ATT0064 Past Performance Questionnaire.pdf

PDF 181 KB Posted

Attached to
TOTAL ENGINEERING AND INTEGRATION SERVICES (TEIS) IV On-Ramp Opportunity
Solicitation number
W91RUS27RA001
Issued by

About this file

This is a Past Performance Questionnaire template issued by the Army Contracting Command (ACC) Aberdeen Proving Ground – Huachuca Division for solicitation W9128Z-20-R-0001. The document is designed to collect structured feedback from government officials and contracting personnel regarding a contractor's or teaming partner's performance on previous contracts or programs.

The questionnaire requires evaluators to assess contractor performance across six primary elements using a six-level rating scale: Exceptional (E), Very Good (V), Satisfactory (S), Marginal (M), Unsatisfactory (U), and Not Applicable (N). The assessment categories include Quality of Product/Service, Schedule, Cost Control, Business Relations, Management of Key Personnel, and Subcontractor Management. Evaluators must provide narrative comments supporting their ratings and address termination history, adherence to technical and management approaches, overall contractor strengths and weaknesses, and whether they would recommend re-award. The questionnaire also collects contractor identification information, evaluator contact details, contract metrics, and product/service descriptions. Completed questionnaires must be submitted to Ms. Adelle Kostur at the ACC Huachuca Division no later than the proposal due date, with submission options via mail or email to facilitate source selection evaluation.

View the file

Other files

File Type Posted
Section J Attachments.xlsx XLSX spreadsheet
ATT0020 TEIS IV - Draft Labor Category Descriptions.docx DOCX document
ATT0063 Past Performance Reference List (PART A).pdf PDF
ATT0066 Small Business Participation Commitment Document (SBPCD).docx DOCX document
ATT0068 Estimated Work Breakout.pdf PDF
ATT0072 DD254 Appendix B- ICD-503.pdf PDF
ATT0052 Sample Task-Satellite Communications.docx DOCX document
ATT0060 Sample Task-Technologies.docx DOCX document
ATT0062 Past Performance Information Summary (PART B).docx DOCX document
ATT0065 CONUS High CONUS OCONUS Labor Rates.xlsx XLSX spreadsheet
Solicitation - W91RUS27RA001.pdf PDF
ATT0009 2.5 item n DISN-EN ICAN-DI Standards Specifications v1_09f FINAL.pdf PDF
ATT0010 2.5 item f USAISEC Cyber Security Assessment and Security Engineering Manual V2.1.pdf PDF
ATT0013 CDRL A003.pdf PDF
ATT0016 CDRL A006.pdf PDF
ATT0025 1.6.1C_ESS Ports and Protocols List.xls XLS spreadsheet
ATT0027 1.6.2B_ITV CONOPS Diagrams.pdf PDF
ATT0036 CDRL SE006 Daily Project Report.pdf PDF
ATT0037 CDRL SE007 Out-Brief.pdf PDF
ATT0041 CDRL SE012 Test Data.pdf PDF
ATT0042 CDRL SE013 Data Analysis Work Products.pdf PDF
ATT0043 CDRL SE014 IAVA Compliance Report.pdf PDF
ATT0046 CDRL SE017 Documentation Evaluation Report.pdf PDF
ATT0047 CDRL SE018 POAM.pdf PDF
ATT0048 CDRL SE019 Executive Summary.pdf PDF
ATT0049 CDRL SE021 Risk Calculator.pdf PDF
ATT0050 CDRL SE022 SCAR.pdf PDF
ATT0063 Past Performance Reference List (PART A).pdf PDF
ATT0067 Joint VentureTeaming Informaiton.xlsx XLSX spreadsheet
ATT0075 DD254 Appendix B- Army Handbook for SCI Contracts.pdf PDF
ATT0005 2.5 item d SIPRNET_Tech_Impl_Criteria V7 - Final 12Nov13.pdf PDF
ATT0011 CDRL A001.pdf PDF
ATT0014 CDRL A004.pdf PDF
ATT0017 CDRL A007.pdf PDF
ATT0018 CDRL A008.pdf PDF
ATT0019 TEIS IV QASP.pdf PDF
ATT0020 TEIS IV - Draft Labor Category Descriptions.docx DOCX document
ATT0021 item a TEIS IV - DD254.pdf PDF
ATT0021 item c TEIS IV - D254 - Contract AT-OPSEC Security Review Cover Sheet.pdf PDF
ATT0023 1.6.1A_ESS Network HW-SW List.xlsx XLSX spreadsheet
ATT0026 1.6.2A_ITV HW-SW List.xlsx XLSX spreadsheet
ATT0031 1.6.3C_NC Ports and Protocols List.xls XLS spreadsheet
ATT0033 CDRL SE003 Pre Deployment Meeting.pdf PDF
ATT0038 CDRL SE008 Post Deployment Meeting.pdf PDF
ATT0044 CDRL SE015 STIG Compliance Report.pdf PDF
ATT0045 CDRL SE016 SE Assessment Report.pdf PDF
ATT0058 CDRL TS29 Trip Report.pdf PDF
ATT0059 CDRL TS30 System Design Plan (SDP).pdf PDF
ATT0070 Fairfax VA WD 2015-4281 rev 37.pdf PDF
ATT0074 DD254 Appendix B- DoDM 5105 Vol 1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section J Attachment 063 W9128Z-20-R-0001

