This document is Section J, Attachment 067 of federal contract W9128Z-19-R-0002, presenting the Government's estimated work breakdown structure for the TEIS IV Program by functional area for informational and planning purposes only.

The TEIS IV Program encompasses 17 base contract task areas with the following estimated work distribution: Information Systems Integration/Installation represents the largest portion at 24.6%, followed by Information Systems Engineering at 15.8%, Project Services at 11.4%, Engineering and Site Surveys at 12%, and Cybersecurity at 10.1%. Additional significant tasks include Test and Evaluation (7.7%), Project Management (6.2%), and Transitional Operations and Maintenance Service (3.6%). Remaining functional areas account for smaller percentages: Information Technology Technical Services (1.5%), Information Systems Documentation (2.7%), Drafting and Illustration Support (2.1%), Technical Instruction (0.5%), Approved Products List Certification (0.1%), Systems/Network Administration (0.5%), Software (0.7%), Systems Analysis (0.2%), and Technology Demonstration and Rapid Prototype Support (0.3%). This breakdown represents the Government's best estimate and is provided solely for contractor planning and proposal development purposes.

View the file

Other files

File Type Posted
Section J Attachments.xlsx XLSX spreadsheet
ATT0020 TEIS IV - Draft Labor Category Descriptions.docx DOCX document
ATT0063 Past Performance Reference List (PART A).pdf PDF
ATT0066 Small Business Participation Commitment Document (SBPCD).docx DOCX document
ATT0068 Estimated Work Breakout.pdf PDF
ATT0072 DD254 Appendix B- ICD-503.pdf PDF
ATT0052 Sample Task-Satellite Communications.docx DOCX document
ATT0060 Sample Task-Technologies.docx DOCX document
ATT0062 Past Performance Information Summary (PART B).docx DOCX document
ATT0065 CONUS High CONUS OCONUS Labor Rates.xlsx XLSX spreadsheet
Solicitation - W91RUS27RA001.pdf PDF
ATT0009 2.5 item n DISN-EN ICAN-DI Standards Specifications v1_09f FINAL.pdf PDF
ATT0010 2.5 item f USAISEC Cyber Security Assessment and Security Engineering Manual V2.1.pdf PDF
ATT0013 CDRL A003.pdf PDF
ATT0016 CDRL A006.pdf PDF
ATT0025 1.6.1C_ESS Ports and Protocols List.xls XLS spreadsheet
ATT0027 1.6.2B_ITV CONOPS Diagrams.pdf PDF
ATT0036 CDRL SE006 Daily Project Report.pdf PDF
ATT0037 CDRL SE007 Out-Brief.pdf PDF
ATT0041 CDRL SE012 Test Data.pdf PDF
ATT0042 CDRL SE013 Data Analysis Work Products.pdf PDF
ATT0043 CDRL SE014 IAVA Compliance Report.pdf PDF
ATT0046 CDRL SE017 Documentation Evaluation Report.pdf PDF
ATT0047 CDRL SE018 POAM.pdf PDF
ATT0048 CDRL SE019 Executive Summary.pdf PDF
ATT0049 CDRL SE021 Risk Calculator.pdf PDF
ATT0050 CDRL SE022 SCAR.pdf PDF
ATT0063 Past Performance Reference List (PART A).pdf PDF
ATT0067 Joint VentureTeaming Informaiton.xlsx XLSX spreadsheet
ATT0075 DD254 Appendix B- Army Handbook for SCI Contracts.pdf PDF
ATT0005 2.5 item d SIPRNET_Tech_Impl_Criteria V7 - Final 12Nov13.pdf PDF
ATT0011 CDRL A001.pdf PDF
ATT0014 CDRL A004.pdf PDF
ATT0017 CDRL A007.pdf PDF
ATT0018 CDRL A008.pdf PDF
ATT0019 TEIS IV QASP.pdf PDF
ATT0020 TEIS IV - Draft Labor Category Descriptions.docx DOCX document
ATT0021 item a TEIS IV - DD254.pdf PDF
ATT0021 item c TEIS IV - D254 - Contract AT-OPSEC Security Review Cover Sheet.pdf PDF
ATT0023 1.6.1A_ESS Network HW-SW List.xlsx XLSX spreadsheet
ATT0026 1.6.2A_ITV HW-SW List.xlsx XLSX spreadsheet
ATT0031 1.6.3C_NC Ports and Protocols List.xls XLS spreadsheet
ATT0033 CDRL SE003 Pre Deployment Meeting.pdf PDF
ATT0038 CDRL SE008 Post Deployment Meeting.pdf PDF
ATT0044 CDRL SE015 STIG Compliance Report.pdf PDF
ATT0045 CDRL SE016 SE Assessment Report.pdf PDF
ATT0058 CDRL TS29 Trip Report.pdf PDF
ATT0059 CDRL TS30 System Design Plan (SDP).pdf PDF
ATT0070 Fairfax VA WD 2015-4281 rev 37.pdf PDF
ATT0074 DD254 Appendix B- DoDM 5105 Vol 1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section J, Attachment 067 W9128Z-19-R-0002

ISEC Estimation of Work Break-Out by Functional Area For Informational Purposes Only

The Government estimates the following breakout of work on the TEIS IV Program according to the functional areas of the TEIS IV Performance Work Statement. This is for informational purposes and represents the Government’s best estimate. This information is provided for planning purposes only.

Work Breakdown Structure

Base Contract Tasks

TEIS IV

Work

Percentage

3.2 Engineering and Site Surveys

3.3 Information Systems Engineering

3.4 Cybersecurity

3.5 Approved Products List Certification

3.6 Information Systems Integration/Installation

3.7 Test and Evaluation

3.8 Software

3.9 Transitional Operations and Maintenance Service

3.10 Information Technology Technical Services

3.11 Information Systems Documentation

3.12 Technical Instruction

3.13 Drafting and Illustration Support

3.14 Project Services

3.15 Project Management

3.16 Systems / Network Administration

3.17 Systems Analysis

3.18 Technology Demonstration and Rapid Prototype Support

12%

15.8%

10.1%

0.1%

24.6%

7.7%

0.7%

3.6%

1.5%

2.7%

0.5%

2.1%

11.4%

6.2%

0.5%

0.2%

0.3%

File details come from the government source that posted it. Updated .