Att L-3 Vol 3 PP-2 Con Data.xlsx
XLSX spreadsheet 22 KB Posted
- Solicitation number
- N6852025R0001
About this file
Attachment L-3 is an Excel template with detailed instructions for completing Table PP-2 Past Performance Contract Data for a federal contract opportunity. The template provides comprehensive guidance for contractors to document their past performance, requiring them to list relevant prime, joint venture, and subcontractor contracts performed within three years of the proposal due date.
Key instructions include specifying contract details such as contract number, type, performance period, total and annualized contract value, CAGE code, procuring agency, and work description. Contractors must provide at least two points of contact who can validate performance, including government Procuring Contracting Officer (PCO), Administrative Contracting Officer (ACO), Program Manager, and an additional contact. The template is specifically designed for the N6852025R0001 solicitation for Enterprise Level Logistics and Engineering Technical Support Services, requiring precise documentation of past performance relevant to naval aircraft, weapons systems, and support equipment engineering services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Statement of Work.Rv1.pdf | ||
| P6_Cost_Summary Spreadsheet.Rv1.xlsx | XLSX spreadsheet | |
| N6852025R0001_Final RFP_LOGEN II_AMEND 0002.pdf | ||
| Attachment Exhibit A CDRLs.Rv1.pdf | ||
| Final RFP N6852025R0001_QandA Part 1Answers_6.6.25.pdf | ||
| Attachment P1-Final RFP N6852025R0001_QandA.xlsx | XLSX spreadsheet | |
| N6852025R0001_Final RFP_LOGEN II_AMEND 0001.pdf | ||
| Attachment P6_Cost_Summary Spreadsheet.xlsx | XLSX spreadsheet | |
| N6852025R0001_Final RFP_LOGEN II.pdf | ||
| GFPAttachment.xlsx | XLSX spreadsheet | |
| B-1 Composite Rates_final RFP.xlsx | XLSX spreadsheet | |
| Att L-1 Vol 1 KA Tables.xlsx | XLSX spreadsheet | |
| Att L-2 Vol 3 PPQ.docx | DOCX document | |
| Attachment Exhibit A- DD1423 LOGEN II Draft CDRLs A001-A012.pdf | ||
| Attachment Exhibit B- DD1423 LOGEN II Draft CDRLs B001-B006.pdf | ||
| DD 254.pdf | ||
| LOGEN II SOW final.pdf | ||
| Attachment P7_ Annual Fully Burdened Labor .xlsx | XLSX spreadsheet |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions ** NOTE: This tab contains instructions for completing Table PP-2**
Instructions: The Offeror shall complete Table PP-2 (Past Performance Contract Data) for each relevant contract, delivery order, or task order number, or those relevant portions whose performance is within three years of the proposal due date. Order the excel worksheets in the following sequence: 1. List all relevant Prime (P) contracts sequentially, from most relevant to least relevant; 2. List all Joint Venture Team Member (T) contracts, sequentially, from most relevant to least relevant; and 3. List all relevant Subcontracts (S), sequentially, from most relevant to least relevant.
Cell C2 Specify the name of the Prime Offeror
Cell C3 Specify the name of the entity who performed the work on the contract reference
Cell C4 Specify the contract reference used in the Executive Summary Table ES-2, Relevant Contract Summary (e.g., Prime (P1...Pn) Subcontractor (S1...Sn), or Joint Venture Team Member (T1...Tn)).
Cell C5 Provide the title of the referenced contract
Cell C6 Provide the contract number (e.g., N00019-10-C-1234) for the contract reference. The Offeror shall complete Table PP-2 for only relevant contracts, or those relevant portions of contracts, that are within 3 years of the proposal due date.
Cell C7 Specify the contract type for the contract reference (e.g., FFP, CPFF, CPIF, FPIF).
Cell C8 If there are Delivery Orders or Task Order (e.g. 0001) Numbers under a contract, the Offeror shall create an individual tab and complete a unique Table PP-2 Past Performance Contract Data for each DO or TO number or those portions of each DO or TO number, whose performance is within 3 years of the proposal due date (i.e., this box shall contain only one DO or TO). The Offeror may only put multiple DO or TO numbers in this box if they can be grouped because they are the same work effort and are evaluated under the same CPAR.
