This is a DD Form 1423-1, Contract Data Requirements List (CDRL), a federal contracting form used to specify data deliverables that contractors must provide to the government during contract performance. The form establishes requirements for a single data item identified as SE018: Plan of Action and Milestones (POA&M). The requiring office is USAISEC, with the contract reference Sample Task 1 para 3.1.3, 3.1.6. The data item is categorized as "Other" and does not require DD 250 inspection/acceptance or draft approval.

The POA&M deliverable must be submitted in Microsoft Word or Excel format, Arial font size 12, black text. The document must be technically sound, logically organized, coherent, and free of typographical and grammatical errors, with a template available from USAISEC if needed. Delivery method requires one soft copy submitted to the Technical Monitor, Contracting Officer's Representative (COR), and Government Project Lead via eMAS and email or CD/DVD, with the subject line fully identifying the document. The document must not be locked or protected to allow government editing post-delivery. The draft is due no later than 10 business days after task completion, with a final delivery due three business days after contractor receipt of government comments. If comments are not provided within two business days of draft delivery, the draft automatically becomes final. Distribution includes the COR, Technical Manager, and Government Project Lead, with three total copies required.

View the file

Other files

File Type Posted
ATT0021 item a TEIS IV - DD254.pdf PDF
ATT0021 item b TEIS IV - DD254 Item 13 Continuation Page.pdf PDF
ATT0076 DD254 Appendix B- Army Handbook for SCI Contracts.pdf PDF
Solicitation Amendment W91RUS27RA0010001 SF 30.pdf PDF
Solicitation Amendment - W91RUS27RA0010001 Conformed Copy.pdf PDF
Questions Spreadsheet.xlsx XLSX spreadsheet
ATT0019 TEIS IV QASP.pdf PDF
ATT0021 item c TEIS IV - D254 - Contract AT-OPSEC Security Review Cover Sheet.pdf PDF
ATT0022 Sample Task Cybersecurity Pkg Update.docx DOCX document
ATT0064 Past Performance Questionnaire.pdf PDF
ATT0064 Past Performance Questionnaire.docx DOCX document
Section J Attachments.xlsx XLSX spreadsheet
ATT0002 2.5 item a CO 2-2023 USAISEC OPSEC Plan.pdf PDF
ATT0003 2.5 item b 24-004 USAISEC Drafting Guide 12 March 2024.pdf PDF
ATT0004 2.5 item c 18-033 USAISEC VIS Software Design Criteria - Final 14 Mar 18.pdf PDF
ATT0006 2.5 item e 13-033-1 Instructional Guide for Developing EIPs-Final_4JUN13.pdf PDF
ATT0012 CDRL A002.pdf PDF
ATT0015 CDRL A005.pdf PDF
ATT0024 1.6.1B_ESS Network Diagram.pdf PDF
ATT0029 1.6.3A_NC HW-SW List.xlsx XLSX spreadsheet
ATT0030 1.6.3B_NC Block Diagram Layout.pdf PDF
ATT0040 CDRL SE011 eMASS upload-download.pdf PDF
ATT0052 Sample Task-Satellite Communications.docx DOCX document
ATT0054 CDRL TS25 EIP.pdf PDF
ATT0056 CDRL TS27 Systems Acceptance Test Plan.pdf PDF
ATT0061 CDRL TS08 Facility Wiring Design Criteria (FWDC).pdf PDF
ATT0062 Past Performance Information Summary (PART B).docx DOCX document
ATT0064 Past Performance Questionnaire.pdf PDF
ATT0065 CONUS High CONUS OCONUS Labor Rates.xlsx XLSX spreadsheet
ATT0066 Small Business Participation Commitment Document (SBPCD).docx DOCX document
ATT0071 DD254 Appendix B- ICD-503.pdf PDF
ATT0001 TEIS IV Revised PWS.pdf PDF
ATT0007 2.5 item i UFC 4-140-03.pdf PDF
ATT0008 2.5 item j I3A Technical Criteria (for OSP Only) November 2017 - Copy.pdf PDF
ATT0021 item b TEIS IV - DD254 Item 13 Continuation Page.pdf PDF
ATT0022 Sample Task Cybersecurity Pkg Update.docx DOCX document
ATT0028 1.6.2C_ITV Ports and Protocols List.xls XLS spreadsheet
ATT0032 CDRL SE001 Weekly Project Report.pdf PDF
ATT0034 CDRL SE004 Test Readiness Review Questionnaire.pdf PDF
ATT0035 CDRL SE005 In-Brief.pdf PDF
ATT0039 CDRL SE009 DCAFS.pdf PDF
ATT0051 CDRL SE023 SCA-V Rec Memo.pdf PDF
ATT0053 CDRL TS24 Site Survey Report.pdf PDF
ATT0055 CDRL TS26 Project Concurrence Memo.pdf PDF
ATT0057 CDRL TS28 Installation Schedule.pdf PDF
ATT0060 Sample Task-Technologies.docx DOCX document
ATT0068 Estimated Work Breakout.pdf PDF
ATT0069 Cochise County AZ WD 2015-5719 rev 28.pdf PDF
ATT0072 DD254 Appendix B- ICD-704.pdf PDF
ATT0073 DD254 Appendix B- IC Tech Spec-for ICD_ICS 705.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: SE018
title: Plan of Action and Milestones (POA&M)
sub:
auth: N/A
ref: Sample Task 1 para 3.1.3, 3.1.6
req_ofc: USAISEC
dd250: N/A
appcode: N/A
dist:
freq: See Blk 16
asof:
firstsub: See Blk 16
subsub: See Blk 16
addressee1: COR
draft1: 1
reg1: 1
repro1:
addressee2: TM
draft2: 1
reg2: 1
repro2:
addressee3: Gov Project Lead
draft3: 1
reg3: 1
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 3
total_reg: 3
total_repro: 0
remarks: Date of first and subsequent submissions: Delivery of the DRAFT is due no later than 10 business days after completion of the associated task. If returned, a follow-on DRAFT is due no later than 3 business days after Contractor receipt of the Government’s comments. If comments are not provided within 2 business days of a DRAFT delivery, that DRAFT will become the FINAL.

Format: Microsoft Word or Excel, Arial, font size 12, black.

Content: Provide deliverable that is technically sound, logically organized, coherent, and free of typographical and grammatical errors. Template can be provided by USAISEC. If template is not provided, the POA&M shall be delivered according to the system owner’s format within the Enterprise Mission Assurance Support Service (eMASS).

Method of delivery: One (1) soft copy of the POA&M shall be submitted to the Technical Monitor, Contracting Officer’s Representative (COR) and Government Project Lead via eMASS and e-mail or CD/DVD. The POA&M shall be fully identified and referenced in the subject line of the email message. The document shall not be locked or protected in any fashion that would prevent text to be copied or edited by the Government after delivery.

group:
total_price:
prep_name:
line_item:
exhibit:
xtdp: Off
xtm: Off
othercat: X
system:
ctr_no:
contr:
remarksb:
Page2: 2
Reset:
prep_date:
app_by:
app_date:
Page: 1
of_pages: 3
app: Adobe Professional 8.0