ATT K No Work Confirmation Form.pdf
PDF 100 KB Posted
- Attached to
- Runway 4R-22L Rehabilitation
- Solicitation number
- 25-02696
- Issued by
- Michigan
About this file
The document is a "No Work Confirmation Form" from the Detroit Metro • Willow Run Wayne County Airport Authority, designed to confirm a contractor or subcontractor's lack of work during a specific payroll period. This form template includes designated fields for date, contractor/subcontractor information, contract number, contract description, specific payroll period dates, and a signature line for the contractor's representative.
While the form itself does not contain completed information, it is associated with the Runway 4R-22L Rehabilitation project at Detroit Metropolitan Wayne County Airport. This project involves removing and replacing approximately 31,000 square yards of Portland cement concrete runway pavement, including airfield lighting, jointing, grooving, maintenance of traffic, and pavement marking. The project is subject to Airport Authority Prevailing Wages Requirements, indicating compliance with local labor standards and potentially involving union or regulated wage scales for workers.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date
Contractor / Subcontractor
Contract #
Contract Description
Confirming no work for payroll period commencing on and ending on
Name and Title
| Text2: |
| Text3: |
| Text4: |
| Text8: |
| Date10_af_date: |
| Date12_af_date: |
| Date13_af_date: |
File details come from the government source that posted it. Updated .