TO MEET
PIPING HEAD REQUIREMENTS.
PHASING NOTES
1. CONSTRUCT THE NEW EQUIPMENT PAD AND INSTALL THE NEW TANK INSIDE B3202.
2. DISCONNECT THE EXISTING DAY TANK FROM THE DIESEL GENERATOR. DISCONNECT THE EXISTING
DAY TANK FROM THE MAIN STORAGE TANK'S FUEL LINES AND DEMOLISH IT.
3. MAKE ALL NECESSARY CONNECTIONS BETWEEN THE NEW TANK AND DIESEL GENERATOR .
4. DEMOLISH THE UNDERGROUND MAIN TANK, VAULT, AND ALL PIPING INTO B3202.
ELECTRIC FIRE PUMP DIESEL FIRE PUMP
ELECTRIC JOCKEY PUMP
SUMP PUMP
SURGE
TANK
ROOF EXHAUST
FAN
F O S
F O S
FOS FOS FOS FOS FOS FOS FOS FOS FOS
NK
ER
A
IR
F
OR
CE
B
AS
E, O
KL
AH
OM
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
ED-101
ELECTRICAL DEMOLITION PLAN
SCALE: 1/4" = 1'-0"
CONCEPT
DESIGN
W W
YK
RE
PL
AC
E
V
AU
LT
A
ND
FU
EL
T
AN
K, B
Ju n
TE
PA
-S R
M
C B
AR
BO
ZA
ED-101
S
ST
AR
R
B W
YM
ER
En gr
\D es ig n\
\2
3\
\0
_S up po rt\
0_ 3_
D ra w in gs
EL
EC
TR
IC
AL
DE
MO
LIT
IO
N
PL
AN
07 08
DEMOLITION GENERAL NOTES
A. ALL INFORMATION AND GENERAL ARRANGEMENTS SHOWN ON DRAWINGS ARE DIAGRAMMATIC AND
SHOW DESIGN INTENT FOR INFORMATION ONLY. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND
EXISTING CONDITIONS PRIOR TO DEMOLITION AND CONSTRUCTION.
B. CONTRACT DOCUMENTS WERE PREPARED FROM FIELD SURVEYS, THEY ARE NOT INTENDED TO
DEPICT UNFORESEEN CONDITIONS THAT MAY ADVERSELY AFFECT THE MECHANICAL SYSTEM
DEMOLITION OR INSTALLATION. MECHANICAL CONTRACTOR SHALL FIELD VERIFY EXISTING
CONDITIONS PRIOR TO STARTING ANY WORK.
C. CONTRACTOR SHALL PROVIDE AN ADEQUATE CONSTRUCTION BARRIER TO PROTECT ALL ADJACENT
AREAS FROM DAMAGE DURING DEMOLITION AND CONSTRUCTION.
D. CONTRACTOR SHALL PROTECT CONDUIT, WIRING, UNDERGROUND PIPING AND DEVICES THAT ARE TO
BE MODIFIED AND/OR RE-INSTALLED.
E. ALL DEMOLISHED EQUIPMENT SHALL REMAIN PROPERTY OF THE US GOVERNMENT. CONTRACTOR SHALL CONSULT WITH CONTRACTING OFFICER FOR DIRECTION ON PROPER DISPOSAL OR STORAGE
OF ALL DEMOLISHED EQUIPMENT.
F. COORDINATE ALL SHUTDOWNS AND REQUIRED WORK IN EACH SPACE WITH THE USER/GOVERNMENT A
MINIMUM OF FOUR WEEKS PRIOR TO STARTING ANY WORK.
G. PRIOR TO ALL DEMOLITION WORK, REMOVE ANY FUEL FROM THE TANK AND UNDERGROUND
PIPING; TEST THE SURROUNDING SOIL TO DETERMINE IF THE TANK IS LEAKING AND IF REMEDIATION
IS REQUIRED; INSPECT THE UNDERGROUND PIPE INSULATION FOR ASBESTOS CONTAINING
MATERIAL (ACM).
DEMOLITION KEYED NOTES
DEMOLISH COMPLETELY THE EXISTING UNDERGROUND FUEL TANK WITH ITS ASSOCIATED
TANK TOP CONTAINMENT SUMP, MANHOLES WITH ITS COVER, FUEL SENSOR, FILL PIPE WITH
SPILL BUCKET, RISER , VENT, FUEL CONNECTION PIPES, FITTINGS, SUBMERGED FUEL
TRANSFER PUMP, ETC. DEMOLISH THE UNDERGROUND VAULT.
DEMOLISH PANELS & TRANSFORMERS, AND FEEDERS. ALL CONDUITS CONDUCTORS,
JUNCTION BOXES, SUPPORTS AND OTHER ASSOCIATED COMPONANET WILL BE
DEMOLISHED. EMPTY CONDUITS WILL BE DEMOLISHED.
MAIN
DISCONNECT
600A.
