Att E - Price Form.xlsx

XLSX spreadsheet 25 KB Posted

Attached to
Runway 4R-22L Rehabilitation
Solicitation number
25-02696
Issued by
Michigan

About this file

The document is a Price Form (Attachment E) for RFB #241298, issued by the Wayne County Airport Authority for the Runway 4R-22L Rehabilitation project at Detroit Metropolitan Wayne County Airport. The project involves removing and replacing approximately 31,000 square yards of Portland cement concrete runway pavement, including airfield lighting, jointing, grooving, maintenance of traffic, and pavement marking. The bid form includes 51 line items covering various aspects of the project, such as contractor quality control, erosion control, mobilization, safety measures, and specific pavement and electrical work.

The pricing structure is all-inclusive, with contractors expected to factor in all expenses including labor, travel, materials, and equipment. The total base bid is $535,000.00, with significant allowances for items like contract security services ($145,000), WCAA operational support ($100,000), and a concrete batch plant ($250,000). The Airport Authority reserves the right to adjust estimated quantities, and unit prices will be used for any additions or deductions. Travel expenses, including airfare and accommodations, are the contractor's responsibility and will not be reimbursed. The bid emphasizes that failure to complete the form correctly by the bid deadline will result in the bid being deemed non-responsive and rejected.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Form - Attachment E

ATTACHMENT E

RFB #241298 - Runway 4R-22L Rehabilitation

Failure to complete this form and submit by the Bid Deadline shall result in your Bid being deemed nonresponsive and rejected without any further evaluation.

PRICING: The price bid shall be all inclusive which means that all related expenses, including labor, travel, mileage, deliverables, tools, materials, equipment, supplies, etc. shall be factored into the unit prices below. Travel, including airfare, hotel, meals, and any other related accommodations are the Contractors responsibility and will not be reimbursed or paid for by the Airport Authority. The Airport Authority reserves the right to change the Estimated Quantities and their respective Item Sub-total and Total Price based on the requirements of the Project. Unit Prices provided on this Price Form will be the prices used for any quantity additions and deductions required. Where there is a discrepancy on a Bidder's submitted Price Form between the Unit Price and Item Subtotal, the Unit Price shall prevail and be used as the basis for calculating the Item Subtotal and Bid Price. The Bidder must complete the Price Form either by hand writing in ink or typing prices in the spaces provided.

