This document is a detailed solicitation specification for the Bureau of Reclamation's Socorro Field Division procurement of a 20-foot High Cube Office Container and a 50 AMP Generator. The solicitation requires a new mobile office container with specific characteristics, including 20-feet length, 8-feet width, 9-feet 6-inches height, two 36-inch windows with security bars, a 1-ton Bard HVAC unit, interior office layout, electrical specifications (8 interior and 2 exterior outlets), and a digital thermostat. The generator must be 50 AMPs, 12KW, and capable of running on diesel or gas with Appleton twist lock connections.
The procurement requires electronic submission of several documents to Mary Maestas, including a delivery schedule (within 14 days of contract award), manufacturer's product data, installation manuals, and warranty information. Delivery is required within 6 months of contract award to the Socorro Field Division in New Mexico, with setup during normal business hours (Monday through Thursday, 7:00am - 5:30pm). The contractor must protect all equipment from damage during transport and delivery, and provide a warranty of at least 12 months. The NAICS code for this procurement is 332311 (Prefabricated Metal Building and Component Manufacturing).
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140R4025Q0079_Amd_0002.pdf | ||
| Sol_140R4025Q0079_Amd_0001.pdf | ||
| 140R4025Q0079_Combined_Synopsis_Solicitation.pdf | ||
| Att2_Pricing_Schedule__MRG_SFD_Mobile_Office_Unit.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bureau of Reclamation- Upper Colorado Region- Albuquerque Area Office
Socorro Field Division- Procurement of One 20-foot, New High Cube Office
& One New 50 AMP Generator
NAICS code is 332311 Prefabricated Metal Building and Component
Manufacturing
Abbreviations, Definitions, and Acronyms
The Bureau of Reclamation commonly used definitions are listed below:
AAO Albuquerque Area Office
BOR Bureau of Reclamation (Reclamation)
CO Contracting Officer
COTR Contracting Officer Technical Representative
FAR Federal Acquisition Regulation
GPM Gallons per Minute
HP Horsepower
LB Pounds (lb or lbs)
PSI Pounds per Square Inch
RPM Revolutions Per Minute
MPH Miles Per Hour
PTO Power take-off
BTU British Thermal Unit
UC Upper Colorado Region
SFD Socorro Field Division
Foreword
The Bureau of Reclamation, Upper Colorado Region, Albuquerque Area Office, Socorro Field
Division (Reclamation) has identified the need for one new 20-foot High Cube Office Container to support ongoing field operations. This mobile office will serve as a secure, weather-resistant workspace essential for site management, safety coordination, and compliance oversight at remote construction locations. Its design will provide reliable shelter during severe weather events and serve as a centralized point for first-response safety efforts. To ensure full operational capability in remote areas, the office will be equipped with a 50 AMP generator capable of powering all electrical functions, including lighting, HVAC systems, communications equipment, and computing devices. This asset will enhance the Socorro Field Division’s ability to perform mission-critical functions—including real-time decision-making, documentation, and coordination—across the Middle Rio Grande Project area.
Specifications
20-foot, New High Cube Office Salient Characteristics
The selected contractor shall supply one new, 20-foot, High Cube Office. The required features include:
Please see the attached picture of a 20-foot Cube Office.
1. 20-foot, New High Cube Office – Salient Characteristics
• Size: 20-feet (Length) x 8-feet (Width) x 9-feet 6-inches (Height)
• Windows: Minimum of two (2) windows
i. Window Size: 36”
1. Window Security: The exterior of each window must be equipped with heavy-duty iron security bars to prevent unauthorized access and enhance protection in remote or unsecured environments.
• HVAC Unit: A New like in Kind 1-ton Bard HVAC with 12,000 BTU cooling and 8KW heat strip controlled by a digital thermostat.
• Bay Doors: Must be permanently removed and professionally enclosed/sealed with matching exterior siding
• Interior Configuration: Must resemble a standard office layout, including finished wall paneling, ceiling, lighting, and space suitable for desks or workstations
• Flooring: Standard flooring that will withstand daily working conditions.
• Electrical
i. Lighting:
1. Light Switch:
a. 1 Light switch only controlling the interior lighting.
b. 1 Light Switch only controlling the exterior lighting
2. Outlets
a. Interior: 8 Outlets
b. Exterior: 2 Exterior with GFCI outlets.
• Load center – 100AMP
• Safety disconnects – 100AMP
2. Minimum Generator Requirements:
• Amps: 50
• KW: 12KW
• Fuel: Diesel or Gas
• Connections: Appleton twist lock Male & Female.
3. Submittal Requirements
• Language: All documents must be prepared in English.
• Accessibility: Submitted documents must comply with Section 508 requirements.
• Labeling: Each submittal must include the contract number, title, and the
Required Submittal Number (RSN).
• Measurement Units: Use U.S. Customary Units.
• Tracking: Assign a unique transmittal tracking number to each submittal.
• Certifications:
o Required certifications must be conducted by a registered professional.
o Manufacturer’s certifications must be signed by an authorized representative.
4. Government Review Process
• Review Time: The Government requires a minimum of 14 days to review and/or approve each submittal or resubmittal unless otherwise specified.
• Additional Time: If extra review time is needed, the Contracting Officer may extend the contract completion date accordingly.
5. Submittal Categories
• A – Action: Requires Government approval.
• I – Informational: Requires Government review and written receipt.
6. Submission Process
• Submit electronic copies for review and approval to Mary Maestas mmaestas@usbr.gov
Submittal Table A
RSN Required Submittal and Description Due Date or Delivery Time Type
S1
The Delivery Schedule (original and any revisions) must include all key elements, including the timeline for deliverables and the
Government’s acceptance of the fully furnished
Mobile Office Unit
Within 14 days after contract award provide
Delivery Schedule and submit Revised Project
Schedule if any dates change more than 5 working days.
A
S2
Manufacturers or Supplier’s Product Data and
General Information for all new equipment and accessories
A minimum of 14 Days prior to purchasing new equipment. A
S3 Manufacturer’s Installation, Operation, Service
& Maintenance, and User Manuals
Provide a minimum of 14 Days prior to final payment.
I
S4 Manufacturer’s Product Warranty Information Furnish with final payment I
Warranty
Equipment supplied under these contract specifications shall be under warranty where applicable to be free of such defects in workmanship as appears under normal use, service, operation, and when owned by the original purchaser. Warranty option should be supplied for the maximum extent beneficial for the Government but cannot be less than 12 months/one year.
mailto:mmaestas@usbr.gov
Delivery and Setup
A. Delivery within 6 months of contract award. It shall be the responsibility of the contractor to arrange delivery to Bureau of Reclamation, Socorro Field Division, Socorro, NM
87801. Socorro Field Division will accommodate delivery needs during normal business hours of Monday thru Thursday 7:00am – 5:30pm. (Special arrangements can be made on
Fridays if given 24hrs notice) Include all costs for shipping, setup, and orientation for
SFD/Reclamation’s personnel. Please contact the following:
Facility Manager (to be named at award)
Bureau of Reclamation
Socorro Field Division
2401 State Road 1, Socorro, NM 87801-2170
B. Successful contractor shall protect all parts/equipment from corrosion, deformation, dents, dings, scratches, breaks, punctures, abrasions, cuts, and other types of damage during storage, handling, transport, and delivery.