PAST PERFORMANCE QUESTIONNAIRE

I. COMPLETION OF QUESTIONNAIRE: The Offeror or teaming partner proposing on this acquisition has requested that your organization complete this Past Performance Questionnaire on its behalf. Please provide frank, concise comments regarding the Offeror’s performance on the contract /program identified below. For assistance with this form or to request an electronic copy please notify the Contract Specialist listed at the address below. Handwritten responses will be accepted. If you need more space than provided, please attach additional pages or write on the back. Please include only relevant information.

Responses will be treated as source selection sensitive information. This information shall be submitted no later than the proposal due date. Return the completed questionnaire either by mail or email to the following address:

Army Contracting Command (ACC) Aberdeen Proving Ground (APG) – Huachuca Division ATTN: Ms. Adelle Kostur 2133 Cushing Street, Bldg. 61801 Room 2637 Ft. Huachuca, AZ 85613-7070 E-mail: adelina.j.kostur.civ@mail.mil and usarmy.huachuca.cecom.mbx.teis-iv-usaisec@mail.mil

(Note: For tracking purposes, in order to match up all questionnaires received to the Prime Offeror (Contractor), include the name of the Prime Offeror with the questionnaire submission. This company name may or may not be affiliated to the referenced contract).

II. EXPLANATION OF CODES:

CODE PERFORMANCE LEVEL

E EXCEPTIONAL – Performance meets contractual requirements and exceeds many requirements to the Government’s benefit. The contractual performance of the element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

V VERY GOOD – Performance meets contractual requirements and exceeds some requirements to the Government’s benefit. The contractual performance of the element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

S SATISFACTORY – Performance meets contractual requirements. The contractual performance of the element being assessed contains some minor problems for which corrective actions taken by the contractor appear or were mailto:usarmy.huachuca.cecom.mbx.teis-iv-usaisec@mail.mil

Section J Attachment 063 W9128Z-19-R-0002 satisfactory.

M MARGINAL – Performance does not meet some contractual requirements.

The contractual performance of the element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions or the contractor’s proposed actions appear only marginally effective or were not fully implemented.

U UNSATISFACTORY – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

N NOT APPLICABLE – Unable to provide a score. Performance in this area not applicable to the effort assessed.

III. CONTRACTOR IDENTIFICATION:

Contractor Name:

Prime or Subcontractor:

Contract Number:

Issuing Contracting Office:

Period of Performance:

Award Value (inclusive of base and all years):

Current Estimated Contract Dollar Amount (do not include unexercised options):

Describe Product/Service Acquired:

IV. EVALUATOR INFORMATION:

Name:

Organization:

Phone Number:

E-Mail Address:

Relation to Program:

(e.g. Contracting Officer, Contract Specialist/Administrator, Contracting Officer's Representative, etc.)