TRANSFORMER
300kVA
MDP
3202-PNL-1
FIRE
CONTROL
PANEL
ATS
EHP1
3202-
PNL-2
ELP1
XFMR XFMR
5kVA 7.5kVA
GENERATOR
ED-101
EXISTING PANEL LAYOUT
OTHER LOADS
B3202
ELECTRIC FIRE PUMP
ELECTRIC JOCKEY PUMP
MAIN DISCONNECT PANEL 2
TRANSFORMERS
ELP1
FIRE ALARM PANEL
ANNUNCIATOR
FUEL TANK
ATS
GENERATOR
EHP1
PANEL 1
BIG VOICE POLE
TRANSFORMER
300kVA
SUMP PUMP
NK
ER
A
IR
F
OR
CE
B
AS
E, O
KL
AH
OM
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
E-101
ELECTRICAL NEW WORK PLAN
SCALE: 1/4" = 1'-0"
CONCEPT
DESIGN
W W
YK
RE
PL
AC
E
V
AU
LT
A
ND
FU
EL
T
AN
K, B
Ju n
TE
PA
-S R
M
C B
AR
BO
ZA
E-101
S
ST
AR
R
B W
YM
ER
En gr
\D es ig n\
\2
3\
\0
_S up po rt\
0_ 3_
D ra w in gs
EL
EC
TR
IC
AL
NE
W W
OR
K
PL
AN
08 08
CONSTRUCTION GENERAL NOTES
A. ALL INFORMATION AND GENERAL ARRANGEMENTS SHOWN ON DRAWINGS ARE DIAGRAMMATIC AND
SHOW DESIGN INTENT FOR INFORMATION ONLY. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND
EXISTING CONDITIONS PRIOR TO DEMOLITION AND CONSTRUCTION.
B. CONTRACT DOCUMENTS WERE PREPARED FROM FIELD SURVEYS, THEY ARE NOT INTENDED TO
DEPICT UNFORESEEN CONDITIONS THAT MAY ADVERSELY AFFECT THE MECHANICAL SYSTEM
DEMOLITION OR INSTALLATION. MECHANICAL CONTRACTOR SHALL FIELD VERIFY EXISTING
CONDITIONS PRIOR TO STARTING ANY WORK.
C. CONTRACTOR SHALL PROVIDE AN ADEQUATE CONSTRUCTION BARRIER TO PROTECT ALL ADJACENT
AREAS FROM DAMAGE DURING DEMOLITION AND CONSTRUCTION.
D. CONTRACTOR SHALL PROTECT CONDUIT, WIRING, UNDERGROUND PIPING AND DEVICES THAT ARE TO
BE MODIFIED AND/OR RE-INSTALLED.
E. COORDINATE ALL SHUTDOWNS AND REQUIRED WORK IN EACH SPACE WITH THE USER/GOVERMENT
A MINIMUM OF FOUR WEEKS PRIOR TO STARTING ANY WORK.
F. ALL SYSTEMS MUST BE TESTED TO VERIFY THE FUNCTIONALITY AND PROPER OPERATION.
NEW WORK KEYED NOTES
PROVIDE AND INSTALL NEW CONDUITS, CONDUCTORS, SUPPORTS AND ANY OTHER
ASSOCIATED COMPONENET FOR THE NEW FUEL DAY-TANK.
PROVIDE AND INSTALL NEW PANELBOARDS, TRANSFORMERS, BREAKERS, CONDUCTORS,
CONDUITS, SUPPORTS AND ANY OTHER ASSOCIATED COMPONENTS.
PROVIDE AND INSTALL NEW INDOOR AND OUTDOOR LED LIGHT FIXTURES FOR THE BUILDING'S
PERMETER AND INTERNAL, BASED ON THE UFC 3-530-01 SPECIFICATIONS AND LIGHTING
LUMENS REQUIRED.
CONTRACTOR MUST PERFORM THE ARC-FLASH STUDY AND BREAKER COORDINATION AS
NEEDED. PROVIDE THE PROPER LABELS.
3 3
ELECTRIC FIRE PUMP
ELECTRIC JOCKEY PUMP
DIESEL FUEL DAY TANK AND PUMP,
FED FROM UNDERGROUND TANK
SOUTH OF BUILDING
MAIN DISCONNECT
SWITCHGEAR
3202-MDP-1
BRANCH PANEL
3202-PNL-1
ATS
XFMR
3202-XFMR-1
EMERGENCY PANEL
EHP1
BIG VOICE POLE
LED WALLPACK
LIGHT FIXTURE
LED WALLPACK
LIGHT FIXTURE
LED WALLPACK
LIGHT FIXTURE
LED WALLPACK
LIGHT FIXTURE
LED WRAPAROUND
SURFACE MOUNT
LIGHT FIXTURE
LED SUSPENDED
LIGHT FIXTURE
LED SUSPENDED
LIGHT FIXTURE
GENERATOR
SUMP PUMP
TRANSFORMER
300kVA
| Sheets and Views |
| G101 |
| 08-230053-E101-E101.pdf |
| Sheets and Views |
| E101 |
| 07-230053-ED101-ED101.pdf |
| Sheets and Views |
| ED101 |
| 02-230053-C101-C100.pdf |
| Sheets and Views |
| C100 |
| 03-230053-CD101-CD101.pdf |
| Sheets and Views |
| CD101 |
| 04-230053-R101-R101.pdf |
| Sheets and Views |
| R101 |
| 05-230053-MD101-MD101.pdf |
| Sheets and Views |
| MD101 |
| 06-230053-M101-M101.pdf |
| Sheets and Views |
| M101 |
| 03-230053-CD101-CD101.pdf |
| Sheets and Views |
| CD101 |
| 05-230053-MD101-MD101.pdf |
| Sheets and Views |
| MD101 |
| 06-230053-M101-M101.pdf |
| Sheets and Views |
| M101 |
| 07-230053-ED101-ED101.pdf |
| Sheets and Views |
| ED101 |
| 08-230053-E101-E101.pdf |
| Sheets and Views |
| E101 |
| 07-230053-ED101-ED101.pdf |
| Sheets and Views |
| ED101 |
| 08-230053-E101-E101.pdf |
| Sheets and Views |
| E101 |
| 02-230053-C100-C100.pdf |
| Sheets and Views |
| C100 |
File details come from the government source that posted it. Updated .