BASE BID
NO.ITEMDESCRIPTIONUNITUNIT PRICEQUANTITYSUBTOTAL
1C-100-15.1Contractor Quality Control Program (CQCP) (Max 2%)LS1$ - 0
2C-102-5.1Installation and Removal of Silt FenceLF1,700$ - 0
3C-102-5.2Temporary Catch Basin Sediment TrapEA4$ - 0
4C-102-5.3Standard Inlet Erosion Protection (Sand Bag)EA75$ - 0
5C-102-5.4NPDES and Soil Erosion and Sedimentation Control Permit and Inspection FeeALLOW$ 10,000.001$ 10,000.00
6C-105-5.1Mobilization (10% Max)LS1$ - 0
7SX-101-22.1Baseline Project ScheduleLS1$ - 0
8SX-120-4.1Airport Safety and Security (7% Max)LS1$ - 0
9SX-120-4.2Low Profile BarricadeEA510$ - 0
10SX-120-4.3Taxiway Ending MarkerEA16$ - 0
11SX-120-4.4Construction Maintenance of Traffic SignsEA10$ - 0
12SX-120-4.5Contract Security ServicesALLOW$ 145,000.001$ 145,000.00
13SX-120-4.6Temporary Guard BoothEA6$ - 0
14SX-120-4.7Runway Closure MarkerEA2$ - 0
15SX-120-4.8WCAA Operational SupportALLOW$ 100,000.001$ 100,000.00
16SX-120-4.9Contract Flagging ServicesHR6,800$ - 0
17SX-120-4.10Safety FenceLF11,800$ - 0
18SX-120-4.11Airfield Sign ModificationsEA76$ - 0
19SX-120-4.12Temporary Light CoversEA149$ - 0
20SX-120-4.13Portable Runway Closure MarkerEA2$ - 0
21SX-125-4.1WCAA Web Based Project Management SoftwareALLOW$ 20,000.001$ 20,000.00
22SX-125-4.2Concrete Batch PlantALLOW$ 250,000.001$ 250,000.00
23SX-125-4.3Engineer’s Field Office and EquipmentLS1$ - 0
24SX-125-4.4Materials Testing and Concrete Curing FacilityLS1$ - 0
25SX-125-4.5Permits and Inspection FeesALLOW$10,000.001$ 10,000.00
26P-101-5.1Pavement Removal by Saw Cutting (17")SY31,200$ - 0
27P-306-8.1Lean Concrete Base CourseSY2,410$ - 0
28P-403-8.1Asphalt Mixture Base CourseTN1,110$ - 0
29P-501-8.1Concrete Pavement (17")SY31,200$ - 0
30PX-511-6.1Partial Depth Patching and Spall Repair (Misc. Maintenance Repair)SF1,500$ - 0
31PX-511-6.2Full Depth Patching (Misc. Maintenance Repair)SF1,500$ - 0
32P-603-5.1Emulsified Tack CoatGAL680$ - 0
33P-605-5.1Joint Sealing Filler (Silicone)LF35,400$ - 0
34P-620-5.1Pavement Marking – No Reflective Media (Black)SF96,000$ - 0
35P-620-5.2Pavement Marking - Type III Reflective Media (White/Yellow)SF68,000$ - 0
36P-620-5.3Temporary MarkingSF21,000$ - 0
37P-621-5.1GroovingSY31,200$ - 0
38L-108-5.1No. 6 L-824C 5kV Cable Inst. In Duct Or ConduitLF18,500$ - 0
39L-108-5.2No. 8 L-824C 5kV Cable (RWSL) Inst. In Duct Or ConduitLF4,100$ - 0
40L-108-5.3No. 6 Solid Green Ground (RWSL) Inst. In Duct Or Conduit, Incl. ConnectorsLF2,050$ - 0
41L-108-5.4No. 6 Solid CU Counterpoise (Airfield) Inst. w/Ground Rods And ConnectorsLF1,900$ - 0
42L-108-5.5No. 1/0 CU Counterpoise (RWSL), Inst. w/Ground Rods And ConnectorsLF150$ - 0
43L-110-5.11W-2" Sch. 40 PVC Conduit Under New Rigid Pvmt., Incl. Trench and BackfillLF500$ - 0
44LX-111-5.1Ground Rod Earth Resistance TestEA197$ - 0
45L-125-5.1Remove Airfield Fixture And XFMR, Store, And ReinstallEA181$ - 0
46L-125-5.2Remove RWSL Fixture, XFMR, And ILC, Store, And ReinstallEA14$ - 0
47L-125-5.3Remove Blank Lid, Store, and ReinstallEA1$ - 0
48L-125-5.4Core Removal Of Entire Light Base In Existing Rigid Pavement, CompleteEA197$ - 0
49L-125-5.5Furnish And Install L-868 CL IB 2-Piece Base In New Rigid Pvmt.EA197$ - 0
50L-125-5.6Pavement Surface Sensor, CompleteLS1$ - 0
51L-125-5.7Fiberform Blockout For Light BaseEA23$ - 0
TOTAL BASE BID =$ 535,000.00

Unit Abbreviations: AC - ACRE, ALLOW - Allowance, CY - Cubic Yard, EA - Each, GAL - Gallon, HR - Hour, LB - Pound, LF - Linear Foot, LS - Lump Sum, SF - Square Foot, SY - Square Yard, TN - Ton

File details come from the government source that posted it. Updated .