V. TERMINATION HISTORY:

1. Has this contract been partially or completely terminated for default or convenience?

YES NO DEFAULT CONVENIENCE

If yes, explain (e.g., inability to meet cost, performance, or delivery schedules).

2. Are there any pending terminations? YES NO

If yes, explain and indicate the status.

VI. ASSESSMENT ELEMENTS: Place an “X” in the appropriate box next to the letter for each item on the questionnaire. Narrative comments supporting the rating are highly desirable to accurately assess the performance of the contractor. Choose the most relevant performance level code that best reflects the contractor’s performance in each area. Attach additional pages if there is insufficient space in the comment space.

1. QUALITY OF PRODUCT/SERVICE Assess the Contractor’s conformance to contract requirements (e.g., quality of information technology support services, phase-in support, etc.) Does the contractor provide qualified personnel, necessary resources, and quality control? Does the contractor meet established guidelines and policies for safety and security? Does the contractor provide accurate reports/data? Did the product/service meet the required level of quality?

What degree of Government technical direction was required to solve problems that arise during performance?

E V S M U N

2. SCHEDULE Assess the timeliness of the contractor against the completion of the contract, task order, milestone, delivery schedules, and administrative requirements (e.g., efforts that contribute to or affect the schedule variance). This assessment of the Contractor’s adherence to the required delivery schedule should include the Contractor’s efforts during the assessment period that contribute to or affect the schedule variance. This element applies to contract closeout activities as well as contract performance. Instances of adverse actions such as the assessment of liquidated damages or issuance of Cure Notices, Show Cause Notices, and Delinquency Notices are indicators of problems which may have resulted in variance to the contract schedule and should, therefore, be noted in the evaluation.

E V S M U N

3. COST CONTROL Assess the Contractor’s effectiveness in forecasting, managing, and controlling contract costs. Include, as applicable, the following information: Does the Contractor keep within the total estimated cost (what is the relationship of the negotiated costs and budgeted costs to actuals)? Did the Contractor do anything innovative that resulted in cost savings? Were billings current, accurate and complete? Are the Contractor’s budgetary internal controls adequate? Are Contractor requests for employee overtime, proposals for equitable adjustments and special projects reasonable, etc.)?

E V S M U N

4. BUSINESS RELATIONS Assess the integration and coordination of all activity needed to execute the contract, specifically the timeliness, completeness, and quality of problem identification, corrective action plans, proposal submittals, the Contractor’s history of reasonable and cooperative behavior (to include timely identification of issues in controversy), customer satisfaction, timely award and management of subcontracts. Include as applicable, information on the following:

Is the Contractor oriented toward the customer? Is the interaction between the Contractor and the Government satisfactory or does it need improvement?

Include the adequacy of the Contractor’s accounting, billing, and estimating systems and the Contractor’s management of Government Furnished Property (GFP) if a substantial amount of GFP has been provided to the Contractor under the contract? Address the timeliness of awards to subcontractors and management of subcontractors, including subcontractor costs. Consider efforts taken to ensure early identification of subcontract problems and the timely application of corporate resources to preclude subcontract problems from impacting overall prime contractor performance.

E V S M U N

5. MANAGEMENT OF KEY PERSONNEL Assess the Contractor’s performance in selecting, retaining, supporting, and replacing key personnel when necessary. How well did the Contractor match the qualifications of the key position(s), as described in the contract, with the person who filled the key position? Is the Contractor providing the site manager/leader or key employee(s) with the necessary resources and support to adequately perform their work?

Does the Contractor adequately address and make efforts to resolve issues/problems concerning the site manager/leader or key employees? Is the Contractor able to solve contract performance problems without extensive guidance from government counterparts, etc.)?

E V S M U N

6. SUBCONTRACTOR MANAGEMENT Assess whether the Contractor provided maximum practicable opportunity for Small Business? Does the Contractor provide effective subcontractor management?

E V S M U N

7. Did the Contractor adhere to its technical and management approach?

YES NO

If no, explain what was different.

8. Please comment on any other Contractor information you consider relevant to this evaluation.

9. Identify the Contractor’s overall strengths and weaknesses.

10. Given the choice, would you award to this Contractor again?

YES NO