Cell C9 If acting as a subcontractor for the contract reference in Cell C6, identify the Subcontract Number/PO Number associated with the prime contract identified in Cell C5 above. Additionally, identify the name of the prime contractor.
For example, PO# 12345 (Sub to XXX; prime contract identified above).
Cell C10 Name of procuring agency (or customer) for the contract reference
Cell C11 Describe the product provided or service performed for the contract reference
Cells C12 - C13 List the period of performance start date and end date using the following format: MM/DD/YYYY. Please ensure that performance is within 3 years of the proposal due date.
Cell C14 Provide the 5 digit CAGE code of contractor identified in Cell C3. The CAGE code for the contract reference in Cell C6 should be the same as the CAGE code for the contractor identified in Table ES-1 Offeror Summary.
Cell C15-C16 Specify the total and Annualized contract value of the contract reference in US dollars. Please use the following format $XXX,XXX,XXX.
Cell C17 Acquisition Phase(s) of Contract, if applicable (e.g., Production, SDD)
Cell C18 Provide a brief description of the work performed and/or the entity's role for this contract reference, and describe how this is relevant to this RFP. Indicate whether the contractor referenced in Cell C3 performed as the Prime or as a subcontractor.
Prime = had the contract directly with the procuring agency.
Subcontractor = to another contractor who had the contract directly with the agency
Cells C19 - C21 Provide the applicable PWS/SOW (Annex E) paragraph numbers from the contract reference to show which portion(s) of the contract reference are relevant to this RFP.
Cell C22 Provide the latest date a CPAR was completed.
Cell C23 If questionnaires were sent, identify the date past performance questionnaires were sent.
Cells C25 - C28 List the POC's name and title, phone number, and email address for the contract reference. Please validate information as current prior to sending PPQs. Please provide at least two POCs.
Past Performance
&"Times New Roman,Regular"&12Instructions
P1
| Table PP-2 Past Performance Contract Data | ||
| 1 | Offeror Name | |
| 2 | Entity Name | |
| 3 | Contract Reference | |
| 4 | Title of Contract | |
| 5 | Contract Number | |
| 6 | Contract Type | |
| 7 | Relevant Delivery/Task Order Numbers (if applicable) | |
| 8 | Subcontract Number/PO Number | |
| 9 | Procuring agency | |
| 10 | Description of product or service | |
| 11 | Period of performance - Start Date MM/DD/YYYY | |
| Period of performance - End Date MM/DD/YYYY | ||
| 12 | CAGE Code (if not the same as Offeror, explain) | |
| 13 | Dollar value of contract (Total) | |
| Dollar value of contract (Annualized) | ||
| 14 | Acquisition Phase | |
| 15 | Brief Work Description and/or Program Responsibility for this past contract. | |
| 16 | a. PWS/SOW paragraphs from contract reference associated with Contractor Support Services for Type Model Series similar to Section J Attachment 3 (Statement of Work,section 1.0 (Background)) | |
| b. PWS/SOW paragraphs from contract reference associated with number of man hours. | ||
| c. PWS/SOW paragraphs from contract reference associated with number of aircraft supported | ||
| 17 | Date of last completed CPARs MM/DD/YYYY | |
| 18 | Date past performance questionnaires were sent. MM/DD/YYYY | |
| 19 | Points of Contact who can validate performance on the past performance contract, specific delivery order or task order number referenced above. | |
| 20 | Gov't PCO | Name: |
Phone:
Email:
21 Gov't ACO Name:
Phone:
Email:
22 Gov't PM Name:
Phone:
Email:
23 Other POC: Name:
Title:
Phone:
Email:
&KFF0000Attachment L-3 Table PP-2 Past Performance Contract Data &KFF0000Solicitation #
&"Times New Roman,Regular"&12PP-1 Past Performance Contract Data
File details come from the government source that posted it. Updated .